Hasil Pencarian

Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 132770 dokumen yang sesuai dengan query
cover
cover
Alphadian Prasetia
"This thesis discusses the Cerntainty Analysis of Operability Natural Gas Liquefaction in PRICO process using Process Simulator software and Random Simulator Generator software. PRICO process is simulated to be 4 cases, the Base Case, Case 2, Case 3, Case 4 using Process Simulator software. Optimal conditions of operability of the process is done by varying the temperature of refrigerant out and the temperature of Natural Gas out of the Main Heat Exchanger. Optimal conditions of operability of the process in terms of benefit based solely on refrigeration cycle operating costs. Optimal conditions of each case is calculated the level of certainty by using Random Simulator Generator and generate the minimum profit and the level of certainty."
Depok: Universitas Indonesia, 2012
T30446
UI - Tesis Open  Universitas Indonesia Library
cover
Slamet
"Unit Gas sweetening merupakan salah satu fasilitas inti pada produksi gas alam di suatu kilang minyak dan/atau gas. Di suatu lapangan gas alam yang dikelola oleh PT. X terdapat masalah sering terjadinya korosi di unit Gas sweetening, terutama pada bagian kolom absorber (unit kontaktor). Disamping itu juga terjadi kehilangan sejumlah gas hidrokarbon bernilai ekonomis tinggi, yang ditandai dengan tingginya komposisi C1-C3 (metana, etana, propane) di aliran venting gas asam. Oleh karena itu, perlu dilakukan kajian teknis untuk mengidentifikasi akar masalah dan aksi yang perlu dilakukan guna menanggulangi masalah tersebut.
Pendekatan yang dilakukan pada kajian teknis ini meliputi kunjungan lapangan (survey), analisis laboratorium, dan simulasi proses Gas sweetening. Survey lapangan ke kilang gas alam dilakukan dengan standar savety yang ketat, untuk mengetahui kondisi aktual di lapangan, termasuk pengambilan data primer dan sampel yang diperlukan untuk analisis laboratorium. Untuk memenuhi aspek teknis dan etika profesi, berbagai pengujian laboratorium dilakukan di Laboratorium Uji yang tersertifikasi oleh KAN (Komite Akreditasi Nasional). Simulator yang digunakan untuk optimasi proses adalah VMGsim. Fluid package yang dipakai adalah Amine Package dengan mode stedy state simulation. Untuk memenuhi aspek teknis dan etika profesi, aplikasi simulator proses yang digunakan (VMGsim) merupakan versi legal yang diperoleh secara formal.
Berdasarkan hasil-hasil kajian yang telah dilakukan menunjukkan bahwa proses korosi di unit Gas sweetening telah terjadi, dengan indikasi meningkatnya kandungan Fe secara drastis (lebih dari 70 kali lipat) dalam larutan amine. Beberapa faktor penyebab kemungkinan terjadinya korosi diantaraanya: (a). Larutan amine yang digunakan mengandung klorin (Cl) sangat tinggi (> 18000 ppm; standar savety < 1000 ppm), (b). CO2 loading di rich amine cukup tinggi (> 0,5 mol CO2/mol amine), dan (c). Konfigurasi unit Gas sweetening yang sederhana (tanpa adanya unit stripping), sehingga larutan amine yang dihasilkan hanya semi-lean amine (bukan lean amine). Pada kondisi existing dapat diperoleh sweet gas dengan kandungan CO2 sesuai spesifikasi, namun hydrocarbon losses di acid gas venting masih cukup tinggi yaitu 1,8 % (kondisi desain: 0,95 %). Beberapa faktor penyebab tingginya hydrocarbon losses tersebut diantaranya adalah: (a). Adanya perubahan suhu feed gas (naik lebih dari 10 oC), (b). Terjadinya foaming di kolom absorber, yang diindikasikan oleh terbentuknya padatan NaHCO3 (analisis FTIR) dan FeCl3 (analisis ICP) pada pelarut amine, (c). Tidak dioperasikannya unit Carbon filter, dan (d). Tingginya laju sirkulasi amine yang digunakan. Optimasi proses yang disertai dengan penambahan beberapa unit (seperti cooler di feed gas, cooler di semi-lean amine, dan heater/boiler sebelum LP-Flash) dapat menurunkan hydrocarbon losses di acid gas venting hingga menjadi 1,3 %. Keuntungan yang didapat setelah optimasi tersebut adalah peningkatan produk sweet gas sebesar 0,47 MMSCFD.

Gas sweetening unit is one of the core facilities in the natural gas production in an oil-gas refinery. In a natural gas field operated by PT. X, there is a problem of corrosion in the Gas sweetening unit, especially in the absorber column (contactor unit). In addition, there is also a loss of valuable hydrocarbon gases, which is characterized by the high composition of C1-C3 (methane, ethane, propane) in the acid gas venting stream. Therefore, it is necessary to conduct a technical study to identify the causes of the problems and the actions that need to be taken to overcome the problems.
The approach taken in this technical study includes field visits (surveys), laboratory analysis, and simulation of the Gas sweetening process. Field surveys to the natural gas refinery are carried out with strict safety standards, to determine the actual conditions in the field, including the collection of primary data and samples needed for laboratory analysis. To meet the technical aspects and professional ethics, various laboratory tests are carried out at a Test Laboratory certified by KAN (National Accreditation Committee). The simulator software used for process optimization is VMGsim. The fluid package used is the Amine Package with a steady state simulation mode. To meet the technical and ethical aspects, the process simulator software used (VMGsim) is the legal version which is obtained formally.
Based on the results of the study, it shows that the corrosion process in the Gas sweetening unit has occurred, with indications of a drastic increase in the Fe content (more than 70 times) in the amine solution. Several factors causing the possibility of corrosion include: (a). The amine solution used contains very high chlorine (Cl) (> 18000 ppm, standard savety < 1000 ppm), (b). CO2 loading in rich amine is quite high (> 0.5 mol CO2/mol amine), and (c). Gas sweetening unit configuration is simple (without any stripping unit), so that the resulting amine solution is only semi-lean amine (not lean amine). In existing conditions, sweet gas can be obtained with CO2 content according to specifications, but hydrocarbon losses in acid gas venting are still quite high, namely 1.8% (design condition: 0.95%). Some of the factors causing the high hydrocarbon losses include: (a). There is a change in the feed gas temperature (increase more than 10 oC), (b). The occurrence of foaming in the absorber column, which was indicated by the formation of solids NaHCO3 (FTIR analysis) and FeCl3 (ICP analysis) in amine solvent, (c). Not operating the Carbon filter unit, and (d). The high rate of circulating amine used. Process optimization accompanied by the addition of several units (such as cooler in feed gas, cooler in semi-lean amine, and heater/boiler before LP-Flash) can reduce hydrocarbon losses in acid gas venting to 1.3%. The advantage obtained after the optimization is an increase in sweet gas products by 0.47 MMSCFD.
"
Lengkap +
Depok: Fakultas Teknik Universitas Indonesia, 2022
PR-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Riza Glorius Pasikki
"Inti dari suatu kilang pencairan gas alam terletak pada unit pendinginan dan unit pencairan gas alam Pemanliaatan energi yang optimal pada unit pendinginan dan unit pencairan akan sangat berpengaruh pada biaya produksi. Metode analisis yang dapat digtmakan untuk menganalisa eiisiensi energi dari suatu plant diantaranya aclalah basil produk utama., recovery produk utama, konsumsi energi spesilik, investasi, kemampuan beroperasi dan pemeliharaan.
Pada penulisan slcripsi ini metode yang digunakan untuk menganalisa eftsiensi energi pada unit pendinginan dan unit pencairan gas alam di kilang LNG PT Badak NGL Co. adalah konsumsi energi spesiiik atau lebih dikenal dengan specific horse power. Makin kecil harga speciic horse power dari suatu kondisi operasi, makin eiisien pula pemenfaatan energinya. Pada skripsi ini juga al-can dibahas langkah-langkah pefhitungan untuk mencari harga specific horse power dan menyusunnya dalam sebuah program komputer dalam bahasa pemrograman Borland Delphi 2.0.
Salah satu variahel yang menentultan besar kecilnya harga specific horse power adalah komposisi re5'igeran komponen ganda atau MCR (Mix Coponem Refigeranr), yang idealnya terdiri clari nitrogen, metana, etana dan propana. Namun pada kenyataannya di lapangan selalu terdapat impuritis dalam MCR yang berupa iso-butana dan nonnal butana. Pengaruh impuritis dan juga pengaruh kornposisi MCR secara keseluruhan terhadap ltarga specilic horse power pada daerah laju produksi LNG tertentu untuk train D yang mennpalcan train lama dan E yang merupakan train baru akan diamati, dan hasilnya akan dituangkan dalam makalah skripsi ."
Lengkap +
Depok: Fakultas Teknik Universitas Indonesia, 1997
S49115
UI - Skripsi Membership  Universitas Indonesia Library
cover
Teuku Riefky Harsya
"Pengembangan kilang LNG Arun yang masa pengoperasiannya akan berakhir pada 2014 menjadi terminal penerima gas dapat membantu memenuhi kebutuhan gas di daerah Aceh dan Sumatera Utara. Kilang ini dapat dimodifikasi mejadi terminal penerimaan dan regasifikasi LNG karena sejumlah fasilitas yang tersedia masih baik dan layak untuk digunakan. Untuk mengetahui kelayakan proyek ini, dilakukan kajian keekonomian serta sensitivitas dengan masa pembangunan dan perbaikan selama 2 tahun, operasional selama 20 tahun serta pasokan LNG sebesar 400MMSCFD untuk tahun pertama dan meningkat sebesar 50 MMSCFD setiap tahunnya hingga mencapai 350 MMSCFD sebagai kapasitas produksi maksimum.
Langkah-langkah yang dilakukan untuk mengkaji kelayakan proyek ini antara lain menganalisa kebutuhan peralatan tambahan untuk proses regasifikasi, menghitung kelayakan keekonomian melalui 4 parameter NPV, IRR, PBP, dan BC Ratio, serta uji sensitivitas dengan menggunakan random number generation simulator untuk mengetahui komponen yang paling sensitif terhadap perubahan.
Adapun hasil analisis keekonomian pemanfaatan kilang Arun menjadi receiving gas terminal menunjukkan bahwa proyek ini layak dijalankan dengan NPV sebesar 454.097.000 USD, IRR 15,4% terhadap MARR 15%, BC ratio sebesar 4, dan payback period jatuh pada tahun ke-6 bulan ke-2 pengoperasian. Hasil uji sensitivitas menunjukkan bahwa tax merupakan faktor yang paling mempengaruhi perubahan.

Utilization of LNG Arun refinery plant, which it’s operational contract will end on 2014, as a receiving gas terminal can help meet the needs of gas in Aceh and North Sumatera. This plant can be modified into a receiving gas terminal and LNG regasification because of some of the existing facilities are still in a good condition and ready to use. Economic analysis should be done to know the feasibility of this project with the construction time for 2 years, 20 years of operational, and 150MMSCFD of LNG supply for start up and increased as much as 50 MMSCFD each year until reach 350 MMSCFD as maximum production capacity.
The steps done to know the feasibility of the project are additional equipment for regasification process study, calculate the economic feasibility through 4 parameter of NPV, IRR, PBP and BC ratio, as well as sensitivity analysis using random number generation simulator to determine the component that is most sensitive to change.
The economic analysis result shows that this project is feasible with NPV of 454.097.000USD, 15,4% of IRR with MARR as much as 15%, BC ratio of 4, and the payback period falls on 2nd month of the 5th year of operational. Sensitivtiy analysis result shows that tax is the most influencing factor to change.
"
Lengkap +
Depok: Fakultas Teknik Universitas Indonesia, 2013
T32520
UI - Tesis Membership  Universitas Indonesia Library
cover
Muhammad Arif Henryawan
"Nitrogen Expander merupakan jenis pencairan gas bumi yang sering diaplikasikan dalam kilang produksi LNG karena beberapa karakteristiknya. Namun, masalah utama dalam pengaplikasian teknologi ini adalah efisiensi energi yang relatif rendah. Dalam penelitian ini, kegiatan optimisasi pencairan gas bumi skala kecil berjenis expander telah dilakukan dengan cara menambahkan sistem precooling
Fungsi objektif dari penelitian ini adalah total konsumsi energi dari sistem pencairan, dengan variabel keputusan berupa tekanan gas bumi pascakompresi, tekanan nitrogen pascakompresi, suhu nitrogen preekspansi, suhu pendinginan refrigeran precooling, dan jenis refrigeran precooling.
Refrigeran yang digunakan sebagai precooling adalah beberapa senyawa hidrokarbon seperti propana, siklopropana, isobutana, nbutana, dan neopentana. Proses simulasi, regresi, dan optimisasi secara berurutan dilakukan dengan perangkat lunak UNISIM, Microsoft Excel, dan GAMS. Solver yang digunakan dalam penelitian ini adalah COUENNE.
Hasil penelitian ini menunjukan bahwa penambahan sistem precooling pada nitrogen expander dapat menurunkan total konsumsi energi hingga 25,24%, tergantung refrigeran yang digunakan. Lebih lanjut, berdasarkan hasil optimisasi yang dilakukan, propana merupakan refrigeran precooling yang paling optimal dalam menurunkan total konsumsi energi jika dibandingkan dengan refrigeran precooling lainnya.

Nitrogen expander is the liquefaction process which suitable for SSLNG production plant because its characteristic. However, the major issue of this technology is it has relatively low energy efficiency. In this study, optimization of small-scale natural gas liquefaction through nitrogen expander was will be conducted with attaching precooled cycle to the liquefaction process.
Unit consumption energy is chosen to be objective function, while decision variables of this study are natural gas pressure after compression, the nitrogen pressure after compression, the inlet temperature of the high-pressure expander, the evaporation temperature in precooling cycle, and type of precooling refrigerant.
The refrigerant which used for precooling cycle are propane, cyclopropane, isobutane, nbutane, and neopentane. Simulation, regression, and optimization process sequentially will be supported by UNISIM, Microsoft Excel, and GAMS software. Moreover, the solver which used for this study is COUENNE.
This study shows that adding precooling cycle to the nitrogen expander system can reduce total consumption energy up to 25,24%, depends on the refrigerant which used. Furthermore, based on optimization result, propane is the most effective precooling refrigerant to reduce total consumption energy if compared with others precooling refrigerant.
"
Depok: Fakultas Teknik Universitas Indonesia, 2019
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Risqi Kurniawan
"Suplai LNG berkembang lebih pesat dibandingkan dengan sumber gas yang lain, dimana rata-rata kenaikannya sebesar 7% per tahun sejak tahun 2000, dan akan terus meningkat porsinya di pasar gas sampai tahun 2020 (IGU, 2015). Optimasi energi dalam proses pencairan diperlukan untuk meningkatkan efisiensi proses dan meningkatkan produksi LNG. Dalam proses pencairan gas bumi, mixed component refrigerant (MCR) lebih banyak digunakan dikarenakan efisiensi energinya yang tinggi, desain yang compact dan transfer panas yang efisien, dibandingkan dengan proses lain yang menggunakan pure refrigerant. Proses Propane Pre-cooled Mixed Refrigerant (C3MR) yang menggunakan MCR adalah proses yang paling banyak digunakan dalam pencairan gas bumi. Proses ini dikembangkan oleh Air Product and Chemical Inc. (APCI).
Tesis ini menyajikan analisa untuk menentukan komposisi MCR pada unit pencairan gas bumi yang menghasilkan kerja kompresor yang minimum, yang dalam hal ini didefinisikan sebagai Specific Horse Power. Performa sistem refrijerasi C3MR tergantung pada komposisi MCR yang digunakan. Dari hasil optimasi menggunakan simulator proses diperoleh komposisi MCR yang optimum yaitu N2 = 0,3% ; CH4 = 41,7% ; C2H6 = 42% ; C3H8 = 16%. Dengan nilai Spesific Horse Power = 8,79 HP.jam/MMBTU dan Coefficient of Performance = 0,7638. Sehingga dengan kapasitas produksi sebesar 242 MMSCFD, diperoleh selisih/penghematan biaya pencairan sebesar Rp 315.474.212,08 per hari, jika dibandingkan dengan menggunakan komposisi awal (Bukacek, 1982) yaitu N2 = 2% ; CH4 = 40% ; C2H6 = 47% ; C3H8 = 11%.

LNG grow faster than others gas source. Increase 7% in average per years since 2000. And will continuosly increase in gas market until 2020 (IGU, 2015). Energy optimation in liquifaction process is needed to increase process efficiency and LNG production capacity. In liquifaction process, mostly used mixed component refrigerant (MCR) due to high energy efficiency, compact desain and efficient heat transfer, compare with other process which utilize pure refrigerant. Process Propane Pre-cooled Mixed Refrigerant (C3MR) which use mixed refrigerant is the best process for natural gas liquefaction. This process develop by Air Product and Chemical Inc. (APCI).
The thesis presents an analysis to determine composition of MCR which produce minimum compressor duty, in this case define as specific horse power. Perform of C3MR refrigeration system depend on composition of MCR used. The optimum composition of MCR are N2 = 0.3% ; CH4 = 41.7% ; C2H6 = 42% ; C3H8 = 16%. With Spesific Horse Power = 8.79 HP.hour/MMBTU dan Coefficient of Performance = 0.7638. So with capacity 242 MMSCFD, merit of liquefaction cost will be 315,474,212.08 IDR/day compare with former MCR composition (Bukacek, 1982) N2 = 2% ; CH4 = 40% ; C2H6 = 47% ; C3H8 = 11%.
"
Lengkap +
Depok: Fakultas Teknik Universitas Indonesia, 2016
T46276
UI - Tesis Membership  Universitas Indonesia Library
cover
Mulyarman
Depok: Fakultas Teknik Universitas Indonesia, 1990
S48758
UI - Skripsi Membership  Universitas Indonesia Library
cover
Sutanto
Jakarta: UI-Press, 1994
536.7 SUT t
Buku Teks  Universitas Indonesia Library
cover
Shinta Pratiwi Rahayu
"Pabrik pengolahan gas X merupakan pabrik pengolahan gas bumi menjadi gas kering yang siap dijual (sales gas) dengan kadar air maksimal 9 lb/MMscf dari proses dehidrasi menggunakan Triethylene Glycol (TEG). Proses regenerasi rich TEG pada pabrik ini hanya mampu menghasilkan lean TEG dengan kemurnian 91,7%. Sehingga pabrik pengolahan gas X hanya mampu mengolah umpan gas sebesar 175 MMscfd. Oleh karena itu perlu dilakukan usaha untuk meningkatkan kemurnian TEG dengan bantuan stripping gas agar kapasitas pabrik dapat ditingkatkan sehingga memberikan nilai keekonomian yang lebih tinggi. Pada laju alir TEG yang tetap, laju alir stripping gas (N2) yang digunakan berada pada kisaran 0 - 2 m3/h. Kapasitas yang memberikan keuntungan per satuan produk yang lebih tinggi dari pada desain awal pabrik adalah 225 MMscfd sebesar 3,9654 USD/MMBtu dengan penggunaan stripping gas sebanyak 0,006 m3/h, sedangkan yang memberikan NPV tertinggi adalah pada kapasitas 585 MMscfd yaitu sebesar 723.800.123 USD.

X gas processing plant is natural gas processing plant that produces dry gas that is ready to be sold (sales gas) with a maximum water content of 9 lb/ MMscf which is obtained from dehydration process using Triethylene Glycol (TEG). The initial design of the rich TEG regeneration process only able to produce lean TEG with a purity of 91,7%. Therefore, this processing plant only able to process the feed gas by 175 MMscfd. Thus, a study can be conducted to determine the effect of stripping gas (N2) on TEG purity so that the plant?s capacity can be increased which also increase the plant?s profits. The results show that when the TEG flow rate is fixed, flow rate of the stripping gas (N2) which can be used in the regeneration process ranges from 0 to 2 m3/h. The only capacity of modification plant which provides more profits per capacity than that obtained from the initial design of the plant is 225 MMscfd worth 3,9654 USD/MMBtu. The amount of stripping gas required in this capacity is as much as 0,006 m3/h. Meanwhile, total profit obtained by comparing NPV shows that the capacity of 585 MMscfd give the highest NPV worth 723.800.123 USD."
Lengkap +
Depok: Fakultas Teknik Universitas Indonesia, 2016
T45571
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>