Ditemukan 29887 dokumen yang sesuai dengan query
Hinze, Jimmie W.
New Jersey: Pearson - Prentice Hall, 2008
691 HIN c
Buku Teks SO Universitas Indonesia Library
Patrick, Charles
New Jersey: Pearson/Prentice Hall, 2004
624 PAT c
Buku Teks Universitas Indonesia Library
Boca Raton: CRC Press, Taylor & Francis Group, 2009
R 658.92 CON
Buku Referensi Universitas Indonesia Library
Newitt, Jay S.
New Jersey:
2005
690NEWC002
Multimedia Universitas Indonesia Library
Newwit, J. S
"More than ever before, a greater need exists for managers to do a better job in planning their construction projects to insure greater success and better profits for all parties involved. This edition of Construction Scheduling: Principles and Practices features comprehensive coverage of scheduling fundamentals in addition to practical applications for the four most popular project management software programs. Designed to be the sole reference for students in this area, this book includes everything from checklists, bar graphs, graphic schedules, and linear scheduling techniques to practical and advanced uses of Critical Path Method (CPM). It uses a step-by-step format and construction examples for key industry software including Microsoft Project; Primavera Project Planner (P3); SureTrak; and P6 Project Manager and Contractor."
Upper Saddle River, NJ: Pearson Education, 2005
690NEWC001
Multimedia Universitas Indonesia Library
Annisa Rianti Utami
"Pada perencanaan suatu pekerjaan konstruksi, penguraian pekerjaan ke dalam beberapa elemen merupakan suatu faktor penting yang dapat mempengaruhi efisiensi dan efektivitas waktu dan biaya. Suatu kesalahan yang terjadi dapat menyebabkan kerugian dalam hal keterlambatan waktu proyek maupun pembengkakan biaya. Kurangnya standarisasi pekerjaan menyebabkan keterlambatan waktu dan biaya menjadi tidak terkendali akibat penambahan waktu pekerjaan. Penelitian ini membahas perencanaan sumber daya dari pekerjaan interior dan pekerjaan lansekap pada bangunan apartemen dengan menggunakan WBS Work Breakdown Structure sehingga dapat meminimalisir kesalahan dan kerugian pada saat tahap konstruksi dengan menggunakan metode penelitian Teknik Delphi melalui validasi pakar yang berpengalaman pada pekerjaan gedung konstruksi. Hasil dari penelitian ini merupakan paket pekerjaan dan alternatif desain pada pekerjaan interior dan lansekap, serta sumber daya yang terindentifikasi dibuthkan setiap paket pekerjaannya.
In the planning of a construction work, decomposing work into several elements is an important factor that can affect efficiency and cost. An error that could result in a loss in terms of time delay and cost swelling. Lack of standardization of work causes the delay of time and expense uncontrolled due to the addition of time work. This study discusses the resource planning of interior work and landscape work in apartment building using WBS Work Breakdown Structure so as to minimize error and loss during construction phase by using Delphi technique method through expert validation experienced on construction work. The results of this study is a package of work and alternative designs on interior and landscape work, as well as the resources that are identified in every work package."
Depok: Fakultas Teknik Universitas Indonesia, 2017
S-Pdf
UI - Skripsi Membership Universitas Indonesia Library
Popescu, Calin
New York: Wiley, 1995
R 624.068 POP p
Buku Referensi Universitas Indonesia Library
Goel, R.K.
London: Elsevier, 2012
624.19 GOE u (1)
Buku Teks Universitas Indonesia Library
Ahuja, Hira N.
New York: John Wiley & Sons, 1994
658.404 AHU p
Buku Teks SO Universitas Indonesia Library
Callahan, Michael T.
New York : McGraw-Hill, 1992.
624.068 CAL c
Buku Teks Universitas Indonesia Library