Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 10388 dokumen yang sesuai dengan query
cover
Kidnay, Arthur J.
"Updated to cover new advances, this book introduces the natural gas industry to readers new to the field or those providing a narrow service who would benefit from an understanding of the overall process. The initial chapters give a brief overview of basic concepts applicable throughout the chemical processing industry. The second part addresses natural gas processing, following the gas stream from purchase at the wellhead to its entrance at the market place. Wherever possible, advantages, limitations, and ranges of applicability of various processes are discussed so that their integration into the overall gas plant can be fully appreciated."
Boca Raton: CRC Press , 2011
665.73 KID f
Buku Teks  Universitas Indonesia Library
cover
Campbell, John M.
Oklahoma: Campbell Petroleum Series, 1976
665.719 CAM g
Buku Teks  Universitas Indonesia Library
cover
Shively, Bob
San Francisco, CA. : Enerdynamics, 2015
665.7 SHI u
Buku Teks  Universitas Indonesia Library
cover
1974
665.73 Pla
Buku Teks  Universitas Indonesia Library
cover
Ghilandy Ramadhan
"Karbon aktif adalah jenis adsorben yang paling banyak digunakan pada Adosrbed Natural Gas (ANG).. Karbon aktif dapat dibuat dari berbagai bahan baku dan salah satunya Eceng Gondok (Eichornia crassipes). Proses pembuatan karbon aktif berbahan dasar Eceng gondok melalui tahap preparasi, karbonasi, dan aktivasi kimia. Activating agent yang digunakan dalam preparasi karbon aktif adalah ZnCl2. Penelitian ini bertujuan untuk mengetahui pengaruh konsentrasi aktivator ZnCl2 yang digunakan untuk pembuatan karbon aktif dari eceng gondok, pengaruh tekanan saat pengisian terhadap kapasitas penyimpanan gas metana pada tabung ANG, serta membandingkan kemampuan adsorpsi dan desorpsi karbon aktif . Variasi konsentrasi ZnCl2 yang digunakan adalah 0,25 N, 1 N, 4 N dan 7 N. Variasi tekanan saat pengiasian gas metana adalah 10 bar, 24 bar dan 35 bar. Metode bilangan Iod dan Uji SEM-EDX digunakan dalam proses karakterisasi. Pada pengujian kapasitas penyimpanan dilakukan pada suhu tetap (isothermal) yaitu 27°C. Karbon aktif komersial jenis EnerG2 digunakan sebagai pembanding. Hasil paling baik didapatkan pada konsentrasi ZnCl2 1 N dengan luas permukaan 365,7 m2/g dan kapasitas penyimpanan gas metana pada 36 bar sebesar 0,29 kg/kg dengan efisiensi 54,9 %.

Activated carbon is a type of adsorbents which most widely used in the Natural Gas (ANG) technology. Activated carbon can be manufactured from a variety of raw materials included water hyacinth (Eichornia crassipes). The process of making an activated carbon from Eichornia crassipe through preparation, carbonation stage, and chemical activation.. This study aims to determine the effect of concentration of Activating agent ZnCl2, effect of pressure of the methane storage , and to compare the ability of activated carbon from water hyacinth and commercial activated carbon. Variations ZnCl2 concentration used was 0.25 N, 1 N, 4 N and 7 N. While variations of gas pressure is 10 bar, 24 bar and 35 bar. Iodine Number test and SEM-EDX is used in the characterization process. In this test, the storage capacity of methane performed at a constant temperature (isothermal) at 27 ° C. EnerG2 types of commercial activated carbon is used as a comparison. The best results obtained at a concentration of ZnCl2 1 N with a surface area of ​​365.7 m2/g and the storage capacity of methane gas at 36 bar of 0.29 kg/kg with an efficiency of 54.9 %."
Depok: Universitas Indonesia, 2016
S63413
UI - Skripsi Membership  Universitas Indonesia Library
cover
Texas : Petroleum Extention Service, 1974
665.73 PLA
Buku Teks  Universitas Indonesia Library
cover
I Wayan Darmayuda
"ABSTRAK
Dalam Rencana Induk Jaringan Transmisi dan Distribusi Gas Bumi Nasional,
telah ada rencana pembangunan jaringan gas kota oleh pemerintah di beberapa
wilayah yang dekat dengan sumber dan infrastruktur gas bumi yang telah ada,
salah satunya adalah untuk rumah susun di DKI Jakarta.
Rumah Susun Benhil (Bendungan Hilir) 2 di Jakarta Pusat, memiliki 614 unit
hunian, merupakan rumah susun yang belum ada jaringan distribusi gas bumi, dan
dekat dengan pipa distribusi gas bumi yang telah ada.
Tahapan yang dilakukan adalah dengan optimasi jaringan pipa untuk distribusi
gas sehingga didapat nilai investasi terkecil, kemudian menganalisa kelayakan
keekonomian proyek.
Layak secara ekonomi dibangun oleh swasta dengan konsumsi gas bumi rata-rata
tiap hunian sebesar 28 m3/bulan. Dengan analisis Benefit Cost Ratio dengan
konsumsi 19 m3/bulan menghasilkan nilai BCR >1 atau layak dibangun oleh
pemerintah.
ABSTRACT
In Master Plan of National Natural Gas Transmission and Distribution, has gas
network development plans by the government in some areas close to the source
and the existing natural gas infrastructure, one of which is for flats in DKI
Jakarta.
Benhil 2 Flats located in Central Jakarta, has 614 residential units, an apartment
where no natural gas distribution network, and close to the existing natural gas
distribution pipelines.
Steps being taken is the optimization of pipelines for gas distribution in order to
get the smallest investment value, and then analyze the economic feasibility of the
project.
Economically feasible built by the private sector natural gas consumption by an
average occupancy rate of 28 m3/month. With the Benefit Cost Ratio analysis of
19 m3/month consumption produces BCR values> 1 or feasible built by the
government."
Fakultas Teknik Universitas Indonesia, 2013
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Ainun Rahmania
"Penyimpanan Liquified Natural Gas (LNG) dapat terjadi Boil-off Gas (BOG) karena suhu lingkungan lebih tinggi dari suhu LNG sehingga berpengaruh terhadap kuantitas dan kualitas LNG. Banyaknya BOG yang terbentuk disepanjang rantai suplai, berubah terhadap waktu. Penelitian ini bertujuan mengetahui banyaknya BOG yang terbentuk dan perubahan kualitas LNG seperti wobbe index, methane number dan heating value yang terintegrasi disepanjang rantai suplai serta untuk mengetahui pengaruh jarak shipping.
Metode yang digunakan yaitu proses simulasi dengan sistem dinamik menggunakan software UniSim Design R390.1. Dari hasil yang didapat, Pada proses loading LNG, BOG yang terjadi sebanyak 2.966 m3 atau sekitar 2,7% dari total LNG yang dibawa. Pada shipping 4.118 m3 atau sekitar 4%. dan pada unloading LNG 2.545 m3, sekitar 2,63% dari sisa LNG setelah proses shipping. Semakin lama waktu shipping maka dapat meningkatkan nilai heating value dan Wobbe index serta menurunkan methane number.

Storage of Liquified Natural Gas (LNG) can occur Boil-off Gas (BOG) because the ambient temperature is higher than the temperature of LNG, it affects on the quantity and quality of LNG. The number of BOGs that are formed along the supply chain changes with time. This study aims to determine the amount of BOG formed and changes in LNG quality such as the Wobbe index, methane number and integrated heating value along the supply chain and also to determine the effect of shipping distance.
The method used is a dynamic system simulation process using UniSim Design R390.1 software. From the results obtained, in the LNG loading process, the BOG that occurred was 2,966 m3 or about 2.7% of the total LNG carried. At shipping 4,118 m3 or about 4%. and on LNG unloading of 2,545 m3, around 2.63% of the remaining LNG after the shipping process. The longer shipping time can increase the heating value and Wobbe index and reduce the methane number.
"
Depok: Fakultas Teknik Universitas Indonesia, 2019
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Dimas Setia Pahlawan
"ABSTRAK
Pemerintah Indonesia mencanangkan program peningkatan pemanfaatan gas bumi dalam negeri hingga mencapai 30 dari total energi nasional pada tahun 2025. Terbatasnya infrastruktur yang ada akan menjadi hambatan utama dalam memaksimalkan pemakaian gas bumi di Indonesia. Tujuan penelitian ini adalah melihat proyeksi aliran gas bumi di Indonesia hingga tahun 2030, dan mendapatkan jadwal perencanaan infrastruktur gas bumi yang harus di bangun di Indonesia. Untuk dapat memproyeksikan aliran gas bumi, optimisasi dilakukan dengan fungsi objektif meminumkan biaya suplai gas bumi di Indonesia pada periode tahun 2016 hingga 2030. Terdapat tiga opsi dari pasokan gas yang dianalisa, yaitu pasokan gas yang berasal dari pipa domestik, LNG domestik LNG impor. Optimisasi diselesaikan dengan menggunakan excel solver dengan metode simplex. Biaya pasokan gas bumi meliputi harga gas bumi pada wellhead dan LNG ex-kilang hingga wilayah hilir yang dibatasi pada city gate pada masing-masing region. Hasil optimisasi menunjukan bahwa aliran suplai gas bumi di Indonesia akan didominasi oleh suplai melalui LNG dengan total suplai mencapai 7.639 MMSCFD pada tahun 2030. Aliran suplai melalui pipa domestik diperkirakan akan mengalami penurunan dari 3.187 MMSCFD pada tahun 2015 menjadi 2.190 MMSCFD di tahun 2030. Untuk menutupi kebutuhan aliran suplai tersebut maka dibutuhkan investasi sebesar 16,9 miliar USD hingga tahun 2030.

ABSTRACT
The Government of Indonesia is implementing a program to increase domestic natural gas utilization up to 30 of total national energy by 2025. The limited existing infrastructure will be a major obstacle in maximizing the use of natural gas in Indonesia. The purpose of this research is to analyzed the projection of natural gas flow in Indonesia until 2030, and to get the schedule of natural gas infrastructure planning in Indonesia. To be able to get projection of natural gas flow, optimization is carried out with objective function to minimize natural gas supply cost in Indonesia in the priode of 2016 to 2030. There are three options of natural gas supply which are analyzed, domestic supply from pipeline, domestic LNG dan import LNG. Optimization is done by using excel solver with simplex method. Natural gas supply cost calculated including natural gas prices at wellheads and LNG refinery to downstream area which is restricted to city gates in each regions. The result show that the natural gas supply flow in Indonesia will be dominated by supply through LNG with total supply reaching 7,639 MMSCFD by 2030. Supply flow through domestic pipeline is predicted to decrease from 3,187 MMSCFD in 2015 to 2,190 MMSCFD in 2030. To cover the need for supply, an investment of 16.9 billion USD is needed by 2030."
2017
T48022
UI - Tesis Membership  Universitas Indonesia Library
cover
Rudyanto
"Dalam penelitian ini akan dilakukan pengembangan formula perhitungan harga Gas Bumi melalui pipa gas yang digunakan sebagai umpan pada Kilang LPG High Recovery. Penentuan harga gas bumi untuk kilang LPG di Indonesia saat ini menggunakan basis energi yang terkandung dalam gas bumi dan belum memasukkan faktor komposisi gas. Prinsip keadilan dianggap telah tercapai dengan keseragaman harga gas bumi padahal dalam prakteknya perhitungan berdasarkan komposisi LPG yang ada pada gas bumi bisa mendapatkan keuntungan baik bagi produsen maupun offtaker gas.
Metode yang digunakan adalah dengan menghitung harga gas dari sisi produsen sebagai willingness to sell WTS dan harga gas dari sisi offtaker gas sebagai willingness to pay WTP. Titik temu harga gas dibuat dalam suatu formula yang dikembangkan terindeks pada harga LPG Aramco dan Minyak Mentah Indonesia ICP.
Usulan harga gas baru dilakukan dengan mengembangkan formula harga awal gas = A 0.5 P-P1 - C-C1 menjadi harga gas = a x A b x B c x C dimana : A = Harga dasar gas Base Price , B = Harga LPG Aramco dikurangi Cost Processing LPG Biaya Capex, Opex, depresiasi , C = Harga kondensat mengacu pada 75 harga minyak mentah Indonesia, a = fraksi komponen C1 dan C2 dalam persen, b = fraksi komponen C3 dan C4 dalam persen, c = fraksi kondensat dalam persen, a b c = 100. Dari hasil perhitungan sensitivitas didapat kenaikan harga gas linear terhadap kenaikan harga LPG Aramco sehingga lebih menguntungkan baik bagi produsen maupun offtaker gas.

In this research, we will develop the formula for calculating the price of Natural Gas through gas pipeline which is used as feed for LPG High Recovery Plant.The determination of natural gas price for LPG refinery in Indonesia currently uses the energy base contained in natural gas and has not yet entered the gas composition factor. The principle of justice is considered to have been achieved with the uniformity of natural gas prices whereas in practice the calculations based on the existing LPG composition on natural gas can benefit both the producers and offtakers of gas.
The method used is to calculate the gas price from the producer side as willingness to sell WTS and gas price from the side offtaker gas as willingness to pay WTP. The gas price meeting point is made in a formulation developed indexed on LPG Aramco and Indonesian Crude Prices ICP.
The proposed new gas price is made by developing the preliminary gas pricing formula A 0.5 P P1 C C1 into the gas price ax A b x B c x C where A Gas base price, B Aramco LPG Price minus Cost Processing LPG Cost of Capex, Opex, depreciation , C Condensate price refers to 75 of Indonesia crude oil price. a fraction of components C1 and C2 in percent, b fraction of C3 and C4 components in percent, c fraction of condensate in percent, a b c 100 . From the calculation of sensitivity, gas prices rose linearly to Aramco LPG price increase so it is more profitable for both the producers and the gas offtaker.
"
Depok: Fakultas Teknik Universitas Indonesia, 2018
T50952
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>