Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 111261 dokumen yang sesuai dengan query
cover
Fakultas Teknik Universitas Indonesia, 1994
S36377
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ferdianto Munir
Depok: Fakultas Teknik Universitas Indonesia, 1994
S36488
UI - Skripsi Membership  Universitas Indonesia Library
cover
Eko Willyono
Depok: Fakultas Teknik Universitas Indonesia, 1995
S36310
UI - Skripsi Membership  Universitas Indonesia Library
cover
Riza Raharja
"ABSTRAK
Sistem kode material merupakan alat untuk mengidentitikasi material dengan cepat dan efisien. Dengan demikian deskripsi material yang panjang dapat diringkas kedalam beberapa angka saja. Sistem kode yang digunakan untuk membuat sistem kode material ini adalah MESC (Mechani l and Equipment System Code).
Dalam perancangan sistem kode, material dikumpulkan kedalam grup-grup utama, berdasarkan bentuk seperti : bahan baku (Raw material), suku cadang mesin (Tools), material konsumsi (Consumables). Kemudian grup utama ini dlbagi dalam sub-grup berdasarkan dimensi dan spesilikaasi material.
Langkah selanjutnya dalam perancangan sistem kode adalah pemilihan sistem kode yang sesuai dengan material. Sistem kode ini dipilih berdasarkan kebutuhan untuk proses identitikasi material. Sehingga sistem kode yang dirancang dapat fleksibel terhadap pertambahan quaniitas material.
Penyimpanan material merupakan bagian dari kegiatan idenlilikasi dan pensotiran material, oleh karena ilu sistem penyimpanan material sangat penting.
Kode lokasi material merupakan alat yang memudahkan operator gudang untuk menemukan material dengan oepat.
Dalam pembuatan kode lokasi material, diperiukan denah storage dan gudang yang tersedia di lndustri Boiler PT. 'X'. Denah tersebut dibagi kedalam baris dan kolom, sehingga sel atau pertemuan antara baris dan kolom merupakan lokasi material. Kode lokasi material berbentuk angka-angka yang menunjukan lokasi (sei) material.
Untuk memudahkan proses identitikasi dan pensortiran material diperlukan suatu sistem lnformasi dengan rancangan sistem database yang menerapkan kode material sebagai alat untuk menghubungkan suatu label dengan tabel lainnye.
Dalam pembuatan sistem informasi ini digunakan Foxpro 2.8 sebagai perangkat Iunak komputer. Dengan demikian rancangan sistem informasi persediaan dapat memberikan informasi mengenai status material dengan cepat Dan pada akhimya usaha untuk meningkatl-can eftisiensi kerja pada departemen pengendalian dapat terwujud.

"
1996
S36660
UI - Skripsi Membership  Universitas Indonesia Library
cover
Dahrijoso Soejakti
"ABSTRAK
PT. X yang memiliki karakteristik sistem manufaktur job order dengan variasi produk dan lingkup pekerjaannya yang dimulai dari proses desain, sering menghadapi masalah yang berupa keterlambatan dan kenaikan biaya material. Karena proses pengadaan material di suatu perusahaan dilaksanakan berdasarkan suatu sistem-prosedur operasi, maka dilakukan review dan analisa pada sistem prosedur tersebut. Dalam suatu analisa, bagaimanapun juga, diperlukan suatu tolok ukur untuk mengkuant sir performance dari suatu sistem. Untuk itu dalam menganalisa sistem-prosedur tersebut, dilakukan pendekatan dengan metode PERT (Program Evaluation and Review Technique). Yaitu dengan menterjemahkan sistem-prosedur yang ada ke dalam suatu jaringan aktivitas, untuk kemudian dicari aktivitas-aktivitas yang kritis dengan metode CPM (Critical Path Method). Aktivitas-aktivitas yang termasuk dalam lintasan kritis tersebut diidentifikasi sebagai aktivitas yang mendapat prioritas dalam pengendaliannya.
Langkah awal yang dilakukan dalam menganalisa adalah mengidentifikasi aktivitas-aktivitas yang ada dalam sistem-prosedur. Mulai dari proses desain sampai dengan proses pengadaan material, serta prosedur prosedur ekstern yang harus dipertimbangkan. Aktivitas-aktivitas tersebut dibuat dalam sequence aktivitas, untuk kemudian direview dan dianalisa apakah ada kemungkinan untuk memperbaiki performance sistem-prosedur dari segi waktu. Sebagai dasar analisa, dilakukan pengambilan data waktu durasi dari masing-masing aktivitas pada proyek masa lalu yang pernah dikerjakan oleh PT X.
Dari data durasi tersebut akan diperoleh waktu optimis, most likely dan pesimis, sehingga dapat dihitung waktu yang dapat diharapkan (te) dan variansinya (6te2) yang menunjukkan performance dari suatu aktivitas.
Setelah dilakukan analisa CPM pada sequence operasi proses pengadaan material tersebut dan dibandingkan dengan jadwal delivery kebutuhan material yang harus dipenuhi (yang diperoleh dari analisa CPM proses fabrikasi), maka akan didapaikan kemungkinan reduksi waktu delivery material yang dapat diharapkan dan probabilitasnya.
Dari metode analisa yang digunakan diatas, juga menunjukkan bahwa sequence operasi/aktivitas dari proses desain dan pengadaan material harus dipertimbangkan dalam setiap penjadwalan suatu proyek Kemudian, dari hasil pembahasan, juga diperlukan langkah pengendalian dalam proses issuing material, seperti penentuan personil yang setara dalam hal tanggung jawab atas pengendalian inventory, dan perlunya penyediaan fasilitas mesin potong di gudang, baik yang ada di pabrik maupun di site. Dan juga diperlukan suatu sistem pengkodean dan informasi material yang merupakan sarana agar langkah pengendalian material dapat dilakukan secara maksimal.

ABSTRACT
The system of manufacture of PT. X with job order characteristic and product variation, wherein scopes of supply include design process, have the problem about material delivery and loosing in cost of material.The system of manufacture of PT. X with job order characteristic and product variation, wherein scopes of supply include design process, have the problem about material delivery and loosing in cost of material.
Because process of material procurement to be done based on the procedure operation system, so review and analyze of the procedure are required. In the analysis, however, it is necessary to use the measure for quantifying performance of the system. Therefore, the analysis to be done with approach to PERT (Program Evaluation and Review Technique) method. By this method, activities which are included in the all procedure system (and the extern procedure relating to) were translated in the activity sequence, thereafter can be found the critical activities by the Critical Path Method (CPM). All critical activities will be identified as the priority activities in the control of material delivery.
In the analysis, identification of activities of operation procedure is the first steps have to do. Beginning from design process to material procurement process, include the extern procedure which has to be considered. Thereafter, all activities to be transferred in the activity sequence to be reviewed and analyzed. As the basis of analyst, duration times of every activity are taken form previous projects had to be executed by PT. X.
Three time estimates such as optimistic, most likely, and pessimistic times will be obtained from those data, so can be calculated the expected elapsed time (te) and variance (te2) to indicate performance of an activity.
By the CPM analysis of the operation sequence of material procurement process, and comparing to delivery schedule of material requirement (to be found from CPM analysis of fabrication process), then can be obtained the result which make possible to reduce expected elapsed times of material delivery and their probabilities.
On the basis of the above analyze method, also shows that operation or activity sequence from design stage to material procurement process have to be considered in the scheduling of the project. In addition, discussion of issuing material process declares that it is necessary to control their implementation, such as assignment of appropriate personnel connection with responsible of inventory control, and it is important to provide cutting machine facility at warehouse, as well as both at factory and project site. And, in order to material control can be done in maximal manner, PT. 'X should applicate the material coding and information system.
"
Depok: Fakultas Teknik Universitas Indonesia, 1994
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Jon Spardi
Depok: Fakultas Teknik Universitas Indonesia, 1991
S35410
UI - Skripsi Membership  Universitas Indonesia Library
cover
Sianipar, Budhi Rinaldi
"Ketersediaan bahan baku merupakan suatu keharusan bagi sebuah perusahaan agar proses produksi dapat betjalan dengan lancar sesuai dengan perencanaan perusahaan. Untuk menjaga ketersediaan bahan baku. dibutubkan suatu proses pengadaan bahan baku yang optimal, yang dapat dicapai dengan cara menerapkan suatu alur kegiatan pengadaan bahan balm yang efektif, efisien, serta terstruktur dengan baik. Peraneangan alur kegiatan pengadaan bahan baku yang optimal sebaiknya didukung oleh beberapa komponen seperti adanya pengkodean bahan baku, perbitungan tingkat aman persediaan bahan baku, perhitungan jumlah.

According to the company's production planning, material availability is a must to maintain the process of production. Therefore, a company needs an optimum material provisions process, which can be achieved by implementing an effective efficient, and well structured of material provisions workflow. .An optimum materia( provisions workflow should be supported by several important components like the use of material code, minimum stock calculation, material order quantity calculation, and also a computerized Database Management Information System regarding to the material provisions. These components have been confinned to optimize the material provisions process hy decreasing the time."
Depok: Fakultas Teknik Universitas Indonesia, 2003
S50140
UI - Skripsi Membership  Universitas Indonesia Library
cover
Pungkas Raharjo
"PT X merupakan perusahaan yang bergerak dibidang pengemasan fleksibel dirnana sistem keljanya menggunakan sistem job order (pesanan) Produk yang dihasilkan adalah produk kemasan Noodles, Jamu, Agar-agar dan lainnya. Bahan baku yang digunakan adalah bahan balcu lokal dan bahan baku impor (resin)- Bahan baku lokal terdirl dari berbagai jenis film (plastik), paper, tinta, solvent dan bahan baku lolcal kecil seperti tape, double tape, kain lap, sarung tangan dan Iain-lain.
Dalam menyusun skripsi ini penulls melakukan kegiatan pengamatan sistem suplai material dani pemasok ke gudang bahan baku. Kegiatan ini meliputi pengamatan langsnng proses penerimaan bahan di gudang bahan baku, proses pengiriman bahan dari gudang bahan baku ke lini produksi, penyimpanan bahan di glldang bahan baku, sarana dan prasarana yang `mendukLmg, proses administrasi penerimaan dan pengiriman bahan serta kegiatan di lini produksi. Masalahnya dibaiasi hmya umuk bahan baku lokal.
Proses penglriman material dilakukan dari Pemasok ke Gudang Bahan Baku PT X. Di tempat ini bahan baku tersebut diturnpuk sementara untuk pengambilan berikutnya dengan menggunakan sistem LIFO (Last in First Out) dan ke lini produksi yang membutuhkarmya. Kegatan arus material yang terjadi saat ini banyak kelemahannya seperti pemborosan dalam hal waktu kerja, banyaknya bahan yang terbuang akibat rnengalami kerusakan dalam produksi, tempat penyimpanan, biaya penyimpanan akibat barang banyak yang rusak, dan sering tezjadinya kesalahan perhitungan jumlah bahan yang ada di gudang bahan baku tersebut.
Usaha yang dilakukan untuk mengumngi kelemahan-kelemahan itu adalah membuat suatu rancangan sistem kanban pemasok dengan pendekatan just in time Rancanan ini meliputi rancangan sistem kanban dengan menggunakan kanban pemasok dan sarana-sarana yang mendukungnya seperti palet, rak penyimpanan, dan kelancaran arus infomrasi antar karyawan dan antara PT X dengan pihak pemasok dan alat transportasi yang memadai. Hasil yang diharapkan adalah menyediakan bahan pada Saat yang tepat ketika dibutuhlcan dan dalam jumlah yang sesuai dengan kebutuhan balk untuk bahan 1ol"
Depok: Fakultas Teknik Universitas Indonesia, 1996
S36663
UI - Skripsi Membership  Universitas Indonesia Library
cover
Nur Yunisyah R.
"Peningkatan efektifitas dan efisiensi pada suatu sistem adalah suatu hal yang mutlak harus terus diupayakan agar perusahaan dapat bertahan dan memenangkan persaingan bisnis yang semakin ketat. Salah satu cara peningkatan ini adalah dengan mengevaluasi proses yang terjadi pada sistem saat ini dan merancang sistem yang lebih baik.
Kantor pusat PT CCBI (Coca Cola Bottling Indonesia) menerapkan metode Material Requirements Planning (MRP) untuk melakukan perencanaan pemesanan material agar kebutuhan material bagi masing-masing operation yang dimiliki perusahaan terpenuhi. Tetapi sistem informasi manajemen untuk metode tersebut masih bersifat semi manual sehingga proses yang dilakukan membutuhkan waktu yang lama serta tingkat kesalahan yang lebih tinggi. Kedua hal ini memungkinkan terjadinya perencanaan pemesanan material yang kurang akurat.
Untuk itu dilakukan pemetaan proses untuk mengetahui secara rinci sistem informasi manajemen (seluruh komponen yang terkait untuk membuat keputusan) untuk MRP ini dan hasilnya dianalisis sehingga dapat diketahui hal-hal apa saja yang masih kurang efektif dan efisien pada sistem ini. Setelah itu maka dilakukan perancangan ulang sehingga didapatkan suatu sistem yang memungkinkan penemuan perencanaan pemesanan material menjadi lebih akurat (efektif) dan waktu pengerjaan menjadi lebih cepat (efsien).

Improvement of effectivity and efficiency in a system is something that absolutely have to always be endeavored so that the company could exist and win in business competition. One way to do this improvement is to evaluate processes in the existing system and design a better system.
National Office PT CCBI use Material Requirements Planning (MRP) method to plan material ordering so that material requirements for each operation of the company could be fulfilled. However, the management information system for this method is still semi manual so that there is much time needed to do process in the system and the error possibility is higher. These both factors may cause less accuracy of the material order planning.
To solve the problem above a process mapping to get the detail of the management information system (all of the components involved to making decision) of this MRP is developed and analysed so that ineffective and inefficient process in this system could be known. After that, a redesign is developed to create a system that could make the material order planning more accurate (effective) and the processing time could be faster (efficient).
"
Depok: Fakultas Teknik Universitas Indonesia, 2003
S50110
UI - Skripsi Membership  Universitas Indonesia Library
cover
<<   1 2 3 4 5 6 7 8 9 10   >>