Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 43135 dokumen yang sesuai dengan query
cover
"In this study, based on the typical binary mixtures (ammonia/water) low temperature thermal power generation cycle, a new method for the potential analysis of hot spring additional power generation is proposed. The calculation model is built with Kalina cycle technology for the power generation potential analysis. According to the characteristics of the cycle, the verification items are given to verify the correctness of the calculation model. It is proved that the model is correct by sampling check a set of calculation data. And then, a case study is carried out in Hokkaido since it has the largest number of hot spring resorts in Japan. Results show that the hot spring additional power generation capability in Hokkaido is about 9828.0 kilowatts. And it can bring additional earnings about 2.781 billion Yen for Hokkaido every year."
JPS 9 (2015)
Artikel Jurnal  Universitas Indonesia Library
cover
Grano Prabumukti
"Sumber mata air panas memiliki potensi untuk menghasilkan tenaga terutama di daerah off grid PLN terpencil . Ada dua siklus biner yang dapat digunakan untuk menghasilkan tenaga dari sumber panas suhu rendah yaitu siklus Kalina dan ORC. Fluida kerja yang digunakan adalah Propana, Propena, R1234yf dan R407a untuk ORC dan Ammonia 85 untuk Siklus Kalina. Simulasi masing-masing siklus untuk tiap fluida kerja dilakukan dengan menggunakan software UNISIM untuk menghasilkan nilai effisiensi dan LCOE dengan mengubah kondisi operasi tekanan masuk turbin, suhu sumber panas dan laju alir sumber panas. Tren nilai effisiensi berbanding terbalik dengan tren nilai LCOE pada pengaruh tekanan masuk turbin. Nilai effisensi terbaik berbeda bergantung pada suhu sumber panas. R1234yf dan Propena dengan konfigurasi basic ORC menghasilkan effisiensi terbaik untuk rentang suhu sumber panas 60oC - 99oC. Dari data simulasi, dapat dibentuk persamaan regresi untuk melakukan pemetaan dari tiap lokasi sumber mata air panas. Dari lokasi hotspring, didapat rentang nilai daya 2,1 kWe - 61,3 kWe dan nilai LCOE 99,4 /kWh -15.9 /kWh. Lokasi hotspring APSGA 2, Losseng 2, Beang, Kawah Sirung, Pamandian, Kadidia, Pulu 1, Sajau 3 dan Sajau 2 berpotensi untuk dikembangkan lebih lanjut karena memiliki nilai LCOE lebih rendah dari pembangkit diesel termurah.

Hotsprings have the potential to generate power, especially in off grid areas of PLN. There are two binary cycles that can be used to generate power from low temperature heat source, Kalina Cycle and ORC. The working fluids used are Propane, Propene, R1234yf and R407a for ORC and Ammonia 85 for Kalina Cycle. The simulation of each cycle for each working fluid is done by using UNISIM software to produce efficiency and LCOE values by changing turbine inlet pressur, heat source temperature and heat source flow rate. Efficiency value trends are inversely proportional to the trend of LCOE values on the influence of turbine inlet pressure. The best value of efficiency differs depending on the temperature of the heat source. R1234yf and Propena with ORC basic configuration produce the best efficiency for hoto temperature range 60oC 99oC. From the simulation data, regression equation can be formed to mapping from each hot springs location. From the hotspring location, there is a range of power values of 2.1 kWe 61.3 kWe and a LCOE value of 99.4 kWh 15.9 kWh. The hotspring locations of APSGA 2, Losseng 2, Beang, Sirung Crater, Pamandian, Kadidia, Pulu 1, Sajau 3 and Sajau 2 have the potential to be developed in the future as they have lower LCOE value than the cheapest diesel generators.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
S67681
UI - Skripsi Membership  Universitas Indonesia Library
cover
Wood, Allen J.
Hoboken, New Jersey: Wiley-IEEE, 2014
621.31 WOO p
Buku Teks  Universitas Indonesia Library
cover
"This book brings together successful stories of deployment of synchrophasor technology in managing the power grid. The authors discuss experiences with large scale deployment of Phasor Measurement Units (PMUs) in power systems across the world, enabling readers to take this technology into control center operations and develop good operational procedures to manage the grid better, with wide area visualization tools using PMU data."
Switzerland: Springer Cham, 2019
e20501174
eBooks  Universitas Indonesia Library
cover
Gaina Sapoetra
"ABSTRAK
Mikrohidro merupakan sebuah istilah yang digunakan untuk instalasi pembangkit listrik yang memanfaatkan potensi energi air. Prinsip kerja dari pembangkit listrik ini cukup sederhana, yaitu menggerakkan turbin dengan memanfaatkan tenaga kinetik air. Air yang memanfaatkan perbedaan ketinggian (head), serta besarnya debit air. Objek Penelitian ini yaitu potensi daerah Kampung Nyomplong, Desa Curug Bitung, Kabupaten Bogor untuk dibangun Pembangkit Listrik Tenaga Mikro Hidro (PLTMH).
Studi mengenai potensi daerah ini dilatar belakangi kondisi daerah yang belum terjangkau oleh jaringan listrik pemerintah. Sumber potensialnya yaitu sebuah Sungai Cisangku yang mengalir melintasi Kampung Nyomplong. Rancangan PLTMH ini mampu menghasilkan daya hingga 5 kW, sedangkan beban warga yang pernah disurvei sebesar 2,358 kW. Jarak saluran distribusi dari pembangkit ke rumah penduduk ±200 m, dengan menggunakan kabel distribusi NFA2X. Pada proses distribusi harus dilakukan analisis tegangan jatuh, supaya sistem tetap beroperasi stabil dan sesuai standar, serta perlu direncanakan pemilihan kabel yang memiliki kekuatan fisik yang baik, sehingga ketika terjadi kenaikan atau kelipatan beban, sistem tetap mampu beroperasi dengan baik dan rugi-rugi daya akan tetap terjaga dan masih dalam batas aman.

ABSTRACT
Micro-hydro is a term used for the installation of power plants that harness the potential energy of water. The working principle of power generation is quite simple, which drives a turbine to harness the kinetic energy of water. Water which utilizes the difference in height (head), as well as the magnitude of water discharge. The research object is a potential area of Nyomplong Village, Curug Bitung village, Bogor Regency to build Micro Hydro Power (MHP).
Studies on the potential of this region against the background conditions in the area that have not been reached by the government the power grid. Potential source is Cisangku river that flowing across the Nyomplong village. The design of the MHP is capable of generating power up to 5 kW, while the load of the people who ever surveyed at 2,358 kW. Distance from the plant to the distribution channel houses ± 200 m, using NFA2X distribution cable. In the distribution process should be carried out voltage drop analysis, so that the system remains stable and appropriate operating standards, as well as the planned elections need a cable that has good physical strength, so that when there is an increase or a multiple load, the system is still able to operate properly and power loss will stay awake and still within safe limits."
Fakultas Teknik Universitas Indonesia, 2014
S54311
UI - Skripsi Membership  Universitas Indonesia Library
cover
Maulana Rifaldi
"Pemanfaatan hasil panas buang suatu sistem pembangkit dapat meningkatkan nilai efisiensi sistem. Siklus Kalina dapat menyediakan solusi untuk membangkitkan daya dari hasil buangan panas pada suatu sistem pembangkit listrik ataupun dari sumber panas bumi dengan temperatur rendah. Untuk mempelajari aplikasi dan perancangan sistem termal yang menggunakan Siklus Kalina digunakan suatu aplikasi pemodelan sistem energi. Proses studi ini dilakukan dengan pembuatan simulasi sistem yang dibantu oleh software Cycle Tempo 5.0 untuk mengetahui efisiensi dan energi yang dapat dibangkitkan dari suatu sumber panas.
Suatu campuran fluida ammonia-water dimanfaatkan sebagai fluida kerja dalam proses sistem siklus Kalina (KCS) 34. Untuk memperoleh daya dan efisiensi maksimum yang dihasilkan sistem dilakukan proses optimasi pada fraksi massa campuran fluida kerja ammonia-water dan tekanan keluar turbin. Dari hasil pemodelan dan simulasi maka didapatkan suatu sistem operasi termal yang memiliki nilai tertinggi pada konfigurasi efisiensi dan daya terbaik.

The utilization of waste heat produce by power plant system will gain the efficiency value for the system it self. Kalina cylce system gives a solution to generate power from wasted heat or from geothermal with low temperature. The modeling application on energy system is use to study the design of thermal system that using Kalina cycle. The study of this process is done by using Cycle Tempo 5.0, a simulating software, to get the data of the efficiency and the energy that could be generate from heat source.
An ammonia-water mixture is use as a working fluid on Kalina cycle system (KCS) 34. to get maximum power output and maximum efficiency, the system will be optimize on the mass fraction of working fluid, ammoniawater, and also the turbine output pressure. The result of the simulation is to get the best performance of KCS 34 that have high power output and efficiency.
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
S37335
UI - Skripsi Open  Universitas Indonesia Library
cover
Mohamad Abu Bakar Salam
"Kestabilan sistem tanaga listrik adalah kemampuan dari suatu sistem tenaga untuk mencapai kondisi kesetimbangan kembali setelah terjadi gangguan. Salah satu parameter yang sangat penting untuk dipertahankan dan diusahakan agar selalu dalam rentang normal adalah frekuensi. Lepasnya saluran interbus dan beberapa pembangkit tidak beroperasi, menyebabkan sistem kekurangan pasokan daya sehingga terjadi penurunan frekuensi. Pengembalian nilai frekuensi ke nilai yang diizinkan dapat dicapai dengan skema pelepasan beban dengan UFR laju penurunan frekuensi, dengan berbantuan perangkat lunak DIgSILENT 15.1.7.
Pada skripsi ini dibuat pelepasan beban secara bertahap, dengan jumlah tahapan yakni 7. Skema pelepasan beban dengan metode UFLS Under Frequency Load Shedding menggunakan rele under frequency relay laju penurunan frekuensi dapat menjaga kestabilan nilai frekuensi dan kesimbangan daya. Dari simulasi yang dilakukan didapat kondisi terbaik dicapai pada skenario 1 saat PLTGU GT2 dan PLTGU ST1 tidak beroperasi, dengan steady state frekuensi 49,994Hz.

The stability of electrical power system is the ability of a system to reach back its equilibrium condition after a experiencing a disturbance. One of the most important parameters for a system to maintain and cultivate in its normal range is frequency. The loose of interbus channel in Cilegon subsystem and an out of service generator led to a decrease in frequency because the system lacks of sufficient power. Recovering the frequency back to its permitted value can be attained by load shedding with UFR frequency decrease speed scheme and with the help of DIgSILENT 15.1.7 software.
In this bachelor thesis, a seven step gradual load shedding scheme is designed. Load shedding scheme with UFLS method using relay under frequency decrease speed is able to maintain the power balance and the frequency stability. From the simulation conducted, the best condition is achieved in the first scenario when PLTGU GT2 and PLTGU ST1 out of service, with the steady state frequency value of 49.994Hz.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
S67827
UI - Skripsi Membership  Universitas Indonesia Library
cover
Arif Zakaria Kapa
"Kajian perencanaan pembangkitan listrik tenaga gas (PLTG) di anjungan Krisna-P CNOOC SES Ltd, dilandasi pertimbangan terbuangnya raw associated gas (RAG). Disisi lain, CNOOC SES Ltd memiliki kontrak penjualan non associated gas ke PLN untuk PLTGU Cilegon. Sebagian non associated gas (gas ekonomis) juga dimanfaatkan sendiri oleh CNOOC SES Ltd untuk pembangkit listrik menggunakan generator turbin gas. Karena kebutuhan akan listrik yang cukup besar maka konsumsi gas untuk pembangkitan sendiri juga besar. Keadaan ini memberi peluang untuk menghemat penggunaan gas bilamana merencanakan pembangkitan listrik yang tidak mengkonsumsi gas ekonomis ini.
Kenyataan bahwa anjungan Krisna-P memiliki sambungan listrik dengan jala-jala kelistrikan CNOOC SES Ltd, memungkinkan perencanaan pembangkitan di anjungan Krisna-P memanfaatkan gas buang ini. Dengan masuknya suplai listrik dari anjungan Krisna-P, membuat penghematan gas ekonomis, sehingga mobilisasi gas ke PLN bisa lebih besar lagi dan memberi keuntungan kepada CNOOC SES Ltd. Dengan demikian kajian keekonomian perencanaan pembangkitan di Krisna-P perlu dilakukan, dengan membandingkan keuntungan ekonomis dari tambahan gas yang di jual ke PLN, karena penghematan ini terhadap biaya investasi yang di perlukan.

Study of planning of electrical power generation by gas resources at Krisna-P platform is based on consideration of raw associated gas (RAG) wasting. At the other side, CNOOC SES Ltd have contract of gas selling to PLN for Gas and Steam Power Generation (PLTGU) Cilegon. Some of non associated gas (economic gas) that being sold to PLN is also utilized by CNOOC SES Ltd for own power generation using gas turbine generators. Due to the high requirement of electrical power the gas consumption for own generation is also high. This condition give an opportunity to save the gas upon there is a plan to make power generation that is not consuming this economic gas.
The fact that Krisna-P platform has electrical connection to CNOOC SES Ltd grid give possibility to have planning for electrical power generation at Krisna-P that consuming this uneconomic gas. By this Krisna-P electrical supplying, there will save the economic gas, so that gas mobilization to PLN can be increased and give more advantage to CNOOC SES Ltd. Therefore, the economic study of power generation planning at Krisna-P platform need to conduct to compare the economic advantage of gas sell to PLN with the investment required.
"
Depok: Fakultas Teknik Universitas Indonesia, 2014
T42628
UI - Tesis Membership  Universitas Indonesia Library
cover
M Yoga Distra Sudirman
"ABSTRAK
Penyediaan sistem informasi (SI) dan teknologi informasi (TI) yang baik dan mengatur segala bentuk layanan terkomputerisasi merupakan tugas pokok dari Bagian Perencanaan Sistem Informasi (BPSI) Sekolah Tinggi Teknik – Perusahaan Listrik Negara (PLN). Tingginya angka keluhan mengenai layanan infrastruktur baik SI maupun jaringan yakni terdapat rata-rata gangguan 160 dalam bentuk layanan jaringan dan 170 bentuk layanan SI sesuai dengan laporan yang diterima melalui SMS center keluhan sistem kampus. Sesuai dengan Service Level Agreement (SLA) didalam renstra BPSI tahun 2011-2016 bahwa sesuai dengan laporan gangguan tersebut sudah melampaui batas SLA yang telah direncanakan, sehingga terdapat kesenjangan antara layanan yang diberikan dengan layanan yang sesuai direncanakan.
Metode pengumpulan data menggunakan kuesioner. Pengukuran kualitas informasi, kualitas sistem dan kualitas layanan akan dilakukan menggunakan model 3Quality. Model ini telah sukses dapat menilai tingkat kualitas yang telah diberikan kepada pengguna. Data akan dianalisis menggunakan tahapan yang terdapat pada Structural Equation Modeling (SEM) dengan menggunakan data primer yang langsung di dapat dari responden yakni pengguna SI/TI STT-PLN. Hasil analisis akan di dapat hipotesis yang valid sesuai dengan hasil analisis. Hasil tersebut akan menjadi menjawab pertanyaan penelitian yang dikemukakan pada indentifikasi permasalahan.
Hasil kesimpulan menyatakan terdapat beberapa hipotesis yang sesuai dengan analisis yang telah dijalankan melalui beberapa tahapan yang diberikan didalam SEM. Terdapat sembilan hipotesis yang valid dan delapan lainnya dinyatakan tidak valid sesuai dengan hasil analisis SEM. Saran untuk penelitian selanjutnya adalah dapat meneliti untuk mengevaluasi sistem yang telah berjalan di institusi pendidikan lainnya dengan meningkatkan ke dalaman model yang ditawarkan oleh 3Quality. Peneliti menganggap bahwa model ini masih dapat dikembangkan agar benar-benar memenuhi kebutuhan institusi dalam mengevaluasi SI/TI yang diberikan kepada pengguna.

ABSTRACT
Provision of information systems ( IS ) and information technology ( IT ) is good and regulates all forms of computerized services are the main duties of the Department of Planning Information Systems ( BPSI ) Sekolah Tinggi Teknik – Perusahaan Listrik Negara (PLN). The high number of complaints about service either IS or network infrastructure there is an average of 160 disturbances in the form of network services and 170 forms of IS services according to reports received via SMS center keluhan campus system. In accordance to Service Level Agreement (SLA) in 2011 to 2014 that including in BPSI strategic plan, according to the disturbance report excessive and SLAs that have been planned, so there is a gap between the services provided with the appropriate services are planned.
Methods of data collection is using questionnaires. Measurement of quality of information, quality system and quality of service will be conducted using the 3Quality model. This model has been successfully able to assess the level of quality that has been given to the user. Data will be analyzed using the steps contained in the Structural Equation Modeling (SEM) by using primary data from respondents directly to the user / IT STT-PLN. The results of the analysis will be valid hypotheses in accordance with the results of the analysis. The results of the research will be to answer questions raised in the identification problem.
The results are some of the conclusions stated in accordance with the hypothesis with that analysis has been run through several stages given in the SEM. There is nine hypothesis that valid and eight more are not valid according to result of SEM analysis. Suggestions for further research is to investigate to evaluate systems that have been running in other educational institutions to increase the depth to the models offered by 3Quality model. Researchers believe that this model can still be developed in order to really meet the needs of the institution in evaluating IS / IT are given to the user."
Jakarta: Fakultas Ilmu Komputer Universitas Indonesia, 2014
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Irana Krisiana
"Kebutuhan energi listrik untuk kehidupan sehari-hari akan terus meningkat seiring dengan pertumbuhan penduduk. Kebutuhan energi listrik tersebut dipenuhi oleh pembangkit-pembangkit listrik berkapasitas besar yang umumnya terletak jauh dari titik beban. Dengan melewati sistem transmisi dan sistem distribusi, tak jarang akan menimbulkan banyak gangguan baik dari faktor internal maupun eksternal. Hal ini akan menurunkan tingkat keandalan sistem tenaga listrik dalam menyediakan kebutuhan listrik kepada konsumen. Demi meningkatkan keandalan sistem distribusi, dipasanglah pembangkit terdistribusi atau Distributed Generation sebagai alternatif pembangkit yang berkapasitas kecil dan dapat dipasang di jaringan distribusi. Menghitung keandalan sistem distribusi ini dilakukan menggunakan metode simulasi menggunakan ETAP dengan hasil peningkatan keandalan yang paling bagus sebesar 78,23 pada SAIFI dan 57,44 pada SAIDI ketika DG dipasang di setiap feeder yang berbeda di dalam satu gardu distribusi yang sama.

The need for electrical energy for everyday life will continue to increase along with population growth. The demand for electrical energy is met by large capacity power plants that are generally located far from the load point. By passing the transmission system and distribution system, sometimes there will be many disturbances both from internal and external factors. To reduce disturbance in order to improve the reliability of the distribution system, a Distributed Generation is installed as an alternative to a small capacity plant and can be installed in a distribution network. Calculating the reliability of the distribution system was performed using a simulation method using ETAP with the best result of reliability improvement of 78.23 at SAIFI and 57.44 on SAIDI when DG installed in each different feeder in the same distribution substation."
Depok: Fakultas Teknik Universitas Indonesia, 2018
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>