Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 155278 dokumen yang sesuai dengan query
cover
cover
cover
Toendan, Erasmus
Depok: Fakultas Teknik Universitas Indonesia, 1997
TA2101
UI - Tugas Akhir  Universitas Indonesia Library
cover
Johanes
Depok: Fakultas Teknik Universitas Indonesia, 1996
TA2091
UI - Tugas Akhir  Universitas Indonesia Library
cover
Bakti Buana Baju Chrisman
Depok: Fakultas Teknik Universitas Indonesia, 1996
TA2094
UI - Tugas Akhir  Universitas Indonesia Library
cover
Syafa Adistia Chairunnisa
"Penelitian ini bertujuan untuk menganalisis peran audit internal dalam penerapan Sistem Manajemen Anti Penyuapan (SMAP) berbasis SNI ISO 37001:2016 di PT PLN (Persero) UPT Salatiga. Metode penelitian yang digunakan adalah pendekatan kualitatif melalui wawancara dengan narasumber dari fungsi kepatuhan anti penyuapan dan audit internal, serta pengumpulan data dari dokumentasi dan kuesioner. Hasil penelitian menunjukkan bahwa audit internal berperan penting dalam memantau kepatuhan, evaluasi risiko, pelaporan audit, dan perbaikan berkelanjutan atas penerapan SMAP. Audit dilakukan menggunakan kerangka Maturity Level yang melibatkan aspek manusia, proses, data, dan sistem. Penelitian juga menemukan kepatuhan terhadap ISO 37001:2016 dan kepuasan tinggi terhadap penerapan SMAP, meskipun ada peluang peningkatan dalam pengelolaan sumber daya fisik dan sistem pelaporan pelanggaran.

This research aims to analyze the role of internal audit in the implementation of the Anti-Bribery Management System (SMAP) based on SNI ISO 37001:2016 at PT PLN (Persero) UPT Salatiga. The research employs a qualitative approach through interviews with anti-bribery compliance function and internal audit, as well as data collection from documentation and questionnaires. The results of the study indicate that internal audit plays an important role in monitoring compliance, risk evaluation, audit reporting, and continuous improvement of the implementation of the SMAP. The audit was conducted using the Maturity Level framework involving human, process, data, and system aspects. The study also found compliance with ISO 37001:2016 and high satisfaction with the implementation of the SMAP, although there are opportunities for improvement in the management of physical resources and the violation reporting system. "
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2025
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Maria Ulfa
"Tesis ini membahas tentang evaluasi sistem pengendalian manajemen proyek ketenagalistrikan di PT PLN (Persero) berdasarkan levers of control dari Robert Simons, pengendalian di setiap aktivitas pengelolaan, dan pengaturan aktivitas sesuai sequence activities. Hasil evaluasi digunakan untuk memberikan saran pencegahan atas keterlambatan penyelesaian proyek dan memberikan gambaran disain supaya proyek selesai tepat waktu. Berdasarkan tesis ini, perusahaan telah membangun pengendalian sesuai levers of control namun perlu memberikan perhatian lagi pada outsourcing yang belum memahami belief system & business conduct boundary, pemanfaatan hasil diagnostic control system yang lebih banyak reaktif dibanding preventif, dan terhadap pegawai yang kurang berpartisipasi dalam interactive control system. Tesis ini juga menunjukkan terdapat aktivitas yang berisiko menyebabkan penyelesaian proyek jadi terlambat dan pengaturan yang belum berurutan, yaitu ketika dokumen disain awal/engineer cost estimate yang disusun oleh konsultan luar dan penyusunan tender document/draf kontrak tidak menyebutkan secara spesifik apakah harga kontrak sudah termasuk/tidak termasuk pajak sehingga berpotensi sengketa, kontrak sudah ditandatangani meskipun pendanaan/perizinan/pembebasan lahan belum tuntas, dan ketika terjadi inisiasi proyek secara mendadak atas permintaan pihak luar yang berwenang sehingga persiapan konstruksi kurang memadai. Terjadinya sengketa, belum tuntasnya pendanaan/ perizinan/pembebasan lahan, dan persiapan yang kurang memadai seringkali menyebabkan penundaan/kendala konstruksi, yang akhirnya penyelesaian proyek menjadi terlambat.

This thesis discusses evaluation control system of electricity project management at PT PLN (Persero) according to levers of control of Robert Simons, control of every activity, and settings of activities according to sequence activities. The result is to provide prevention advices of project completion tardiness and to give design overview so the project would be completed timely. In this research, the company has built control system in according to levers of control, but it needs to pay attention to outsourcing which does not understand the belief system & business conduct boundary, utilization of diagnostic control system more reactive than preventive, and employees who participate less in interactive control system. Research also shows that there are risky activities which cause the lateness of project completion and not sequent settings, ie when the basic design/cost estimate arranged by outsider consultant and preparation of tender document/draft of contract not mention specifically whether the contract price included/excluded taxes so potentially dispute, signed contract though funding/licensing/land acquisition incomplete, and when occurs initiation of the project suddenly by request of the authorized outsider party so the preparation of the construction is inadequate. Disputes, funding/licensing/land acquisition incomplete, and inadequate preparation often cause delay/constraints of construction, that finally completion of the project become late.
"
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2013
T33763
UI - Tesis Membership  Universitas Indonesia Library
cover
cover
cover
Anindita Eka Wibisono
"Kegiatan usaha di bidang ketenagalistrikan tidak akan terlepas dari value chain aktivitas ketenagalistrikan yang dimulai dari pembangkitan, transmisi, distribusi sampai dengan ritel. Dalam siklus aktivitas ketenagalistrikan tersebut, selalu timbul adanya susut energi listrik akibat dari selisih antara jumlah energi listrik yang diproduksi dengan jumlah energi listrik yang dicatat sebagai penjualan kepada pelanggan. PT PLN (Persero) sebagai BUMN di bidang ketenagalistrikan, sejak Desember 2007 telah memiliki kebijakan perusahaan dalam rangka pengendalian susut jaringan distribusi yang dituangkan dalam buku berjudul Pedoman Peta Kegiatan dan Identifikasi Proses Bisnis Distribusi.
Karya akhir ini meneliti bagaimana upaya pengendalian susut energi listrik pada jaringan distribusi yang dilakukan di PT PLN (Persero) area distribusi Jakarta Raya dan Tangerang, dampaknya terhadap subsidi listrik Pemerintah pada PT PLN (Persero). Faktanya, aktivitas pengendalian susut energi listrik pada jaringan distribusi dibagi menjadi aktivitas pengendalian karena penyebab faktor teknis dan faktor non teknis.

Electricty business value chain consist of power generation activities, transmission and distribution network activities, and retail activities. Usually energy losses happen, due to the calculation gap between electricity produced by power plants and recorded as sales to the customer. Since December 2007, regarding to the Board of Director Decree, PT PLN (Persero) has developed corporate policy to control energy losses, particularly energy losses on distribution network.
This thesis examines what are the efforts conducted by PT PLN (Persero) distribution area Jakarta Raya and Tangerang and how effective they were to control energy losses on distribution network and also its impact to the electricity subsidy provided by the government. In fact, the activities to control the losses divided into technical factors and non technical factors.
"
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2014
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>