Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 370 dokumen yang sesuai dengan query
cover
Kamakshaiah, S.
New Delhi: Tata McGraw-Hill, 2011
621.313 KAM h
Buku Teks  Universitas Indonesia Library
cover
Kamakshaiah, S.
New Delhi: McGraw-Hill Education (India) Private, 2013
621.319 KAM h
Buku Teks  Universitas Indonesia Library
cover
cover
"[PLN akan mebangun saluran transmisi tegangan tinggi arus searah (HVDC), saluran ini meliputi transmisi udara di Pulau Sumatera, saluran kabel bawah laut di Selat Sunda, dan transmisi udara di Pulau Jawa. Salah satu cara untuk mendapatkan saluran yang efektif adalah penggunaan kawat berkas.
Dalam penentuan kawat berkas yang efektif, pada penelitian ini akan digunakan pertimbangan – pertimbangan karakteristik HVDC, seperti pertimbangan susut tegangan, kerugian daya karena korona, gangguan bising, daya hantar arus ,dan massa konduktor.
Dari hasil penelitan diperoleh saluran transmisi HVDC yang efektif, yaitu saluran ganda dengan kawat berkas 5 konduktor ACSR untuk diameter keselurahan masing – masing konduktor 29,9mm – 38,21mm dan saluran ganda dengan kawat berkas 4 konduktor ACSR untuk diameter keseluruhan masing - masing konduktor 38,22mm – 48,85mm., One way to get an effective channel is the use of the bundle conductor. The use of bundle conductor is expected to minimize power losses, the corona, and increased ampacity.
In determining the effective bundle conductor, in this study will be used considerations of the characteristics HVDC, such as consideration of voltage drop, corona power loss, audible noise, ampacity, and the mass of the conductor.
The research results for the effective HVDC transmission line are double circuit channel with 5 bundle conductor , each ACSR conductor has overall diameter about 29,9mm - 38,21mm and double circuit channel with 4 bundle conductor , each ACSR conductor has overall diameter about 38,22mm – 48,85mm.]"
Fakultas Teknik Universitas Indonesia, 2014
S59270
UI - Skripsi Membership  Universitas Indonesia Library
cover
Dimas Ramananda
"ABSTRAK

Kebutuhan energi listrik dari tahun ke tahun semakin meningkat. Peningkatan ini sejalan dengan meningkatnya laju pertumbuhan ekonomi, laju pertumbuhan penduduk, dan pesatnya perkembangan di sektor industri. Kebutuhan energi Indonesia, salah satunya energi listrik saat ini terpusat di Jawa-Bali. Untuk memenuhi kebutuhan listrik sistem Jawa-Bali ke depan, sebagian besar akan disuplai dengan PLTU berbahan bakar batubara yang telah direncanakan akan dibangun di Pulau Jawa.

Sumber energi primer batubara di Pulau Jawa hampir dapat dikatakan tidak ada. Sehingga untuk memenuhi kebutuhan batubaranya harus didatangkan dari Pulau Sumatera dan Kalimantan yang memiliki sumber batubara. Disamping itu ada rencana pembangunan transmisi HVDC sebagai sistem interkoneksi Sumatera-Jawa dengan membangkitkan energi listrik di Mulut Tambang Sumatera Selatan kemudian energi listriknya ditransmisikan langsung ke Pulau Jawa. Skripsi ini bertujuan menganalisis keekonomian penggunaan transmisi HVDC untuk sistem interkoneksi Sumatera-Jawa dalam penyedia tenaga listrik di Jawa dibanding dengan pengiriman batubara dari Sumatera untuk PLTU di Jawa.


ABSTRACT

Electricity needs from year to year increase. This increase is in line with the increasing pace of economic growth, population growth, and rapid development in the industrial sector. Indonesia's energy demand, one of which electrical energy is currently concentrated in Java-Bali. For Supply demand of the Java-Bali electricity system in the future, most will be supplied by coal-fired power plant planned to be built in Java.

Primary energy sources of coal in Java almost nothing can be said. So as to meet the needs of the coal must be imported from the island of Sumatra and Kalimantan, which has a coal resource. Besides, there are plans to build a HVDC transmission system with a Java-Sumatra interconnection generate electricity in South Sumatra Mine Mouth then electrical energy is transmitted directly to Java. This study aims to analyze the economical use of HVDC transmission system for the Java-Sumatra interconnection of electric power provider in Java than with the delivery of coal to the power plant in Sumatra, Java

"
Fakultas Teknik Universitas Indonesia, 2014
S56831
UI - Skripsi Membership  Universitas Indonesia Library
cover
Kunzru, Hari
London: Penguin Books, 2005
813 Kun t
Buku Teks  Universitas Indonesia Library
cover
Kunzru, Hari
London: Penguin Books, 2004
822 KUN p
Buku Teks  Universitas Indonesia Library
cover
Gatot Meganoto
"Berbagai pertimbangan sehubungan dengan keuntungan-keuntungan penyaluran daya dengan tegangan tinggi arus searah atau High Voltage Direct Current (HVUC), maka minat terhadap sistem ini timbul kembali sejak awal tahun 1930-an. Perbedaan antara penyaluran tegangan dc dengan tegangan ac adalah; penyaluran tegangan dc baru dapat dilakukan setelah melalui suatu transformasi dari sistem ac ke dc dan sebaliknya. Disisi pengirim, tegangan ac ditransformasikan ke tegangan dc melalui suatu sistem penyearah (konverter rektifier). Sedangkan disisi penerima, tegangan dc diubah kembali menjadi ac melalui peralatan pembalik (konverter inverter). Oleh karena itu, inti dari sistem transmisi dc terletak pada peralatan peralatan pengubahnya yakni rektifier dan inverter ditambah dengan komponen-komponen pendukung utamanya, misalnya; transformator konverter dan lain-lain. Sedangkan komponen dasar dari rektifier dan inverter terdiri dari grup-grup tiristor yang membentuk rangkaian jembatan 6-katup 3 fasa. Melalui suatu sistem kontrol, rek-titer dan inverter tersebut akan bekerja jika gerbang pada tiristor dicetuskan tegangan. Waktu ketika gerbang tiristor dinyalakan (d) menentukan karakteristik gelombang ac/dc yang dihasilkan. Sehingga untuk menghasilkan respon tertentu, harga ini dapat bervariasi tergantung pada perubahan beban. Hal yang perlu diperhatikan saat perancangan sistem HVDC adalah penyaturan tegangan dc, gejala transien dan kondisi tunak serta pengaruh yang ditimbulkan pada saat terjadi gangguan. Kondisi-kondisi tersebut dijelaskan dalam bentuk pemodelan dan simulasi yang dilakukan dengan program EMTP (Elecrromagnetic Transient Program) dan PSPICE untuk memberikan hasil pendekatan dari kondisi sebenarnya."
Depok: Fakultas Teknik Universitas Indonesia, 1996
S38934
UI - Skripsi Membership  Universitas Indonesia Library
cover
McAdams, William H.
New York : McGraw-Hill, 1958
536.2 MCA h
Buku Teks  Universitas Indonesia Library
cover
Martin, James
Englewood Cliffs, NJ: Prentice-Hall, 1972
621.38 MAR s
Buku Teks  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>