Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 14247 dokumen yang sesuai dengan query
cover
Rajapakse, Ruwan
Burlington, MA : Elsevier/Butterworth-Heinemann, , 2008
624.154 RAJ p (1)
Buku Teks  Universitas Indonesia Library
cover
Poulos, H.G.
New York: John Wiley & Sons, 1980
624.154 POU p
Buku Teks  Universitas Indonesia Library
cover
Tomlinson, Michael John
"Buku yang berjudul "Pile design and construction practice" ini ditulis oleh M. J. Tomlinson. Buku ini membahas tentang desain dan konstruksi bangunan."
London: E & Fn Spon, 1997
R 624.154 TOM p
Buku Referensi  Universitas Indonesia Library
cover
Poulos, H.G.
New York: Wiley, 1980
624.154 POU p
Buku Teks  Universitas Indonesia Library
cover
Munson, Albe E.
New York: McGraw-Hill, 1974
624.15 MUN c
Buku Teks  Universitas Indonesia Library
cover
Hardjanto
"Pile Cap yang mempunyai fungsi untuk menyebarkan beban dari komponen tekan maupun tarik ke kelompok tiang, sehingga beban terbagi secara merata pada setiap tiang anggota. Pile cap juga mengakomodasi penyimpangan posisi yang diakibatkan oleh beban horisontal. Rekahan (crack) bisa terjadi pada pertemuan pilecap dan tiang pancang dikarenakan momen-momen lentur akibat beban lateral pada kondisi sambungan jepit (fixed) maupun sendi (pinned).
Penelitian ini diawali dengan studi hasil penelitian Kim, Zhang mengenai tahanan lateral pile cap pada grup tiang. Kemudian dilakukan pemodelan pile cap dengan dua macam ketebalan, dengan mengambil 2D dan 3.5D, dimana D adalah diameter tiang pancang. Selain itu diambil juga kedudukan tiang pancang, diatas muka tanah dan dibawah permukaan tanah. Pemodelan dan analisis dilakukan dengan menggunakan software FLPier. Kemudian dilakukan perbandingan hasil analisis pile cap pada ketebalan 2D dan 3.5D.
Defleksi yang terjadi pada ketebalan pile cap 2D pada lead pile, ditunjukkan lebih besar daripada lead pile dengan ketebalan 3.5D. Momen pile cap pada lead pile selalu lebih besar daripada posisi rear, balk pada ketebalan pile cap 2D maupun 3.5D. Pada ketebalan pile cap 3.5 D, momen yang terjadi lebih besar dari momen yang terjadi pada ketebalan pile cap 2D."
Depok: Fakultas Teknik Universitas Indonesia, 2004
T14972
UI - Tesis Membership  Universitas Indonesia Library
cover
Ranganathan, R.
New Delhi : Tata McGraw-Hill, 1990
624 RAN r
Buku Teks  Universitas Indonesia Library
cover
Haureta Nova Aisyah
"Meningkatknya kebutuhan akan fasilitas kesehatan harus selalu diselaraskan dengan pembangunan infrastruktur tersebut yaitu Rumah Sakit. Namun beberapa Rumah Sakit dalam tahap konstruksi atau pembangunan mengalami keterlambatan. Terdapat faktor-faktor permasalahan yang mungkin mengakibatkan keterlambatan tersebut. Faktor faktor permasalahan merupakan salah satu sumber risiko.
Tujuan dari penelitian ini adalah untuk mengidentifikasi faktor risiko yang berpengaruh, penyebab risiko dominan dan rekomendasi risiko. Melalui metode survey terhadap kontraktor utama untuk mengetahui sumber risiko yang selanjutnya dianali dengan metode Analytical Hierarchy Process (AHP) untuk mengetahui peringkat risiko, kemudian dengan faktor risiko SNI dicari risk level. Untuk menganalisis risiko dominan digunakan metode korelasi antara risiko yang muncul dengan kinerja waktu proyek dari metode survey.
Hasil penelitian berupa faktor risiko dominan yang berpengaruh terhadap kinerja waktu pada tahap konstruksi Rumah Sakit yaitu. Terdapat dua faktor risiko dominan yaitu"Periode Pembayaran Tidak Sesuai Kontrak" dan"Perubahan Desain". Faktor-faktor risiko tersebut dibahas secara menyeluruh dari penyebab risiko, dampak risiko hingga rekomendasi respon risiko.

The increasing need for health facilities should always be aligned with the infrastructure development ie Hospital. However, several hospitals are under construction or development has been delayed. There are factors that may lead to problems such delay. Factors issues are one source of risk.
The purpose of this study was to identify factors influencing risk, the risk causes dominant and recommendation of risk. Through survey methods against the main contractor to find out the source of risk is then analyzed by Analytical Hierarchy Process (AHP) to determine the risk rating, then the risk factor SNI sought risk level. To analyze the risk of correlation between the predominantly used method of risk that comes with the project time performance of survey methods.
The results is the dominant risk factors that affect the performance of time at the hospital construction. There are two dominant risk factor is"Payment Period that Not Suitable from The Contract" and "Change Design". The risk factors discussed thoroughly of the cause of the risk, the impact of risk until risk response recommendations.
"
Depok: Fakultas Teknik Universitas Indonesia, 2013
S53607
UI - Skripsi Membership  Universitas Indonesia Library
cover
Marendra Uka Ermaya
"ABSTRAK
Penelitian ini membahas tentang pengalokasian berbagai macam risiko pada stakeholder terkait seputar proyek yang mana diambil contoh proyek Mass Rapid Transit Jakarta pada tahapan konstruksi proyek dimana dalam proyek ini terdapat keterlambatan dalam penyelesaiannya dikarenakan alokasi risiko yang tidak tepat. Penelitian ini adalah penelitian kualitatif dengan desain deskriptif. Pengalokasian risiko perlu dilakukan untuk mengetahui tanggung jawab tiap stakeholder terhadap risiko terkait yang mana bila tidak dialokasikan pada stakeholder yang tepat akan membuat proyek terhambat. Penelitian ini menggunakan metode delphi dan survei menggunakan kuesioner. Setelah dilakukan analisa dan validasi didapatkan masing-masing risiko yang muncul dengan para stakeholder utama yang menanggungnya dengan mayoritas risiko ditanggung oleh pihak kontraktor.

ABSTRACT
This paper discusses the allocation of various types of risk on relevant stakeholders about the project which were sampled on Jakarta Mass Rapid Transit project in the construction phase of the project where in this project, the time to finished the project has delayed because of risk allocation is not proper. This study is a qualitative research with descriptive design. The allocation of risk needs to be done properly to determine the responsibilities of each stakeholder to the associated risks which if not allocated to the appropriate stakeholders will make the project impeded. This study use Delphi method and questionnaire survey. After being analyzed and validated, we obtain emerging risks with the key stakeholders who bear the risk with the majority of the risk is borne by the contractor."
Depok: Fakultas Teknik Universitas Indonesia, 2016
S66410
UI - Skripsi Membership  Universitas Indonesia Library
cover
Narayanan, R.S.
London: Spon Press, 2001
624 NAR i (1)
Buku Teks  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>