Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 13039 dokumen yang sesuai dengan query
cover
Watson, Neville
"Accurate knowledge of electromagnetic power system transients is crucial to the operation of an economic, efficient and environmentally friendly power systems network without compromising on the reliability and quality of Electrical Power Supply. Electromagnetic transients simulation (EMTS) has become a universal tool for the analysis of power system electromagnetic transients in the range of nanoseconds to seconds. This book provides a thorough review of EMTS and many simple examples are included to clarify difficult concepts. This book will be of particular value to advanced engineering students and practising power systems engineers."
London: Institution of Engineering and Technology, 2007
e20451638
eBooks  Universitas Indonesia Library
cover
Chowdhuri, Printidra
New York: John Wiley & Sons, 1996
621.31 CHO e
Buku Teks  Universitas Indonesia Library
cover
Faya Safirra
"Dalam sistem tenaga listrik, penyaluran tenaga listrik yang baik merupakan hal yang vital dalam memenuhi kebutuhan beban. Pada sistem tenaga listrik Jawa Bali, terdapat permasalahan dalam transmisi tenaga listrik dari timur ke barat Jawa, yaitu ketidakseimbangan pembebanan jalur utara (Sirkit Ungaran-Mandiracan 1&2) dan jalur selatan (Sirkit Pedan-Tasik & sirkit Pedan-Kesugihan-Tasik) karena perbedaan impedansi saluran, juga masalah penurunan tegangan pada sisi barat Jawa. Permasalahan tersebut bisa diselesaikan dengan memasang UPFC pada sistem tenaga listrik Jawa Bali. Hasil simulasi menunjukkan bahwa pemasangan UPFC pada sirkit Pedan-Tasik dapat membantu meningkatkan transfer jalur selatan sampai sebesar 5% dan menurunkan transfer jalur utara sampai sebesar 5% untuk semua skenario transfer. Peningkatan nilai tegangan pada sisi barat Jawa yaitu region 1 dan 2 juga bisa didapat. Kestabilan sistem setelah terjadi gangguan juga bisa dicapai dalam waktu yang lebih singkat jika dibandingkan dengan sistem tanpa UPFC.
In electric power system, a good power transmission is vital in meeting the needs of the load. In Java Bali electric power system, there are problems in the transmission of electric power from east to west of Java, namely the loading imbalance of north transmission line (Ungaran-Mandiracan 1 & 2) and the south transmission line (Pedan-Tasik & Pedan-Kesugihan-Tasik) because of differences in line impedance, also the voltage drop problem on the west side of Java. Those problems can be solved by using the UPFC in the Java-Bali power system. The simulation results show that UPFC installation on Pedan-Tasik circuit can improve the transfer of the south transmission line up to 5% and lower the transfer of north transmission line up to 5% for all transfer scenarios. Increasing the voltage on the western side of Java, the region 1 and 2, can also be obtained. In addition, the stability of the system after an interruption can be achieved in a shorter time compared to system without UPFC."
Depok: Fakultas Teknik Universitas Indonesia, 2016
S65261
UI - Skripsi Membership  Universitas Indonesia Library
cover
"This book discusses topics related to power electronics, especially electromagnetic transient analysis and control of high-power electronics conversion. It focuses on the re-evaluation of power electronics, transient analysis and modeling, device-based system-safe operating area, and energy balance-based control methods, and presenting, for the first time, numerous experimental results for the transient process of various real-world converters."
Singapore: Springer Nature, 2019
e20508052
eBooks  Universitas Indonesia Library
cover
Bambang Arie Sadewo
"ABSTRAK
Penelitian ini melakukan simulasi gangguan lepasnnya suplai daya yang diterima oleh PT Bukit Asam Unit Pertambangan Tanjung Enim sehingga terjadi gangguan beban lebih didalam sistem. Penelitian ini menggunakan metode pelepasan beban berdasarkan prioritas sehingga frekuensi sistem kembali kedalam rentang operasi frekuensi yang diijinkan. Terdapat dua skenario gangguan yang dilakukan pada yakni 1 terputusnya suplai yang diberikan oleh pembangkit listrik negara PLN sehingga sistem disuplai oleh 3 unit Generator dan 2 terputusnya suplai yang diberikan oleh PLN disertai hilangnya salah satu unit Generator. Diperoleh nilai frekuensi pada saat skenario 1 yaitu 48.74 Hz. Pada saat skenario 2 diperoleh nilai bervariasi akibat unit Generator yang ikut terputus bervariasi dari sistem yaitu, skenario 2 terputusnya PLN dengan Generator 1 sehingga frekuensi sistem 42,46 Hz,PLN dengan Generator 2 sebesar 42,46 Hz,serta PLN dengan Generator 3 sebesar 42,42 Hz.Dilakukan metode pelepasan beban sehingga didapat nilai frekuensi pada skenario 1 yaitu 49,8 Hz . Selain itu skenario 2 dengan terputusnya PLN dengan Generator 1 sebesar 50 Hz,PLN dengan Generator 2 sebesar 49,53 Hz,dan PLN dengan Generator 3 sebesar 49,51 Hz. Dengan melakukan simulasi gangguan beban lebih dengan penanggulangannya maka PT Bukit Asam Unit Pertambangan Tanjung Enim dapat memperoleh solusi apabila terjadi gangguan tersebut didalam sistem.

ABSTRAK
This study simulated the disruption of loss of power supply received by PT Bukit Asam Unit Pertambangan Tanjung Enim causing overload in system. This study uses a method of priority load release so that the frequency of the system back into the permitted operating frequency range. There are two interruption skenarios performed on 1 disconnection of supply supplied by state power plant PLN so that the system is supplied by 3 Generator units and 2 disconnection of supply provided by PLN accompanied by loss of one Generator unit. Obtained a frequency value at the time of skenario 1 is 48.74 Hz. At the time of skenario 2, the value varies due to the interrupted Generator unit varies from the system that is, the 2nd skenario of PLN interruption with Generator 1 so that the system frequency is 42.46 Hz, PLN with Generator 2 is 42.46 Hz, and PLN with Generator 3 is 42 , 42 Hz. Conducted the method of load release so that the frequency value obtained in skenario 1 is 49.8 Hz. Besides, skenario 2 with PLN breakdown with Generator 1 of 50 Hz, PLN with Generator 2 equal to 49,53 Hz, and PLN with Generator 3 equal to 49,51 Hz. By simulating more load disturbances with mitigation then PT Bukit Asam Unit Pertambangan Tanjung Enim can obtain solutions if it rsquo s happen on the system."
2017
S68040
UI - Skripsi Membership  Universitas Indonesia Library
cover
Denno, Khalil
Boca Raton: CRC Press, 1992
621.319 DEN h
Buku Teks  Universitas Indonesia Library
cover
Aidala, Joseph B.
Englewood Cliffs, NJ: Prentice-Hall, 1980
621.319 21 AID t
Buku Teks  Universitas Indonesia Library
cover
Angga Wira Pramana
"Arus inrush transformator timbul ketika sebuah transformator di-energize. Berdasarkan kejadian lapangan yang terjadi di CNOOC SES ltd, pada saat transformator di-energize pemutus tenaga pada 3 generator trip akibat relay differensial generator bekerja. Ketiga generator ini letaknya berdekatan dengan transformator yang di-energize, sehingga rentan terhadap arus inruh transformator. Arus inrush transformator ini memiliki komponen DC yang besar dan berlangsung dalam waktu yang cukup lama. Hal ini membuat CT mengalami saturasi sehingga output CT tidak lagi ideal. Pada skripsi ini akan dibahas mengenai karakteristik arus inrush pada transformator, peristiwa saturasi pada CT dan sistem proteksi diferensial pada generator. Digunakan MATLAB Simulink 7.6.0 untuk mensimulasikan kondisi transient sewaktu transformator di-energize sehingga didapatkan karakteristik arus inrush transformator dalam domain waktu dan domain frekuensi.
Dari hasil simulasi didapatkan arus inrush transformator ini memiliki komponen DC yang tinggi sehingga membuat CT mengalami saturasi dan dari hasil simulasi juga didapatkan bahwa arus inrush transformator memiliki komponen harmonik ke-2 yang juga tinggi. Dari analisis data yang didapatkan di lapangan, diketahui bahwa CT pada ketiga generator mengalami saturasi. Peristiwa saturasi CT ini disebabkan oleh komponen arus DC yang besar saat transformator dienergize. Terakhir, peristiwa salah operasi ini dapat dicegah dengan menggunakan fungsi dualsetpoin yang terdapat pada SR 489 atau menggunakan SR745 pada transformator untuk mendeteksi harmonik ke-2 pada saat energize transformator.

Transformer inrush currents occur when a transformer is energized. Based on field incident that occurred in CNOOC SES ltd, when the transformer is energized the circuit breaker at the three generators trip due to generator differential relay work. The generators’s location adjacent to the energized transformer, making it vulnerable to inruh current transformer. The transformer inrush current has a large DC component and takes place in a long time. This makes CT undergo CT saturation so the output is no longer ideal. In this paper will discuss the characteristics of the transformer inrush currents, saturation events in CT and differential protection system on the generator. 7.6.0 MATLAB Simulink is used to simulate transient conditions during in-energize the transformer so that the transformer inrush current characteristic obtained in the time domain and frequency domain.
Simulation results are the transformer inrush current has a high DC component that makes CT saturate, the results also showed that the inrush current transformer has high 2nd harmonic components. From the analysis of the data obtained in the field, it is obtained that the generators had CT saturation. This event caused by high DC current component of the of enrgizing inrush currnet. Lastly, one of the event's operation can be prevented by using a function dualsetpoin contained on SR745 SR 489 or use the transformer to detect the 2nd harmonic at energize the transformer.
"
Depok: Fakultas Teknik Universitas Indonesia, 2013
S46511
UI - Skripsi Membership  Universitas Indonesia Library
cover
Grace Missrani Bangun
"ABSTRAK
Kebutuhan listrik saat ini semakin meningkat, namun produksi batubara sebagai pembangkit konvensional semakin menipis. Jadi pemerintah sedang menggalakkan penggunaan energi baru dan terbarukan. Sebagai contoh adalah PLTS. Pada penelitian ini akan mengembangkan penelitian sebelumnya dengan fokus pada studi hubung singkat pada sistem tenaga listrik Lombok khususnya pada 3 titik yang berbeda yaitu GI 150 kV Kuta, GI 150 kV Paokmotong, dan 150 kV GI Sengkol. Dimana akan dibandingkan antara tanpa PLTS dan menggunakan PLTS. Beberapa skenario dilakukan dengan memvariasikan kapasitas PV, yaitu 5 MWp, 10 MWp, 15 MWp, dan 20 MWp. Pada penelitian ini dilakukan simulasi dengan bantuan ETAP 12.6.0. Hasil studi yang diperoleh untuk analisis hubung singkat tanpa PLTS adalah 2.546 pada 150 kV GI Kuta; 3.021 di GI Paokmotong; dan 2.861 pada 150 kV GI Sengkol. Pada analisis gangguan hubung singkat menggunakan PLTS didapatkan hasil maksimal sebesar 2.599 pada 150 kV GI Kuta; 3.027 pada 150 kV GI Paokmotong; dan 2.873 pada 150 kV GI Sengkol. Dari hasil yang diperoleh dapat diketahui bahwa tidak ada perubahan yang signifikan pada gangguan hubung singkat.
ABSTRACT
The demand for electricity is currently increasing, but coal production as a conventional generator is running low. So the government is promoting the use of new and renewable energy. An example is PLTS. This study will develop previous research with a focus on short circuit studies on the Lombok electric power system, especially at 3 different points, namely GI 150 kV Kuta, GI 150 kV Paokmotong, and GI Sengkol 150 kV. Where will be compared between without PLTS and using PLTS. Several scenarios are carried out by varying the PV capacity, namely 5 MWp, 10 MWp, 15 MWp, and 20 MWp. In this study, a simulation was carried out with the help of ETAP 12.6.0. The study results obtained for short circuit analysis without PLTS are 2,546 at 150 kV GI Kuta; 3,021 at GI Paokmotong; and 2,861 at 150 kV GI Sengkol. In the short circuit analysis using PLTS, the maximum result is 2,599 at 150 kV GI Kuta; 3,027 at 150 kV GI Paokmotong; and 2,873 at 150 kV GI Sengkol. From the results obtained, it can be seen that there is no significant change in the short circuit fault."
Depok: Fakultas Teknik Universitas Indonesia, 2019
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Sandy Akbar
"Pengolahan data transient elektromagnetik bertujuan mendapatkan sifat fisis batuan berdasarkan resistivitas terhadap kedalaman, yang nantinya akan dianalisa untuk mengetahui daerah prospek hidrokarbon. Tahpan dalam pengolahan data untuk mendapatkan nilai resistivitas terlebih dulu mendapatkan nilai resistivitas semu. Nilai resistivitas semu pada metode Transient Electromagnetic (TEM) dapat ditentukan dengan menggunakan beberapa formula yang dikembangkan oleh Kaufman & keller, Zonge, Fitterman & Stewart, dan Cristensen. Dalam proses pemilihan formula TEM yang digunakan analisa dengan mencari perbedaan relative dengan bantuan dari data sintetik, fonnula Fitterman & Stewart memiliki nilai perbedaan relatifitas 0,37%. Korelasi nilai resistivitas dilakukan dengan membandingkan nilai resistivitas yang didapat hasil perhitungan berdasarkan formula TEM dengan nilai resistivitas semu yang diperoleh dari hasil pemodelan l dimensi dengan software LOTEM maupun dengan software IX1D. Proses automatisasi dibuat bertujuan untuk melakukan efisiensi dalam proses perhitungan nilai resistivitas semu dengan software Matlab inenggunakan aplikasi GUIDE Pemodelan 1 dimensi yang di gabungkan dari bebarapa titik sounding bertujuan mendapatkan profil resistivitas yang nantinya akan memberikan informasi bawah permukaan. Dari profil resistivitas semu terhadap kedalaman terlihat adanya struktur yang berupa antiklin pada daerah 500-3000m dengan kedalaman 1000an meter. Pada daerah struktur antiklin terlihat nilai resistivitas yang tinggi mengindikasikan kemungkinan adanya hidrokarbon.

Processing of transient electromagnetic data to obtain physical properties of rocks based on the resistivity with depth, which will be analyzed to determine areas of hydrocarbon prospects. Stages in data processing to obtain resistivity values first obtaining apparent resistivity value. Value of apparent resistivity on the method of Transient Electromagnetic (TEM can be determined by using some formula that was developed by Kaufman & Keller, Zonge, Fitterman & Stewart, and Cristensen. In the process of choice formula used TEM analysis by looking for relative dwerences with the heha of synthetic data, Fitterman & Stewartls formula has the value 0.3 7% dwerence relativity. Correlation of resistivity values is done by comparing the obtained resistivity values calculated based on the formula TEM apparent resistivity value obtained from the one-dimensional modeling software or with software IXID LOTEM. Automatic process is made aimed at improving efficiency in the process of calculating the value of apparent resistivity with Matlab software using GUIDE aplication. Modeling one- dimensional in combination of Many diagnostic point to obtain a profile of resistivity sounding which will provide subsurface information. From the profile of apparent resistivity with depth seen in the form of the anticline structure in the 3,000 m with a depth of 500-meter 1000an. At the regional anticline structure visible high resistivity values indicate the possibility of hydrocarbons."
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 2010
S29468
UI - Skripsi Open  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>