Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 84062 dokumen yang sesuai dengan query
cover
"Industri konstruksi memiliki tingkat fragmentasi yang tinggi. Salah satu kemungkinan solusi dalam mengatasinya adalah dengan penerapan konsep konstruksi ramping (lean construction), khususnya
dalam pengelolaan rantai pasok, atau supply chain management. Berbagai studi mengenai kinerja supply chain pada industri manufaktur telah dilakukan, namun pengembangan indikator kinerja supply chain
dalam industri konstruksi masih belum banyak dikenal. Pada makalah ini dibahas pengembangan indikator-indikator sebagai alat bantu untuk mengevaluasi kinerja terkait efektifitas dan efisiensi supply chain pada proyek konstruksi di Indonesia, dalam konteks pencapai
an proses produksi yang lebih ?ramping.? Metoda penyusunan dimulai dengan identifikasi jenis-jenis data yang tipikal tersedia dalam
proyek-proyek konstruksi (kontraktor besar) melalui survey. Studi litera
tur terhadap berbagai indikator yang biasa digunakan dalam sektor manufaktur juga dilakukan untuk kemungkinan proses adopsi maupun adaptasi. Setelah indikator-indikator disusun, dilanjutkan dengan telaah potensi penggunaannya pada proyek konstruksi. Sepuluh indikator diusulkan dan potensi penggunaannya cukup baik, terutama pada perusahaan kontraktor besar. Penggunaan indikator dalam menunjang tercapainya konstruksi ramping ini akan menjadi lebih optimal apabila terdapat beberapa perbaikan kondisi yang diharapkan,
yaitu: pencatatan data mengenai monitoring kedatangan material;pembakuan seluruh formulir yang diperlukan; dan dokumentasi hal-hal yang berhubungan dengan keluhan berbagai pihak yang terlibat dalam pelaksanaan proyek. Hal ini akan bermanfaat dalam upaya perbaikan pencapaian value bukan saja bagi pihak owner namun juga bagi seluruh pihak yang terlibat.

Abstract
The fragmented nature of the construction industry can be alleviated by implementing the concept of ?lean construction,? particularly supply chain mangement. Studies on the performance of supply chains
in manufacturing industry are accessible, however, its adaptation in
developing performance indicators of supply chains in construction industry is much needed. The development of performance indicators
suitable for the construction industry is discussed in this paper. These indicators can be used as tools for evaluating the performance of supply chains in the context of their effectiveness and efficiency during
production process towards lean condition, on Indonesia n construction projects. The attempt to formulate these indicators involved identifying the types of data commonly recorded on typical large construction projects, based on field surveys. The survey was supported with literature study on the indicators used in manufacturing industry for possible adaptation. The potential application of the initial set of indicators were then verified on several construction sites, and resulted in ten indicators recommended for
application on large construction projects. Because most large projects have implemented comprehensive data recording system, these data should optimally be used for analyzing the production process in the efforts to minimize wastes. It is recommended that contractors improve their data recording systems by adding monitoring of material arrivals, formulating standard forms, and documenting customers? complaints. This can benefit a contractor?s efforts in providing the value demanded by the client, but also the satisfactory of and positive cooperation from other stakeholders in the supply chains."
Fakultas Teknik UI, 2008
pdf
Artikel Jurnal  Universitas Indonesia Library
cover
"The fragmented nature of the construction industry can be alleviated by implementing the concept of
"lean construction, " particularly supply chain management. Studies on the performance of supply chains
in manufacturing industry are accessible, however, its adaptation in developing performance indicators
of supply chains in construction industry is much needed. The development of performance indicators
suitable for the construction industry is discussed in this paper. These indicators can be used as tools for
evaluating the performance of supply chains in the context of their efectiveness and efficiency during
production process towards lean condition, on Indonesian construction projects. The attempt to formulate
these indicators involved identifying the types of data commonly recorded on typical large construction
projects, based on _field surveys. The survey was supported with literature study on the indicators used in
manufacturing industry for possible adaptation. The potential application of the initial set of indicators
were then verified on several construction sites, and resulted in ten indicators recommended for
application on large construction projects. Because most large projects have implemented comprehensive
data recording system, these data should optimally be used for analyzing the production process in the
efforts to minimize wastes. It is recommended that contractors improve their data recording systems by
adding monitoring of material arrivals, formulating standard forms, and documenting customers'
complaints. This can benefit a contractor efforts in providing the value demanded by the client, but also
the satisfactory of and positive cooperation from other stakeholders in the supply chains.
"
Jurnal Teknologi, 22 (3) September 2008 : 169-178, 2008
JUTE-22-3-Sep2008-169
Artikel Jurnal  Universitas Indonesia Library
cover
cover
Satra Dama
Depok: Fakultas Teknik Universitas Indonesia, 2003
T40629
UI - Tesis Membership  Universitas Indonesia Library
cover
Alma`arif
"ABSTRAK
Penelitian ini menganalisis praktek pengelolaan irigasi, pendidikan dan perdagangan bebas dihubungkan dengan konsep desentralisasi fungsional dalam kerangka kebijakan desentralisasi di Indonesia. Pendekatan yang digunakan dalam penelitian ini adalah pendekatan konstruktivis yang biasa juga disebut pendekatan kualitatif dengan tipe penelitian deskriptif. Hasil penelitian menunjukkan bahwa terdapat beberapa faktor yang menyebabkan tidak diadopsinya desentralisasi fungsional dalam kebijakan desentralisasi di Indonesia pada urusan pengairan, pendidikan, dan perdagangan bebas. Tidak diakomodasinya lembaga politik, independensi petani, integrasi sungai dan jaringan irigasi, dan konstitusi negara merupakan faktor-faktor dari urusan irigasi. Adapun faktor-faktor yang menyebabkan desentralisasi fungsional tidak diadopsi pada urusan pendidikan adalah eksistensi dewan pendidikan, independensi sekolah, devolusi pengelolaan pendidikan, dan konstitusi negara. Sementara untuk urusan perdagangan bebas, faktor kelembagaan pemerintahan Batam, struktur keanggotaan dewan kawasan, ketidakjelasan BP. Batam dalam sistem ketatanegaraan, serta konstitusi negara menjadi faktor tidak diakomodasinya desentralisasi fungsional pada urusan perdagangan bebas. Pada umumnya, pengaturan oleh konstitusi merupakan penyebab umum tidak diadopsinya desentralisasi fungsional. Konstruksi tata kelola desentralisasi dalam kebijakan desentralisasi di Indonesia kedepan khususnya pada sektor irigasi, pendidikan, dan perdagangan bebas dapat dilakukan secara bertahap dimulai dari kerjasama antar daerah, kolaborasi pusat dan daerah dalam bentuk dewan hingga menuju pembentukan lembaga berbasis desentralisasi fungsional.

ABSTRACT
This research analyze the practice of irrigation, education, and free trade governance linked with functional decentralization concept in Indonesia decentralization policy frame. This research use constructivist approach and qualitative descriptive method. Research result find several factors that cause functional decentralization in Indonesia decentralization policy for irrigation, education, and free trade is not adopted. Political institution is not adopted, independence of the farmers, integration of river and irrigation web, and state constitution, are the factors from irrigation side. Several factors in education are the existence of educational boards, the independence of school, devolution in education governance, and state constitution. For free trade, the institution of Batam governance, members structure in Batam boards, the uncertainty of BP. Batam in Indonesia administration structure, and state constitution, which make functional decentralization is not adopted. Generally, state constitution is major factor of functional decentralization is not adopted.The Construction of Decentralization in the Future of Indonesia Decentralization Policy especially in irrigation, education, and free trade can be done gradually begin from inter local government cooperation, state local collaboration in boards until establishing the functional decentralization organization."
[;;;, ]: 2017
T48777
UI - Tesis Membership  Universitas Indonesia Library
cover
Anastasya Leony
"Penggunaan Fabric Formwork dalam dunia konstruksi telah dilakukan sejak tahun 1950-an. Pada saat itu fabric formwork atau yang biasa disebut dengan bekisting kain digunakan untuk membuat sebuah bangunan terkenal yaitu Felix Candela dengan desain dan konstruksi cangkang beton bertulang. Bekisting kain (fabric formwork) merupakan teknologi yang menggunakan kain tekstil untuk membuat cetakan yang digunakan untuk pengecoran beton. Bila dibandingkan dengan cetakan konvensional yang menggunakan kayu, kayu lapis dan baja, bekisting kain lebih fleksibel, mudah digunakan, ringan, permeabel dan menggunakan biaya yang lebih murah. Dengan penelitian-penelitian yang telah dilakukan pada fabric formwork dalam dunia konstruksi, semua peneliti tersebut menyebutkan bahwa penggunaan fabric formwork sangat berpengaruh dalam hal biaya. Oleh karena itu, penulis melakukan penelitian ini guna membuktikan hal tersebut dan juga untuk meninjau deformasi dari fabric formwork berbahan dasar woven polyethylene dengan berbagai variasi bentang. Penulis membuktikan nilai deformasi yang paling efektif dari variasi panjang bentang dan juga tinggi bekisting. Penulis juga melakukan variasi pada pembebanan, yaitu pembebanan dengan menggunakan metode hidrostatik umum dan pembebanan dengan menggunakan metode DIN. Selain itu, penulis melakukan metode data error analysis untuk membuktikan pengaruh beban terhadap deformasi.

The use of Fabric Formwork in the construction world has been carried out since the 1950s. At that time, fabric formwork or commonly called fabric formwork was used to make a famous building, Felix Candela, with the design and construction of reinforced concrete shells. Fabric formwork is a technology that uses textile fabrics to make molds used for concrete casting. When compared with conventional molds that use wood, plywood and steel, fabric formwork is more flexible, easy to use, lightweight, permeable and uses lower costs. With studies that have been carried out on formwork fabric in the construction world, all the researchers mentioned that the use of formwork fabric is very influential in terms of cost. Therefore, the authors conducted this study to prove this and also to review the deformation of woven polyethylene fabric formwork with a variety of span. The author proves that the greatest deformation occurs in the longest span. Thus the author can show the most efficient span both in terms of the magnitude of the deformation and the costs used in making formwork. The author also makes variations on loading, namely loading using the general hydrostatic method and loading using the DIN method. In addition, the authors conducted a data error analysis method to prove the effect of the burden on deformation.
"
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
"Industri konstruksi dikenal sebagai industri yang tidak efisien. Penerapan lean construction khususnya pengelolaan rantai pasok, atau Supply Chain Management (SCM), adalah salah satu usaha
yang berpotensi untuk meningkatkan efisiensi suatu pelaksanaan proyek konstruksi. Pada proyek pembangunan gedung bertingkat tinggi,
terdapat kecenderungan peningkatan peran pemilik proyek
dalam penyusunan jaringan supply chain konstruksi. Strategi pemecahan kontrak merupakan upaya pihak pemilik untuk meningkatkan value atas biaya yang sudah dikeluarkannya. Namun, jaringan supply chain konstruksi yang efektif selayaknya adalah jaringan yang dapat meningkatkan value bagi seluruh pihak yang terlibat. Untuk mengetahui gambaran kinerja supply chain pada proyek konstruksi bangunan gedung, telah dilakukan survei ke empat lokasi proyek di Jakarta. Dengan menggunakan sepuluh indikator yang dipilih berdasarkan konsep-konsep lean construction (conversion, flow, dan value), didapatkan gambaran karakteristik kinerja proyek-
proyek yang memiliki bentuk supply chain yang berbeda. Analisa terhadap nilai-nilai indikator menunjukkan bahwa para
kontraktor secara umum telah menjalankan konsep conversion. Pembentukan hubungan kerjasama jangka panjang dengan pihak
subkontraktor dan supplier, serta pengadaan material strategis secara terpusat adalah upaya kontraktor dalam SCM. Di sisi lain, implementasi konsep flow dan value dalam proyek konstruksi masih lemah.

Abstract
Construction has not been considered as an efficient industry. The application of lean construction principles, particularly the Supply Chain Management (SCM), is potential to improve the efficiency of
construction processes. Recent trends show the increasing role of owners in selecting the construction supply chains on high-rise building projects. Owners prefer to deal with different partners using
separate contracts in order to increase value of their expenses. While this strategy has benefited owners, however, an effective supply chain should also increase values for all the parties involved in the supply chain. The effect of separating contract on supply chain performance
has been contemplated; thus, the first step of the study was
to obtain a general portrayal of supply chain performance.
Surveys to four high-rise building construction sites in Jakarta, each had different characteristics, were conducted and by using the previously developed performance indicators, arough assessment on
their performances has been identified. The indicators include three aspects, namely, ?conversion,? ?flow,? and ?value.? The findings
indicate that among the three issues, the concept of ?conversion? is the most realized in construction projects. The study also found that contractors maintain long term partnerships with subcontractors and
suppliers; furthermore, contractors have implemented central-based strategic material procurement. Although ?flow? and?value?
concepts have only been partially recognized, these findings demonstrated that contractors had implemented strategies in line with supply chain management.
"
[Fakultas Teknik UI, Institut Teknologi Bandung. Fakultas Teknik Sipil dan Lingkungan], 2008
pdf
Artikel Jurnal  Universitas Indonesia Library
cover
Nadya Ghifani Syahputri
"Proyek konstruksi bangunan gedung rumah sakit memiliki kompleksitas dan ketidakpastian yang tinggi jika dibandingkan dengan konstruksi bangunan lainnya sehingga berbagai faktor dapat mempengaruhi jalannya proyek konstruksi. Dalam pelaksanaannya, diperlukan kerjasama antara pihak-pihak yang berkepentingan. Akan tetapi, pihak-pihak tersebut mempunyai kepentingan dan tujuan yang berbeda sehingga konflik atau perselisihan dapat terjadi akibat perbedaan pendapat. Perselisihan yang terjadi berpotensi menimbulkan klaim yang dapat mengarah kepada permohonan tambahan biaya, tambahan waktu, hingga dispute. Penelitian ini bertujuan untuk mengidentifikasi faktor-faktor penyebab klaim konstruksi pada proyek konstruksi bangunan gedung rumah sakit dan mengembangkan sistem manajemen klaim untuk menurunkan dispute. Penelitian dilakukan dengan mengumpulkan data melalui survei kuesioner. Hasil penelitian menunjukkan terdapat 10 faktor risiko penyebab klaim yang dapat menyebabkan dispute serta tindakan preventif berupa sistem manajemen klaim untuk menurunkan terjadinya dispute. 10 faktor tersebut terbagi menjadi 3 aspek, yaitu aspek perilaku, kontraktual, dan operasional.

Hospital building construction projects have high complexity and uncertainty when compared to other building constructions so that various factors can affect construction projects. In its implementation, cooperation between interested parties is required. However, these parties have different interests and goals so that conflicts or cannot occur due to differences of opinion. Disputes that may occur are claims that can lead to additional efforts, additional time, to disputes. This study aims to eradicate the factors that cause claims in hospital building construction projects and develop a claims management system for disputes. The research was conducted by collecting data through a questionnaire survey. The results showed that there were 10 risk factors for claims that could lead to disputes as well as preventive measures in the form of claims management to reduce the occurrence of disputes. The 10 factors are divided into 3 aspects, namely behavioral, contractual, and operational aspects."
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Muhammad Fikri Faizan
"Proyek pembangunan gedung bertingkat khususnya di kota besar di Indonesia merupakan salah satu alternatif pembangunan yang dilakukan dalam rangka mengatasi keterbatasan lahan. Konstruksi proyek gedung bertingkat merupakan pekerjaan yang berbahaya karena terdapat keunikan dan kompleksitas dalam lingkungan kerja, sehingga berpotensi menimbulkan adanya kecelakaan konstruksi. Tingginya kasus kecelakaan konstruksi erat kaitannya dengan pihak-pihak yang berkaitan langsung dengan proyek konstruksi atau sering disebut dengan stakeholder. Di Indonesia, stakeholder konstruksi terdiri dari kontraktor, subkontraktor, konsultan struktur, konsultan arsitektur, owner, dan MK (Konsultan Pengawas). Penelitian ini bertujuan untuk menganalisis persepsi atau pemahaman stakeholder terhadap risiko keselamatan konstruksi pada bangunan gedung bertingkat dengan metode photographic Q-methodology, serta menggunakan analisis koefisien Kendall’s W, Friedman’s χ2, dan Kruskal-Wallis untuk mengukur pemahaman stakeholder. Secara keseluruhan, kontraktor, subkontraktor, konsultan struktur, owner, dan MK memiliki pemahaman yang sedang, sedangkan konsultan arsitektur memiliki pemahaman yang rendah. Dari hasil tersebut, penulis merumuskan rekomendasi untuk meningkatkan pemahaman seluruh stakeholder terhadap risiko keselamatan konstruksi di Indonesia.

The construction of high-rise buildings, particularly in major cities in Indonesia, is one of the alternative development approaches undertaken to address land limitations. The construction of high-rise buildings involves hazardous work due to the unique characteristics and complexities of the work environment, which can potentially lead to construction accidents. The high incidence of construction accidents is closely related to the parties directly involved in construction projects, commonly referred to as stakeholders. In Indonesia, construction stakeholders include contractors, subcontractors, structural consultants, architectural consultants, owners, and supervising consultants. This study aims to analyze the stakeholders' perceptions or understanding of construction safety risks in high-rise buildings using the photographic Q-methodology. Additionally, Kendall's W coefficient, Friedman's χ2, and Kruskal-Wallis analyses are used to measure stakeholders' understanding. Overall, contractors, subcontractors, structural consultants, owners, and supervising consultants have a moderate level of understanding, while architectural consultants have a low level of understanding. Based on these findings, the author formulates recommendations to enhance the understanding of all stakeholders regarding construction safety risks in Indonesia."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
F.X. Supartono
"Makalah ini menyampaikan kegunaan Iuar atau external prestressing sebagai suatu cara perbaikan struktur bangunan gedung. Dengan pemberian pratekan di luar elemen beton, maka usaha perbaikan menjadi Iebih mudah tanpa harus mengganggu bagian dalam elemen disamping kemudahan cara kontrol kualitas pada sistem ini. Sebagai studi kasus untuk menyampaikan beberapa segi menarik dari perbaikan gedung MMP dan gedung APC di Jakarta, yang dilaksanakan dengan metoda external prestressing."
Depok: Fakultas Teknik Universitas Indonesia, 1998
LP-pdf
UI - Laporan Penelitian  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>