Ditemukan 7905 dokumen yang sesuai dengan query
Siddayao, Corazon Morales
Kuala Lumpur: Oxford University Press, 1978
333.823 2 SID o
Buku Teks SO Universitas Indonesia Library
Dam-de Jong, Daniƫlla, 1978
Cambridge, UK: Cambridge University Press, 2015
346.044 DAM i
Buku Teks Universitas Indonesia Library
Arif Zakaria Kapa
"Kajian perencanaan pembangkitan listrik tenaga gas (PLTG) di anjungan Krisna-P CNOOC SES Ltd, dilandasi pertimbangan terbuangnya raw associated gas (RAG). Disisi lain, CNOOC SES Ltd memiliki kontrak penjualan non associated gas ke PLN untuk PLTGU Cilegon. Sebagian non associated gas (gas ekonomis) juga dimanfaatkan sendiri oleh CNOOC SES Ltd untuk pembangkit listrik menggunakan generator turbin gas. Karena kebutuhan akan listrik yang cukup besar maka konsumsi gas untuk pembangkitan sendiri juga besar. Keadaan ini memberi peluang untuk menghemat penggunaan gas bilamana merencanakan pembangkitan listrik yang tidak mengkonsumsi gas ekonomis ini.
Kenyataan bahwa anjungan Krisna-P memiliki sambungan listrik dengan jala-jala kelistrikan CNOOC SES Ltd, memungkinkan perencanaan pembangkitan di anjungan Krisna-P memanfaatkan gas buang ini. Dengan masuknya suplai listrik dari anjungan Krisna-P, membuat penghematan gas ekonomis, sehingga mobilisasi gas ke PLN bisa lebih besar lagi dan memberi keuntungan kepada CNOOC SES Ltd. Dengan demikian kajian keekonomian perencanaan pembangkitan di Krisna-P perlu dilakukan, dengan membandingkan keuntungan ekonomis dari tambahan gas yang di jual ke PLN, karena penghematan ini terhadap biaya investasi yang di perlukan.
Study of planning of electrical power generation by gas resources at Krisna-P platform is based on consideration of raw associated gas (RAG) wasting. At the other side, CNOOC SES Ltd have contract of gas selling to PLN for Gas and Steam Power Generation (PLTGU) Cilegon. Some of non associated gas (economic gas) that being sold to PLN is also utilized by CNOOC SES Ltd for own power generation using gas turbine generators. Due to the high requirement of electrical power the gas consumption for own generation is also high. This condition give an opportunity to save the gas upon there is a plan to make power generation that is not consuming this economic gas. The fact that Krisna-P platform has electrical connection to CNOOC SES Ltd grid give possibility to have planning for electrical power generation at Krisna-P that consuming this uneconomic gas. By this Krisna-P electrical supplying, there will save the economic gas, so that gas mobilization to PLN can be increased and give more advantage to CNOOC SES Ltd. Therefore, the economic study of power generation planning at Krisna-P platform need to conduct to compare the economic advantage of gas sell to PLN with the investment required."
Depok: Fakultas Teknik Universitas Indonesia, 2014
T42628
UI - Tesis Membership Universitas Indonesia Library
Maesen, L.J.G. van der
Bogor: Prosea, 1992
R 581.60959 PLA I
Buku Referensi Universitas Indonesia Library
Bogor: Prosea, 1994
R 581.60959 PLA VI
Buku Referensi Universitas Indonesia Library
Bogor: Prosea, 1995
R 581.60959 PLA VII
Buku Referensi Universitas Indonesia Library
Bogor: Prosea, 1993
R 581.60959 PLA
Buku Referensi Universitas Indonesia Library
London: Routledge, 2007
650.095 9 MAN
Buku Teks Universitas Indonesia Library
Bogor: Prosea, 1999
580 PLA
Buku Teks SO Universitas Indonesia Library
Leiden: Backhuys , 2003
333.953 PLA
Buku Teks SO Universitas Indonesia Library