Ditemukan 5075 dokumen yang sesuai dengan query
Elonka, Stephen Michael
New York: McGraw-Hill , [1974, c1975]
621.4 ELO s
Buku Teks Universitas Indonesia Library
Elonka, Stephen Michael
"Buku yang berjudul "Standard plant operators' manual" ini ditulis oleh Stephen Michael Elonka. Buku ini membahas tentang perlengkapan elektrik, sistem udara, dan transmisi tenaga."
New York: McGraw-Hill, 1980
R 621.402 ELO s (1)
Buku Referensi Universitas Indonesia Library
New York: McGraw-Hill, 1984
621.042 PRA
Buku Teks Universitas Indonesia Library
Elonka, Stephen Michael
"Buku yang berjudul "Standard plant operator's questions & answers" ini ditulis oleh Stephen Michael Elonka dan Joseph Frederick Robinson. Buku ini berisikan pertanyaan serta jawaban mengenai standar operator."
New York: McGraw-Hill, 1981
R 621.4 ELO s II (1)
Buku Referensi Universitas Indonesia Library
Elonka, Stephen Michael
"Buku yang berjudul "Standard plant operator's questions & answers" ini ditulis oleh Stephen Michael Elonka dan Joseph Frederick Robinson. Buku ini berisikan pertanyaan serta jawaban mengenai standar operator."
New York: McGraw-Hill, 1981
R 621.4 ELO s II (1)
Buku Referensi Universitas Indonesia Library
Elonka, Stephen Michael
"Buku yang berjudul "Standard plant operator's questions & answers" ini ditulis oleh Stephen Michael Elonka dan Joseph Frederick Robinson. Buku ini berisikan pertanyaan serta jawaban mengenai standar operator."
New York: McGraw-Hill, 1981
R 621.4 ELO s II (1)
Buku Referensi Universitas Indonesia Library
Elonka, Stephen Michael
"Buku yang berjudul "Standard plant operator's questions & answers" ini ditulis oleh Stephen Michael Elonka dan Joseph Frederick Robinson. Buku ini berisikan pertanyaan serta jawaban mengenai standar operator."
New York: McGraw-Hill, 1981
R 621.4 ELO s II (1)
Buku Referensi Universitas Indonesia Library
Dewa Gde Pratama Purnayoga
"ULPLTG Maleo merupakan pembangkit listrik dengan 4 unit mesin turbin gas berkapasitas 25 MW yang memiliki peranan penting dalam memberi pasokan energi listrik kepada sistem SULUTGO. Keandalan dan kesiapan unit menjadi prioritas bagi perusahaan. Selama ini ULPLTG Maleo tidak memiliki standar dalam melaksanakan pemeliharaan terhadap mesin yang mengalami shutdown dalam jangka waktu lama. Riwayat pemeliharaan unit menunjukkan adanya temuan korosi dan white spot pada blade compressor main engine sehingga perlu ditentukan tindakan mitigasi yang tepat. Berdasarkan hal tersebut pelaksanaan praktik keinsinyuran ini bertujuan untuk merencanakan metode preservasi yang dapat diterapkan sesuai dengan riwayat peralatan dan kondisi lingkungan di ULPLTG Maleo. Berdasarkan pengujian yang dilakukan dapat diketahui bahwa penerapan metode preservasi yang dilakukan memberi pengaruh terhadap perbandingan nilai temperatur dan kelebapan serta menjaga nilai kelembapan port borescope inspection nomor 4 selalu pada nilai %RH terendah namun masih dipengaruhi oleh temperatur dan kelembapan lingkungan ULPLTG Maleo. Hasil pemeriksaan borescope menunjukkan tidak terjadi perubahan kondisi korosi dan white spot yang signifikan pada blade stage 1, 2 dan 16 namun pada blade stage 2 terjadi penurunan tingkat white sport secara minor sehingga dapat disimpulkan pelaksanaan preservasi yang dilakukan kurang efektif dalam mengatasi permasalahan utama.
ULPLTG Maleo is a power plant which plays an important role in providing electrical energy to the SULUTGO system. The unit's maintenance history shows the presence of corrosion and white spots on the main engine compressor blade, so appropriate mitigation measures need to be determined. Based on this, the implementation of this engineering practice aims to plan preservation methods that can be applied by the history of the equipment and environmental conditions at ULPLTG Maleo. Based on the tests carried out, it can be seen that the application of the preservation method has an influence on the comparison of temperature and humidity values ââand maintains the humidity value of port borescope inspection number 4 always at the lowest %RH value but is still influenced by the temperature and humidity of the Maleo ULPLTG environment. The results of the borescope examination showed that there was no significant change in the condition of corrosion and white spots on blade stages 1, 2 and 16. However on blade stage 2 there was a minor decrease in the level of white sport, so it can be concluded that the preservation implementation carried out was less effective in overcoming the main problem."
Depok: Fakultas Teknik Universitas Indonesia, 2023
PR-pdf
UI - Tugas Akhir Universitas Indonesia Library
"Thermal power plant performance analysis focuses on the presentation of reliability-based tools used to define performance of complex systems and introduces the basic concepts of reliability, maintainability and risk analysis aiming at their application as tools for power plant performance improvement, including, selection of critical equipment and components, definition of maintenance plans, mainly for auxiliary systems, and execution of decision analysis based on risk concepts."
London: Springer-Verlag, 2012
e20418805
eBooks Universitas Indonesia Library
Wahyu Hanaldi
"Keandalan dan efisiensi pada suatu pembangkit listrik menjadi suatu indikator penting dalam system tenaga listrik. Pembangkit yang mengalami derating atau gangguan akan berdampak signifikan terhadap system kelistrikan. Sedangkan pembangkit yang tidak efisien akan menjadi pilihan terakhir dalam pembangkitan tenaga listrik. Peralatan yang mengalami kerusakan dapat berdampak jangka panjang berupa penurunan umur dan turunnya efisiensi.Sehingga hal ini diperlukan suatu perawatan yang optimal sehingga meningkatkan keandalan pembangkit dan menurunkan biaya operasional. Paper ini bertujuan untuk optimisasi pemeliharaan prediktif berbasis resiko untuk mencegah dampak ganda pada pembangkit.Penelitian ini dilakukan dengan metode pemetaan resiko dan menghitung waktu pelaksanaan maintenance dan dapat menurunkan biaya operasi dan pemeliharaan.
The reliability and efficiency of power plants become an important indicator in electrical power system. Generators and other supporting equipment that experience derating or disturbance will deteriorate on the electrical power supply. Thus, predictive maintenance becomes essential effort to improve the efficiency and reliability of the plant. In this study, we investigate the risk based predictive maintenance on 740 MW MuaraKarang Combined Cycle Power Plant CCPP, Indonesia through the risk mapping methods. The steps in risk assessment including risk identification, risk analysis, risk evaluation and risk treatment were employed to analyze the MuaraKarang CCPP. We found that the optimized maintenance schedule played significant influence to the reliability and efficiency and have direct consequences to the operation and maintenance cost."
Depok: Fakultas Teknik Universitas Indonesia, 2018
T50623
UI - Tesis Membership Universitas Indonesia Library