Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 22817 dokumen yang sesuai dengan query
cover
Rheinfelder, William A.
England: Foulsham-Tab, 1976
621.388 1 RHE c
Buku Teks  Universitas Indonesia Library
cover
Qashtalani Haramaini
"[Sejalan dengan pertumbuhan industrialisasi, dimana kebutuhan akan tenaga listrik besar sekali, sehingga generator dapat digunakan sebagai sumber pembangkit tenaga listrik. Dalam pengoperasiannya, generator sering mengalami gangguan hubung singkat yang terjadi didalam maupun diluar generator. Gangguan tersebut dapat terjadi setiap saat dan bersifat merusak generator yang dapat mengganggu aliran daya kekonsumen. Akibat yang ditimbulkan tersebut maka perlu diberikan peralatan pengaman untuk generator, agar gangguan yang terjadi setiap saat dapat diamankan sedini mungkin tanpa merusak generator dan apabila generator dihubungkan kesistem tidak mengganggu sistem. Pemilihan rele pengaman untuk generator tersebut didasarkan pada gangguan yang mungkin timbul, yang ditinjau dari situasi dan kondisi setempat, sehingga setelah dihitung didapat peneyetelan rele diferensial dengan batas ambang 0,16 A dan rele arus lebih 0,96 A dengan waktu 2 detik , rele gangguan tanah stator 0,17 A, rele daya lebih 144 watt rele tegangan lebih 121 Volt, rele beban tak seimbang 0,94 A dan 12,4 detik, rele kehilangan medan 1,2 Ohm dan diameter kerja 9,7 Ohm dan rele daya balik disetel -2,34%
, In line with the growth of industrialization, where the demand for power is
enormous, so that the generator can be used as a source of power generation.
In conducting the operation, the generator often experience short circuit that
occurred within and outside the generator The disorder can occur at any time and
destructive generator that can disrupt power flow to consument.
With the impact that it should be given safety equipment to the generator, so that
disturbance at any waktu can be secured as early as possible without damaging
the generator when the generator is connected to a system and do not disturb the
sistem.
Selection of safety relays for the generator is based on problems that may arise,
which in terms of local circumstances, so that can know what amount of the
amount of influence in the disorder, which scale is used to determine the amount
of setting. So that after calculation ,relay differential threshold setting is 0,16 A
and overcurrent is 0,96 A with time delay 2 s,stator ground fault relay 0,17
A,Overload relay 144 W, Overvoltage 121 V, Load Unbalance relay 0,94 A and
12,4 s, Loss of Excitation relay 1,2 Ohm and diameter 9,7 Ohm and Reverse
Power Relay is setting -2,34%]
"
Depok: Fakultas Teknik Universitas Indonesia, 2015
S62029
UI - Skripsi Membership  Universitas Indonesia Library
cover
Syarif Hidayatullah
"
Koordinasi Proteksi rele arus lebih menjadi bagian dari sistem proteksi tenaga listrik di pengeboran minyak lepas pantai. Penurunan produksi sumur menjadikan rekonfigurasi jaringan akan dilakukan sehingga studi koordinasi proteksi diperlukan agar mencapai keamanan dan keandalan operasional yang diinginkan. Studi koordinasi proteksi dilakukan dengan perangkat lunak Electric Transient and Analysis Program (ETAP). Studi ini membahas permasalahan koordinasi proteksi sistem eksisting pada sisi transmisi tenaga listrik akibat selektivitas proteksi yang kurang baik berdasarkan diagram star. Metodologi dalam perancangan ulang dilakukan dengan mengacu pada standar yang disesuaikan dengan sistem eksisting (ANSI) melalui perhitungan dengan luaran kualitatif. Perancangan ulang koordinasi sistem proteksi telah dilakukan sehingga mendapatkan koordinasi antar rele sesuai dengan tujuan awal (diatas 300ms antar rele).

Overcurrent relay protection coordination is part of the electric power protection system in offshore oil drilling. The decrease in well production means that network reconfiguration will be carried out so that a protection coordination study is required in order to achieve the desired operational security and reliability. Protection coordination studies were carried out using the Electric Transient and Analysis Program (ETAP) software. This study discusses the problem of coordinating the protection of the existing system on the power transmission side due to deficient protection selectivity based on the star diagram. The methodology for redesigning is carried out by referring to standards adapted to the existing system (ANSI) through calculations with qualitative outcomes. Redesigning the coordination of the protection system has been carried out to obtain coordination between relays in accordance with the initial goal (above 300ms between relays)."
Depok: 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Hanggara Kusuma
Depok: Fakultas Teknik Universitas Indonesia, 2000
T40697
UI - Tesis Membership  Universitas Indonesia Library
cover
Brewer, Dennis, 1949-
New York: McGraw-Hill, 2012
621.388 53 BRE b
Buku Teks  Universitas Indonesia Library
cover
Arif Astomo
"Keinginan dari para pemegang hak cipta dalam penyiaran program-program premium, telah memicu perusahaan TV kabel untuk membuat suatu sistem keamanan dalam penyiaran program tersebut. Salah satu sistem keamanan yang dibuat adalah dengan memanipulasi sinyal video yang akan disiarkan atau yang dikenal dengan istilah scrambling video.
Saat ini telah terdapat berbagai macam metode scrambling video, diantaranya adalah traps, video inversion, interfering carrier, horizontal sync suppression dan digital audio encryption. Akan tetapi, metode-metode tersebut sistem keamanannya hanya memanfaatkan kelemahan proses detuning dari TV. Sehingga dengan menghilangkan kelemahan tersebut, para pembajak video dapat dengan mudah memperoleh siaran program-program premium.
Pada skripsi ini, akan dirancang suatu simulasi sistem scrambling video dengan menggunakan teknik pengacakan pixel yang digabungkan dengan suatu address code melalui sistem operasi matriks. Selanjutnya hasil scrambling video akan divariasikan dengan besar sample time mulai dari 1/15 hingga 1/60, serta jumlah delay dari tiap sample frame video yang disiarkan. Proses analisis akan dilihat pada tampilan video display dan vector scope.
Hasil analisis simulasi menunjukkan bahwa tingginya tingkat keamanan dari scrambling video ditentukan oleh banyaknya pixel video yang terbagi, penggunaan manipulator-manipulator matriks dan acaknya nilai pembangkitan matriks oleh address code. Variasi sample time 1/15 akan memberikan hasil distorsi yang terbesar, sedangkan sample time 1/60 akan memberikan pengurangan kedipan video dan hasil distorsi yang terkecil.

The demand from the rights holder in broadcasting their premium programs has triggered TV cable company to make a security system for those programs. One of the security system that has been made is by manipulating the video signals or been known by the word of video scrambling.
Until now, there are so many method of video scrambling, like traps, video inversion, interfering carrier, horizontal sync suppression dan digital audio encryption. However, those security system methods are only using the weaknesses of detuning process by the television set. So that, by eliminating these weaknesses, the hijacker can get those premium programs easily.
In this semi thesis, will be designed a simulation video scrambling system with random pixel technique that has been combined with a unique address code based on matrix operation system. Furthermore, the result of scrambling video will be varied with adjusting the sample time from 1/15 to 1/60 and varying the number of delay of each sample video frame that will be broadcasted. The analysis process will be showed in the video display and vector scope.
The simulation analysis result shows that security of scrambling video is depends on the number of video pixel divided, the use of matrix manipulators and randomize the value of matrix generator by address code. The sample time 1/15 will gives the largest distortion, whereas sample time 1/60 will gives reduction in video flicker and smallest distortion.
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
S40456
UI - Skripsi Open  Universitas Indonesia Library
cover
Adrial Mardensyah
"Saluran udara tegangan tinggi merupakan salah satu komponen dalam system tenaga listrik yang sering mengalami gangguan. Gangguan pada saluran udara dapat disebabkan hubungan singkat, beban lebih, surja petir, topan, cuaca buruk dan lain-lain. Gangguan ini dapat menyebabkan terganggunya kelangsungan operasi dan kerusakan peralatan pada sistem tenaga listrik. Untuk itu diperlukan system proteksi yang handal yang dapat mengidentifikasi gangguan dengan cepat sekaligus mengamankan bagian sistem yang terganggu dari bagian lain yang masih dapat berjalan normal.
Suatu sistem proteksi karena berbagai macam faktor dapat mengalami kegagalan operasi, oleh sebab itu selain proteksi utama diperlukan proteksi cadangan yang dapat bekerja ketika proteksi utama gagal bekerja. Rele jarak dapat digunakan sebagai proteksi utama sekaligus sebagai proteksi cadangan jauh pada saluran udara tegangan tinggi. Sedangkan rele arus lebih dan rele gangguan tanah digunakan sebagai proteksi cadangan lokal jika rele jarak gagal bekerja.
Dalam skripsi ini akan dilakukan studi perencanaan koordinasi rele proteksi untuk proteksi utama maupun proteksi cadangan pada saluran udara tegangan tinggi yang menghubungkan gardu induk Gambir Lama dengan gardu induk Pulomas. Koordinasi dilakukan dengan menghitung setelan rele jarak yang digunakan sebagai proteksi utama sekaligus sebagai proteksi cadangan jauh serta menghitung setelan rele arus lebih dan rele gangguan tanah yang digunakan sebagai proteksi cadangan lokal. Rele jarak dapat dikoordinasikan dengan auto reclose relay untuk menutup pemutus tenaga secara otomatis beberapa saat setelah terjadi gangguan. Rele jarak yang dikoordinasikan dengan auto reclose relay dapat meningkatkan kontinuitas pelayanan energi listrik.

High voltage transmission lines is one of component in electrical power system, which subject to a lot of fault. This fault can caused by short circuit, overloads, lightning, wind etc,. Faults may caused disturbance in electrical power system and could also damaged component of the power system. In order to minimize damage caused by faults, it needs to install power system protection. The purpose of power system protection is to recognize certain system abnormalities which, if undetected could lead to damage of equipement or extended loss of service.
In many cases it is not feasible to ensure that power system protection can operate correctly. For that, power system must have a back-up protection in cases the main protection failed to operate. Distance relay can operate both as main protection and remote back up protection to the adjacent feeder in transmission lines. Overcurrent and ground fault relay is use for local back up protection in transmission lines.
This paper will study coordination of protection relay for both main and back up protection in transmission line connecting substation Gambir Lama ? Pulomas. This carry out by calculate relay setting for distance relay, overcurrent relay and ground fault relay to determine gradded settings to achieve selectivity. Distance relay also suitable for use in association with high speed auto reclosing for the protection of important transmission lines. The use of auto reclosing have advantages for reduction of the minimum interruptions of supply to consumer.
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
S40518
UI - Skripsi Open  Universitas Indonesia Library
cover
Fakultas Teknik Universitas Indonesia, 1992
S37968
UI - Skripsi Membership  Universitas Indonesia Library
cover
Al-Khatib, Mazen
"Contents :
- Preface
- Chapter One: Overview of IPTV Concepts, Developments, and Components
- Chapter Two: Computer Networking Basics
- Chapter Three: Overview of IPTV Components
- Chapter Four: IPTV Systems' Components Design and Development
- Chapter Five: Advanced Concepts for Future IPTV Networks
- Chapter Six: IPTV Market Overview
- References
- List of Figures
- List of Tables
- Index "
Chicago: International Engineering Consortium, 2007
e20448058
eBooks  Universitas Indonesia Library
cover
Achmad Fauzan
"Skripsi ini membahas perancangan sebuah sistem intelligent building dengan SMS sebagai media kontrol terhubung dengan rangkaian pengendali yang dapat menterjemahkan perintah perintah SMS menjadi suatu command control untuk mengendalikan relay board juga memberikan laporan dari feedback device yang dikendalikan oleh mikrokontroller sehingga dapat mengetahui status proses kontrol suatu relay board suatu berjalan dengan benar atau tidak.

This thesis is design an intelligent building system using SMS as control media with control circuit that can translate SMS command to other command controls that can control relay board it's also give report from controlled feed back device that cntrolled by microcontroller to know the system either work or not ."
Depok: Fakultas Teknik Universitas Indonesia, 2013
S44486
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>