Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 4418 dokumen yang sesuai dengan query
cover
Djiteng Marsudi
Jakarta: Erlangga, 2005
621.312 DJI p
Buku Teks SO  Universitas Indonesia Library
cover
Djiteng Marsudi
"Buku ini menjelaskan proses pembangkitan energi listrik, jenis-jenis pusat listrik, instalasi listrik pada pusat listrik, masalah utama dalam pembangkitan energi listrik, sistem interkoneksi, sistem penyediaan energi listrik dan mutu energi listrik, manajemen pembangkitan energi listrik, dan pengembangan pembangkitan energi listrik di Indonesia. Dengan pendekatan yang praktis dan konstektual dengan kondisi Indonesia."
Jakarta: Erlangga, 2011
621.312 DJI p (1)
Buku Teks SO  Universitas Indonesia Library
cover
Djiteng Marsudi
"Buku ini menjelaskan proses pembangkitan energi listrik, jenis-jenis pusat listrik, instalasi listrik pada pusat listrik, masalah utama dalam pembangkitan energi listrik, sistem interkoneksi, sistem penyediaan energi listrik dan mutu energi listrik, manajemen pembangkitan energi listrik, dan pengembangan pembangkitan energi listrik di Indonesia. Dengan pendekatan yang praktis dan konstektual dengan kondisi Indonesia."
Jakarta: Erlangga, 2011
621.312 DJI p (1)
Buku Teks SO  Universitas Indonesia Library
cover
Abdul Kadir
Jakarta : UI-Press, 2010
621.314 38 ABD t
Buku Teks  Universitas Indonesia Library
cover
"Tulisan ini bertujuan untuk memberi pencerahan tentang apa yang sesungguhnya terjadi di dalam reaktor nuklir, sehingga reaktor nuklir tidak lagi dipandang sebagai suatu "kotak hitam". Selain itu diuraikan secara ringkas tiga jenis utama PL TN dan riwayat pembangunan PL TN di dunia."
537 JIEK 1:1 (2008)
Artikel Jurnal  Universitas Indonesia Library
cover
Sibarani, Michael Bonardo Siswono
"Studi ini berfokus pada pentingnya peningkatan kebutuhan energi yang berkelanjutan. Penelitian ini bertujuan untuk mengkaji potensi dari implementasi sistem Photovoltaic (PV), Micro Wind Turbine (MWT), dan Battery Energy Storage System (BESS) sebagai pasokan listrik pada PLTD Sikakap. Metode yang digunakan dalam penelitian ini adalah analisis data sistem dan simulasi dengan software HOMER Pro. Data sistem yang digunakan meliputi data dari sistem listrik PLTD Sikakap serta spesifikasi PV, MWT, dan BESS yang akan disimulasikan. Simulasi dengan software HOMER Pro digunakan untuk memprediksi kinerja dari sistem hibrida PV-MWT-BESS dan menganalisis kelayakan ekonominya. Hasil penelitian menunjukkan bahwa potensi dari implementasi sistem hibrida PV-MWT-BESS pada PLTD Sikakap sangat menjanjikan. Sistem hibrida ini dapat menurunkan penggunaan dari bahan bakar fosil dan meningkatkan keandalan serta efisiensi pembangkit listrik PLTD Sikakap. Analisis kelayakan ekonomi menunjukkan bahwa konfigurasi dengan menggunakan generator diesel, PV, MWT, BESS memiliki efisiensi biaya, keandalan sistem, dan penggunaan energi terbarukan yang sangat baik. Hal ini menunjukkan bahwa sistem hibrida ini secara ekonomis layak untuk diimplementasikan.

This study focuses on the importance of increasing sustainable energy demand. This research aims to assess the potential of implementing Photovoltaic (PV), Micro Wind Turbine (MWT), and Battery Energy Storage System (BESS) as electricity sources at the Sikakap diesel power plant. The methods used in this research include system data analysis and HOMER Pro software simulation. The system data includes information from the Sikakap diesel power plant electricity system, and specifications for PV, MWT, and BESS that will be simulated. Simulation using HOMER Pro software is used to predict the performance of a PV-MWT-BESS hybrid system and analyze its economic feasibility. The results show that the potential for implementing the PV-MWT-BESS hybrid system at the Sikakap diesel power plant is very promising. This hybrid system can reduce fossil fuels use and increase the reliability and efficiency of the Sikakap diesel power plant. The economic feasibility analysis indicates that the configuration using diesel generators, PV, MWT, BESS has excellent cost efficiency, system reliability, and renewable energy usage. This suggests that the hybrid system is economically viable. "
Depok: Fakultas Teknik Universitas Indonesia, 2024
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Budiyanto
"Sumber energi terbarukan merupakan sumber energi yang potensial untuk dikembangkan, seperti tenaga angin, matahari, dan air. Perkembangan teknologi elektronika daya seperti invertor memberikan solusi atas penggunaan energi terbarukan pada sistem jaringan listrik mikro (microgrid) arus bolak - balik, namun sistem ini sering mengalami persoalan pada frekuensi, tegangan, daya aktif dan daya reaktif saat dua buah atau lebih invertor bekerja bersamaan, sehingga perlu peralatan sinkronisasi dan pengendali yang rumit. Pengembangan sistem jaringan listrik miko arus searah (JLMAS) juga dikembangkan seiring dengan perkembangan peralatan rumah tangga yang dapat dioperasikan dengan sumber arus searah, hal ini juga merupakan solusi dari keterbatasan pada jaringan listrik mikro arus bolak - balik. Dalam sistem JLMAS penggabungan dua buah atau lebih sumber energi terbarukan dapat dengan mudah diparalel, dengan syarat tegangan dan polaritanya sama. Sehingga ini menjadikan peluang untuk mengembangkan sistem JLMAS.
Pembangkit energi terbarukan seperti sel surya dan turbin angin sangat dipengaruhi oleh kondisi alam sehingga produksi listrik yang dihasilkan tidak stabil dan bahkan terhenti sama sekali, untuk itu perlu dilengkapi dengan baterai yang fungsinya selain sebagai penyimpan energi juga untuk menjaga agar pasokan daya listrik ke jaringan listrik mikro menjadi lebih kontinyu. Saat baterai mengalami penurunan dan tidak mampu dalam memberikan suplai energi maka perlu adanya baterai cadangan yang dapat memasok energi ke sistem jaringan. Agar baterai cadangan dapat bekerja maka perlu ada pengendali untuk mengatur kerja baterai tersebut. Beberapa penelitian tentang pengendali tegangan dari pembangkit energi terbarukan telah dilakukan, namun masih dalam satu sistem pembangkit. Penelitian ini bertujuan untuk mengendalikan sistem JLMAS dari dua atau lebih sumber energi terbarukan dan satu baterai cadangan yang mensuplai ke jaringan lisrtik mikro.
Dalam penelitian ini didapatkan sistem pengendali JLMAS yang dapat mendeteksi besarnya tegangan baterai PV dan baterai cadangan pada tegangan 10,8 - 13,6 Vol, yang berfungsi untuk mengatur SOCmin dan SOC maks pada baterai. Tegangan yang digunakan pada sistem JLMAS adalah 254 Vas, tegangan ini dihasilkan dari pengembangan invertor menjadi konvertor penaik tegangan AS-AS dari 12Volt menjadi 254 Volt. Hasil analisa dan perencanaan JLMAS dengan kapasitas daya 1200 VA, dengan penempatan beterai secara terintegrasi besarnya kapasitas pembangkit sel surya pada masing - masing sebesar 9729,42 Wp, sedangkan besarnya kapasitas baterai lokal (baterai PV) sebesar 850 Ah dan baterai cadangan 5000 Ah dengan lama waktu penyimpanan energi 3 hari. Dalam sistem JLMAS beban yang digunakan adalah beban arus bolak - balik berbasis swiching (SMPS) sehingga tanpa harus mengunakan invertor.

The renewable energy source is a source of potential energy to be developed, such as wind, solar, and water energy. The development of power electronics technology such as inverter provides a solution for the use of renewable energy on an AC micro grid system (microgrid), but this system often has problems on frequency, voltage, active power and reactive power when two or more inverters work together, so synchronization and controlling complex equipment are needed. The developing of DC micro grid systems (JLMAS) is also done along with the development of household appliances that can be operated with direct current source. It is also a solution of the limitations on AC micro grid. In JLMAS system combining two or more sources of renewable energy can be easily paralleled, on conditions that the voltage and polarity are the same. So it creates the opportunity to develop a system JLMAS.
The renewable energy such as solar cells and wind turbine are strongly influenced by natural conditions so that electricity production is not stable and even stopped altogether, for it needs to be equipped with a battery that has functions not only as an energy storage but also to ensure the supply of electrical power to the micro grid becomes more continuous. When the battery has decreased and is not able to provide energy supplies, it needs a backup battery that can supply energy to the network system. For backup battery in order to work properly it needs a voltage controller for controlling the battery operation. Some researches on controlling the voltage of renewable energy generation has been done, but still in a generating system. This research aims to control the JLMAS system from two or more sources of renewable energy and a battery backup supplying to the micro electric network.
In this research, it is obtained that the control system of JLMAS that can detect the magnitude of voltage of PV battery and a spare battery at a voltage of 10,8 to 13.6 Volt, which works to regulate SOC min and max on the battery. The voltage used in the JLMAS system is 254Vdc, this voltage is resulted from the development of an inverter to become a boost converter from 12 Volt to 254 Volt. Results of analysis and planning JLMAS with 1200 VA power capacity, with placement of battery in integrating, the magnitude of solar cell generation capacity on each amounting to 9729,42 Wp, while the magnitude of the local battery capacity (battery PV) of 850Ah and a 5000 Ah of battery backup with the duration of energy storage time is 4 days. In JLMAS system is used alternating current load based on switching (SMPS) without using inverter.
"
Depok: Fakultas Teknik Universitas Indonesia, 2014
D1489
UI - Disertasi Membership  Universitas Indonesia Library
cover
Muhammad Ilyas Savier Alfikri
"Karya tulis ini membahas simulasi dan optimasi tujuan ganda proses regasifikasi hidrogen cair. Tujuan penulisan karay tulis ini adalah untuk mengetahui potensi pemanfaatan energi dingin hidrogen cair. Terdapat dua faktor utama yang melatarbelakangi proses pemanfaatan energi dingin hidrogen. Pertama, energi yang dikonsumsi pada proses pencairan hidrogen adalah 3,3 kWh/kg hidrogen cair (Departement of Energy U.S.A., 2009). Kedua, energi yang tergandung dalam hidrogen adalah 120 MJ/kg (Van Hoecke et al., 2021). Proses pemanfaatan energi dingin hidrogen cair yang dibahas adalah kombinasi Siklus Brayton dan ekspansi. Simulasi dilakukan pada Aspen HYSYS V.10 dengan fluid packageĀ­ Peng-Robinson. Fluida kerja yang digunakan dalam simulasi adalah fluida kerja Helium dan fluida kerja campuran Helium-Neon. Optimasi dilakukan pada aplikasi MS Excel. Algoritma yang digunakan adalah modifikasi dari I-MODE yang dibuat oleh Sharma & Rangiah, 2013. Optimasi tujuan ganda memaksimalkan energi listrik yang dibangkitkan dan meminimalkan biaya pompa dengan variabel penentu adalah laju alir dan komposisi fluida kerja, serta tekanan penguapan hidrogen cair. Dengan laju alir hidrogen cair 30 ton/hari, diperoleh kondisi operasi yang optimum 1836 kg/jam fluida kerja Helium dengan tekanan penguapan sebesar 68 atm. Energi listrik yang dibangkitkan adalah 0,934 GWh per tahun dan biaya pompa yang dibutuhkan adalah $12.305.142.

This paper discusses simulation and multi-objective optimization of regasification liquid hydrogen. This paper is written to identify the utilization of hydrogen cold energy potency. There are two main factors behind this study. The amount of energy consumed in the liquefaction process is 3.3 kWh/kg of liquid hydrogen (Departement of Energy U.S.A., 2009), and the hydrogen energy content is 120 MJ/kg (Van Hoecke et al., 2021). The process simulation is a combination of the Brayton Cycle and direct expansion. The simulation is conducted on Aspen HYSYS V.10 with Peng-Robinson fluid package. The working fluids that are used in this simulation are Helium and Helium-Neon mixture. The optimization is conducted in MS Excel. I-MODE algorithm (Sharma & Rangiah, 2013) is modified to run the optimization process. Multi-objective optimization will maximize the amount of electricity and minimize the cost of the pump by changing the flow rate and composition of the working fluid, and the regasification pressure. Liquid hydrogen flow rate set to be constant at 30 ton/h, the optimum condition is 1863 kg/h Helium as working fluid and regasification pressure at 68 atm. The amount of electricity generated is 0.934 GWh per year and the cost of the pump is $12.305.142."
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Eko Adhi Setiawan
"Pencarian sumber energi baru dan terbarukan sebagai sumoer energi alternatif terus dilakukan, mengingat semakin berkurangnya cadangan sumber energi hidrokarbon di dunia. Salah satu potensi sumber energi altematif yang dapat dikonversikan menjadi energi listrik di Indonesia adalah energi ombak. Hal ini mengingat kenyataan bahwa tujuh puluh persen dari luas wilayah Indonesia berupa laut. Teknologi konversi energi ombak yang sudah dikembangkan adalah teknologi "Saluran meruncing" (Tapered Channel) atau Tapchan, teknologi "Kolom Air Berosilasi" (Oscillating Water Column/OWC) seperti Mighty Whale, "Tangki udara bertekanan tetap" (Constant Air Pressure Tank) dan sebagainya. Pada tesis ini akan dibahas mengenai potensi ombak di Indonesia yang dilanjutkan dengan studi pemanfaatan energi ombak untuk pembangkitan tenaga listrik dengan mempertimbangkan berbagai hal seperti tinggi, periode ombak serta besarnya daya yang dapat dimanfaatkan.

The search for new and renewable energy as alternative energy resources is still being done due to the depletion of hydrocarbon reserves all over the world One of this alternative energy resources which can be converted into electrical energy in Indonesia is sea wave energy. This is because of the fact that 70% of Indonesia's surface consists of the sea. Sea waves energy conversion technologies already being developed are the Tapered Channel technology or Tapchan, Oscillating Water Column technology like Mighty Whale, Constant Air Pressure Tank, etc. This thesis discusses the sea waves energy potential in Indonesia followed by a study to utilize it for electric power generation by keeping in mind many points like height, periods of sea waves and the power which can be utilized.
"
Depok: Fakultas Teknik Universitas Indonesia, 2000
T41010
UI - Tesis Membership  Universitas Indonesia Library
cover
Salma Azra Fatimah
"

Energi listrik adalah salah satu energi yang sangat dibutuhkan demi keberlangsungan hidup manusia dengan peningkatan penggunaan setiap tahunnya. Di Indonesia sendiri, sebagian besar sumber energi pembangkitan listrik masih berasal dari batu bara, sehingga pemerintah menargetkan pengembangan PLTS atap hingga 3,6 GW pada tahun 2025. Demi mendukung program tersebut, PLTS eksisting tetap harus dijaga kinerjanya, di mana salah satu cara untuk menguji keandalan sistem tersebut adalah dengan melakukan evaluasi kinerja mengacu pada standar IEC 61724, yaitu standar untuk mengukur kinerja fotovoltaik. Penelitian ini melakukan studi mengenai implementasi PLTS Atap On-Grid 90 kWp di Gedung Energi 625 Pusat Penelitian Ilmu Penerapan dan Teknologi (Puspiptek), Serpong, Tangerang Selatan. Gedung ini merupakan pusat pengembangan dan penerapan ilmu pengetahuan dan teknologi berbasis penelitian. Sebagai data acuan, akan dilakukan simulasi data seharusnya menggunakan perangkat lunak PVsyst. Berdasarkan simulasi, dihasilkan energi keluaran PLTS tahunan sebesar 130.451 kWh denganĀ  performance ratio sebesar 81,30% dan capacity factor sebesar 16,21%. Sedangkan, hasil pengukuran menghasilkan energi keluaran tahunan sebesar 102.491 kWh dengan rasio performa sebesar 73,51% dan capacity factor sebesar 13%. Rata-rata penurunan produksi energi tahunan sebesar 6,32% dengan energy performance index yang diperoleh adalah 80,21%.


Electrical energy is one of the most important energies for human life and sustainability with a constant increase in usage every year. In Indonesia, most of the electricity generated comes from coal, resulting in the government targeting solar power plant development up to 3,6 GW by 2025. To support the initiative, all the existing solar power plants have to sustain their performance, and one of the methods is to evaluate the system's performance according to the IEC 61724 standard, which is a standard to measure the performance of photovoltaic. This research is studying the implementation of a 90 kWp On-Grid Rooftop Solar Power Plant in the Energy Building of Pusat Penelitian Ilmu Pengetahuan dan Teknologi (Puspiptek), Serpong, South Tangerang. This government-owned building is used as a center for the development and application of science and technology based on research. For data reference, a simulation with PVsyst software was conducted. Based on simulation, the yearly output energy yielded 130.451 kWh with a performance ratio of 81,30% and a capacity factor of 16,21%. While the measured data obtained a yearly energy output of 102.491 kWh with a performance ratio of 73,51% and a capacity factor of 13%. The average output energy degradation is 6,32% with an acquired energy performance index of 80,21%.

"
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>