"If television participates in the construction of a nation by circulating the signs , symbols and narratives that allow its citizens to imagine themselves into a community, what kind of nation is constructed on transcultural television format? based on the analysis of the production and representation of nation on the program pinoy big brother, the local adaptation of the Big Brother international television franchise using quantitative and qualitative metodologies, this study finds that transcultural television seems to perpetuate hegemonies that favor corporate interests at the expense of excluding a large part of the Philippines cultural diversity."
Artikel Jurnal  Universitas Indonesia Library
cover
Hegar Adrian
"Seiring dengan pertumbuhan ekonomi Indonesia yang semakin meningkat sehingga banyak diselengarakan proyek konstruksi dengan skala besar, semakin besar suatu proyek maka akan semakin komplek pekerjaannya. Proyek konstruksi sangat erat dengan berbagai risiko perubahan yang memungkinan untuk terjadinya konflik. Untuk menghindari sengketa atas konflik yang terjadi karena adanya perubahan, sangat penting bagi kontraktor untuk mengajukan klaim dengan langkah-langkah yang ditentukan sesuai dengan kondisi kontrak. Proses improvisasi pelaksanaan klaim pada penelitian ini disini berupa pengembangan sistem administrasi dan dokumentasi klaim pada proyek konstruksi.
Metode yang digunakan pada penelitian ini berupa studi kasus penanganan klaim proyek konstruksi di PT X dengan menganalisa faktor-faktor dominan pada klaim proyek konstruksi yang didapatkan dari penelitian terdahulu serta jurnal-jurnal internasional. Faktor-faktor tersebut dianalisa lebih lanjut dengan metode Interpretive Structural Modeling (ISM) yang bertujuan untuk mendapatkan hubungan antara masing-masing faktor sehingga didapatkan suatu model proses setiap indikator klaim, hasil dari analisa ISM berupa diagram hubungan antara masing-masing variabel dari setiap indikator, antara lain: identifikasi klaim, perencanaan klaim, penyajian klaim, administrasi klaim dan dokumentasi klaim, yang dikembangkan menjadi Standar Operasional Prosedur (SOP) Klaim di PT X yang berguna untuk membantu kontraktor/penyedia jasa dalam pengajuan klaim, agar klaim yang mereka ajukan bisa diterima oleh pengguna jasa/owner.

Along with Indonesia's economic growth increased in line which held by largescale construction projects , the bigger of scale of the project will increase the complexity of work, with the result of project construction loaded with a variety of risk changes that allow for conflict, to avoid disputes over the conflict because the change, it is important for contractors to make a claim under the measures determined in accordance with the conditions of the contract. The improvement claims process in this research is the development of administrative systems and documentations claim in construction project.
The method used is a case study of handling claims on construction projects at PT X by analyze domain factors claim on construction project which got from previous research and international journals. The factors will be analyzed using Interpretive Structural Modeling (ISM) method to obtain the relationship between these factors, so the result is a proces model every claim indicator the results of the analysis ISM in the form of a flowchart between each of the variables of each indicator, among others: identification of claims, claims planning, presentation of claims, claims administration and claims documentation, developed into Standard Operating Procedure (SOP) Claims in PT X that help contractors in claims submission,in other their claim can be accepted by owner.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
T48908
UI - Tesis Membership  Universitas Indonesia Library
cover
Muhammad Multazam
"Proyek konstruksi harus diselesaikan sesuai dengan jadwal yang telah ditentukan, hal ini merupakan pekerjaan yang sulit untuk dicapai karena kerumitannya, melibatkan banyak pihak dan lingkungan yang dinamis. Karakteristik proyek konstruksi yang penuh dengan berbagai risiko mengharuskan kontraktor untuk cepat beradaptasi dengan berbagai dinamika perubahan, di mana salah satu upaya yang dilakukan untuk mengatasi tantangan ini adalah dengan membentuk Kerja Sama Operasi. Dengan berbagai risiko, konstruksi selalu terbuka untuk kemungkinan terjadinya perselisihan, sehingga perlu untuk merancang konsep manajemen klaim dalam Kerja Sama Operasi.
Metode yang digunakan dalam penelitian ini adalah studi kasus penanganan klaim proyek Kerja Sama Operasi di PT X dengan menganalisis faktor-faktor yang mendominasi klaim proyek yang diperoleh dari penelitian sebelumnya. Dengan memperoleh faktor risiko dominan dalam pelaksanaan klaim proyek Kerja Sama Operasi, temuan penelitian akan digunakan untuk menghindari terjadinya penolakan klaim yang selanjutnya dikembangkan menjadi Standar Operasional Prosedur (SOP) klaim Kerja Sama Operasi di PT X untuk membantu kontraktor meraih target klaim.

Construction projects should be completed according to a predetermined schedule, this is a work that is difficult to achieve because of its complexity, involves many parties and a dynamic environment. The characteristics of construction projects that are full of various risks require the contractor to quickly adapt to the various dynamics of change, where one of the efforts made to deal with these challenges is to establish Joint Ventures. With a variety of risks, the construction is always open to the possibility of disputes, so that it is necessary to design a claim management concept in the Joint Ventures project to obtain success in its implementation.
The method used in this research is a case study of handling claim of Joint Ventures projects at PT X by analyzing the factors that dominate the project claims obtained from previous research. By obtaining the dominant risk factors in achieving the Joint Ventures project claim target, finding activities will be prepared to eliminate the occurrence of claims rejection. Throughout this research, the findings revealed that, establish provisions on limitation of intervention by the parent company of both parties, prepare clear coordination pattern regarding job allocation sharing between each member, clarifying the duration of approval drawings by the owner, determine the responsibility party in working on the design and its changes, prepare personnel who are experienced in detecting claims during the execution of work, and more finding activity which are developed into Standard Operational Procedures (SOP) claims of Joint Ventures at PT X to support contractors reach claim target.
"
Depok: Fakultas Teknik Universitas Indonesia, 2019
T53361
UI - Tesis Membership  Universitas Indonesia Library
cover
Ahmad Sobirin
"ABSTRAK
Urbanisasi telah mengubah tutupan lahan dari permukaan lolos air menjadi permukaan
kedap air yang dapat berdampak pada peningkatan limpasan hujan di kawasan
perkotaan. Penelitian ini bertujuan untuk menilai efektifitas sebaran spasial Green
Infrastructure (GI) dalam pengurangan limpasan hujan di berbagai spektrum hujan.
Simulasi pengurangan limpasan hujan melalui penerapan GI diimplementasikan pada
DTA yang berlokasi di Pondok Kelapa, Duren Sawit, Jakarta Timur. EPA SWMM
digunakan untuk mensimulasi model hidrologi melalui tiga skenario : skenario-1
baseline (kondisi eksisting tanpa penerapan GI), skenario-2 GI (penerapan GI melalui
rain garden, rain barrel dan porous pavement), skenario-3 RDTR (sesuai Rencana
Detail Tata Ruang DKI Jakarta). Hasil simulasi SWMM menunjukkan skenario-2 GI
untuk hujan kala ulang 2-, 5-, 10-, 25-, 50-tahun menghasilkan persentase pengurangan
total volume limpasan secara berurutan sebesar 9.76%, 8.76%, 8.27%, 7.50%, 7.05%
dan persentase pengurangan debit puncak sebesar 9.29%, 7.97%, 5.83%, 3.49%, 2.21%
dibandingkan tanpa penerapan GI. Adapun untuk skenario-3 RDTR untuk kala ulang
hujan yang sama menghasilkan persentase penambahan total volume limpasan secara
berurutan sebesar 7.43%, 6.15%, 5.36%, 4.67%, 4.20% dan persentase penambahan
debit puncak sebesar 3.93%, 2.33%, 1.29%, 0.63%, 0.63% dibandingkan dengan
kondisi eksisting tanpa penerapan GI.

ABSTRACT
Urbanization has changed the land use from pervious cover to impervious cover which
have an impact on increasing runoff in urban areas. The objective of this study is to
determine the effectiveness of spatial distribution of Green Infrastructure (GI) in
reducing runoff under various design storms. Simulation of runoff reduction is carried
out by implementing the GI in the catchment area located in Pondok Kelapa, Eastern
Jakarta, Indonesia. EPA SWMM 5.1 was used to simulate the performance of GI on
reducing runoff in the study site for three simulation scenarios: baseline scenario
(current conditions), GI scenario (implementing rain garden and rain barrel) and
Rencana Detail Tata Ruang (RDTR) scenario. The results show that GI scenario
compared to the baseline scenario under various design storms 2-year, 5-year, 10-year,
25-year and 50-year return periods reduce the total runoff volume approximately 9.76%,
8.76%, 8.27%, 7.50%, 7.05, respectively and reduce the peak flows approximately
9.29%, 7.97%, 5.83%, 3.49%, 2.21%. For RDTR scenario compared to BL scenario
resulting in percentile of total runoff volumes increase were 7.43%, 6.15%, 5.36%,
4.67%, 4.20% and the percentile of peak flows increase were 3.93%, 2.33%, 1.29%,
0.63%, 0.63% for the same return periods.

"
2019
T52731
UI - Tesis Membership  Universitas Indonesia Library
cover
Eta Retno Wulandari
"Keterlambatan merupakan permasalahan yang sering terjadi di dunia konstruksi. Masalah keterlambatan proyek juga terjadi pada Proyek RBB Relokasi di Bank XYZ yang mengakibatkan mundurnya waktu relokasi atau operasional cabang di lokasi baru. Menurut data proyek RBB PT. Bank XYZ tahun 2018, ada 58% proyek relokasi yang mengalami keterlambatan penyelesaian. Sedangkan tahun 2019, rasio keterlambatan meningkat menjadi 79%. Keterlambatan dapat disebabkan karena perencanaan yang tidak efektif atau pengendalian proyek yang buruk. Penelitian ini dilakukan untuk menentukan strategi dan mengembangkan prosedur sistem perencanaan dan pengendalian proyek sehingga dapat meningkatkan kinerja waktu Proyek RBB Relokasi di Bank XYZ.
Metode yang digunakan dalam penelitian ini adalah dengan studi kasus dan survey responden. Analisis statistik dan analisis risiko digunakan untuk mengetahui tingkat risiko pada proses perencanaan dan pengendalian yang berpengaruh pada kinerja waktu, untuk kemudian dirumuskan respon preventif dan korektif atas risiko yang paling dominan. Dari penelitian ini diketahui bahwa risiko yang paling berpengaruh pada kinerja waktu proyek RBB relokasi di Bank XYZ adalah pada perencanaan dan pengendalian proyek terkait dengan manajemen integrasi, manajemen lingkup, manajemen waktu, manajemen biaya dan manajemen komunikasi proyek. Sehingga dari rumusan aktivitas respon risiko tersebut dikembangkan suatu prosedur perencanaan dan pengendalian proyek berbasis PMBOK 2017 untuk dapat meningkatkan kinerja waktu Proyek RBB Relokasi di Bank XYZ sebagai hasil akhir penelitian ini.

Delay is a problem that often occurs in the construction project. Project delays also occur in the Relocation Project at PT. Bank XYZ which caused a delay in branch operations at the new place. According to PT Bank XYZ's project data for 2018, there were 58% of the relocation projects that delays in completion. And in 2019, the delays ratio increase to 79%. Delays can be caused by ineffective planning or poor project control. This research was conducted to find the strategy and to develop planning and project control procedures to improve the time performance of the Relocation Project at PT. Bank XYZ.
The method used in this research is case study and survey of respondents. Statistical analysis and risk analysis are used to find the level of risk in the planning and control process that affects to time performance. Then the preventive and corrective responses to the most dominant risks are formulated. From this study it is known that the most influential risk to the time performance of the RBB relocation project at XYZ Bank is in project planning and control related to integration management, scope management, time management, cost management, and project communication management. Then from the recommendations of risk response activities, planning and project control procedures were developed based on PMBOK 2017 to improve the time performance of the RBB Relocation Project at XYZ Bank as the result of this study.
"
Jakarta: Fakultas Teknik Universitas Indonesia, 2020
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Tan Wang, Hsiao
"Do indigenous peoples find the law to be an impediment or an asset in achieving selfgovernment? Past literature on indigenous legal mobilization often suggests that legal procedures and language constrain indigenous expression and may even lead to tribal divisions. For indigenous self-government movements, the law is often viewed as a hindrance. However, these studies often do not consider how the legal consciousness of activists changes during the mobilization process, particularly how interactions
with the law can reshape individual and collective subjectivities, as well as the relationships between tribes and the state. Researchers have discussed the judicial role as a legislative lever and its constitutive function, but they have not adequately
explained the key mechanisms to challenge unequal power structures. This article, using the Katratripulr Solar Case as a case study, elucidates indigenous legal mobilization strategies that surpass existing academic findings. The breakthrough lies
in the exercise of the right to consultation and consent, through which indigenous people and tribes construct a collective subject position that allows for engagement with modern law, thereby showcasing indigenous agency. This article delineates three subject concepts and one subject practice: the strategic subject that reins in moral disputes, the overlapping jurisdiction subject for self-built autonomy, the transboundary subject beyond state administration, and the political subject practicing these three subject concepts. The construction of these subject agencies helps indigenous people and tribes “reposition” the starting point (the self), destination (self-government), and route (practice) of self-government. Although Taiwan has yet to pass any indigenous self-government legislation, if indigenous people or tribes can return to the collective subject expressions internally and externally as described above, it will facilitate turning legal impediments into assets and promote indigenous self-government."
Taipei: Taiwan Foundation for Democracy, 2023
059 TDQ 20:2 (2023)
Artikel Jurnal  Universitas Indonesia Library
cover
Andry Arifin
"Penelitian ini fokus pada permasalahan dalam proses bisnis pembelian di industri jasa konstruksi yang disebabkan oleh harga barang dan/atau jasa tidak kompetitif, barang dan/atau jasa terlambat dibeli dan penawar potensial tidak ikut dalam proses pembelian yang berakar masalah pada proses pembelian yang tidak efektif dan efisien.
Metode yang dipakai dalam penelitian ini ada 2 yaitu Pena Aliran Amar
Fungsi (Cross Functional Flow Chart) untuk memetakan proses bisnis dan Metode Analisa Struktur Proses Bisnis untuk menganalisa hasil perbaikan proses bisnis pembelian tersebut.
Efisien dan Efektif merupakan parameter penilaian proses bisnis
tradisional, pengembangan yang dilakukan oleh Tjaden menghasilkan parameter statik yang dapat dipergunakan untuk mengukur hasil perbaikan proses bisnis. Parameter stalik tersebut adalah efisiensi siklus, tingkat kesederhanaan (Simplicity), tingkat integrasi (integration), dan tingkat fleksibilitas (flexibility).

This thesis focus in describing purchasing business process problems in
construction industry which is caused by not competitive price, procurement delay and potential bidder can not involve in purchasing process. All this problems are caused by in-effective and in-efficient purchasing business process in that industry.
Method which is used in this thesis can be divided in two stages, first by
using cross functional Ilow chart for mapping as-is purchasing business process and the second is using business process structural analysis to analyze the result of purchasing business process improvement.
Efficient and effective is the old parameter to analyze business process.
research by Tjaden has found static parameters which can be used to measure the result of business process improvement. These static parameters are cycles time efficiency. simplicity, integration and flexibility."
Depok: Fakultas Teknik Universitas Indonesia, 2005
T16134
UI - Tesis Membership  Universitas Indonesia Library
cover
Atik Khomsiati
"Seiring dengan berjalannya kemajuan metode-metode yang digunakan dalam pelaksanaan suatu proyek konstruksi, maka banyak kemungkinan-kemungkinan ataupun alternatif cara untuk ataupun dalam pelaksanaan suatu proyek konstruksi hingga selesai.
Dilatarbelakangi atas hal tersebut, maka saya mencoba untuk mengangkat beberapa pekerjaan dalam suatu proyek konstruksi untuk di bahas. Proyek konstruksi yang di tinjau adalah proyek konstruksi perumahan. Beberapa pekerjaan yang di maksud adalah pekerjaan pasangan bata, plester, aci dan rangka atap. Pekerjaan-pekerjaan tersebut di pilih karena pada pekerjaan-pekerjaan tersebut dapat dikerjakan dengan cara yang lebih praktis dan adanya kemungkinan untuk penghematan biaya pelaksanaannya. Yaitu dengan menggunakan material-material alternatif dengan fungsi yang sama dan dapat menghasilkan suatu hasil atau produk yang lebih baik. Material-material alternatif tersebut adalah bata ringan, semen mortar dan rangka atap baja ringan.
Dengan melengkapi data-data selain dari buku panduan suatu produk tersebut, dapat di tambah dari kuisioner dan foto-foto. Sehingga setelah diolah dan perhitungkan kembali, dapat menghasilkan ataupun memberi pengaruh yang baik terhadap kontraktor yang melaksanakan suatu proyek konstruksi perumahan tersebut.

Through to the methods progress that are used in operational of construction project, there are so many ways or alternatives to complete the construction project. Because of that reason, I try to choose some works in construction project as the topics.
The construction project that I take is housing construction project. Some works are bricks work, plaster work and roof truss. Those works are chose because they can be done by the easier ways and make the cost more cheaper than the costom ones. The materials alternative with the same function can produce the product better than the costom ones. The materials alternative are light brick, mortar cement and light truss.
Besides the guide book from the products, we can also add the informations from quisioners and photographs. So we can analyze and get the results. And we can make the conclution for the contractor is : by using the materials alternative, we can get the good influences more than the costom ones.
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
S50557
UI - Skripsi Open  Universitas Indonesia Library
cover
Nabila Qolbi Aulia Wibawa
"Konstruksi adalah sektor penting yang memberikan kontribusi besar terhadap perekonomian nasional di seluruh dunia. Faktor-faktor yang mempengaruhi produktivitas konstruksi harus dipantau secara efisien untuk mencerminkan status perkembangan industri dan kinerja ekonomi. Indeks Produktivitas Malmquist (MPI) digunakan sebagai kerangka komprehensif dalam penelitian ini untuk mengukur dan membandingkan kinerja produktivitas perusahaan konstruksi di Indonesia, Cina, dan Jepang karena Cina dan Jepang memiliki pengaruh yang sangat besar di kawasan Asia-Pasifik dan bahkan dunia perekonomian global. Mengingat sektor konstruksi memainkan peran penting dalam pembangunan ekonomi, pemahaman dan tolok ukur produktivitas perusahaan-perusahaan di pasar Asia yang dinamis ini sangatlah penting. Analisis ini mencakup kumpulan data multi-tahun, yang memanfaatkan indikator keuangan dan operasional utama. Temuan ini memberikan wawasan berharga bagi para pembuat kebijakan, investor, dan pemangku kepentingan industri yang berupaya meningkatkan daya saing dan mendukung pertumbuhan berkelanjutan di sektor konstruksi di seluruh perekonomian Asia yang beragam. Jepang secara konsisten menunjukkan tingkat produktivitas tertinggi. Hal ini menunjukkan bahwa perusahaan konstruksi Jepang telah menerapkan praktik yang lebih efisien dan efektif.

Construction is an important sector that makes a major contribution to national economies around the world. Factors influencing construction productivity must be thought out efficiently to reflect the industrial development status and economic performance. The Malmquist Productivity Index (MPI) is used as a comprehensive framework in this research to measure and measure the productivity performance of construction companies in Indonesia, China and Japan as China and Japan have a very large influence in the Asia-Pacific region and even the global economic world. Given that the construction sector plays a critical role in economic development, understanding and measuring the productivity of companies in this dynamic Asian market is critical. This analysis includes a multi-year data set, leveraging key financial and operational indicators. These findings provide valuable insights for policymakers, investors and industry stakeholders seeking to increase competitiveness and support sustainable growth in the construction sector across Asia's diverse economies. Japan consistently shows the highest levels of productivity. This shows that Japanese construction companies have implemented more efficient and effective practices."
Jakarta: Fakultas Teknik Universitas Indonesia, 2024
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Fitroh Hayati
"Klaim dalam industri konstruksi merupakan masalah yang dapat mengarah kepada permohonan tambahan biaya atau tambahan waktu serta perselisihan antara pemilik bangunan dan kontraktor.
Perpanjangan waktu pelaksanaan tidak hanya berdampak pada penurunan kinerja waktu namun juga pada peningkatan pemakaian anggaran biaya yang dapat menurunkan kinerja biaya proyek. Untuk itu kontraktor berhak mengajukan klaim konstruksi.
Kemampuan kontraktor dalam mengelola klaim dengan baik melalui manajemen klaim dapat membangun strategi untuk mengurangi, menghindari kerugian yang mungkin terjadi atau bahkan mendapatkan keuntungan. Tujuan penulisan ini adalah mengidentifikasi faktor-faktor yang mempengaruhi keberhasilan pengajuan klaim.
Penelitian dilakukan dengan menganalisa proyek Grand Indonesia. Metode yang digunakan adalah analisa dengan pendekatan AHP untuk mengetahui faktor yang paling berpengaruh terhadap pengajuan kompensasi biaya dan analisa delphi untuk memvalidasi data oleh pakar.
Hasil dari penelitian ini didapatkan faktor dominan yaitu dokumentasi pekerjaan proses konstruksi, merupakan faktor yang paling menentukan keberhasilan dalam pengajuan klaim.

Claim in construction industry is a problem leading to request of additional cost or time extensions, which can lead to a dispute between the owner and contractor.
However, extension of time does not only result in the decrease of time performance of the project, but also in the increase of project cost, which in return can cause a decline in that cost performance of the project. So, contractor have a chance to granting of claim.
The ability of a contractor to well manage this claim can assist him in building a strategy to reduce or avoid the loss, which might occur or even gain profit. This research focuses on identifying factors that influencing the successful granting of claim.
The research is conducted by analyzing Grand Indonesia Project, which have applied for cost compensations. The methods employed in this research are, first, AHP analysis to find out the most influencing factors in the granting of cost compensations and, second, Delphi analysis to validate data from experts.
As results of this research, the most influencing factors in successful granting of claim on grand Indonesia project are a good documentation on construction project.
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
S35732
UI - Skripsi Open  Universitas Indonesia Library