Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 29 dokumen yang sesuai dengan query
cover
Kuala Lumpur: Didier Millet ltd., 2007
R 759.2 MAL
Buku Referensi  Universitas Indonesia Library
cover
Darling, Diana
Singapore: Archipelago Press, 1999
R 915.986 DAR b
Buku Referensi  Universitas Indonesia Library
cover
Singapore: Editions Didier Millet, 2005
R 759.2 SAR
Buku Referensi  Universitas Indonesia Library
cover
Shaw, K.E.
Singapore: University Education Press, 1973
341.29 SHA s
Buku Teks  Universitas Indonesia Library
cover
Kamsiah M. Bostock
Selangor: Kamsiah Binti Mohammad, 2011
823 KAM m
Buku Teks  Universitas Indonesia Library
cover
Bridges, D.S.
new York: Springer-Verlag, 1994
511.3 BRI c
Buku Teks  Universitas Indonesia Library
cover
Lim, Huck Chin
Malaysia: Lim Huck Chin, 2006
R 302.595 LIM m
Buku Referensi  Universitas Indonesia Library
cover
"Indonesian trading development rapidly shows an improvement with neighbour countries such as Malaysia and Singapore. Even though the transportation infrastructures arround Malacca Straits are currently just provided by boats. For balancing the development trading reasons, Indonesian Government concerns to facilitate the building of transportation infrastructures or a fix-link infrastructure, a crossing bridge between Sumatera island (Indonesia) and Malaysia. Malacca strait Bridge (MSB) between Indonesia and Malaysia is a part of Trans Asia road link, has been planned since years ago. To support the current planning, the research and development Agency - Ministry of Public Works-Republic of Indonesia (Badan Penelitian dan Pengembangan, Kementrian Pekerjaan Umum, Indonesia) needs to make a reviewing on a pre-feasibility study (Pre FS) for MSB. Pre FS activity involved many disciplines of knowledge especially for road/corridor, transportation, bridge, geotechnical, , sea shore, environment, and social-economic-culture-policy. Pre FS result results that break event point for Corridor I among Dumai-P. Rupat-P. Medang Malaysia may be expected between 25 and 30 years based on Benefit Cost Ratio methode, using cable stayed and suspension bridges and girders. The longest span for cable stayed and suspension bridges are 2600 m and 1280 m. respectively. The selected corridior must be intensively discussed about technology absorbed and safety factor, resources capability for maintenance , integration within toll road network, fundation technology in the sea, and users psychology and comfort. Consession for operator may apply for 30 to 40 years."
JUJAJEM
Artikel Jurnal  Universitas Indonesia Library
cover
"The regime of navigations for the straits of Mallaca (and Singapore) would be the regime of "Transit passage" as stipulated in Part III of the 1982 UNCLOS...."
DIPLU 1(1-2)2009
Artikel Jurnal  Universitas Indonesia Library
cover
"As a sea passage, the Malacca straits and Singapore Straits are very important to international shipping because it provides the shortest sea raoute between the Indian Ocean and the Pacific Ocean...."
Artikel Jurnal  Universitas Indonesia Library
<<   1 2 3   >>