Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 86721 dokumen yang sesuai dengan query
cover
Muhammad Misykat Hiksas
"Pemanfaatan Photovoltaic sebagai sumber energi terbarukan penting bagi pertumbuhan ekonomi yang berkelanjutan. Pemerintah Indonesia memiliki komitmen kuat untuk menggunakan sistem PV. Menurut rencana nasional, sistem Photovoltaic cocok untuk meningkatkan pasokan listrik di daerah terpencil. Akibatnya jumlah sistem Photovoltaic banyak dimanfaatkan untuk mencapai tujuan. Tesis sarjana ini meneliti penetrasi Sistem Photovoltaic yang tinggi di sebuah pulau yang terhubung ke grid Lombok 20 kV. Tiga waktu kritis setiap hari dianalisis untuk mensimulasikan perilaku intermiten sistem Photovoltaic, dan kemudian studi load flow disimulasikan menggunakan DIgSILENT Power Factory 17.0.4 untuk melihat dampak pada jaringan transmisi antara pulau dan grid pulau utama.

The utilization of Photovoltaic as renewable energy sources is important for sustainable economic growth. Indonesia government has a strong commitment to use PV system. According to the national plan, Photovoltaic systems are suitable for increasing electrical supply in remote area. As a result the numbers of Photovoltaic system are expected to utilize in order to achieve the goal. This bachelor thesis examines the high penetration of Photovoltaic System at an island connected to Lombok 20 kV grid. Three critical times of day are analyzed to simulate intermittent behavior of Photovoltaic system, and then load flow study is simulated using DIgSILENT Power Factory 17.0.4 to see impact on the line between island and main island grid.
"
Depok: Fakultas Teknik Universitas Indonesia, 2018
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Wilhelmina S.Y.M Sawai
"Studi aliran daya merupakan gambaran kondisi sistem pada suatu saat. Salah satu kondisi yang biasanya dipantau adalah saat tegangan pada sistem 500 kV berkurang atau lebih dari grid code yang ditentukan. Hal ini memberi dampak yang besar kepada beban. Di saat kondisi tegangan kurang atau lebih perhatian ditujukan pada ketersediaan daya. Pemakaian bank kapasitor, dapat membantu menstabilkan sistem tegangan, sehingga sistem dapat bekerja optimal.
Studi aliran daya penting untuk perencanaan, operasi, penjadwalan ekonomis dan pertukaran daya antar area. Hasil perhitungan aliran daya mengetahui dengan cepat adanya kemungkinan terjadi gangguan. Studi aliran daya sistem Jawa ? Bali, menunjang strategi operasi dalam menghadapi kondisi sistem tahun 2007- 2011. Studi aliran daya menggunakan Metode Newton-Raphson dan Program Electrical Transient Analyzer Program (E.T.A.P.).

Load flow studies on a system is a description of the system condition in a certain period of time. One of the condition that frequently being observed is each time current in 500 kV system is lessened or more from grid code. This circumstance gives a great impact at the load. At moment of system under voltage or over voltage, the focus is concentrated on the availability of power. The use of capacitor the bank, may help stabilizing the voltage system there by causing the system to run optimally.
The study of load flow is essential for planning, operation, economic or financial scheduling and energy exchangie inter areas. The calculation the possibility of power flows constitutes early necessary condition the know disruptions. Load flow studies on the Java Bali systems provides a support on operation strategies in facing system conditions of the year 2007-2011. The study carry out Newton- Raphson method and Electrical Transient Analyzer Program (E.T.A.P.).
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
T25056
UI - Tesis Open  Universitas Indonesia Library
cover
Nadya Gistriagung
"Penggunaan sistem hibrid yang terdiri dari PLTS terhubung ke jaringan PLN 20 kV(On-grid), didukung dengan penggunaan dan penambahan sistem BESS, memungkinkan memiliki stabilitas yang terjaga serta dapat menjadi alternatif dalam mempertahankan kehandalan serta efisiensi ekonomi dalam penyaluran energi listrik. Oleh karena itu, penelitian ini bertujuan untuk menganalisa kinerja sistem berdasarkan Analisa aliran daya serta kestabilan tegangan dan respon frekuensi sistem pada sistem kelistrikan Gedung Energi PUSPITEK,Serpong. Pengolahan data tersedia dan analisis dilakukan dengan membuat simulasi menggunakan bantuan perangkat lunak DigSILENT PowerFactory. Hasil secara menyeluruh simulasi dan analisis terhadap analisa aliran daya dan kestabilan sistem kelistrikan akibat variasi sumber daya dan variasi skenario gangguan yang terjadi, dengan rata-rata perubahan tegangan dan frekuensi yang relatif kosntan dalam kondisi yang sesuai dengan standar aturan sistem tenaga listrik.

The use of a hybrid system consisting of PLTS connected to the 20 kV (On-grid) PLN network, supported by the use and addition of the BESS system, allows for maintained stability and can be an alternative in maintaining reliability and economic efficiency in the distribution of electrical energy. Therefore, this study aims to analyze the performance of the system based on the analysis of power flow and the stability of the voltage and frequency response of the system on the electrical system of the Gedung Energi PUSPITEK, Serpong, The available data processing and analysis is carried out by making simulations using the DigSILENT PowerFactory software. The results of the overall simulation and analysis of the analysis of power flow and stability of the electrical system due to variations in power sources and variations in fault scenarios that occur, with an average change in voltage and frequency that are relatively constant in conditions that comply with the standard rules of the electric power system."
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Nadya Amanda Pritami
"ABSTRAK
Pertumbuhan penduduk yang tinggi menjadi faktor utama meningkatnya kebutuhan listrik di Indonesia. Kondisi fluktuasi beban yang sangat cepat ini harus diantisipasi dengan ketersediaan pembangkit yang memadai. Apabila beban meningkat tetapi suplai yang diberikan turun maka akan terjadi overload. Overload ini mengakibatkan suplai akan padam karena neraca suplai daya dengan beban tidak seimbang. Load shedding adalah metode tahapan pemisahan beban secara terencana untuk mengatasi terjadinya penurunan frekuensi yang disebabkan oleh kenaikan beban pada generator. Prioritas beban sangat berpengaruh terhadap tahapan load shedding.

ABSTRACT
A high population growth has become a major factor from increasing electricity demand in Indonesia. The conditions of rapid load fluctuations must be anticipated by the availability of adequate power plant. If the load increases but the supply decreases there will be overloaded. The effect of this overload conditions will cause the supply is outages due to between supply and load is unbalanced. Load shedding is a method of unburdening stages planned to address the decline in frequency caused by the increase in the load on the generator. Load Priority greatly affect the load shedding stage"
2014
S53504
UI - Skripsi Membership  Universitas Indonesia Library
cover
Muhammad Pandu Rizkhi Prasetyo
"Pertumbuhan ekonomi dan populasi menyebabkan peningkatan konsumsi energi listrik. Oleh karena itu, konsumsi energi dan penyediaan daya di masa mendatang perlu diprakirakan sejak dini. Terdapat beberapa metode yang telah diterapkan, namun dalam hal ini penulis melakukan peramalan kebutuhan energi menggunakan metode Neural Network (NN) berdasarkan data-data meliputi rasio elektrifikasi, energi terjual pelanggan, PDRB (Produk Domestik Regional Bruto) serta jumlah penduduk pada wilayah Jamali (Jawa Madura Bali). Adapun simulasi NN dilakukan pada software Matlab. Walaupun demikian, peramalan kebutuhan energi kali ini hanya dapat dilakukan pada waktu yang terbatas, karena tingkat kepercayaan ramalan menurun mengikuti kenaikan tahun dimana tingkat kepercayaan maksimum R2 = 0,9852 diperoleh pada peramalan kebutuhan energi selama 6 tahun ke depan.

Economic and population growth led to increased consumption of electrical energy. Therefore, energy consumption and power supply in the future need to be predicted early on. There are several methods that can be applied, but this study will use artificial Neural Network (ANN) for demand forecasting based on data that consist of electrification ratio, energy-sold customers, GDP (Gross Domestic Product) and the number of residents in the area of Jamali. The simulation is done by using Matlab. However, the peak demand forecasting can only be done in a limited time, because the confidence level forecast to decline following the year in which the increase in the maximum confidence level R2 = 0.9852 is obtained on demand forecasting for the next 6 years."
Depok: Fakultas Teknik Universitas Indonesia, 2016
T45371
UI - Tesis Membership  Universitas Indonesia Library
cover
Hanindito Titah Prameswara
"Salah satu contoh penerapan energi baru terbarukan EBT yang sedang berkembang adalah Pembangkit Listrik Tenaga Surya PLTS. Berdasarkan data Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) PT PLN (Persero) 2019-2028 disebutkan bahwa potensi energi matahari (surya) di Indonesia sebesar 207.898 MW (4,80 kWh/m2/hari) dan hanya sebesar 78,5 MW kapasitas terpasang di Indonesia. Pada penelitian ini dilakukan studi interkoneksi PLTS 5 MWp dengan jaringan tegangan menengah 20 kV Daerah X sebagai salah satu penerapan energi baru terbarukan di Indonesia. Studi interkoneksi mencakup analisis aliran daya dan analisis gangguan hubung singkat tiga fasa. Pada analisis aliran daya diperoleh hasil bahwa sistem PLTS mampu menyuplai kebutuhan beban pada sistem sebesar 5.000 kW daya aktif. Didapatkan juga bahwa interkoneksi PLTS dengan sistem mengakibatkan kenaikan level tegangan dari setiap bus pada sistem sebesar 0,08-1,41%, serta membuat perubahan persentase pembebanan komponen sebesar 0,01% hingga 93,01%. Hasil analisis gangguan hubung singkat tiga fasa menunjukkan bahwa interkoneksi PLTS dengan sistem memiliki besar nilai arus gangguan hubung singkat sebesar 5,70-7,01 kA, sehingga nilai arus gangguan untuk seluruh bus masih jauh di bawah nilai kapasitas pemutusan arus hubung singkat sistem proteksi yang bernilai 25 kA. Hasil studi interkoneksi yang diperoleh menujukkan bahwa interkoneksi sistem PLTS 5 MWp dengan jaringan tegangan menengah 20 kV Daerah X dapat dilakukan.

One example of the application of new renewable energy that is currently developing is solar power plant. Based on data from Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) PT PLN (Persero) 2019-2028, it is stated that the potential of solar energy in Indonesia is 207,898 MW (4.80 kWh/m2/ day) and only 78.5 MW of capacity installed in Indonesia. In this study, a 5 MWp solar power plant was interconnected with a 20 kV medium-voltage network of Area X as one of the renewable energy applications in Indonesia. Interconnection studies include power flow analysis and three phase short circuit fault analysis. In the analysis of the power flow results obtained that the Solar Power Plant system is capable of supplying the load requirements to the system of 5,000 kW active power. It was also found that interconnection of solar power plant with the system resulted in an increase in the voltage level of each bus in the system by 0.08 to 1.41%, as well as changing the percentage of component loading by 0.01% -93.01%. The results of the three-phase short circuit fault analysis show that the interconnection of the solar power plant system has a short circuit fault current value of 5.70-7.01 kA, so the fault current value for the whole bus is still far below the value of the short circuit current capacity of the protection systems short circuit worth 25 kA. The results of the interconnection study showed that interconnection of a 5 MWp solar power plant system with a 20 kV medium voltage network Area X can be carried out."
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Kevin Geovany
"Energi fosil yang semakin menipis mendorong perkembangan energi baru terbarukan untuk menggantikannya. Pembangkit Listrik Tenaga Surya (PLTS) merupakan salah satu jenis pembangkit ramah lingkungan dengan sumber tak terbatas dan untuk mengetahui kelayakan pemasangannya perlu dilakukan perhitungan dan analisis. Pada penelitian ini dilakukan analisis pada studi optimasi PLTS pada jaringan tegangan menengah 20 kV Sanana, Maluku Utara untuk memastikan kelayakan interkoneksi PLTS secara teknis dengan bantuan perangkat lunak DIgSILENT PowerFactor. Hasil analisis optimasi menunjukkan bahwa nilai optimal kapasitas PLTS adalah sebesar 800 kWp. Hasil simulasi aliran daya menunjukkan bahwa pemasangan PLTS mampu menambah kapasitas pembangkitan dan dapat menggantikan penggunaan generator PLTD, serta kondisi tegangan bus masih dalam kondisi aman dalam batasan -10% dan +5%. Pada simulasi hubung singkat didapatkan hasil yang menunjukkan bahwa interkoneksi PLTS dapat mengurangi nilai arus hubung singkat bila dibandingkan saat PLTS belum terinterkoneksi dengan sistem. Pada simulasi kestabilan saat salah satu generator padam, didapatkan bahwa saat PLTS belum terhubung dan saat PLTS sudah terhubung didapat nilai tegangan berada dalam batas tegangan -10% hingga +5% dan nilai frekuensi dalam rentang 49,5 – 50,5 Hz sesuai dengan aturan distribusi Indonesia sehingga interkoneksi PLTS tidak mengganggu kestabilan sistem saat generator padam. Simulasi kestabilan saat PLTS padam dan saat kondisi cuaca hujan disertai gelap, didapat hasil yang menunjukkan bahwa untuk mencegah terjadinya gangguan tersebut, minimal harus ada satu generator yang berperan sebagai penyuplai daya cadangan untuk menjaga kestabilan sistem.

The depletion of fossil energy encourages the development of renewable energy to replace it. Solar Power Plant is one of many renewable power plant with unlimited sources and to determine the feasibility of its installation it is necessary to do calculations and analyzes. In this study, an analysis is carried out on the solar power plant optimization study on the 20 kV medium voltage network in Sanana, North Maluku to ensure the technical feasibility of PV interconnection by using DIgSILENT PowerFactory software. The results of the optimization analysis show that the optimal value of solar power plant capacity is 800 kWp. The results of the load flow simulation show that the installation of solar power plant adds generating capacity and can replace the use of diesel generator, and the bus voltage condition is still in a safe condition within the limits of -10% and +5%. In the short-circuit simulation, the results show that the interconnection of solar power plant can reduce the value of short-circuit current when compared to when solar power plant has not been connected to the system. In the stability simulastion whe one of the generators outages, it is found that when the solar power plant is not connected and when the solar power plant is connected, the voltage value is within the voltage limit of -10% to +5% and the frequency value is in the range of 49.5 – 50.5 Hz according to the rules distribution in Indonesia so that the solar power plant interconnection does not disturb the stability of the system when the generator outages. Simulation of stability when the solar power plant outages and when weather condition is dark rainy, the results show that to prevent these disturbances, there must be at least one generator that acts as a backup power plant to maintain system stability."
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Achmad Bambang Sumadiyana
"Salah satu faktor yang menentukan kualitas dan keandalan sistem tenaga listrik adalah pengoperasian sistem pada tegangan dan frekuensi konstan dengan rugirugi daya seminimal mungkin. Hal ini dapat diketahui dengan analisis aliran daya pada kondisi normal. Simulasi yang menggunakan ETAP dilakukan terhadap sistem 150 kV Region Jakarta-Banten dengan dua situasi yaitu penggunaan grid dan atau IBT.
Simulasi dengan menggunakan IBT menghasilkan data perhitungan yang lebih baik dibandingkan simulasi dengan menggunakan grid. Kompensasi pada suatu rel akan menyebabkan berkurangnya aliran daya reaktif menuju rel tersebut sehingga dapat mengurangi arus, rugi-rugi daya dan jatuh tegangan pada saluran serta menambah faktor daya.
One of the factors which determines quality and reliability of power system is system operation with constant voltage and frequency with minimal losses. Those can be seen using load flow analysis in normal condition. ETAP can be applied on 150 kV Region Jakarta-Banten System with two situations that are using grid or IBT.
The result of simulation using IBT is better than the simulation using Grid. The compensation at one bus will cause decreasing of reactive power to the bus, and lead to decreasing of current, power losses and voltage drop at line transmission, and increasing power factor.
"
Depok: Fakultas Teknik Universitas Indonesia, 2009
R.03.09.06 Sum s
UI - Skripsi Open  Universitas Indonesia Library
cover
Doni Abdul Mukti
"Proteksi adalah pengaman pada sistem tenaga listrik yang terpasang pada sistem distribusi tenaga listrik, trafo tenaga, transmisi tenaga listrik dan generator listrik dipergunakan untuk mengamankan sistem tenaga listrik dari gangguan listrik atau beban lebih dengan cara memisahkan bagian sistem tenaga listrik yang terganggu dengan sistem tenaga listrik yang tidak terganggu sehingga sistem kelistrikan yang tidak terganggu dapat terus bekerja.
Sistem proteksi pada gardu T75B, T149 dan MG61 terjadi kegagalan kerja dimana saat ada gangguan hubung singkat disisi konsumen, mengakibatkan PMT (Pemutus Tenaga) Penyulang trip. Hal ini mengakibatkan pemadaman meluas yang tidak diharapkan. Untuk mengetahui penyebab kegagalan sistem proteksi dilakukan beberapa pengujian dan analisis menggunakan metode Root Cause Analysis yaitu pengujian koordinasi relay proteksi, pengujian performa alat proteksi, analisis konstruksi sistem proteksi, dan Perhitungan pemilihan alat proteksi.
Pada gardu T75B, penyebab kegagalan sistem proteksi terdapat pada kesalahan pemilihan Transformator Arus yang jenuh saat dialiri arus gangguan melebihi 3.375 A. Pada gardu T149, penyebab kegagalan sistem proteksi terdapat pada pengaturan timing trip antara gardu dstribusi dan penyulang koasi memiliki kesamaan pada kurva Definite Time yaitu 0,2 sekon. Pada gardu MG61, penyebab kegagalan sistem proteksi terdapat pada kesalahan pemilihan Transformator Arus yang jenuh saat dialiri arus gangguan melebihi 1.250 A. Diharapkan dengan hasil pengujian tersebut dapat menjadi acuan untuk perbaikan sistem proteksi sehingga kegagalan serupa tidak terulang kembali.

Protection is a safety in the electric power system installed in the electric power distribution system, power transformer, electric power transmission, and generator used to secure the power system electricity from electrical disturbances or overloads by separating the disturbed parts of the electric power system from the undisturbed electrical power system so that the undisturbed electrical system can continue to work.
The protection system at the Distribution Substation of T75B, T149 and MG61 has a work failure where when there is a short circuit on the consumer side, it causes the PMT (Power Breaker) for the Feeder does not trip. This resulted in an unexpected widespread blackout. To find out the cause of the failure of the protection system, several tests and analyzes were carried out using Root Cause Analysis methods, namely protection relay coordination testing, protection equipment performance testing, protection system construction analysis, and calculation of selection of protection equipment.
At the T75B substation, the cause of the protection system failure is the Current Transformer design error which is saturated when the fault current exceeds 3.375 A. At the T149 substation, the cause of the protection system failure is the timing trip setting between the distribution substation and the feeder which has the same Definite Time curve as 0,2 sec. At the MG61 substation, the cause of the failure of the protection system is the Current Transformer selection which is saturated when the fault current exceeds 1.250 A.It is hoped that the test results can be used as a reference for improvement protection system so that similar failures do not recur.
"
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Eko Wahyu Supriyadi
"ABSTRAK
Peningkatan keandalan sistem tenaga lisirik adalah suatu tuntutan dalam rangka usaha untuk meningkatkan pelayanan terhaLlap konsumen listrik Pelayanan yang baik adalah menjadi tujuan pada setiap pengusahaan sistem tenaga listrik.
Sistem distribusi sebagai bagian dari sistem tenaga listrik, merupakan bagian terbesar asal mula terjadinya pemutusan pelayanan. OIeh karena itu tingkat keandalan suatu sistem distribusi penlu diketahui untuk memperoleb mutu pelayanan yang diinginkan.
Tingkat keandalan sistem disiribusi ditentukan oleh unjuk kerja masing-masing komponen yang mendukung beroperasinya sistem distribusi tersebut Dengan diketahuinya tingkat keanda1an sistem distribusi akan dapat diambil kebijaksanaan untuk lebih meningkatkan pelayanan.

"
1995
S34291
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>