Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 100225 dokumen yang sesuai dengan query
cover
Huyon Syef
Depok: Fakultas Teknik Universitas Indonesia, 1993
S48747
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ferry
Depok: Fakultas Teknik Universitas Indonesia, 1994
S36337
UI - Skripsi Membership  Universitas Indonesia Library
cover
Satrio Wicaksono Prakoso
"Penelitian ini bertujuan untuk merancang sistem informasi pencatatan aset dan inventaris di Badan Layanan Umum Daerah (BLUD) DKI Jakarta. Studi ini didasarkan pada temuan dari Laporan Pemeriksaan (LHP) yang dikeluarkan oleh Badan Pemeriksa Keuangan Republik Indonesia (BPK RI) yang menyatakan bahwa ada beberapa masalah mengenai aset di BLUD (BPK RI, 2017). Penelitian ini diharapkan dapat menjawab pertanyaan penelitian mengenai bagaimana merancang sistem aset dan persediaan yang dibutuhkan oleh BLUD untuk membantu proses pengendalian internal dan manajemen aset. Penelitian ini menggunakan Framework for the Application of System Thinking (FAST) sebagai metode untuk pengembangan sistem yang dikembangkan oleh Whitten dan Bentley (2007). Penelitian ini menggunakan pendekatan studi kasus dengan metode triangulasi, di mana data kualitatif sebagai data primer, yaitu dengan melakukan wawancara dan observasi. Unit analisis dalam penelitian ini adalah BLUD yang bertanggung jawab atas manajemen aset. Saat ini, sistem informasi aset yang ada hanya merekam aset tetap dan tidak terhubung ke sistem pelaporan keuangan. Informasi aset dan persediaan harus dipindahkan secara manual dengan memasukkan kembali nilai untuk menyiapkan laporan keuangan. Hasil dari penelitian ini adalah perancangan sistem informasi aset untuk meningkatkan pengendalian internal.

This research aims to design an information system to asset and inventories recording at DKI Jakarta Regional Public Service Agency (BLUD). This study is based on the findings from Examination Report (LHP) issued by the Indonesian Supreme Audit Institution (BPK RI) which states that there are quite a few problems about assets at BLUD (BPK RI, 2017). This research is expected to answer research questions about how to design the system of assets and inventories needed by BLUD to assist the process of internal control and asset management. This study uses the Framework for the Application of Systems Thinking (FAST) as a method for systems development popularized by Whitten and Bentley (2007). This study uses a case study approach with the triangulation method, where the qualitative data as primary data by conducting interviews and observations. Unit of analysis in this study is the BLUD responsible for asset management. Currently, the existing asset information systems only record fixed assets and not connected to the financial reporting system. Assets and inventories information need to move manually by re- inputting the value to prepare financial statements. The result of this research is a design of asset information system to enhance internal control. "
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2019
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Bayu Purbahana
"PT MCE Seimitsu Indonesia adalah sebuah perusahaan PMA yang bergerak di bidang sheet metal stamping press. Perusahaan ini merupakan sub kontraktor dari PT. Daihwa yang melakukan perakitan untuk Pioneer Electronics Asia Centre Pte, Ltd. di Singapura. Produk hasil rakitannya bempa peranglcat elektronik seperti amplifier, walkman dan sebagainya. Aktivitas produksi pada PT. MCE berdasarkan job or-der dari PT. Daihwa. PT. Daihwa melakukan pernesanan barang setengah jadi kepada PT. MCE 1 bulan sebelum perakitan dilaksanakan, dimana beberapa bulan sebelumnya telah memberikan perkiraan jumlah pesanan (forecast) sebagai dasar pemesanan bahan baku. Seluruh pesanan dari pihak pelanggan terscbut dipasok oleh PT. MCE secara bertahap disesuaikan dengan tanggal pengiriman yang telah ditentukan. Proses pengendalian persediaan bahan baku pada PT. MCE dilakukan secara manual. Perhitungan kebutuhan bahan baku dilakukan berdasarkan perkiraan jumlah pesanan yang diberikan oleh pelanggan. Perkiraan jumlah pesanan yang diberikan tersebut seringkali meleset dari pesanan aktual yang diketahui dari Purchase Order (P/O) yang diterima, sehingga fluiduasi kebutuhan bahan baku sulit dikendalikan. Berdasarkan hal diatas, dirancang suatu sistem pengendalian persediaan bahan baku yang dapat menganlisipasi fluktuasi besamya pesanan aktual terhadap perkiraan jurnlah pesanan sehingga pengendalian persediaan bahan baku dapat terencana dengan baik. Langkah pertama dilakukan penentuan besarnya pemesanan bahan baku yaitu sebesar 60% dari perkiraan jumlah pesanan untuk kebutuhan 1% bulan ke depan dan kebutuhan aktual untuk 1 bulan ke depan berdasarkan kekurangan atau kelebihan bahan baku yang telah dipesan 1 bulan sebelumnya. Kemudian disusun suatu program aplikasi yang dapat mendukung sistem baru tersebut agar lebih efisien dan akurat dalam menyediakan informasi dan pengambilan keputusan untuk pengendalian persediaan bahan baku."
Depok: Fakultas Teknik Universitas Indonesia, 2002
S37265
UI - Skripsi Membership  Universitas Indonesia Library
cover
Milky Umar
"Pengendalian persediaan pada suatu perusahaan merupakan suatu hal yang penting karena persediaan adalah suatu asset yang memiliki nilai cukup tinggi dalam suatu perusahaan. Penelitian ini adalah untuk memperoleh model persediaan material MRO dalam upaya penurunan biaya persediaan menggunakan sistem Min-Max. Agar perhitungan menjadi lebih komprehensif, dilakukan pemilihan material yang dijadikan sebagai objek penelitian dengan menggunakan klasifikasi ABC dan kriteria fast moving dan menghasilkan 23 material yang terpilih.
Peramalan juga dilakukan kepada setiap material dengan melihat pola permintaan dari material itu sendiri, metode peramalan Croston diperuntukkan bagi permintaan yang berpola lumpy /intermittent, sedangkan Single Exponential Smoothing untuk permintaan yang berpola regular.
Hasil dari penelitian ini adalah jumlah pesan ekonomis (Q*), titik pemesanan kembali (Min*), persediaan pengaman (SS), serta tingkat persediaan maksimum (Max*). Dari perhitungan penelitian dengan menggunakan sistem Min-Max dan dibandingkan dengan sistem Min-Max eksisting, diperoleh hasil optimalisasi biaya persediaan dalam setahun sebesar 41%.

Inventory control in companies is an important thing because inventory is an asset that has a high value for companies. This studys objective is to obtain MRO material inventory model in order to decrease inventory cost using Min-Max system. In order for the calculation to be more comprehensive, The selection materials for the object of the research are 23 materials that selected based on the ABC Classification and the fast moving criteria.
Forecasting is applied for each material by looking at the demand pattern of the material itself, Crostons forecasting method is used for lumpy / intermittent patterned demand, while Single Exponential Smoothing for regular patterned demand.
The results of this study are the number of economic order quantity (Q *), reorder point (Min *), safety stock (SS), maximum inventory levels (Max*). From the calculation of research by using Min-Max system and compared with existing Min-Max system, obtained the result of the optimization of inventory cost in yearly by 41%.
"
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2017
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Muhammad Yunus
"Pada teknologi penyimpanan basah, bahan bakar nuklir bekas disimpan di rak penyimpanan yang ditempatkan di dalam kolam air. Untuk mempertahankan temperatur air kolam agar berada pada batas kondisi operasi normal, panas yang dihasilkan akibat sisa peluruhan bahan bakar akan didinginkan oleh sistem pendingin. Pada penelitian ini akan dilakukan upaya penghematan energi pada sistem pendingin kolam bahan bakar bekas khususnya pada sistem chiller. Tujuan dari penelitian ini adalah mengembangkan desain Heat pipe Heat Exchanger (HPHE) pada sistem refrigerasi yang digunakan pada sistem pendingin loop sekunder. Dengan menggunakan sistem refrigerasi yang dilengkapi HPHE ini diharapkan dapat meningkatkan efektifitas dan penghematan penggunaan energi. Prototipe HPHE yang dikembangkan terdiri 5 buah heat pipe yang disusun sejajar dan dipasang diantara evaporator dan kompresor. Untuk melihat pengaruh HPHE terhadap performa sistem, maka dilakukan pengujian sistem refrigerasi dengan dan tanpa HPHE dan variasi beban kalor pada evaporator dengan variasi temperatur awal air 35 °C, 40 °C, 45 °C, 50 °C, dan 55 °C. Proses pengujian dilakukan selama 30 menit dengan daya penuh. Dari hasil pengujian diperoleh bahwa seiring dengan peningkatan variasi temperatur air, sistem refrigerasi mengalami penurunan kerja kompresor, peningkatan efek pendinginan, serta kenaikan coefficient of performance (COP). Penggunaan HPHE pada sistem refrigerasi terbukti mampu meningkatkan performa sistem dengan kerja kompresor yang semakin menurun, serta efek pendingin dan nilai COP yang semakin meningkat. Hasil optimal diperoleh pada variasi temperatur awal 55 °C dengan nilai kerja kompresor 48,1 kJ/kg, efek pendinginan 282,03 kJ/kg, dan COP 5,9. Resistansi termal HPHE semakin menurun seiring dengan kenaikan variasi temperatur air dengan nilai resitansi terbaik yaitu 0,37 °C/W. Dengan demikian, HPHE sangat potensial untuk diterapkan di sistem refrigerasi termasuk pada sistem pendingin kolam bahan bakar nuklir bekas demi meningkatkan efisiensi pendinginan dan menurunkan konsumsi listrik.

In wet storage technology, spent fuel is stored on storage racks placed within a water pool. To maintain the water pool temperature within the limits of normal operating conditions, the heat generated due to the residual decay of the spent fuel will be cooled by the cooling system. This study aims to implement energy-saving in the chiller system of the spent fuel pool cooling system, particularly focusing on the chiller system. The objective of this research is to develop a Heat Pipe Heat Exchanger (HPHE) design for the refrigeration system used in the secondary loop of the cooling system. By incorporating the HPHE in the refrigeration system, it is expected to enhance efficiency and energy conservation. The developed prototype of the HPHE consists of five parallelly arranged heat pipes installed between the evaporator and the compressor. To assess the impact of the HPHE on the system's performance, refrigeration system testing is conducted with and without the HPHE, considering variations in heat load on the evaporator with variation of initial water temperatures of 35 °C, 40 °C, 45 °C, 50 °C, and 55 °C. The testing process is carried out over 30 minutes at full power. Results from the testing indicate that with an increase in water temperature variations, The refrigeration system undergoes a reduction in compressor work, an enhancement in cooling efficiency, and an increase in the coefficient of performance (COP). The utilization of HPHE in the refrigeration system proves more effective in enhancing system performance, with a decreasing compressor work, an increasing cooling effect, and an elevated COP. The optimal results were obtained at an initial temperature variation of 55 °C, yielding a compressor work value of 48.1 kJ/kg, a cooling effect of 282.03 kJ/kg, and a COP of 5.9. The thermal resistance of the HPHE decreases with an increase in water temperature variation, with the best resistance value being 0.37 °C/W. Therefore, HPHE demonstrates significant potential for application in refrigeration systems, including those used in the cooling of spent fuel pools, to improve cooling efficiency and reduce electrical consumption."
Depok: Fakultas Teknik Universitas Indonesia, 2024
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Hutahean, Frans Ondo
"Pelayanan jasa pemeliharaan kendaraan bermotor sangat erat hubungannya dengan kepuasan pelanggannya, oleh karena itu salah satu indikator untuk memuaskan pelanggan yaitu dengan ketersediaan barang yasng dibutuhkan.
Perusahaan perlu melakukan metode pengontrolan dalam segala bidang agar dapat memenuhi setiap permintaan konsumen. Penelitian ini mencoba untuk menggunakan ilmu manajemen persediaan maka tingkat fluktuasi permintaan dapat di antisipasi, sehingga dapat mencegah terjadinya kekurangan persediaan dan kelebihan persediaan. Untuk menghindari kejadian tersebut maka dibuat tingkatan persediaan yang akurat supaya tidak terjadi kelebihan atau kekurangan persediaan, dengan menggunakan metode Maximum Level Inventory.
Metode ini digunakan untuk menentukan jumlah pesanan yang dapat meminimumkan total biaya persediaan serta pembelian yang optimal dan untuk mencari total persediaan yang tetap untuk dibeli dalam setiap kali pembelian untuk menutup kebutuhan selama satu periode.
Model Persediaan dengan target level inventory (maximum level inventory) adalah lebih baik dengan model persediaan saat ini, dimana model persediaan dengan target level inventory (maximum level inventory), dapat melakukan penghematan sebesar Rp 26,217,000. Pada depalan periode penelitian (I Juli sampai IV Agustus 2009).

Maintenance services of motor vehicles is closely related to customer satisfaction, therefore, an indicator for customer satisfaction with the availability of necessary goods. Companies need to control methods in all fields to meet any consumer demand.
This study tries to use the science of inventory management is the level of fluctuations in demand can be anticipated, thus preventing supply shortages and excess inventory.
To avoid the incident made an accurate inventory levels to avoid excess or shortage of supply, using the method of Maximum Inventory Level. This method is used to determine the number of orders that may minimize total inventory costs and optimal purchases and to look for a fixed total supplies to be purchased in each purchase to cover the need for an period.
Target Level Inventory method better than current condition, where Target Level Inventory method can reduceimg amount Rp. 26,217,000,- in eight periode research (I July to IV Augst 2009).
"
Depok: Fakultas Teknik Universitas Indonesia, 2009
S52004
UI - Skripsi Open  Universitas Indonesia Library
cover
M. Yanuar P.
"ABSTRAK
PD. JB adalah perusahaan home industri pengolahan kayu yang membuat peti pengepakan dan palet dengan menggunakan mesin-mesin modem. Produk yang dihasilkan ini berdasarkan pesanan konsumen yang digunakan untuk mendukung produksi maupun untuk mengirim barang_ Pelanggan utama PD. JB adalah PT. Toyota Astra Motor (peti pengepakan untuk pengiriman eksport CKD komponen mobiI).
Dalam menjalankan usahanya PD. .TB masih dikelola secara tradisional sebagai suatu usaha sampingan Namun seiring dengan naiknya nilai lukar dolar yang menyebabkan meningkamya ekspor yang dilakukan pelanggan, permintaan pun bertambah. Perusahaan mulai tumbuh dan mempunyai prospek yang menjanjikan.
Dipihak lain, perusahaan mengalami kesulitan dalam mengelola permintaan, akibatnya sering teujadi keterlambatan dalam pengiriman karena masalah produksi dan bahan baku.
Tulisan skripsi ini adalah merancang suatu konsep sistem perencanaan dan pengendalian produksi dan persediaan (PPIC) berdasarkan pendekatan integrasi MRP II dan JIT dengan mengambil contoh kasus pada produksi bulan Agustus |999 di PD. JB.
Untuk itu dikumpulkan dan diolah data yang diperlukan. Merancang konsep langkah-langkah pelaksanaan perencanaan dan pengendalian produksi dan persediaan.
Kemudian menganalisa dan menerapkan sistem PPIC pada kondisi produksi bulan Agustus 1999. Diharapkan dapat menjadi pola PPIC untuk mengatasi masalah dan memberikan umpan balik untuk perbaikan kuakitas, biaya dan pengiriman (QCD)"
2000
S49912
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ufiyyu Fakkur
"ABSTRAK
Skripsi ini membahas tentang pengendalian persediaan logistik menggunakan analisis ABC, EOQ, ROP, Max-Min, dan Kanban. Tujuan penelitan ini adalah Memperoleh gambaran pengendalian persediaan logistik umum pada tahap perencanaan dan penyimpanan di RSIA SamMarie Basra tahun 2015. Disain penelitian ini adalah deskriptif operational research. Penelitian dilakukan dengan wawancara mendalam, observasi, dan telaah dokumen.
Hasil penelitian menunjukkan pengendalian persediaan logistik umum di RSIA SamMarie Basra belum didukung SPO dengan penghitungan perencanaan menggunakan metode konsumsi. Terdapat perbedaan safety stock dan frekuensi pemesanan antara sebelum dan sesudah analisis. Hasil analisis dan rancangan kartu Kanban dapat digunakan dalam pengendalian persediaan logistik di RSIA SamMarie Basra.

ABSTRACT
This study discuss about logistics inventory control using ABC analysis, EOQ, ROP, Max-Min and Kanban. The purpose of this research is an overview acquire general logistics inventory control at the planning and storage stage in RSIA SamMarie Basra in 2015. The design of this research is descriptive operational research. The study was conducted by in-depth interviews, observation, and document analysis.
The results showed a general logistics inventory control in RSIA SamMarie Basra has not been supported by SPO. Quantification of logistic planning has been using consumption method. There are differences in safety stock and order frequency between before and after analysis. Results of the analysis and design of Kanban cards can be used in inventory control logistics in RSIA SamMarie Basra.
"
Depok: Universitas Indonesia, 2015
S62564
UI - Skripsi Membership  Universitas Indonesia Library
cover
Pantas Marihot Lawrentsius
"ABSTRAK
Skripsi ini membahas mengenai manajemen persediaan material untuk memproduksi mobil merek X tipe 1 di PT XYZ dengan pendekatan System Dynamics. Penelitian ini disusun dengan rancangan studi kasus untuk menerapkan model Janamanchi (2011). Tujuan dari penelitian ini adalah menganalisis manajemen persediaan material yang dapat mengurangi biaya penyimpanan dan backlog dalam dua skenario, yaitu permintaan fluktuatif dengan tren naik dan tren turun. Penelitian ini menemukan bahwa pengurangan biaya penyimpanan dan backlog dapat dicapai dengan mengubah safety stock coverage dan lead time pengiriman. Safety stock coverage dapat diubah ke tingkat terendah yang dapat perusahaan terapkan. Sedangkan lead time pengiriman material bergantung dengan kondisi permintaan.

ABSTRACT
This study discusses the materials inventory management to produce automobile brand X type 1 in PT XYZ with System Dynamics approach. This study was conducted with case study design to apply Janamanchi (2011) model. The purpose of this study is to analyze the materials inventory management to reduce holding cost and backlog in two scenarios, which is demand fluctuates with upward trend and downward trend. This study found that the holding cost and backlog reduction can be achieved by changing the safety stock coverage and lead time delivery of materials. Safety stock coverage can be changed to the lowest level that company can apply, while lead time delivery of materials depend on the demand conditions.;"
2016
S65739
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>