Ditemukan 115307 dokumen yang sesuai dengan query
Ilma Fathnurfirda
"Industri film Indonesia mengalami penurunan perolehan jumlah penonton yang cukup signifikan pada tahun 2011. Akibatnya film Indonesia mengalami kesulitan untuk bersaing dengan film impor. Untuk mengatasinya diperlukan suatu strategi industri yang tepat. Analisis SWOT merupakan metoda untuk mendapatkan strategi bedasarkan kekuatan, kelemahan, peluang dan ancaman yang ada pada suatu industri. Kemudian dilakukan pembobotan terhadap strategi yang dihasilkan dengan analisis SWOT menggunakan Proses Analisis Hirarki (AHP). Hasilnya, strategi diprioritaskan untuk dapat mengatasi permasalahan industri film Indonesia adalah alternatif strategi Strength-Opportunities.
Indonesian film industry has decreased the acquisition of a significant number of moviegoers in 2011. As a result, the film Indonesia has struggled to compete against imported films. The purpose this study is to solve the problem by a proper industrial strategy. SWOT analysis is a method to get the strategy based on the strengths, weaknesses, opportunities and threats that exist in the industry. Then, we do the weighting of the strategy produced by the SWOT analysis using the Analysis Hierarchy Process (AHP). The results, strategies that is prioritized to address the problems of the Indonesian film industry is an alternative strategy of Strength-Opportunities."
Depok: Fakultas Teknik Universitas Indonesia, 2012
T30864
UI - Tesis Open Universitas Indonesia Library
Andi Budiansyah
"Skripsi ini membahas tentang cara membobotkan indikator modal intelektual dan menentukan peringkat Modal Intelektual di Sentra Industri di Kota Bandung dengan elemen Modal Manusia, Modal Struktural dan Modal Relasional dengan Metode Entropy dan TOPSIS. Penelitian ini bertujuan untuk memetakan modal intelektual yang ada di sentra industri kreatif di kota bandung sebagai salah satu masukan untuk pengembangan sentra industri selanjutnya. Hasil penelitiannya adalah setiap sentra industri mempunyai kelebihan dan kelemahan di setiap elemen Modal intelektual sehingga pemerintah harus dapat membantu untuk meningkatkan sentra industri di kota bandung tersebut.
This thesis discusses how to count heavily on indicators of intellectual capital and to rank the Intellectual Capital in Industrial Center in Bandung, with the elements consist of Human Capital, Structural Capital and Relational Capital with Entropy and TOPSIS method. This research’s objective is to map the intellectual capital that is in the center of the creative industries in Bandung, as one of the inputs for the development of further industrial district. The results of this research are that any industrial centers have strengths and weaknesses in each intellectual capital elements that the government should help them to improve the industrial centers in the city of Bandung."
Depok: Fakultas Teknik Universitas Indonesia, 2013
S44426
UI - Skripsi Membership Universitas Indonesia Library
Novandra Rhezza Pratama
"Pengambilan keputusan dalam proyek adalah suatu usaha yang kompleks. Proyek adalah organisasi sementara yang dikelilingi oleh ketidakpastian yang melekat. Ketidakpastian yang dapat terjadi dalam proyek antara lain ketidakpastian waktu,biaya, dan kualitas. Untuk mengatasi berbagai kompleksitas tersebut, maka diperlukan suatu evaluasi kinerja proyek. Pada salah satu perusahaan jasa pertambangan minyak dan gas di Indonesia,evaluasi kinerja telah dilakukan, namun dilakukan secara terpisah dan hanya sedikit kriteria yang dievaluasi, sehingga kinerja proyek secara keseluruhan masih belum terlihat. Untuk itu perlu dilakukan evaluasi kinerja pada proyek perusahaan tersebut dengan pendekatan MCDA (Multi-criteria decision analysis) dengan menggunakan metode MACBETH yang dapat memodelkan elemen proyek menjadi suatu kelompok tingkat pengawasan untuk memudahkan pengambilan keputusan oleh manajer proyek.
Decision-making in a project is a complex undertaking. A project is a temporary organization that is surrounded by inherent uncertainties. Uncertainties that may occur in the project, among others, are the uncertainty of the time, cost, and quality. To overcome this complexity, we need a project performance evaluation. At one of the services the oil and gas in Indonesia, the performance evaluation has been done, but done separately and only few criteria are evaluated, so that the overall project performance is still not visible. Therefore it is necessary to evaluate the performance of the company's project with the MCDA (Multi-criteria decision analysis) approach using MACBETH method that can model the elements of the project into a supervisory level group to facilitate decision-making by the project manager."
Depok: Fakultas Teknik Universitas Indonesia, 2013
S45954
UI - Skripsi Membership Universitas Indonesia Library
Monica Debbigrisyafti
"Manajemen risiko berperan penting dalam meningkatkan ketahanan suatu organisasi untuk mengatasi risiko yang teridentifikasi. Peningkatan urbanisasi global, kebutuhan keamanan, serta permintaan produk ramah lingkungan yang melatarbelakangi pertumbuhan industri lift tentunya tidak terlepas dari risiko. Namun, pada industri lift belum banyak ditemukan penelitian mengenai penilaian risiko khususnya pada bidang instalasi lift. Penelitian ini bertujuan untuk membuat analisis penilaian risiko pada proses isntaalasi lift yang selanjutnya dapat dijadikan sebagai acuan dalam memitigasi risiko. Penilaian expert digunakan untuk menghasilkan bobot kepentingan prioritas job step dan task pada instalasi lift. Risiko paling tinggi yaitu job step 10 dan risiko paling rendah yaitu job step 1.
Risk management has been known as a discipline that plays an important role in improving the resilience of an organization to address the risks identified. As the increasing of global urbanization, security needs, and the demand for environmental friendly products, has been underlying the growth of the elevator industry, thus can not be separated from the risks. However, in the elevator industry has not found much research on risk assessment, especially in the field of elevator installation. This study aims to make a risk assessment analysis on the elevator installation process which then used as a reference in mitigating risk. Expert judgement being used to generate the priority weight of each job step and task on the elevator installation. The result are job step 10 has the highest risk and job step 1 has the lowest risk."
Depok: Fakultas Teknik Universitas Indonesia, 2017
T47835
UI - Tesis Membership Universitas Indonesia Library
Ari Nugroho
"Pertumbuhan industri berdampak terhadap peningkatan kebutuhan listrik di berbagai tempat, hal ini juga terjadi di Provinsi Kalimantan Barat, khususnya di Kabupaten Bengkayang. Sebagian pasokan listrik di Bengkayang masih tergantung dari pembangkit listrik yang diperoleh dari Sarawak, yaitu salah satu negara bagian Malaysia yang berbatasan dengan Kalimantan. Maka dari itu, untuk mengurangi ketergantungan listrik, perlu dibangun suatu Pembangkit Listrik Tenaga Nuklir (PLTN). Pertimbangan penggunaan teknologi PLTN diantaranya didasari karena faktor kemampuannya dalam menghasilkan listrik dengan skala yang besar, mengurangi pemakaian energi fosil, dan juga mengurangi emisi karbondioksida sebagai hasil dari proses pembangkitannya. Namun demikian, untuk membangun suatu PLTN, diperlukan tapak yang memenuhi aspek kelayakan (feasibility) dan keandalan (reliability). Pada penelitian ini dilakukan penilaian untuk menentukan satu tapak PLTN yang merupakan hasil penilaian dari beberapa lokasi tapak PLTN di Kabupaten Bengkayang. Metode yang digunakan dalam penelitian ini adalah Multi Criteria Decision Analisis (MCDA) yang digunakan pada platform Sistem Informasi Geografi (SIG) dan Analytical Hierarchi Process (AHP). Tahap pertama analisis dengan SIG diperoleh 3 lokasi tapak (candidate sites) PLTN, sedangkan tahap kedua dengan menggunakan analisis AHP diperoleh 1 tapak (selected site). Selected site untuk tapak PLTN di Kabupaten Bengkayang terletak di Batu Belah di Desa Karimunting.
Industrial growth has an impact on increasing the electricity demands in various places, this has also taken place in West Kalimantan Province, especially in Bengkayang Regency. Some electricity supplies in Bengkayang mainly depend on the power plant that is imported from Sarawak, which is one of the Malaysian states. Therefore, to reduce dependence on electricity, it is necessary to build a Nuclear Power Plant (NPP). Some of considerations for utilizing a nuclear power plant technology are based on its advantages factors such as the capability of generating electricity on a large scale, reducing the use of fossil energy, as well as reducing carbon dioxide emissions as a result of the generation process. However, to build a nuclear power plant requires a thorough assessment to meets the feasibility and reliability requirements. This study was carried out to determine one selected NPP site out of three NPP candidates sites located in Bengkayang Regency. The method used in this study is Multi Criteria Decision Analysis (MCDA) under the Geographic Information System (GIS) platform and Analytical Hierarchy Process (AHP). The first step analysis using GIS resulted 3 candidate sites, while the second step by means of applying AHP analysis resulted 1 selected site. The selected site for NPP in Bengkayang Regency is located at Batu Belah in Karimunting Village."
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership Universitas Indonesia Library
San Cristobal Mateo, Jose Ramon
"Decision making in the renewable energy industry involves an increasingly complex constellation of factors and a growing range of input. This volume shows how multi-criteria techniques provide decision makers with a valuable and inclusive methodology."
London: Springer, 2012
e20397687
eBooks Universitas Indonesia Library
Nabila Mardhatillah
"Dalam meningkatkan kinerja produk baru, perusahaan perlu memutuskan langkah strategis di luar kegiatan operasional sehari-hari. Di sisi lain, pengambilan keputusan strategi tersebut dipengaruhi oleh banyak faktor, baik secara internal maupun eksternal. Penelitian ini mengambil studi kasus perusahaan telekomunikasi untuk menganalisis faktor-faktor apa saja yang mempengaruhi beserta bobot pengaruhnya dengan metode SWOT-AHP. Selanjutnya, bobot tersebut akan digunakan dalam analisis QSPM untuk mengurutkan prioritas strategi yang diusulkan. Penelitian ini menunjukan bahwa strategi "Melakukan promosi dengan pihak eksternal" dan "Melakukan promosi dan edukasi untuk menarik pelanggan baru" merupakan strategi yang paling tepat untuk dijalankan.
In order to improve new product performance, a company must decide on strategic activities asides from daily activities. On the other side, strategy selection is affected by many factors, both coming from internal and external. This research was conducted at telecommunication company to determine what factors affecting the strategy selection and their weights using SWOT-AHP. Afterwards, those weights would be used in QSPM analysis to prioritize proposed strategy alternatives. This research showcased that "Establishing partnership with external parties" and "Triggering promotion and education in order to attract new customers" are the most preferred strategies."
Depok: Fakultas Teknik Universitas Indonesia, 2016
S63031
UI - Skripsi Membership Universitas Indonesia Library
"The aim of this article was to develop an interval type-2 fuzzy permutation method for addressing multiple criteria decision-making problems under incomplete preference information. Furthermore, this article present an experimental analysis to examine the implementation efficiency and the applicable scope of the proposed method. Interval type-2 fuzzy sets are more capable than ordinary fuzzy sets of handling imprecision and imperfect information in real-world applications. This article used interval type-2 fuzzy sets to capture imprecise or uncertain decision information in fields that require multiple criteria decision analysis. Based on pairwise criterion comparisons of the alternatives using a signed distance-based approach, this article presents a concordance-discordance analysis and propose an integrated programing model in the interval type-2 fuzzy permutation method. Finally, computational experiments with enormous amounts of simulation data are designed to examine the influence of numbers of alternatives and criteria on the implementation efficiency and the applicable scope of the proposed method. "
JIPE 32:5 (2015)
Artikel Jurnal Universitas Indonesia Library
"Memilih produk asuransi membutuhkan proses pengambilan keputusan yang cukup rumit karena melibatkan banyak kriteria seperti brand image perusahaan, besar premi yang harus dibayarkan, kemudahan prosedur klaim, dan lain sebagainya, sebagai bahan pertimbangan dalam prosesnya. Salah satu metode yang sesuai untuk digunakan dalam pengambilan keputusan ini adalah Analytic Hierarchy Process (AHP). Penelitian ini dilakukan untuk mengetahui apakah metode AHP dapat digunakan dalam suatu sistem penunjang keputusan. Untuk mendukung penelitian, dibuat suatu sistem penunjang keputusan yang berisi modul simulasi untuk memilih produk asuransi. Berdasarkan skenario pengujian yang dibuat, diperoleh hasil bahwa solusi yang diberikan oleh sistem cukup akurat dan mendekati kemampuan manusia dalam mengambil keputusan."
Fakultas Ilmu Komputer Universitas Indonesia, 2008
pdf
Artikel Jurnal Universitas Indonesia Library
Luthfi Galang Kharisma
"Upaya memaksimalkan penggunaan komponen dalam negeri dalam industri hulu migas merupakan komitmen untuk mendorong pertumbuhan industri barang dan jasa nasional. Peningkatan tingkat komponen dalam negeri tidak terlepas dari strategi yang digunakan oleh pemerintah dalam mengatur perusahaan migas untuk menggunakan produk dalam negeri. Diperlukan suatu rumusan strategi yang menjadi prioritas dalam usaha peningkatan komponen dalam negeri. Analisis SWOT memberikan suatu bentuk strategi dengan menganalisis pengaruh faktor internal dan eksternal suatu organisasi. Faktor internal berupa kekuatan dan kelemahan, dan faktor eksternal berupa peluang dan ancaman. Kemudian dilakukan pembobotan terhadap strategi yang dihasilkan oleh analisis SWOT dengan menggunakan analytic hierarchy process (AHP). Hasilnya, strategi yang diprioritaskan dalam rangka peningkatan komponen dalam negeri pada industri hulu migas adalah strategi Strength-Opportunities.
Efforts to maximize domestic components in the upstream oil and gas industry is committed to encouraging the growth of national goods and services industries. Increased levels of domestic components can not be separated from the strategies used by the government to regulate oil and gas companies to use domestic products. It requires a strategy formulation is a priority in efforts to increase domestic components. SWOT analysis provides a form of strategies by analyzing internal and external factors influence an organization. Internal factors such as strengths and weaknesses, and external factors such as opportunities and threats. Then be weighted against the strategy produced by a SWOT analysis using the analytic hierarchy process (AHP). As a result, the priority strategy in order to increase the domestic component of the upstream oil and gas industry is Strength- Opportunities strategies"
Depok: Fakultas Teknik Universitas Indonesia, 2013
S44398
UI - Skripsi Membership Universitas Indonesia Library