Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 4509 dokumen yang sesuai dengan query
cover
Fisk, Edward R.
New York: John Wiley & Sons, 1981
620.006 8 FIS c
Buku Teks SO  Universitas Indonesia Library
cover
New York: McGraw-Hill, 1983
624.068 5 MCH
Buku Teks  Universitas Indonesia Library
cover
London: Butterworth, 1986
R 624 CIV
Buku Referensi  Universitas Indonesia Library
cover
New York: Butterworth, 1994
R 624 CIV
Buku Referensi  Universitas Indonesia Library
cover
Oxford: Butterworth-Heinemann, 1995
R.621.809 2 MEC
Buku Teks  Universitas Indonesia Library
cover
London: Butterworth-Heinemann, 1993
696 PLA
Buku Teks SO  Universitas Indonesia Library
cover
Brindley, Keith
Oxford: A Butterworth-Heinemann Book, 1994
621.381 BRI n
Buku Teks  Universitas Indonesia Library
cover
Davies, John
Oxford: Newnes, 1994
621.384 DAV r
Buku Teks  Universitas Indonesia Library
cover
Dita Setyo Rini
"[Salah satu tenaga terampil bidang jasa konstruksi yang memegang peranan signifikan terhadap kesuksesan sebuah proyek adalah pelaksana lapangan pekerjaan gedung (Building Construction
Engineer). Oleh karena itu risiko Building Construction Engineer dalam melaksanakan tugasnya perlu diperhitungkan. Metode yang dipakai dalam penelitian adalah metode penelitian berbasis risiko yang dapat menggambarkan kuantifikasi efek potensial dan hubungan sebab akibat dari faktor risiko dominan yang ada secara tepat dan akurat. Pengumpulan data dilakukan melalui wawancara, kuisioner dan studi literatur. Analisa risiko yang digunakan adalah Analyctic Hierarchy Process (AHP) dengan standar Risk Management Guidelines untuk menentukan tingkat level risiko. Output dari penelitian ini didapatkan kompetensi berupa elemen kompetensi dan kriteria unjuk kerja Building Construction Engineer berbasis risiko;One skilled labor in construction services which has a significant role for the success of a project is the executor of building engineer (building construction engineer). Therefore the building construction engineer’s risk needs to be analyzed. The method used in the study is a research method based on the risks of quantification that can appropriately and accurately describe the potential effect and the causality of the existing dominant risk factors appropriately and accurately, so that can improve the performance of the construction project. This study uses quantitative
methods. Data collected such as interviews, questionnaires and literature study. Risk analysis used Analyctic Hierarchy Process (AHP) with standards of Risk Management Guidelines for determining the level of risk. The output of this research is an element of competency and performance criteria for risk-based building construction engineer., One skilled labor in construction services which has a significant role for the success of a project is
the executor of building engineer (building construction engineer). Therefore the building
construction engineer’s risk needs to be analyzed. The method used in the study is a research
method based on the risks of quantification that can appropriately and accurately describe the
potential effect and the causality of the existing dominant risk factors appropriately and accurately,
so that can improve the performance of the construction project. This study uses quantitative
methods. Data collected such as interviews, questionnaires and literature study. Risk analysis used
Analyctic Hierarchy Process (AHP) with standards of Risk Management Guidelines for
determining the level of risk. The output of this research is an element of competency and
performance criteria for risk-based building construction engineer.]"
Fakultas Teknik Universitas Indonesia, 2015
T44724
UI - Tesis Membership  Universitas Indonesia Library
cover
Furnas, C.C.
New York: Time Incorporated, 1966
R 620 FUR e
Buku Referensi  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>