Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 10311 dokumen yang sesuai dengan query
cover
Demirel, Yasar
"[Understanding the sustainable use of energy in various processes is an integral part of engineering and scientific studies, which rely on a sound knowledge of energy systems. Whilst many institutions now offer degrees in energy-related programs, a comprehensive textbook, which introduces and explains sustainable energy systems and can be used across engineering and scientific fields, has been lacking. Energy : production, conversion, storage, conservation, and coupling provides the reader with a practical understanding of these five main topic areas of energy including 130 examples and over 600 practice problems., Understanding the sustainable use of energy in various processes is an integral part of engineering and scientific studies, which rely on a sound knowledge of energy systems. Whilst many institutions now offer degrees in energy-related programs, a comprehensive textbook, which introduces and explains sustainable energy systems and can be used across engineering and scientific fields, has been lacking. Energy : production, conversion, storage, conservation, and coupling provides the reader with a practical understanding of these five main topic areas of energy including 130 examples and over 600 practice problems.]"
London: [Springer, ], 2012
e20397660
eBooks  Universitas Indonesia Library
cover
Culp, Archie W.
Tokyo : McGraw-Hill, 1979
621.042 CUL p (1)
Buku Teks  Universitas Indonesia Library
cover
Culp, Archie W.
Jakarta: Erlangga, 1989
621.042 CUL pt
Buku Teks  Universitas Indonesia Library
cover
Culp, Archie W.
New York: McGraw-Hill, 1991
621.042 CUL p (1)
Buku Teks  Universitas Indonesia Library
cover
Sorensen, Harry A.
New York: John Wiley & Sons, 1983
621.4 SOR e (1)
Buku Teks  Universitas Indonesia Library
cover
cover
Banyu Nurinsan Putewa
"Sistem hybrid berupa penggabungan dua jenis sumber kelistrikan sangat dibutuhkan untuk memenuhi kebutuhan kelistrikan pada saat ini. Hal ini dikarenakan meningkatnya kebutuhan listrik masyarakat umum dan terbatasnya daya generator yang bekerja. Namun, masalah kestabilan tegangan menjadi salah satu faktor yang perlu dicarikan solusi ketika menggunakan sistem hybrid. Dalam skripsi ini akan diajukan simulasi sistem dengan menggunakan pengendali agar tegangan pada sisi beban tetap stabil.

Hybrid system contains two different source of electricity. It is very usefull for today's need, because the electricity's demand is increasing everyday and the generator have the limit of its power. One of the problem is the stability, hybrid system has a bad voltage's stability sometimes. The voltage's controller will be described in this final project, so that the voltage's stability in the load's side will keep steady."
Depok: Fakultas Teknik Universitas Indonesia, 2014
S56809
UI - Skripsi Membership  Universitas Indonesia Library
cover
Gaina Sapoetra
"ABSTRAK
Mikrohidro merupakan sebuah istilah yang digunakan untuk instalasi pembangkit listrik yang memanfaatkan potensi energi air. Prinsip kerja dari pembangkit listrik ini cukup sederhana, yaitu menggerakkan turbin dengan memanfaatkan tenaga kinetik air. Air yang memanfaatkan perbedaan ketinggian (head), serta besarnya debit air. Objek Penelitian ini yaitu potensi daerah Kampung Nyomplong, Desa Curug Bitung, Kabupaten Bogor untuk dibangun Pembangkit Listrik Tenaga Mikro Hidro (PLTMH).
Studi mengenai potensi daerah ini dilatar belakangi kondisi daerah yang belum terjangkau oleh jaringan listrik pemerintah. Sumber potensialnya yaitu sebuah Sungai Cisangku yang mengalir melintasi Kampung Nyomplong. Rancangan PLTMH ini mampu menghasilkan daya hingga 5 kW, sedangkan beban warga yang pernah disurvei sebesar 2,358 kW. Jarak saluran distribusi dari pembangkit ke rumah penduduk ±200 m, dengan menggunakan kabel distribusi NFA2X. Pada proses distribusi harus dilakukan analisis tegangan jatuh, supaya sistem tetap beroperasi stabil dan sesuai standar, serta perlu direncanakan pemilihan kabel yang memiliki kekuatan fisik yang baik, sehingga ketika terjadi kenaikan atau kelipatan beban, sistem tetap mampu beroperasi dengan baik dan rugi-rugi daya akan tetap terjaga dan masih dalam batas aman.

ABSTRACT
Micro-hydro is a term used for the installation of power plants that harness the potential energy of water. The working principle of power generation is quite simple, which drives a turbine to harness the kinetic energy of water. Water which utilizes the difference in height (head), as well as the magnitude of water discharge. The research object is a potential area of Nyomplong Village, Curug Bitung village, Bogor Regency to build Micro Hydro Power (MHP).
Studies on the potential of this region against the background conditions in the area that have not been reached by the government the power grid. Potential source is Cisangku river that flowing across the Nyomplong village. The design of the MHP is capable of generating power up to 5 kW, while the load of the people who ever surveyed at 2,358 kW. Distance from the plant to the distribution channel houses ± 200 m, using NFA2X distribution cable. In the distribution process should be carried out voltage drop analysis, so that the system remains stable and appropriate operating standards, as well as the planned elections need a cable that has good physical strength, so that when there is an increase or a multiple load, the system is still able to operate properly and power loss will stay awake and still within safe limits."
Fakultas Teknik Universitas Indonesia, 2014
S54311
UI - Skripsi Membership  Universitas Indonesia Library
cover
Skogestad, Sigurd
London: CRC Press, 2009
660 SKO c
Buku Teks SO  Universitas Indonesia Library
cover
Amir Erlangga
"Dalam aplikasi enjinering baik dalam bidang industri atau lainnya, kadang kala ditemukan bahwa kebutuhan akan daya listrik, pendinginan dan pemanasan diperlukan secara bersamaan. Salah satu contohnya adalah dalam bidang perhotelan yang membutuhkan daya listrik, pendinginan untuk ruangan dan pemanasan baik untuk ruangan atau air hangat. Sistem combined cooling, heating and power generation (CCHP) atau disebut juga trigeneration adalah sistem yang terdiri dari power system, mesin pendingin absorpsi dan sebuah penukar kalor.
Untuk aplikasi dan perancangan CCHP, sebelumnya dibuat sebuah model sistem dan dilakukan perhitungan biaya energi (bahan bakar) berdasarkan pada kesetimbangan energi hingga biaya investasi dan payback period sehingga dapat diputuskan selanjutnya apakah sistem ini dan konfigurasi seperti apa yang dapat diaplikasikan. Pilihan konfigurasi sistem CCHP yang digunakan adalah dengan menggunakan diesel engine, gas engine dan turbin gas pada power system nya.
Dari hasil perhitungan ketiga konfigurasi sistem CCHP yang coba diaplikasikan pada perhotelan diperoleh bahwa untuk konfigurasi dengan diesel engine dan turbin gas tidak dapat digunakan karena dari sisi biaya energi lebih besar dibandingkan tanpa menggunakan sistem CCHP dan saving cost yang terlalu rendah sehingga mengakibatkan payback period yang lama. Untuk konfigurasi dengan gas engine diperoleh biaya energi hotel dapat ditekan maksimum sebesar Rp. 180.590.337,31, dengan biaya investasi total sebesar Rp. 7.510.550.179,3 dan payback period selama 6,57 tahun.

Engineering application in industrial or etc sometimes found there is a simultaneous need for electricity, cooling and heating. For example is in hotel business, we can found that it need of electricity, cooling for rooms and heating to heat water. Combined cooling, heating and power generation (CCHP) or called trigeneration is a system consists of power system, absorption cooling system and heat exchanger for heating system.
For application and planning, we make a model and calculate the energy cost (fuel cost) based on energy balance, investment, and payback period so later can be decided the feasibility and what configuration of the system can be applied. The configurations of CCHP that chosen is use Diesel engine, gas engine and gas turbine as a power system.
The results of three configurations applied to hotel business that used; show that configuration using Diesel engine and gas turbine couldn?t be applied because energy cost (fuel cost) is more expensive compared to energy cost without CCHP system and saving cost is too small so it affected to too long payback period. By using gas engine, the energy cost for hotel can be reduced maximum at Rp. 180,590,337.31; investment cost estimated is Rp. 7,510,550,179.3 with payback period is 6.57 years."
Depok: Fakultas Teknik Universitas Indonesia, 2008
T25322
UI - Tesis Open  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>