Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 96148 dokumen yang sesuai dengan query
cover
Mahdi
"ABSTRACT
Penyetelan ulang pengendali proportional integral dilakukan pada pabrik penghilangan CO2 pengolahan gas alam lapangan Subang. Penyetelan ulang ini dilakukan untuk meningkatkan kinerja pengendali pada pabrik tersebut. Pengendali pada pabrik yang diteliti pada penelitian ini adalah pengendali tekanan gas umpan PIC 1101, pengendali laju alir air FIC 1102, dan pengendali laju alir sirkulasi amina FIC 1103. Metode penyetelan ulang pengendali yang diusulkan adalah metode Ziegler-Nichols PRC, Wahid-Rudi-Victor WRV, Cohen-coon, setelan hasil autotuner pada simulator, dan fine tuning. Dari hasil pengujian terhadap setiap metode penyetelan yang diusulkan, didapatkan hasil setelan yang memberikan hasil paling baik untuk setiap pengendali, yaitu setelan fine tuning. Penyetelan menggunakan fine tuning berhasil meningkatkan kinerja pengendali PIC 1101 sebesar 77,42, FIC 1102 sebesar 90.59 dan FIC 1103 sebesar 13,06 untuk penurunan nilai setpoint SP sebesar 5. Sementara untuk kemampuan pengendali mengatasi gangguan didapatkan peningkatan kinerja pengendali PIC ndash; 1101 sebesar 86,04, FIC 1102 sebesar 90,8 dan FIC 1103 sebesar 24,8.

ABSTRACT
A proportional ndash integral controller retuning is performed on CO2 removal plant in natural gas processing Subang field. Retuning is performed to increase controller performance on the plant. Retuning will be performed on feed gas pressure controller PIC ndash 1101, make up water flow controller FIC 1102 , and amine circulation flow controller FIC 1103 on the plant. Retuning methods used are Ziegler ndash Nichols PRC, Wahid Rudi Victor WRV, Cohen coon, tuning from simulator autotuner, and fine tuning method. Result of this research shows that retuning that gives the highest improvement for the controllers is tuning with fine tuning method for every controller. Retuning with fine tuning can give 77,42 improvement for PIC ndash 1101, 90,59 improvement for FIC 1102, and 13,06 improvement for FIC ndash 1103 for 5 setpoint SP reduction. While for controller capability to handle disturbance, fine tuning can give 86,04 improvement for PIC ndash 1101, 90,8 improvement for FIC ndash 1102, and 24,8 improvement for FIC 1103."
2018
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Muhammad Farhan Pratama
"Tingginya kandungan gas CO2 pada cadangan gas alam di Indonesia merupakan tantangan yang cukup berdampak bagi proses produksi dan pemanfaatan cadangan gas alam tersebut. Untuk meningkatkan aspek teknis dan terhindar dari masalah-masalah operasional pada proses penghilangan gas CO2, salah satu aspek yang dapat ditingkatkan adalah sistem pengendalian yang diaplikasikan ke sistem tersebut. Adanya variabel disturbance pada suatu sistem dapat menurunkan kinerja sistem pengendali yang digunakan. Dalam mengatasi masalah tersebut, aplikasi pengendali multi-loop PI dengan melibatkan disturbance model dinilai mampu meningkatkan kinerja sistem pengendalian dan mengeliminasi efek dari variabel disturbance tersebut. Dengan demikian, penelitian ini bertujuan untuk memperoleh disturbance model berdasarkan first order plus dead time (FOPDT) yang telah diverifikasi dan memperoleh kinerja pengendalian yang optimal dengan melibatkan model tersebut ke dalam sistem pengendali multi-loop PI. Dalam memperoleh kinerja pengendalian yang optimal dilakukan proses tuning dengan menggunakan metode biggest log modulus tuning (BLT) dan fine tuning, untuk dibandingkan dengan kinerja pengendalian multivariable model predictive control (MMPC) oleh Wahid, Meizvira dan Wiranoto (2018) pada sistem linear dan non-linear. Disturbance model dirancang berdasarkan perubahan variabel disturbance laju alir gas alam dengan membuat setpoint controlled variable (CV) tidak berubah, yaitu tekanan gas alam umpan sebesar 511,4 psia dan laju alir make-up water sebesar 10,5 psig. Hasil disturbance model yang paling merepresentasikan sistem yang dikendalikan adalah yang diperoleh menggunakan metode Solver. Dengan melakukan uji perubahan setpoint dan variabel disturbance, diketahui bahwa pengendali multi-loop PI-fine tuning menghasilkan kinerja pengendalian yang lebih baik daripada sistem pengendali MMPC, PI re-tuning dan multi-loop PI-BLT, baik pada sistem linear maupun non-linear. Hal ini menunjukkan bahwa penyusunan pengendali multi-loop PI pada sistem linear dengan melibatkan disturbance model dapat digunakan sebagai dasar dalam meningkatkan kinerja pengendalian pada sistem non-linear.

The high content of CO2 in natural gas reserves in Indonesia is a challenge that has quite an impact on its production and utilization process. To improve the technical aspects and avoid operational problems in the CO2 gas removal, one aspect that can be improved is the applied control system. The existence of a disturbance variables in a system may downgrade the performance of the used control system. To overcome this problem, the application of a multi-loop PI controller which involves disturbance model is considered to be able to improve the performance of the control system and eliminate the effects of the disturbance. Thus, this study aims to obtain a disturbance model based on the verified first order plus dead time (FOPDT), to be applied to the design of a linear multi-loop PI control system. To obtain optimal control performance of multivariable model predictive control model (MMPC) which has been conducted by Wahid, Meizvira and Wiranoto (2018), both on linear and non-linear system. The disturbance model is designed based one changes in the natural gas flow rate as disturbance variable by setting the setpoint of all controlled variables (CV) unchanged), which are the feed natural gas pressure on 511,4 psig, and make-up water flow rate on 10,5 psig. Through setpoint and disturbance variable change tests, it is known that the multi-loop PI-fine tuning controller produces better control performance than MMPC, PI re-tuning and multi-loop PI-BLT control system, both on linear and non-linear systems. Thus, by involving the disturbance model on linear multi-loop PI controller system design might be a bases for improving control system performance in non-linear system.
"
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Shinta Pratiwi Rahayu
"Pabrik pengolahan gas X merupakan pabrik pengolahan gas bumi menjadi gas kering yang siap dijual (sales gas) dengan kadar air maksimal 9 lb/MMscf dari proses dehidrasi menggunakan Triethylene Glycol (TEG). Proses regenerasi rich TEG pada pabrik ini hanya mampu menghasilkan lean TEG dengan kemurnian 91,7%. Sehingga pabrik pengolahan gas X hanya mampu mengolah umpan gas sebesar 175 MMscfd. Oleh karena itu perlu dilakukan usaha untuk meningkatkan kemurnian TEG dengan bantuan stripping gas agar kapasitas pabrik dapat ditingkatkan sehingga memberikan nilai keekonomian yang lebih tinggi. Pada laju alir TEG yang tetap, laju alir stripping gas (N2) yang digunakan berada pada kisaran 0 - 2 m3/h. Kapasitas yang memberikan keuntungan per satuan produk yang lebih tinggi dari pada desain awal pabrik adalah 225 MMscfd sebesar 3,9654 USD/MMBtu dengan penggunaan stripping gas sebanyak 0,006 m3/h, sedangkan yang memberikan NPV tertinggi adalah pada kapasitas 585 MMscfd yaitu sebesar 723.800.123 USD.

X gas processing plant is natural gas processing plant that produces dry gas that is ready to be sold (sales gas) with a maximum water content of 9 lb/ MMscf which is obtained from dehydration process using Triethylene Glycol (TEG). The initial design of the rich TEG regeneration process only able to produce lean TEG with a purity of 91,7%. Therefore, this processing plant only able to process the feed gas by 175 MMscfd. Thus, a study can be conducted to determine the effect of stripping gas (N2) on TEG purity so that the plant?s capacity can be increased which also increase the plant?s profits. The results show that when the TEG flow rate is fixed, flow rate of the stripping gas (N2) which can be used in the regeneration process ranges from 0 to 2 m3/h. The only capacity of modification plant which provides more profits per capacity than that obtained from the initial design of the plant is 225 MMscfd worth 3,9654 USD/MMBtu. The amount of stripping gas required in this capacity is as much as 0,006 m3/h. Meanwhile, total profit obtained by comparing NPV shows that the capacity of 585 MMscfd give the highest NPV worth 723.800.123 USD.
"
Depok: Fakultas Teknik Universitas Indonesia, 2016
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
1974
665.73 Pla
Buku Teks  Universitas Indonesia Library
cover
Muhammad Ikhlas Ibrahimsyah
"Pengembangan lapangan gas bumi baru setelah ditemukan memerlukan desain pabrik pengolahan gas bumi, termasuk di Lapangan X. Selain desain proses, desain kontrol proses juga sangat penting. Untuk itu, pada pemisahan awal gas bumi yang akan diproses lebih lanjut, dirancang pengendalian proses menggunakan pengontrol proporsional-integral berbasis sistem identifikasi ulang (PI-SRI). Terdapat tiga sumur (Alpha, Betha, dan Charlie), separator dan cooler pada proses pemisahan awal dan terdapat tiga jenis kontroler (tekanan [PC], level [LC] dan temperatur [TC]). Untuk menentukan parameter kontroler PI yang optimal, dilakukan tiga kali identifikasi sistem untuk menghasilkan tiga model first-order plus dead-time (FOPDT). Ketiga model tersebut dimasukkan dalam persamaan tuning untuk metode Ziegler-Nichlos sehingga dihasilkan tiga parameter kontroler PI. Untuk menguji kinerja kendali yang optimal digunakan perubahan set point (SP) pada PC, LC dan TC, serta gangguan berupa perubahan laju aliran gas bumi yang berasal dari ketiga sumur tersebut. Indikator kinerja pengendalian yang digunakan adalah overshoot dan settling time. Hasil penelitian menunjukkan bahwa model FOPDT untuk proses pemisahan awal produksi gas bumi berdasarkan tiga variabel terkontrol memiliki =−1,614, =0,24 dan =0,01 untuk PC; =−0.882, =0.2295 dan =0.2385 untuk LC dan =−0.063, =1.5075 dan =0.0425 untuk TC. Harga parameter kontroler PI yang memberikan performansi kontrol optimum (overshoot dan settling time) adalah =−13,383, =0,033 untuk PC; =−132.6, =0.483 untuk LC, dan =−506.7, =0.142 untuk TC.

The development of a new natural gas field after being discovered requires the design of a natural gas processing plant, including in Field X. In addition to process design, process control design is also very important. For this reason, at the initial separation of natural gas which will be further processed, process control is designed using a proportional-integral controller based on a re-identification system (PI-SRI). There are three wells (Alpha, Betha, and Charlie), separator and cooler in the initial separation process and there are three types of controllers (pressure [PC], level [LC] and temperature [TC]). To determine the optimal PI controller parameters, three system identifications were carried out to produce three first-order plus dead-time (FOPDT) models. The three models are included in the tuning equation for the Ziegler-Nichlos method so that three PI controller parameters are produced. To test the optimal control performance, changes in the set point (SP) of the PC, LC and TC are used, as well as disturbances in the form of changes in the flow rate of natural gas originating from the three wells. The control performance indicators used are overshoot and settling time. The results showed that the FOPDT model for the initial separation process of natural gas production based on three controlled variables had =−1.614, =0.24 and =0.01 for PC; =−0.882, =0.2295 and =0.2385 for LC and =−0.063, =1.5075 and =0.0425 for TC. The parameter values ​​for the PI controller that provide optimum control performance (overshoot and settling time) are =−13,383, =0.033 for PC; =−132.6, =0.483 for LC, and =−506.7, =0.142 for TC."
Depok: Fakultas Teknik Universitas Indonesia, 2019
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Najoan, Nestorius Sowor
"Industri pengolahan gas alam di Indonesia merupakan industri yang layak untuk investasi. Hal ini dikarenakan cadangan gas alam yang cukup banyak di Indonesia, pemanfaatannya yang kurang maksimal, kenaikan subsidi BBM, serta pasar yang menjanjikan.
Pabrik pengolahan gas alam yang akan dibangun ini mempunyai kapasitas sebesar 153,257.238 MMSCF/tahun dan diharapkan akan beroperasi selama 19 tahun. Angka tersebut didapatkan berdasarkan analisa pasar Indonesia. Pabrik ini akan dibangun di Kecamatan Batui, Kabupaten Banggai, Sulawesi Tengah. Proses yang ada dalam pabrik ini menggunakan mode operasi kontinyu.
Gas alam akan diproses menggunakan dua proses utama yaitu proses sweetening dan fraksionasi. Proses sweetening merupakan proses absorbsi menggunakan pelarut DEA yang bertujuan untuk membersihkan gas alam umpan.
Proses fraksionasi merupakan proses utama yang akan memisahkan gas alam menjadi produk gas kota, LPG serta kondensat. Produk gas kota direncanakan akan didistribusikan menggunakan dua alternatif transportasi yaitu dengan perpipaan atau CNG. Unjuk kerja proses yang baik ditunjukkan dengan effisiensi energi sebesar 82.61% (proses sweetening) dan 98.57% (proses fraksionasi).
Berdasarkan perhitungan ekonomi, pabrik pengolahan gas alam yang akan dibangun ini membutuhkan investasi sekitar US$ 160 juta dan biaya manufaktur sekitar US$ 57.7 juta.
Dengan analisa ekonomi, didapatkan nilai NPV untuk proyek ini sekitar US$ 94 juta, IRR sebesar 25%, dan PBP sekitar 6 tahun. Perubahan paling sensitif terhadap kelayakan pabrik ini adalah kapasitas produksi pabrik, dimana produksinya tidak boleh kurang dari 76136.884 MMSCF/tahun atau 49.68% dari kapasitas produksi dasar pabrik. Analisa resiko dengan metode Monte Carlo berdasarkan parameter IRR lebih besar dari tingkat diskonto (11%) menyatakan peluang kelayakan pabrik untuk distribusi gas kota dengan jaringan pipa sebesar 82.15% sedangkan dengan CNG sebesar 79.78%.
Berdasarkan analisa ekonomi yang telah dilakukan maka pabrik ini telah memenuhi tingkat kelayakan secara ekonomi dan layak untuk dibangun."
Depok: Fakultas Teknik Universitas Indonesia, 2005
S49533
UI - Skripsi Membership  Universitas Indonesia Library
cover
D. Gusnoto Harywendro
"ABSTRAK
Proses penurunan tekanan dan temperatur suatu gas bumi pada entropi konstan dengan bantuan Turboexpander banyak digunakan dalam proses pengolahan gas bumi.
Residu gas bumi di Central Plant lapangan Arjuna ARII yang sebagian komposisinya metana, diekpansikan melalui turboexpander untuk dimanfaatkan efek pendinginannya.
Besarnya penurunan temperatur yang dapat dihasilkan dengan turboexpander berkisar antara 80 ± 90°F pada effisiensi berkisar antara 80 ± 100%.
Penulis juga membahas bagaimana cara memperoleh harga effisiensi yang optimum, dan apa saja yang bias dilakukan untuk menaikkan effisiensi.
Jika proses penurunan temperatur dan tekanan gas bumi ini dilakukan dengan fjafltuan Joule Thomson Valve, diperoleh penurunan temperatur hanya berkisar 40 ± 50°F.
Akibatnya jika Expander dimafkan dan prctses gas di bypass melalui JT valve, temperatur jadi kurang dingin sehingga banyak propana yang tidak mencair dan terbawa dalam bentuk fase gas.
Dalam tugas akhir ini dibahas mengenai perhitungan termis turboexpander dan Joule Thomson Valve, perbandingan unjuk kerjanya serta effisiensi yang optimum dari turboexpander.

"
1995
S36513
UI - Skripsi Membership  Universitas Indonesia Library
cover
Kameliya Hani Millati
"Gas Natuna merupakan salah satu cadangan gas bumi terbesar di Indonesia, mencapai 50,27 TSCF. Pemanfaatan gas Natuna terhambat oleh kandungan CO2 tinggi, mencapai 71%. Kandungan CO2 tinggi membutuhkan proses separasi CO2 dari gas bumi dan penanganan limbah gas asam secara khusus karena dapat menyebabkan pemanasan global. Selain CO2, gas Natuna juga mengandung 0,6% H2S. Pada penelitian ini, dilakukan simulasi proses pengolahan gas Natuna dengan teknologi LNG-EOR-CCS. Fokus utama dari penelitian ini adalah perbandingan membran dan CFZ untuk separasi CO2 dari gas bumi, aspek teknis dan aspek ekonomi.
Berdasarkan hasil simulasi dan perhitungan, proses separasi CO2 menggunakan membran (hydrocarbon losses 6,5%; konsumsi energi 0,86 MJ/kg CO2) memberikan hasil lebih bagus daripada CFZ (hydrocarbon losses 9,6%; konsumsi energi 0,48 MJ/kg CO2) dari aspek teknis. CFZ dapat memberikan hasil lebih bagus jika dikombinasikan dengan membran sebagai proses separasi lebih lanjut terhadap produk bawah CFZ (hydrocarbon losses 1,66%; konsumsi energi 0,50 MJ/kg CO2). Dari aspek ekonomi, biaya proses produksi LNG menggunakan CFZ + membran (12,82 $/MMBtu) membtuhkan biaya produksi sedikit lebih murah daripada membran (12,92 $/MMBtu).

Natuna gas is one of the largest natural gas reserves in Indonesia, reaching 50.27 TSCF. Natuna gas utilization is limited by high CO2 content, reaching 71%. High CO2 content requires special method for CO2 separation from natural gas and sour gas waste handling because it could lead to global warming. In addition to CO2, Natuna gas also contains 0.6% H2S. In this study, simulation process for Natuna gas treatment is done using LNG-CCS-EOR technology. The main focus in this study is to compare membrane and CFZ for CO2 separation from natural gas, technical aspects and economic aspects.
Based on simulation and calculation, CO2 separation process using membrane technology (hydrocarbon losses 6,5%; energy consumption 0,86 MJ/kg CO2) shows a better result than CFZ (hydrocarbon losses 9,6%; energy consumption 0,48 MJ/kg CO2) in technical performance. CFZ will give a better result than membrane if combined with membrane as the further separation process for the bottom product of CFZ (hydrocarbon losses 1,66%; energy consumption 0,50 MJ/kg CO2). From the economical aspect, the cost of LNG production process using CFZ + membrane (12,82 $/MMBtu) is a bit cheaper than membrane (12,92 $/MMBtu).
"
Depok: Fakultas Teknik Universitas Indonesia, 2016
S63736
UI - Skripsi Membership  Universitas Indonesia Library
cover
Hutabarat, Herman R.
"Pemanfaatan gas alam di Indonesia belum dilakukan secara optimal, walaupun Indonesia mempunyai sumber gas yang melimpah. Gas alam memiliki potensi yang menjajikan, baik dari segi teknis maupun ekonomis. Pabrik pengolahan gas alam akan didirikan di kecamatan Batui, kabupaten Banggai, Sulawesi Tengah. Sumber gas alam akan diambil dari lapangan gas Matindok dan Senoro. Pabrik ini akan mempunyai kapasitas produksi sebesar 86.400 MMSCF/tahun dan akan beroperasi selama 20 tahun. Pemrosesan gas alam akan dilakukan melalui tiga tahap. Tahap pertama adalah sweetening, dilakukan untuk mengurangi kadar C02 dan H2S dalam gas. Pelarut yang digunakan adalah MEA {tnonoethanolamine). Tahap kedua adalah dehidrasi, untuk mengurangi kadar air, dilakukan dengan memakal TEG (Triethylene Giycol). Tahap terakhir adalah fraksionasi, yaitu penusahan gas berdasarkan fraksi beratnya. Berdasarkan perhitungan ekonomi, pabrik pengolahan gas alam yang akan dibangun ini membutuhkan investasi US$ 188,857,944.64 dan biaya manufaktur sekitar US$54,811.532.99. Setelah dilakukan analisa kelayakan pabrik didapatkan nilai dari parameter kelayakan pabrik yaitu NPV (US$ $125,760,066.06), IRR (28.22%), dan PBP (5 tahun 5 bulan) yang memenuhi syarat kelayakan ekonomi. Analisa sensitivitas yang dilakukan faktor harga beli gas alam, harga jual gas kota, harga jual elpiji. dan kapasitas produksi."
Depok: Fakultas Teknik Universitas Indonesia, 2006
S49543
UI - Skripsi Membership  Universitas Indonesia Library
cover
Hutahaean, David P.
"Investasi pada konstruksi pabrik elpiji dan pemurnian gas dilakukan mengingat potensi sumber daya gas alam Indonesia yang sangat besar yaitu 65 TCF (trillion cubic feel) tetapi pemanfatannya terbatas, pasar yang menjanjikan dan melonjaknya beban subsidi bahan bakar minyak. Pabrik ini akan dibangun di Kecamatan Batui, lebih dekat dengan blok Matindok, Sulawesi Tengah, dengan mode operas! kontinu mengingat umpan dan produknya berfasa gas. Lapangan gas Senonoro dan Matindok akan menjadi pemasok bahan baku pada industri pengolahan gas elpiji dan pemumian gas. Gas alam yang berasal dan lapangan gas Matindok dikategorikan sebagai gas alam asam (sour natural gas) karena mengandung hidrogen snifida (H2S) dengan kadar 5000 ppm dan cadangan gas alam sebesar 0,45 BCFG (billion cubic feet gas), sedangkan gas alam dari Senoro kandungan H2S rendah dan cadangannya sebesar 3 BCFG. Perlakuan pertama untnk gas lumpan ialah pemisahan partikel padatan dan debu yang terbawa oleh gas. Setelah itu gas akan dialirkan menuju proses Sweetening, bertujuan untuk menghilangkan kandungan CO2 dan H2S yang terkandung dalam gas alani, melalui proses absorbs! oleh pelamt kimia MEA (monoethanolamine). Kandmigan FLO diliilangkan melalui proses Dehidrasi dengan menggunakan pelarut TEG (Triethylene Glycol). Setelah itu gas akan dialirkan menuju kolom fraksionasi. kandungan metana dan etana terdapat pula propana dan butana yang signifikan pada gas alamnya, maka periu dilakukan proses pengambilan gas-gas ini mengingat nilai ekonomisnya. Produk yang akan dihasilkan ialah gas kota, LPG dan kondensat. Sehingga membutul-ikan dua kolom fraksionasi yaitu kolom deelhanizer dan kolom debuthanizer. Untuk dasar perhitungan dari analisa teknis, menggunakan alat bantu software HYSYS 3.1. Neraca energi imtuk proses pemumian dan proses utama dihitung secara terpisah dikarenakan perbedaan perhitungan termodinamika yang digunakan (fluid package), dimana untuk proses pemumian yaitu pembersihan gas, digunakan amine package dan Soave-Redlich-Kwong (SRK) package, sedangkan untuk proses utama digimakan Peng Robinson package."
Depok: Fakultas Teknik Universitas Indonesia, 2006
S49566
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>