Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 2228 dokumen yang sesuai dengan query
cover
Robinson, Richard
North Sidney: Allen & Unwin, 1986
330.122 ROB i
Buku Teks SO  Universitas Indonesia Library
cover
Wallace, Robert
New York : Time-Life Books, 1967
947 WAL r
Buku Teks SO  Universitas Indonesia Library
cover
Setyo Wardoyo
"Jika engkau kehilangan kesabaranmu, makan engkau akan kehilangan kesempatanmu!"
Jakarta: Grasindo (PT Gramedia Widiasarana Indononesia), 2014
899.221 32 SET r
Buku Teks  Universitas Indonesia Library
cover
De Landa, Manuel
Cambridge: Polity, 2017
149.2 DEL r
Buku Teks SO  Universitas Indonesia Library
cover
Adelina Sapitri
"Globalisasi perdagangan dunia dan semua sektor industri termasuk industri konstruksi menyebabkan tingkat persaingan yang sangat tinggi dari para pelaku bisnis konstruksi. Ukuran proyek konstruksi terus tumbuh dan berkembang sehingga kontraktor dipaksa untuk selalu memperhatikan perencanaan dan pengendalian pembiayaannya. Keterlambatan Pelaksanaan yang terjadi pada proyek konstruksi sangat berhubungan erat dengan cash flow, untuk itu perlu dilakukan identifikasi faktor penyebab keterlambatan pelaksanaan yang berpengaruh terhadap cash flow pada suatu proyek agar pada periode selanjutnya dapat memperbaiki kinerja proyek dan mengatasi keterlambatan dengan cara yang efisien. Metode analisa yang digunakan untuk menguji variabel didalam penelitian ini adalah metode Analytical Hierarchy process (AHP), yaitu suatu metode yang digunakan untuk mencari faktor?faktor penyebab keterlambatan yang berpengaruh terhadap cash flow dengan memberikan peringkat/rangking dari hasil survey yang didapat. Dari hasil penelitian dan analisa yang dilakukan didapat faktor-faktor penyebab keterlambatan yang sangat berpengaruh terhadap cash flow, sedangkan penelitian terhadap Cash flow proyek dari studi kasus yang diambil pada Proyek The Capital Residence mengalami sedikit gangguan faktor internal kontraktor dan menyebabkan tertundanya waktu pelaksanaan proyek kurang lebih 5 bulan dari waktu pelaksanaan yang telah ditetapkan.

World trade globalization and all of sectors, including construction industry, cause a very keen competition between construction businessmen. The construction project becomes bigger and wider, so contractors are forced to be always aware in planning and managing the cost of the project. The delays that happens to the construction project is related so close to cash flow, There for we need to identificate the cause factors of delays that affect a project cash flow in order to improve project work and solve the problem of delayed efficiently. Analysis method that is used for examining variable in this observation is a Analytical Hierarchy process (AHP) method. The method are used to find cause factors of the delays that influence the cash flow by giving levels/ranks from survey result. The observation and the analysis show the cause factors of the delays that influence cash flow badly. In the other hand, the observation of project cash flow taken from case study of The Capital Residence project get a little internal trouble in contracting and cause delayed project application for about five months from time limit."
Depok: Fakultas Teknik Universitas Indonesia, 2006
S35862
UI - Skripsi Membership  Universitas Indonesia Library
cover
Tigar, Michael E.
New York: Monthly Riview Press, 1977
340.1 Tig l
Buku Teks  Universitas Indonesia Library
cover
Hammond, John Lawrence, 1872-1949
London : Methuen, 1952
338.39 HAM r
Buku Teks  Universitas Indonesia Library
cover
Schwartz, Benjamin
Cambridge, UK: Harvard University Press, 1952, 1961
951.04 SCH c
Buku Teks SO  Universitas Indonesia Library
cover
Schlesinger, Arthur Meier
New York: Macmillan, 1933
973.917 SCH h
Buku Teks SO  Universitas Indonesia Library
cover
Todd, Lewis Paul
New York: Harcourt, Brace & World, 1961
973 TOD r
Buku Teks SO  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>