Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 13849 dokumen yang sesuai dengan query
cover
Knief, Ronald Allen
New York: McGraw-Hill, 1981
621.48 KNI n (1)
Buku Teks  Universitas Indonesia Library
cover
Ferguson, Charles D.
New York: Oxford Univesity Press, 2011
333.792 4 FER n
Buku Teks  Universitas Indonesia Library
cover
JPEN 14(1-2)2012
Artikel Jurnal  Universitas Indonesia Library
cover
Gomez Cadenas, Juan Jose
"This book explains how society will face an energy crisis in the coming decades owing to increasing scarcity of fossil fuels and climate change impacts. It carefully explores this coming crisis and concisely examines all of the major technologies related to energy production (fossil fuels, renewables, and nuclear) and their impacts on our society and environment. The author argues that it is wrong to pit alternatives to fossil fuels against each other and proposes that nuclear energy, although by no means free of problems, can be a viable source of reliable and carbon-free electricity. He concludes by calling for a diversified and rational mix of electricity generation in order to mitigate the effects of the energy crisis. Throughout, the book is spiced with science, history, and anecdotes in a way that ensures rewarding reading without loss of rigor."
Milan: [, Springer], 2012
e20398924
eBooks  Universitas Indonesia Library
cover
Wood, Janet
"Introduction to the various types of nuclear reactors worldwide and information on prototype designs
Many different reactor systems have been proposed and some of these have been developed to prototype and commercial scale. Six types of reactor (Magnox, AGR, PWR, BWR, CANDU and RBMK) have emerged as the designs used to produce commercial electricity around the world. A further reactor type, the so-called fast reactor, has been developed to full-scale demonstration stage. These various reactor types will now be described, together with current developments and some prototype designs."
London: Institution of Engineering and Technology, 2007
e20451586
eBooks  Universitas Indonesia Library
cover
Jakarta: LIPI Press, 2005
341.755 IND
Buku Teks  Universitas Indonesia Library
cover
Benedict, Manson
New York : McGraw-Hill, 1981
621.48 BEN m
Buku Teks  Universitas Indonesia Library
cover
Connolly, Thomas J.
New York : John Wiley & Sons, 1978
621. 48 CON f
Buku Teks  Universitas Indonesia Library
cover
Munawir Sadzali Razak
"Penelitian ini bertujuan untuk mengevaluasi efektivitas Program Sosialisasi Pembangkit Listrik Tenaga Nuklir (PLTN) yang dilaksanakan mulai pada tahun 2010 di Kabupaten Bangka Barat yang merupakan daerah yang menjadi lokasi calon tapak PLTN. Penelitian ini menggunakan pendekatan post positivism, dan menggunakan metode pengumpulan data secara kuantitatif dan kualitatif, melalui survei kepada masyarakat, wawancara kepada pelaksana program serta studi terhadap dokumen dan literatur yang terkait.
Hasil penelitian dapat disimpulkan bahwa Program sosialisasi PLTN di Kabupaten Bangka Barat belum efektif karena tingkat partisipasi, tingkat pemahaman dan tingkat penerimaan masyarakat terhadap PLTN masih lebih rendah dibandingkan dengan target yang diinginkan. Kondisi ini disebabkan faktor internal yaitu rendahnya intensitas kegiatan sosialisasi, dan faktor eksternal seperti peristiwa kecelakaaan PLTN di Fukushima Daichi, aktivitas dari LSM yang kontra terhadap PLTN, serta sikap pemerintah pusat yang sampai saat ini belum memutuskan kapan PLTN mulai dibangun.
Penelitian ini menyarankan agar pelaksana program mengintensifkan kegiatan sosialisasi, bersikap responsif pada isu negatif terkait PLTN yang beredar di masyarakat serta mendorong pemerintah pusat membentuk Tim Nasional Persiapan dan Perencanaan Pembangunan PLTN yang bertugas menyiapkan seluruh aspek pembangunan PLTN termasuk kegiatan sosialisasi.

This study aimed to evaluate the effectiveness of Nuclear Power Plant (NPP) Socialization Program which started in 2010 in West Bangka Regency which is a prospective nuclear power plant site. This study used a post-positivism approach and combines quantitative and qualitative research methods, and data collected in this study using a survey to the community, as well as the program implementer interviews and also study the documents and related literature.
The results of this study concluded that the socialization program in West Bangka Regency NPP has not been effective because of the level of participation, the level of understanding and the level of public acceptance of NPP is lower than the desired target. This condition is caused by internal factors, namely the low intensity of socialization activities, and external factors such as the accidents at the Fukushima Daichi NPP, the activities of NGOs cons of nuclear power plants, as well as the policy of the central government has yet to decide when the construction of NPP begun.
This study suggested that the program managers should intensify dissemination activities, to be responsive to the negative issues related to NPP in the community and also encourage the central government formed a National Team for Preparation and Planning NPP which is in charge of setting up all aspects related to nuclear power plant construction, including socialization.
"
Depok: Fakultas Ilmu Sosial dan Ilmu Politik Universitas Indonesia, 2014
T42466
UI - Tesis Membership  Universitas Indonesia Library
cover
Arum Puni Rijanti
"Sistem kelistrikan Jawa-Bali pernah mengalami krisis sampai pertengahan tahun 2009, sumber: Kompas, Sabtu 31 Mei 2008. Pemadaman tidak bisa dihindari karena kapasitas pembangkit PLN tidak bertambah secara signifikan. Dengan pertumbuhan konsumsi listrik di atas 6 persen, cadangan daya pun terus tergerus. Rata-rata pertumbuhan pemakaian listrik pada kuartal I-2008 mencapai 6,8 persen, sementara target pertumbuhan dalam Anggaran Pendapatan dan Belanja Negara (APBN) 2008 hanya 1,9 persen. Dengan menggunakan patokan pertumbuhan itu pula, pemerintah menetapkan kuota bahan bakar minyak (BBM) untuk PLN sebanyak 9,1 kiloliter. Sementara itu, realisasi pemakaian BBM sampai April 2008 sudah mencapai 3,651 juta kiloliter atau 42,24 persen dari kuota. Cadangan daya tergerus menjadi 25 persen dari batas yang seharusnya 40 persen.
Sistem kelistrikan Jawa-Bali mengalami defisit 800-900 MW, yang mengakibatkan pemadaman bergilir di wilayah Banten, DKI Jakarta, Jawa Barat, Jawa Tengah, Jawa Timur Daerah Istimewa Yogyakarta dan Bali. Defisit disebabkan beberapa hal antara lain penurunan daya di sejumlah pembangkit PLN dan Swasta, kenaikan beban pemakaian listrik di Jawa-Bali, serta ketidaklancaran pasokan BBM ke pembangkit PLN. Hal ini terjadi karena masih dominan menggunakan pembangkit listrik berbahan bakar fosil. Cadangan bahan bakar fosil lama kelamaan akan habis kalau tidak disiasati dalam pemakaiannya. Penggunaan bahan bakar fosil ini pula yang dapat meningkatkan kadar emisi CO2 dan SO2 yang merupakan pemicu adanya pemanasan global.
Kajian ini bertujuan untuk melihat rencana optimasi pengambangan pembangkit listrik Jawa Bali dengan membandingkan pemakaian batubara dan nuklir bila dilihat dari nilai fungsi obyek, LOLP, emisi CO2 dan SO2. Diaman hasil tahun keluaran PLTN akan dipakai untuk perhitungan aliran daya bila PLTN masuk ke sistem Jawa Bali dan membandingkan rencana lokasi penempatan PLTN yaitu Banten dan Semenanjung Muria.

Electrical systems Java-Bali has experienced a crisis until the mid-2009, source: Kompas, Saturday, May 31, 2008. Extinction cannot be avoided because of PLN's generating capacity has not increased significantly. With electricity consumption growth above 6 percent, the reserves were dwindling resources. The average electricity consumption growth in the first quarter of 2008 reached 6.8 percent, while the growth target in the Budget Revenue and Expenditure (Budget) in 2008 only 1.9 percent. By using the same standards that growth, the government set a quota of oil fuel (BBM) to PLN 9.1 of kiloliters. Meanwhile, the realization of the use of fuel until April 2008 has reached 3.651 million kiloliters, or 42.24 percent of the quota. Backup power eroded to 25 percent of the limit should be 40 percent.
System of Java-Bali electricity deficit 800-900 MW, which resulted in rotating blackouts in the area of Banten, DKI Jakarta, West Java, Central Java, East Java, Yogyakarta and Bali. The deficit caused by several things including a decrease in the number of power plants and private sectors, an increase in electricity consumption load in Java-Bali, and the smooth fuel supply for power plants. This happens because it is still the dominant power plants using fossil fuel. Fossil fuel reserves will run out over time if not saving in its use. The use of these fossil fuels also can increase the levels of CO2 and SO2 emissions which are the trigger of global warming.
This study aims to look at plans floating power plant optimization Java and Bali by comparing the use of coal and nuclear when viewed from the value of object function, LOLP, CO2 and SO2 emissions. The results in output of nuclear power plants will be used to calculate the flow of power when nuclear power plants into the Java-Bali system and compare the plans of where to place nuclear plants Banten and Muria Peninsula.
"
Depok: Fakultas Teknik Universitas Indonesia, 2009
T26713
UI - Tesis Open  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>