Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 114798 dokumen yang sesuai dengan query
cover
Bambang Kustituanto
Jogjakarta: BPFE, 1984
519 BAM s
Buku Teks SO  Universitas Indonesia Library
cover
Kerlinger, Fred Nichols, 1910-
Semarang: Nur Cahaya, 1987
519.536 KER k
Buku Teks SO  Universitas Indonesia Library
cover
Iswandono Sardjonopermono
Yogyakarta: BP FE, 1981
001.42 ISW s
Buku Teks SO  Universitas Indonesia Library
cover
Djoko Prajitno
Yogyakarta: Liberty, 1985
519.536 DJO a
Buku Teks SO  Universitas Indonesia Library
cover
Universitas Indonesia, 2003
S27390
UI - Skripsi Membership  Universitas Indonesia Library
cover
Sudjana
Bandung: Tarsito, 1983
519.54 SUD t
Buku Teks SO  Universitas Indonesia Library
cover
Sudjana
Bandung: Tarsito, 1996
519.536 SUD t
Buku Teks SO  Universitas Indonesia Library
cover
Sri Muljati
"ABSTRAK
Telah dilakukan berbagai upaya pencegahan dan pemberantasan penyakit Demam Berdarah Dengue antara lain dengan Sistem Kewaspadaan Dini Kejadian Luar Biasa Demam Berdarah Dengue (SKD KLB DBD) terutama didaerah endemik DBD, namun insiden penyakit DBD cenderung meningkat dan jumlah daerah terjangkit DBD juga meningkat jumlahnya. Dinas Kesehatan Dati II pada umumnya belum dapat melaksanakan SKD KLB DBD secara optimal. Hambatan pelaksanaan SKD KLB DBD di Dati II sangat bervariasi, dan dari evaluasi kegiatan surveilan Program Pemberantasan Penyakit DBD di Kodya Bandung tahun 1995/1996 - 1997/1998 menunjukkan bahwa hambatan utama SKD KLB DBD adalah pada kegiatan pengumpulan data, analisis data dan penyajian hasil analisis serta pemanfaatan data dalam SKD KLB DBD.
Studi ini merancang suatu model pengembangan SKD KLB DBD berdasarkan sistem informasi geografi (SIG) dan analisis runtut waktu data DBD di Kodya bandung dengan menggunakan program aplikasi Epi Info dan Epi Map. Program Aplikasi yang telah siap pakai akan memudahkan petugas dalam pemasukan data, analisis dan penyajian hasil analisa data yang dibuat lebih spesifik dengan tampilan peta wilayah dan indikator DBD.
Tahapan pengembangan sistem SKD KLB DBD di Dati II Kodya Bandung terdiri dari penelitian awal, analisis. sistem, desain sistem dan pengembangan sistem. Tahap selanjutnya adalah uji coba sistem, tetapi tidak dilakukan dalam penelitian ini karena keterbatasan waktu. Uji coba direncanakan di beberapa Dati II agar diperoleh gambaran tentang penerapan sistem yang baru, dan kemudian diharapkan sistem tersebut dapat diterapkan di semua Dati II.

ABSTRACT
Development of The Early Warning System for Unusual Event of Dengue Haemorrhagic Fever ( EWS UE DHF ) According of the Geography Information System and DHF Time Series Data Analysis in Bandung MunicipalityIt has been taken some efforts of prevention and Dengue Haemorrhagic Fever Control the Early Warning System of Unusual Event of DHF ( EWS UE DHF ) especially in the DHF Endemic area, however the DHF incident trend is increasing as well as the number of the contagious DHF area. In general, the Health Service District H can not implement the EWS UE DHF optimally- The constraint of the implementation of EWS UE DHF in District area varies, and the activity evaluation of DHF Surveilllance Control Programme in Bandung Municipality in the year 1995 - 1997 shown that the main constraint of EWS UE DHF is data collection activity, analysis data and presentation of analysis result as well as data utilization for EWS UE DHF.
This study design a model of developing EWS UE DHF according to the Geographical Information System ( GIS ) and DHF Time Series data Analysis in Bandung Municipality by using the application of Epi Info and Epi Map Program. The Application Program which is ready to use will make the workers easier in entering the data, analysis and presentation of data analysis result which made in more specific with the Map Area Appearance and DHF indicator.
Development phase system of EWS UE DHF in Bandung Municipality is consist of the preliminary research, analysis system, design system and development system. The next phase is a try-out to the system, but it will not be carried out in this research because of the time limitation. The trial will be planned for some districts area in order to get some ideas about the new system implementation, and hopefully the system can be used for all districts B.
"
Depok: Universitas Indonesia, 1998
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Yuwono HS.
"Fly over Pondok Kopi berada di pertemuan antara jalan I Gusti Ngurah Rai dengan jalan Penggilingan, jalan Pondok Kopi dan Rel Kereta Api antara Jakarta - Cikampek, dan mempunyai hal-hal spesifik lokasi yang sempit konstruksi yang berbentuk melengkung vertikal maupun horisontal. Problem utama yang dihadapi adalah waktu dan biaya.
Data primer antara lain jumlah dan waktu kereta api melintas, waktu pintu kereta api ditutup dan dibuka, posisi kendaraan setiap 5 menit, dan waktu yang dibutuhkan dari posisi kendaraan menutup lokasi pekerjaan sampai dengan tidak menutup, diperoleh dari hasil observasi selama satu hari satu malam pada hari Jumat.
Waktu efektif dipengaruhi oleh jumlah lintasan kereta api, dan hal-hal yang berkenaan dengan lintasan tersebut. Sedangkan produktivitas kerja disamping dipengaruhi oleh waktu efektif, dan faktor lalu lintas. Dengan metode regresi linier, waktu efektif dan faktor lalu lintas dapat dihitung, dan masing-masing mempunyai persamaan yang signifikan, dengan nilai r = 0,951, dan 0,985. Dengan fungsi-fungsi tersebut, maka besarnya waktu kerja efektif dan faktor lalu lintas setiap jamnya dapat dihitung. Pada jam kerja umumnya, yaitu antara pukul 8 pagi sampai dengan 4 sore, besarnya waktu efektif sebesar sekitar 58,14 %, dan sedangkan dari pagi pukul 7 sampai sore pukul 6 sebesar 56,20 %.; sedangkan faktor lalu lintas sebesar 70,89 % dan 71,99 %.
Waktu efektif dan faktor lalu lintas dapat digunakan untuk mengevaluasi dan mengendalikan waktu dan biaya pelaksanaan di lapangan. Sebagai gambaran dalam aplikasi di lapangan, pekerjaan beton K450 yang paling dipengaruhi, sedangkan pekerjaan kabel prestressed kurang. Secara umum resiko tambahan biaya tersebut merupakan fungsi kuadratik terhadap perubahan waktu. Sebagai gambaran untuk percepatan 30 hari, pekerjaan beton K450 mengalami resiko tambahan biaya cukup besar yaitu 8,58 % sedangkan pekerjaan kabel prestressed 2,12 % saja, dan bila dihitung secara keseluruhan pekerjaan proyek beresiko tambahan biaya sebesar 3.87 %. Dengan demikian metode paling efektif dalam melakukan pengendalian tersebut adalah dengan melakukan trade of resiko biaya dan waktu, dengan dibantu dengan teknik statistik regresi dan program linier."
Depok: Fakultas Teknik Universitas Indonesia, 2001
T10368
UI - Tesis Membership  Universitas Indonesia Library
cover
Fakultas Teknik Universitas Indonesia, 2000
TA2963
UI - Tugas Akhir  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>