Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 6187 dokumen yang sesuai dengan query
cover
Andres, Cameron K.
New Jersey: Prentice-Hall, 1998
690 AND p
Buku Teks  Universitas Indonesia Library
cover
Andres, Cameron K.
New Jersey: Prentice-Hall, 2001
690 AND p
Buku Teks  Universitas Indonesia Library
cover
Smith, Ronald C.
New Jersey : Prentice-Hall, 1993
690 SMI p
Buku Teks  Universitas Indonesia Library
cover
Fatzinger, James A. S.
New Jersey: Pearson-Prentice Hall, 2004
692.5 FAT b
Buku Teks  Universitas Indonesia Library
cover
Liebing, Ralph W.
New York: John Wiley & Sons, 1982
690 LIE s
Buku Teks  Universitas Indonesia Library
cover
Emmitt, stephen
West Sussex: Wiley-Blackwell, 2010
690 EMM b
Buku Teks  Universitas Indonesia Library
cover
Alexander, Christopher
New York: Oxford University Press, 1977
R 720.1 ALE p
Buku Referensi  Universitas Indonesia Library
cover
S.N. Manohar
New York: McGraw-Hill, 1985
690.15 MAN t
Buku Teks  Universitas Indonesia Library
cover
Wendy Extrada
"Semakin banyaknya infrastruktur permanen dapat memperluas lapisan kedap air di permukaan tanah DKI Jakarta. Sebagian besar air hujan tidak terserap tanah, tetapi menjadi run off dan langsung masuk ke sungai. Limpasan hujan yang membawa sedimen, tercampur dengan sampah yang tidak terkelola, menyebabkan alur sungai dan waduk mengalami penyempitan, pendangkalan, dan aliran limpasan yang melebihi kapasitas alur sungai tersebut dapat menyebabkan banjir di Jakarta.
Pemerintah akan melakukan pengerukan beberapa sungai dan waduk di wilayah DKI Jakarta, melalui Jakarta Urgent Flood Mitigation Project (JUFMP) - Jakarta Emergency Dredging Initiative (JEDI). Pada kegiatan ini dibutuhkan pengkajian terhadap penggunaan dan kombinasi alat berat yang sesuai dengan tingkat kesulitan pada kondisi wilayah sekitar sungai dan waduk yang padat penduduk.
Kombinasi alat berat terbaik untuk sungai adalah excavator back hoe PC 220, wheel loader WA -120, dump truck kapasitas 22 m3, dan untuk waduk berupa kapal keruk Ellicott 370 HP Dragon, wheel loader WA - 120, dump truck kapasitas 22 m3. Penggunaan kombinasi alat berat yang efektif pada normalisasi sungai dan waduk dapat meminimalkan biaya dalam proyek ini sebesar 12,04 % pada waduk dan 23,78% pada sungai. Secara keseluruhan nilai rata-rata efisiensi biaya yang dihasilkan untuk JUFMP-JEDI adalah 20,65 %.

Increasing permanent buildings and infrastructures expands the impervious layer on the land surface in Jakarta. It caused most of the rain water are not absorbed by the soil. The run off will go straight into the river, along with sediment and unmanaged solid waste. The result is narrowing and silted rivers and reservoirs. Run off that exceeds the capacity of the river channel causing floods in Jakarta.
Goverment willing to execute the dredging of the rivers and reservoirs in some areas, through Jakarta Urgent Flood Mitigation Project (JUFMP) - Jakarta Emergency Dredging Initiative (JEDI) plan. It needs assessment of the use and combination of heavy equipment in accordance with the level of difficulty on the condition around the river and reservoirs which are densely populated.
The best combination of heavy equipment for rivers is back hoe excavator PC 220, wheel loader WA -120 and dump truck with capacity of 22 m3, while for reservoirs is Ellicott 370 HP Dragon dredger, wheel loader WA - 120 and the dump truck with capacity of 22 m3. The use of effective heavy equipment combination on rivers and reservoirs normalization are able to minimize the costs of the project amounted to 12.04% for reservoirs and 23.78% for rivers. Overall average efficiency value of JUMFD-JEDI is 20,65%.
"
Depok: Fakultas Teknik Universitas Indonesia, 2013
S52953
UI - Skripsi Membership  Universitas Indonesia Library
cover
Prayudha Widwicahyo
"Pembangunan High Rise Building di DKI Jakarta setiap tahun semakin meningkat, seiring dengan semakin padatnya kebutuhan bangunan di lahan yang terbatas. High Rise Building kerap dijadikan solusi dengan tujuan pembangunan sebagai mix used development building, dengan luas lahan yang terbatas dapat dijadikan berbagai kepentingan komersial. Meningkatnya pembangunan tersebut harus diiringi oleh kontraktor dengan menunjukkan ketepatan waktu pelaksanaan konstruksi untuk menunjukkan performa perusahaan dan dari pihak pemilik untuk mencapai tujuan yang sama yaitu ketepatan waktu penyelesaian proyek. Hal tersebut harus didukung dengan peningkatan produktivitas pekerjaan konstruksi oleh berbagai pihak dengan bentuk kolaborasi.

The construction of the High Rise Building in DKI Jakarta is increasing every year, along with the increasingly dense need for buildings on limited land. High Rise Building is often used as a solution with the aim of developing it as a mix used development building, with a limited area of land that can be used for various commercial purposes. The increase in development must be accompanied by contractors with timely construction implementation to show the performance of the company and the owner to achieve the same goal, namely the timeliness of project completion. This must be supported by increasing the productivity of construction work by various parties in the form of collaboration."
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>