Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 16890 dokumen yang sesuai dengan query
cover
Anderson, Collin
Mulgrave : Vic. : Images, 2012
R 725.2 AND e
Buku Referensi  Universitas Indonesia Library
cover
Feizal Manaf
"Pengujian ini dimaksudkan untuk mendapatkan hasil stabilitas tanah yang lebih baik (dengan menambahkan bahan Additive Kapur dan Abu Sekam Padi.
Dengan menggunakan beberapa macam komposisi campuran Additive yaitu : 2,5% ; 5% dan 7,5%, maka dapat dibandingkan Sifat Mekanik, Sifat Fisik dan Sifat Kimiawi tanah campuran tersebut dengan tanah aslinya.
Pengujian Sifat Mekanik, memperlihatkan hasil Kekuatan Geser (Direct Shear), Kuat Tekan Bebas, Pemadatan (Compaction), serta Daya Dukung (CBR).
Pengujian Sifat Fisik, memperlihatkan hasil Batas-batas Atterberg (Batas Cair, Batas Plastis, Batas Susut dan Indeks Plastisitas) Specific Gravity dan Morfologi.
Pengujian Sifat Kimiawi, memperlihatkan hasil Unsur-unsur kimia dan mineral yang terkandung serta reaksi kimia yang terjadi.
Dari hasil pengujian-pengujian tersebut dapat dibandingkan sifat-sifat tersebut diatas antara tanah asli dan tanah yang telah dicampur dengan bahan Kapur atau Abu Sekam Padi dengan komposisi 2,5%, 5% dan 7,5%."
1994
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Powers, Alan
"Peter Aldington started his independent architectural practice in 1962, quickly earning an international reputation for designing small houses that respected their village locations and achieved magical transitions between interior and garden. The group of three houses at Haddenham, Buckinghamshire (1964-68), now listed Grade II*, where Aldington created a well-known garden, is still widely admired and visited, and has been vested in a trust. John Craig became a partner in the practice in 1970 and they went on to design ground-breaking doctors' group practice surgeries, shops, office interiors and public housing."
London : RIBA, 2009
e20436577
eBooks  Universitas Indonesia Library
cover
Melvin, Jeremy
Basel: Birkhäuser, 2000
720.941 MEL y
Buku Teks  Universitas Indonesia Library
cover
Achmad Tardiyana
Jakarta: Gramedia Pustaka Utama , 2005
729 ACH l
Buku Teks SO  Universitas Indonesia Library
cover
Cornelia Anastasia Lembang
"Penilaian permukaan jalan adalah proses untuk mengevaluasi kondisi jalan yang ada, mendeteksi semua jenis kerusakan jalan. Kondisi jalan menjadi hal yang penting mengingat salah satu faktor penyebab kecelakaan lalu lintas. Metode penilaian permukaan jalan saat ini mahal, memakan waktu, dan padat karya. Sebagian besar pendekatan penilaian permukaan jalan saat ini menggunakan kendaraan bergerak yang disesuaikan secara unik untuk setiap karakteristik guna memantau permukaan jalan dan hanya memeriksa sejumlah lokasi tertentu. Proyek penelitian ini bertujuan untuk meningkatkan metode penilaian permukaan jalan saat ini menjadi lebih fleksibel, efektif, murah, dan membutuhkan lebih sedikit tenaga kerja. Selain itu, ini akan menghubungkan prosedur penilaian permukaan jalan saat ini dengan deteksi berbasis Smartphone dengan menghasilkan referensi yang komprehensif. Selain itu, tinjauan literatur algoritma pendeteksian berbasis Smartphone dan metode penelitian hadir untuk memfasilitasi tautan tersebut. Deteksi berbasis smartphone memberikan peluang baru untuk meningkatkan metode penilaian jalan karena kemampuannya untuk mengevaluasi area yang lebih luas dan membutuhkan lebih sedikit tenaga, biaya, dan waktu. Namun, pendeteksian berbasis smartphone tidak dapat menggantikan keseluruhan metode penilaian jalan, tetapi memberikan peluang untuk memperkecil ukuran area yang perlu dikunjungi.

Road surface assessment is a process to evaluate the existing road condition, it detects all kinds of road defects. Road condition is important knowing that it is one of the factors that cause road accidents. The current road surface assessment method is expensive, time consuming, and labour intensive. The majority of the current road surface assessment approach use a moving vehicle that is uniquely tailored for each characteristic to monitor the road surface and examines just a limited number of locations.This research project aims to improve the current road surface assessment method to be more flexible, effective, inexpensive, and requires less labour work. Moreover, it will link the current road surface assessment procedure with Smartphone based detection by generating a comprehensive reference. In addition, literature review of Smartphone based detection algorithms and research method is present to facilitate the link. Smartphone based detection gives a new opportunity to improve the road assessment method due to its ability to evaluate larger area and it requires less labour, cost, and time. However, Smartphone based detection cannot replace the entire road assessment method, but it gives the chance to lessen the size of areas that need to be visited."
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Bizley, Graham
"Following on from Graham Bizley's successful Architecture in Detail, Architecture in Detail II presents 40 case studies of detailing on recent construction projects. Over 150 full colour drawings and photos provide a reference compendium for the professional architect seeking detailing inspiration. Originally featured in Building Design's In Detail magazine, the included projects represent some of the most interesting and innovative techniques in recent architecture. Graham Bizley's beautifully presented detail drawings allow the architect to easily see how ideas and techniques can be applied"
Amsterdam [Netherlands]: Architectural Press , 2010
729 BIZ a
Buku Teks SO  Universitas Indonesia Library
cover
cover
Aboubaker. Y.Y. Alfakhri
"Construction delays have become endemic in Libya. It is imperative to create awareness of the extent to which such delays can adversely affect project delivery, especially with regard to road construction projects. It is clear that the Libyan road construction industry also faces the issue of not being able to complete projects within the allocated time. This paper identifies the effects of road construction delays, evaluates these through a questionnaire, and assesses them using an empirical method. A detailed review of related literature produced the secondary data, while the primary data was obtained via a structured questionnaire which targeted the road construction projects owners, consultants and contractors. A 71% response rate was achieved; 256 out of the 360 questionnaires sent out were returned. Descriptive statistics were used to analyze the data received from the questionnaires. The findings of the study reveal that the major outcomes of road construction project schedule overruns in Tripoli, Libya include cost overruns, time extensions, disputes, loss of profit, breaches of contract, poor quality of work and company’s bad reputation. The study makes a contribution to the knowledge of the subject of the outcomes of road construction project schedule overruns in Tripoli. Computation of the means and standard deviations, together with a structural equation model, have been used for the data analysis and inference. It is found that delays in road construction projects widely lead to cost overrun, time overrun, litigation and disputes. The findings of the study also provide significant insights into the construction industry, which will help it formulate strategies in order to avoid delays and their consequences. The most important effects identified were time overrun, cost overrun and obstruction of economic and country development. The recommendations and limitations are discussed in the concluding part of the study."
Depok: Faculty of Engineering, Universitas Indonesia, 2018
UI-IJTECH 9:4 (2018)
Artikel Jurnal  Universitas Indonesia Library
cover
Taihutu, Felix
"Setiap perusahaan jasa konstruksi selalu berusaha mengadakan inventori. Dengan inventori diharapkan dapat memperlancar pelaksanaan pekerjaan konstruksi sehingga tidak terjadi stockout material di proyek yang berpotensi mempengaruhi waktu proyek. Tujuan dari penelitian ini adalah mengidentifikasi faktor-faktor risiko inventori, dampak serta tindakan terhadap risiko utama pada proyek jalan di Ambon. Penelitian dilakukan dengan metode wawancara dan kuesioner. Analisa data dilakukan bertahap meliputi uji dua sampel, AHP, level risiko, uji validitas dan reliabilitas, uji korelasi, analisa faktor, dan uji regresi. Hasil penelitian menunjukan bahwa permintaan material yang kurang lengkap atau tidak mencukupi, dan aksesibilitas yang sulit selama proses pengiriman berpengaruh terhadap kinerja waktu.

Each construction services company always tries to holding inventory. With inventory is expected to facilitate the implementation of construction works so there is no stockout materials in the projects that could potentially affecting time of the project. The aim of this research is to identify the risk factors and the impact of inventory, knowing the action on the main risk in Ambon road project. Research conducted by method of interview and a questionnaire. Data analysis was conducted in two test sample, AHP, level of risk, test validity and reliability, correlation test, factor analysis and regression test. Research showed that risk factors major effect on performance time road projects in ambon, namely demand material not complete or insufficient, and the difficult accessibility during the process of delivery.
"
Depok: Fakultas Teknik Universitas Indonesia, 2013
T32924
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>