Muhammad Faris Aufar
"Sistem proteksi sangatlah penting dalam sistem tenaga listrik, terutama untuk kehandalan kerja dan perlindungan pada sistem dalam mesin-mesin listrik. Rele merupakan salah salah satu alat proteksi yang banyak digunakan pada sistem tenaga listrik. Jenis rele bermacam-macam tergantung karakteristik yang dibutuhkan, salah satunya adalah rele jarak dan rele diferesial penghantar. Pada PT. PLN, penggunaan sistem proteksi mutlak diperlukan untuk mendukung kinerja sistem tenaga listrik karena sebagai perusahaan listrik negara, PLN merupakan gardu terdepan dalam pendistribusian listrik di seluruh Indonesia sehingga tentunya diharapkan keberlangsungan sistem listrik tidak terganggu.
Pada skripsi ini, penulis akan mengangkat topik tentang konfigurasi proteksi dimana pada sistem transmisi SUTT (Saluran Udara Tegangan Tinggi) di daerah Alam Sutera akan dibangun gardu induk baru sehingga dengan adanya penambahan sistem, konfigurasi sistem proteksi yang lama perlu diperbaharui untuk menyesuaikan dengan sistem yang baru secara keseluruhan. Karena fokus lebih diutamakan pada proteksi utama, maka rele yang akan dibahas pada skripsi ini adalah rele jarak dan rele diferensial penghantar yang biasa digunakan pada SUTT. Untuk melihat koordinasi rele setelah perhitungan, akan digunakan metode scanning untuk melihat hubungan koordinasi antar rele dalam sistem yang baru. Sehingga di dapatkan hasil rekonfigurasi dan pengaruhnya pada sistem sebelumnya.

Protection system is essential in an electrical power system, especially for the reliability and protection on the system in electric machines. Relay is one of the devices that is widely used in the protection system of electric power. There are various types of relay based on characteristics that are required on system, two of them are distance relay and line differential relay. In PT. PLN, the usage of protection system is undoubtedly needed to support the performance of electrical power systems because their position as main electrical company on the state, PLN is forefront for electrical distribution throughout Indonesia so it is expected that sustainability of the electrical system is not disturbed.
In this thesis, the author will discuss the topic of protection system configuration about the high voltage overhead power line of transmision system in the area of Alam Sutera where the new main substation will be built. To adjust this new system as a whole, the old protection system needs to be updated. This thesis will focus in main protection of the system, the relay that will be discussed on this thesis is distance relay and line differential relay which commonly used in high voltage overhead transmission line. For the simulation of distance relay coodination, scanning method will be used to see the relation of coordination of the relay on the new system. Therefore the result can be gotten by reconfiguration and the impact for the previous system."
Depok: Fakultas Teknik Universitas Indonesia, 2014
S55035
UI - Skripsi Membership  Universitas Indonesia Library
cover
Dhimas Permana
"ABSTRACT
Proyeksi kebutuhan tenaga listrik di wilayah Balaraja cenderung mengalami kenaikan peningkatan beban, sehingga untuk memenuhi kebutuhan tersebut diperlukan pengembangan sarana kelistrikan diantaranya pengembangan sistem transmisi. Pengembangan tersebut mengharuskan sistem proteksi pada sistem transmisi untuk disesuaikan dalam hal desain dan setting peralatannya. Salah satu peralatan penting dalam proteksi sistem transmisi adalah relai jarak yang dapat mendeteksi adanya gangguan hubung singkat. Pada skripsi ini, pengembangan sistem transmisi di Balaraja terjadi dengan menambahkan Gardu Induk Spinmill sehingga akan membuat konfigurasi penyetelan relai jarak yang berada didekat Gardu Induk Spinmill akan berubah. Selain itu, secara keseluruhan bentuk konfigurasi saluran udara tegangan tinggi 150 KV di Balaraja adalah saluran ganda ke ganda yang akan berpengaruh terhadap kinerja relai jarak akibat pengaruh infeed dan mutual impedansi urutan nol sehingga penyetelan relai jarak akibat adanya penambahan Gardu Induk Spinmill perlu memperhatikan faktor yang dapat mempengaruhi kinerja relai jarak tersebut. Berdasarkan simulasi setting rekonfigurasi yang telah mempertimbangkan faktor-faktor yang dapat mempengaruhi kinerja relai jarak maka dapat diambil kesimpulan bahwa rekonfigurasi setting relai jarak di Balaraja sudah benar dikarenakan tidak ada zona pengaman yang tumpang tindih dan zona pengaman relai jarak memiliki jangkauan setting yang dapat melindungi saluran transmisi sesuai dengan kaidah penyetelan

ABSTRACT
The projection of electricity demand in Balaraja region tends to the load increase, so to fulfill the requirement, it is necessary to develop electricity facilities such as the developing of transmission system. The development requires protection systems on the transmission system to be customized in terms of design and equipment settings. One of the important device in the protection of transmission system is a distance relay that can detect a short circuit fault. In this thesis, the development of transmission system in Balaraja occurs by adding the Spinmill Substation so that it will make the configuration of the distance relay adjustment near the Spinmill Substation will change. In addition, the overall configuration of the 150 KV high voltage overhead transmission lines in Balaraja is double to double channel which will affect the relay distance performance due to the infeed and mutual impedance of zero sequence so that the distance relay adjustment due to the addition of the Spinmill Substation should take into consideration factors affect the performance of the distance relay. Based on the simulation of reconfiguration settings that have considered factors that may affect the performance of the distance relay it can be concluded that the reconfiguration of the relay distance settings in Balaraja is correct because there is no overlapping security zone and the relay distance safety zone has a range of settings that can protect the transmission line according to the setting rules. "
2018
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Yuslan Basir
"ABSTRACT
High Voltage measurement based on the electro-optic effect of LiTaOa crystal plate has been developed. This crystal was placed between two parallel plates which more like capacitor arrangement.
On the first step, this system was capable only to measure the do voltage from 0 to 1 kV, and the ac voltage from 0 to 0.3 kV. But, by enlarging the spaces in between one side at crystal to one of the plate surface, d, the range of measurement was increased up to 4.8 kV, with d =7 mm."
1992
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Junaidi
Depok: Fakultas Teknik Universitas Indonesia, 1992
S37992
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ade Rustiawati Wijaya
"Kestabilan tegangan merupakan salah satu syarat sistem operasi tenaga listrik. Tegangan pada sistem tenaga listrik akan mengalami collapse seiring dengan kenaikan beban yang terus menerus hingga mencapai batas maksimumnya. Selain itu terlepasnya unit-unit pembangkit dan sirkit penghantar juga merupakan salah satu penyebab jatuhnya tegangan.
Dalam studi kasus ini, tegangan krititis pada Subsistem Bekasi Cibatu dan Kembangan akan dianalisis dengan menggunakan metode kurva PV. Kurva ini menjelaskan hubungan antara daya aktif dan tegangan pada suatu bus. Dengan menaikkan beban, maka nilai tegangan kritis pada pembebanan maksimum dapat diperoleh.
Hasil penelitian menunjukkan bahwa susbistem yang diterapkan skenario lepas pembangkit Unit 8 PLTU Suralaya memiliki tegangan kritis terendah sekaligus penurunan tegangan kritis terbesar yaitu subsistem Cibatu dengan tegangan kritis sebesar 423.087 kV atau mengalami penurunan sebesar 5.192 % dari tegangan kritis kondisi normalnya.

Voltage stability is one of requirements among operation of electrical power system. Voltage on electrical power system will collapse along with continuously rising load until its maximum limit and due to lose of generator unit and conductor circuit.
In this study case, critical voltage at these Subsystem Bekasi Cibatu and Kembangan will be analyzed using PV curve method. The curve explains relationship between active power and voltage on a load bus. Critical voltage value on maximum loading can be yielded when load is increased.
This research resulted that application of lose scenario of PLTU Suralaya Unit 8 has the biggest impact of critical voltage drop at Cibatu subsystem. Critical voltage of Cibatu subsystem is 423.087 kV or its critical voltage decrease to 5.192 % from its critical voltage at normal condition.
"
Depok: Fakultas Teknik Universitas Indonesia, 2015
S58702
UI - Skripsi Membership  Universitas Indonesia Library
cover
Delhi: Khanna Publishers, 1982
621.31 HIG (2)
Buku Teks  Universitas Indonesia Library
cover
Jha, R. S.
Delhi: Dhanpat Rai & Sons, 1981
621.3 JHA c
Buku Teks  Universitas Indonesia Library
cover
"This book addresses the very latest research and development issues in high voltage technology and is intended as a reference source for researchers and students in the field, specifically covering developments throughout the past decade. This unique blend of expert authors and comprehensive subject coverage means that this book is ideally suited as a reference source for engineers and academics in the field for years to come."
London: Institution of Engineering and Technology, 2007
e20451602
eBooks  Universitas Indonesia Library
cover
Eko Santoso
"Otomatisasi dynamometer adalah suatu usaha memodifikasi dari dynamometer yaitu dengan memasang / menambah suatu peralatan pengaman yang bertujuan agar dynamometer yang pada mulanya hanya berfungsi sebagai alat ukur dikembangkan juga fungsinya sebagai pengaman alat tarik secara otomatis sesuai dengan gaya tarik yang dikehendaki.
Perencanaan modifikasi mesin tarik dilakukan sedemikian rupa yaitu dengan memasang roll/bantalan gelinding diantara 2 (dua) casis (casis bagian atas menempel pada peralatan dan casis bagian bawah sebagai casis tambahan yang ditopang oleh roda. Maksud pemasangan roli adalah untuk memudahkan gerakan antara kedua casis.
Perencanaan modifikasi antara mesin tarik dan dynamometer diatur sedemikian rupa, sehingga apabila mesin tarik menarik kawat penghantar selanjutnya akan menggerakan dynamometer. Gaya tarik dari kawat penghantar yang diterima dynamometer dirubah menjadi gaya tekan melalui fluida yang menggerakan jarum kerja dynamometer.
Dengan memasang peralatan pengaman pada dynamometer, maka pengaturan gaya tarik kawat penghantar dapat dilaksanakan sesuai dengan gaya tarik yang dikehendaki dengan mengatur besaran gaya yang ada pada dynamometer."
Depok: Fakultas Teknik Universitas Indonesia, 1995
S36274
UI - Skripsi Membership  Universitas Indonesia Library
cover
Syamsir Abduh
Jakarta: Salemba Teknika, 2001
621.319 13 SYA t
Buku Teks  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>