Ditemukan 119922 dokumen yang sesuai dengan query
Lukluk Khairiyati
"Pada tesis ini dilakukan pengukuran dan analisis ketidakpastian resistor standar 1 Ω tipe Fluke 742A. Analisa ketidakpastian meliputi ketidakpastian parameter ukur rasio Jembatan Komparator Arus Searah dan ketidakstabilan suhu resistor yang diuji. Pengukuran kesalahan parameter ukur rasio jembatan DCC tipe Guildline 6675A dilakukan menggunakan metode generik dan metode basis resistansi yang merupakan metode pengujian yang dikembangkan. Pengukuran koefisien suhu resistor standar 1 Ω uji dilakukan pada rentang suhu 18 oC hingga 28 oC. Pengukuran resistor standar ini dilakukan dengan menurunkan nilai resistor standar 1 Ω tipe Thomas yang tertelusur pada sistem QHR di Puslit KIM-LIPI kepada resistor standar termaksud.
Diperoleh hasil pengukuran kesalahan parameter ukur rasio jembatan DCC dengan metode generik untuk rasio 0,1:1 hingga 10:1 adalah (0,14 ± 1,68) ppm, sedangkan dengan metode basis resistansi untuk rasio kombinasi hubung paralel atau seri-paralel dan untuk rasio hubung seri masing-masing sebenar (1,19 ± 1,81) ppm dan (-0,44 ± 0,15) ppm. Nilai koefisien suhu resistor standar akibat perubahan suhu didapat a=1,66 ppm/ oC dan b = -0,031 ppm/ oC2. Menggunakan nilai-nilai tersebut ketidakpastian resistor standar 1 Ω tipe fluke 742A sebesar 1,00002048 Ω dengan ketidakpastian sebesar 0,000000146 Ω.
Measurement and uncertainty analysis of standard resistor (Fluke-742A) 1 Ω type is reported. The uncertainty analysis consists of the uncertainty of Direct Current Comparator Bridge (DCC Bridge) and temperature instability of the resistor under test. The error measurement of the ratio measure parameter of 6675A DCC Bridge-Guildline was done using generic method and base resistor method which is a developed measuring method. Measurements of coefficient temperature of standard resistor under test it for temperature range of 18 oC to 28 oC. The measurement of the standard resistor was done using DCC Bridge by disseminating the standard resistor value of 1 Ω Thomas type that is traceable to QHR Puslit KIM-LIPI to the standard resistor referred. The error measurement value of the ratio measure parameter using generic method at the ratio of 0.1:1 to 10:1 was , whereas, the error measurement result using base resistor method at the ratio of parallel or series-parallel circuit combination and the ratio of series circuit were and respectively. The coefficient temperature values of standard resistor regarding temperature changes ware a=1,66 ppm/ oC and b = -0,031 ppm/ oC2. Based on the measurement, the value of standard resistor of 1 Ω Fluke 742A type was 1,00002048 Ω with the uncertainty of 0,000000146 Ω."
Depok: Fakultas Teknik Universitas Indonesia, 2014
T41569
UI - Tesis Membership Universitas Indonesia Library
Bryan Oscareino Malik
"Sistem off-grid merupakan salah satu solusi untuk daerah yang masih terisolasi dari jaringan listrik interkoneksi sehingga kebutuhan konsumen akan listrik dapat terpenuhi melalui adanya sistem pembangkitan sendiri untuk daerah tersebut. Sebagai salah satu sistem yang berkembang maka diperlukan adanya penelitian lebih lanjut terhadap sistem ini khususnya terhadap aspek kualitas daya sistem. Penelitian ini akan mempelajari distorsi harmonik tegangan yang berasal dari sumber pembangkit sehingga dapat dianalisa salah satu aspek kualitas dayanya. Dengan adanya penelitian distorsi harmonik sumber maka dapat dijadikan bahan pertimbangan untuk memilih sumber pembangkit yang bekerja secara efisien dan kontinu untuk sistem off-grid yang lebih baik.
Off grid system is one of the solution for the isolated and unreachable area by interconnection system, so that consumer?s demand of electricity could be fulfilled with their own energy generation system in the area. The new developed system need to be analyzed especially in the term of power quality. This observation will study the harmonics voltage distortion caused by energy generator source so at least one of the power quality aspect could be analyzed. Harmonics voltage observation hopefully could become one of the consideration in choosing the best power supply that could work efficiently and continuesly for the better off grid system."
Depok: Fakultas Teknik Universitas Indonesia, 2014
S56778
UI - Skripsi Membership Universitas Indonesia Library
Limbong, Jonathan Martin Marojahan
"Dalam sistem tenaga listrik banyak terdapat beban listrik non-linear, salah satu beban non-linear adalah konverter. Konverter dapat ditemukan dalam aplikasi transmisi HVDC, seperti pada rancangan sistem HVDC Sumatra Jawa. Beban non linier tersebut dapat menyebabkan distorsi harmonik. Distorsi harmonik merupakan suatu gejala dalam sistem tenaga listrik yang mengakibatkan perubahan tegangan, arus dan bentuk gelombang yang ada di dalam sistem. Pengaruh distorsi harmonik terhadap nilai arus dan tegangan tersebut, juga mempengaruhi unjuk kerja beberapa komponen listrik lainnya, salah satunya komponen pengukur nilai arus maupun tegangan.
Dalam sistem tenaga listrik, komponen proteksi atau rele proteksi yang ada menggunakan komponen listrik yang mengukur nilai arus dan tegangan. Oleh karenanya sebuah rele proteksi dapat terpengaruh oleh distorsi harmonik sehingga mengganggu unjuk kerja rele proteksi tersebut. Namun distorsi harmonik dapat dikurangi dengan keberadaan filter pada sistem tenaga listrik.
In a power system there are many non-linear loads; one example of non-linear loads is converter. Converters can be found in HVDC transmission applications, such as Java-Sumatra HVDC system design. The non-linear load can cause harmonic distortion. Harmonic distortion is a phenomenon in electric power systems resulting in changes in voltage, current and waveforms in the system. Effect of harmonic distortion on the current and voltage values also affected the performance of some other electrical components, for example components that measure values of current and voltage. In electric power system, component of protection or protection relays use components that measure values of current and voltage. Therefore a protection relay can be affected by harmonic distortion and interfere the protection relay operation. However, harmonic distortion can be reduced by the presence of the filter on the power system."
Depok: Fakultas Teknik Universitas Indonesia, 2014
S56999
UI - Skripsi Membership Universitas Indonesia Library
Harry Sudibyo S.
"
ABSTRAKPenggunaan compiler untuk sel-sel terstruktur seperti RAM, ROM, PLA dan Multiplier sudah tidak asing lagi dalam perancangan pemakaian Integrated Circuit (IC) yang spesifik. Dalam makalah ini akan diuraikan secara garis besarnya saja tentang metodologi pengetesan circuit-circuit yang dibuat dari rangkaian sel-sel tersusun (Rangkaian IC). Unsur-unsur pokok dalam metodologi pengetesan ini adalah: Vector compilers yang merupakan penghasil test yang sesuai untuk rangkaian sel-sel tersusun. Strategi pemisahan (An isolation strategy) yang memperbolehkan pengetesan ini dapat diaplikasikan pada rangkaian blok fungsi."
Fakultas Teknik Universitas Indonesia, 1993
LP-pdf
UI - Laporan Penelitian Universitas Indonesia Library
Nurul Awalia
"Tesis ini membahas mengenai kedudukan PT Perusahaan Listrik Negara (Persero) yang merupakan Badan Usaha Milik Negara sebagai Pemegang Izin Usaha Penyediaan Tenaga Listrik dalam penugasan Pemerintah untuk melakukan pelayanan publik dengan membeli tenaga listrik yang berasal dari pembangkit tenaga listrik yang berbasis energi terbarukan. Kebijakan Pemerintah dalam rangka mendorong pengembangan dan pemanfaatan energi terbarukan secara optimal untuk memenuhi penyediaan tenaga listrik secara khusus tertuang dalam ketentuan Pasal 19 Peraturan Pemerintah Nomor 59 Tahun 2007 tentang Kegiatan Usaha Panas Bumi dan peraturan pelaksanaannya serta beberapa Peraturan Menteri yang mengatur mengenai penugasan Pemerintah kepada PT Perusahaan Listrik Negara (Persero) untuk melakukan pembelian tenaga listrik yang berbasis dari energi terbarukan yang dijual oleh pengembang pembangkit listrik swasta atau Independent Power Producer (IPP).
PT Perusahaan Listrik Negara (Persero) sebagai suatu badan usaha selayaknya dapat menentukan sendiri pelaksanaan bisnis dan harga listriknya sendiri namun dengan penugasan dimaksud seperti tidak diberi kebebasan untuk berunding sendiri dengan investor, padahal dengan segala keahlian dan pengalamannya, PT Perusahaan Listrik Negara (Persero) lebih tahu kebutuhan mengenai berapa tenaga listrik yang harus dibeli, berapa harga pantasnya, dan sebagainya. Tesis ini menggunakan metode penelitian yuridis normatif dengan bentuk hasil penelitian preskriptif analitis. Hasil penelitian ini menyimpulkan bahwa penugasan dimaksud diperlukan dalam rangka mendorong pengembangan dan pemanfaatan energi terbarukan secara optimal dalam penyediaan tenaga listrik.
This thesis discusses about the position of PT PLN (Persero) is a State Owned Enterprise License Holder of Electricity Supply in the assignment of the Government to perform a public service by purchasing electricity from power plants based on renewable energy. Government policy in order to encourage the development and utilization of renewable energy optimally to meet the electric power supply is specifically stipulated in the provisions of Article 19 of Government Regulation No. 59 Year 2007 on Geothermal Operations and its implementing regulations as well as some of the regulation governing the assignment of the Government to the PT Perusahaan Listrik Negara (Persero) to purchase electricity from renewable energy based being sold by a private power plant developer or Independent Power Producer (IPP). PT PLN (Persero) as a business entity should be able to determine its own conduct of business and the price of the electricity itself, but with such an assignment is not given the freedom to negotiate with the investors themselves, but with all the expertise and experience, PT PLN (Persero) more know about how much power needs to be purchased, what price, and so on. This thesis research using normative juridical form of prescriptive analytical research results The results of this study concluded that the assignment is necessary in order to encourage the development and optimal utilization of renewable energy in electricity supply."
Salemba: Fakultas Hukum Universitas Indonesia, 2014
T-Pdf
UI - Tesis Membership Universitas Indonesia Library
Zulfahmi Akmal
"Listrik yang di masa depan kemungkinan besar menjadi sebuah komoditas akan mengubah sistem listrik yang ada di seluruh dunia. Setiap pemilik rumah akan berupaya untuk turut serta dalam pasar listrik tersebut. Oleh karena itu, dibutuhkan sebuah pengaturan beban agar dapat dihasilkan keuntungan yang maksimal bagi pemilik rumah tersebut. Pengaturan tersebut harus memerhatikan harga listrik yang di masa depan akan menjadi dinamis. Pada skripsi ini, penentuan harga listrik diasumsikan menggunakan real time pricing (RTP). Selain itu, seringnya terjadi mati listrik (blackout) di Indonesia akan menjadi pertimbangan dalam rancangan sistem ini sehingga rumah pintar tersebut tidak akan mengalami mati listrik.
Electricity that is becoming a comodity will change the existing electrical system. Every house owner will be eager to join the electricity market. Thus, a load management is needed to give a maximum profit for the house owner. The load management must consider the electricity price that is becoming dynamic. In this work, it is assumed that the pricing used is real time pricing (RTP). In the other hand, the high frequency of blackout occuring in Indonesia will become a consideration in the design of this system so that the owner of the house will not experience it."
Depok: Fakultas Teknik Universitas Indonesia, 2015
S59613
UI - Skripsi Membership Universitas Indonesia Library
Yansen
"Penggunaan tegangan DC dalam jaringan distribusi juga memiliki beberapa kelebihan dibanding tegangan AC. Tegangan DC ini bisa dihasilkan dengan menggunakan penyearah, baik untuk sumber AC satu fasa maupun tiga fasa. Pada skripsi ini dibahas salah satu bentuk rangkaian penyearah dengan IGBT (Insulated Gate Bipolar Transistor) menggunakan metode pengontrolan arus dengan sinyal PWM (Pulse Width Modulation). Simulasi dilakukan dengan menggunakan modul Simulink Matlab 6.5 dan diperoleh hasil konfigurasi sistem dengan menggunakan parameter simulasi dan konstanta pengendali PI (Proportional Integrator) yang tepat. Keluaran tegangan DC yang diperoleh adalah konstan dan dapat mengikuti nilai acuan yang ditetapkan. Untuk analisa kestabilan, digunakan diagram bode dan respon step. Analisa bode juga digunakan untuk menentukan konstanta pengendali (Kp dan K;) yang paling baik. Dengan menggunakan konstanta pengendali yang paling baik, nilai resistor R, induktor L dan kapasitor C divariasikan untuk menentukan nilai yang paling optimum. Dari hasil simulasi, performansi terbaik diperoleh dengan menggunakan nilai Kp = 0,13 dan Ki = 1."
Depok: Fakultas Teknik Universitas Indonesia, 2006
S40691
UI - Skripsi Membership Universitas Indonesia Library
Nadya Putri Anggraini
"Tesis ini membahas tentang peran pemerintah dan swasta dalam usaha ketenagalistrikan di Indonesia dan menganalisis bagaimana penafsiran Mahkamah Konstitusi dalam menolak Uji Materil Undang-undang Nomor 30 Tahun 2009 tentang Ketenagalistrikan. Penelitian ini bersifat Normatif dengan pendekatan sinkronisasi hukum vertikal dan juga didukung dengan pendekatan kasus. Berdasarkan hasil penelitian diperoleh hasil Peran pemerintah dalam usaha ketenagalistrikan berupa pemberian subsidi kepada konsumen listrik. Subsidi merupakan kebijakan yang ditujukan untuk membantu konsumen tertentu agar dapat membayar produk atau jasa yang diterimanya dengan tarif dibawah harga pasar. Dalam menyediakan listrik, pemerintah juga mengendalikan harga jual. Selanjutnya, peran swasta dalam usaha ketenagalistrikan diperlukan terutama dalam pembangkit tenaga listrik yang diharapkan dapat mencukupi kekurangan pasokan listrik nasional. Sorotan utama yang menyangkut peran swasta dalam ketenagalistrikan adalah masalah perizinan. Mahkamah Konstitusi memutuskan untuk menolak Uji Materil yang diajukan oleh SP-PLN dengan pertimbangan bahwa pemisahan usaha (Unbundling) yang dimaksud dalam UU Nomor 30 Tahun 2009 tentang Ketenagalistrikan berbeda dengan yang dimaksuda dalam UU Nomor 20 tahun 2002 tentang Ketenagalistrikan yang sebelumnya dibatalkan oleh MK pada tahun 2004.
These theses discuss about the role of the Indonesian government and private sectors in Indonesia on Electricity in Indonesia and analyze the situation based on Indonesian law. This discussion is based on Indonesian Constitutional Court on rebutting the Law on Judicial Review no. 30 of 2009 on Electricity. The research uses a normative approach on vertical law synchronization in case report. Result result shows that the role of Indonesian government on subsidising for electricity in the form of subsidising the electricity consumer. The subsidize is in the form of aiming at helping certain consumer to be able to pay for the product or servise based on the opportunity in getting lower price off the market. In providing electricity of the community, the Indonesian government also control the price for the market. On the other hand, the role of private sectors or needed in the electricity providership in order to overcome the shortage of electricity for the Indonesian community. This research pinpoint on the role of the private sectors? consessions on electricity. The Indonesian Constitutional Court verdicted on Unbundling of the Indonesian Law based on Law Clause no 33 of 2009 on Electricity is different from Indonesian Law based on Law Clause no. 20 of 2002 on Electricity that was canceled by Indonesian Constitutional Court in 2004."
Depok: Fakultas Hukum Universitas Indonesia, 2011
T28319
UI - Tesis Open Universitas Indonesia Library
Nasrul Fatah
"Energi listrik sebagian besar masih menggunakan bahan bakar fosil yang semakin menipis jumlahnya. Pemborosan energi listrik harus segera diatasi agar tercipta pemakaian yang lebih hemat dan efisien. Penelitian ini dilakukan untuk menganalisis potensi pemborosan energi listrik pada beban penerangan sebuah perusahaan tekstil. Penelitian ini menggunakan data pola perilaku konsumsi energi penerangan serta teknologi peralatannya untuk mengetahui besar penggunaan energi. Potensi pemborosan energi dihitung dengan mengurangi penggunaan energi dengan perilaku penghematan energi serta penggantian teknologi lampu yang digunakan. Pada skenario pertama dilakukan penggantian teknologi lampu yang lebih hemat energi didapatkan potensi penghematan energi sebesar 10.011,96 kWh/bulan. Sedangkan pada skenario kedua dilakukan perbaikan pola perilaku pemakaian energi penerangan didapatkan potensi penghematan pemborosan energi sebesar 1.720,80 kWh/bulan. Adapun pada skenario ketiga merupakan gabungan dari kedua skenario didapatkan potensi penghematan energi sebesar 10.968,48 kWh/bulan.
Most of the electrical energy is still using fossil fuel dwindling in number. Electrical energy waste must be overcome in order to create a more efficient use. This study was conducted to analyze the potential waste of electrical energy on lighting load in a textile company. This study used patterns of behavior data and the lighting equipment technology to learn the energy consumption. Waste energy potential calculated by reducing energy usage with energy saving behavior and replacement lamp technology used. The first scenario is to replace lamps by more efficient lamps that can save potential energy equal to 10,011.96 kWh/month. While in the second scenario is to improve lighting energy usage behavior that can save potential energy equal to 1720.80 kWh/month. The third scenario is a combination of both scenarios obtained potential energy savings of 10,968.48 kWh/month."
Depok: Fakultas Teknik Universitas Indonesia, 2014
S53545
UI - Skripsi Membership Universitas Indonesia Library
Amien Rahardjo
Depok: Fakultas Teknik Universitas Indonesia, 1997
LP-pdf
UI - Laporan Penelitian Universitas Indonesia Library