Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 349 dokumen yang sesuai dengan query
cover
Djokoarto
1988
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Damar Ravie Cahyadi
"Pembangkit Listrik Tenaga Uap PT. PJB UP Muara Karang merupakan PLTU yang memerlukan pemasakan dengan bahan bakar gas atau minyak sebagai bahan bakar pemasakannya untuk menghasilkan uap agar turbin pembangkit dapat bergerak. Motor induksi memainkan peran penting terutama motor pompa pengisi boiler yang berfungsi mengalirkan air murni yang sudah diproses ke boiler untuk pemasakan. Performa efisiensi pembangkit ditentukan oleh berfungsinya dari peralatan-peralatan bantu yang digunakan untuk menentukan prioritas dan potensi-potensi penghematan energi diperlukan langkah manajemen audit energi dengan cara pemakaian energi di pembangkit terutama di motor pompa pengisi boiler. Perlu diketahui pada motor induksi didapati arus 360 ampere pada unit 5B motor pompa pengisi boiler yang dikarenakan penurunan isolasi. Hal ini dengan kondisi polarisasi indeks total dari total fasa senilai 4,953 dan disipasi faktor daya total dari total fasa senilai 0,1437% sehingga mempengaruhi efisiensi proses produksi. Arus bocor yang disebabkan oleh kenaikan tangen delta akibat penurunan tahanan isolasi oleh usia, suhu, kelembapan, dan kontaminasi pada motor pompa pengisi boiler menurut IEEE .Std.62.22 dan IEEE. 43-2013 masih layak digunakan. Pemeliharaan MCA (Maintenance Control Audit) dapat menganalisis dan mengontrol agar mesin listrik bekerja sesuai dengan produksi pemakaian energi sendiri agar berjalan dengan baik diperlukan pada sistem pembangkit. Pemeliharaan MCA dengan cara menganalisis data yang ada di lapangan yang dapat mengontrol energi yang dipakai oleh motor pompa pengisi boiler supaya tidak keluar dari batas maksimumnya di PLTU unit 5. Cara pemeliharaan MCA dapat mengatasi kenaikan arus yang dapat membuat terjadinya hubung singkat.

PLTU PT. PJB UP muara karang is a power plant that requires cooking with gas or oil as fuel to produce steam so that the turbines can move. Induction motor plays an important role, especially motor boiler feed pump that serves to drain pure water that has been processed into boiler for compaction. The performance of plant efficiency is determined by the proper functioning of the auxiliary equipment used to determine the priorities and potentials of energy saving required energy audit management measures by means of energy consumption in the plant, especially in boiler feed pump motors. induction motors are found current 360 ampere in unit 5B boiler feed pump motor due to decreased insulation. This is by polarizing the total index of the total phase of 4,953 and the dissipation of the total power factor of the total phase of 0.1437% thereby affecting the efficiency of the production process. More currents are caused by the increase in delta tangents due to decreased insulation prisoners by age, temperature, humidity, and contamination of boiler feed pump motors according to IEEE. Std.62.22 and IEEE. 43-2013 is still worth using. Maintenance MCA (Maintenance Control Audit) can analyze and control so that the electrical engine works in accordance with the production of its own energy consumption in order to run properly required on the generating system. MCA maintenance by analyzing data in the field that can control the energy used by boiler feed pump motors so as not to get out of the maximum limit in pltu unit 5. MCA maintenance can overcome the increase in current that can make a short circuit happen."
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Hafidz Nurhantoko
"Getaran suatu komponen mesin yang telah melewati standar yang ditentukan dapat menurunkan performa kerja mesin dan menyebabkan kerusakan sehingga dapat terjadi overhaul. Oleh karena itu dibutuhkan sebuah sistem pemantauan kondisi getaran pada komponen mesin. Tujuan dari penelitian ini adalah untuk menentukan waktu dimana komponen akan mengalami kerusakan berdasarkan data kondisi terdahulu dan mendiagnosa penyebab getaran yang terjadi sehingga dapat menghasilkan suatu penjadwalan pemeliharaan berdasarkan jangka waktu yang telah ditentukan. Metode yang digunakan ialah analisa kecenderungan yang disesuaikan dengan ISO 10816 dan analisa spectrum getaran. A Kondisi getaran yang terjadi pada unit High Pressure Boiler Feed Pump 2 yaitu DE Pompa = 7,19 mm/s pada bulan Maret tahun 2019, DE Motor = 4,60 mm/s pada bulan Agustus tahun 2019, NDE Pompa = 4,51 mm/s pada bulan September 2019, dan NDE Motor = 4,53 mm/s pada bulan Juli tahun 2020. Pada analisa spectrum ditemukan bahwa terjadi gejala kerusakan antara lain Blade Pass Frequency, Rotor Bar Pass Frequency, Journal Bearing Looseness, Resonansi, dan Unbalance.

Vibrations of a machine components that have passed the prescribed standards can decrease the performance of the work of the machine and cause damage that can happen to an overhaul. Therefore it takes a vibration condition monitoring system on the engine components. The purpose of this research is to determine the time in which the components will be damaged based on the previous conditions and diagnose the cause of the vibration that occurs so it can generate a maintenance scheduling based on the time period specified. The method used is the trending analysis that adapted to ISO 10816 and vibration spectrum analysis. Measurement of vibration conditions has been conducted on two units High Pressure Boiler Feed Pump, as measured at four points, namely the Drive End of the pump, the Motor Drive End, Non Drive End of the pump, the Non Drive End Motor on each point made on the axial axis, horizontal and vertical. The conditions of the vibration that occurs at the unit 39 s High Pressure Boiler Feed Pump 2 IE DE Pump 7.19 mm s in March 2019, DE Motors 4.60 mm s in August of 2019, NDE Pump 4.51 mm s in September 2019, and NDE Motor 4.53 mm s in July to know 2020 n. On the analysis of the spectrum found that symptoms of damage among other Blade Pass Frequency, Rotor Bar Pass Frequency, Journal Bearing Looseness, Resonance, and Unbalance. "
Depok: Fakultas Teknik Universitas Indonesia, 2018
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Sukandar
"Tesis ini meneliti tentang kegagalan yang terjadi di sistem boiler feed water (BFW) di sebuah industri petrokimia. Kegagalan terjadi akibat adanya penipisan lokal pada ujung saluran injektor inhibitor dari pipa BFW, yang menyebabkan pipa mengalami kebocoran.
Untuk mengetahui penyebab kegagalan, dilakukan pengujian-pengujian menurut prosedur umum analisis kegagalan, yang mencakup pengujian-pengujian kekerasan, komposisi kimia, fraktografi/metalografi, produk korosi, polarisasi, efek pH, dan simulasi aliran.
Hasil pengujian menunjukkan bahwa kekerasan, komposisi kimia, dan struktur mikro pipa sesuai dengan spesifikasi material yang digunakan (ASTM A 106 grade B). Hasil pengujian produk korosi menunjukkan bahwa permukaan pipa terkorosi karena produk korosi mengandung elemen-elemen yang korosif. Pengujian polarisasi dan efek pH membuktikan bahwa laju korosi menurun dengan penambahan inhibitor dan peningkatan pH pada BFW. Pengujian simulasi menunjukkan bahwa terjadi turbulen pada aliran yang melewati nozzle check valve, tetapi pada ujung saluran injektor inhibitor tampak adanya daerah depresi dengan arah terbalik.
Berdasarkan hasil pengujian-pengujian tersebut dapat disimpulkan bahwa karena lokasi ujung injektor yang terletak di daerah depresi aliran, terbentuk caustic sebagai akibat reaksi antara inhibitor (Sodium Tripolyphosphatel Na3PO4) dengan air (BFW). Caustic menyebabkan ujung saluran injektor menjadi getas (embritllement) sehingga dengan aliran air yang rendah saja sudab dapat melepas lapisan caustic di ujung saluran injektor.
Untuk menghindari terjadinya caustic pada ujung saluran injektor inhibitor, maka posisinya disarankan untuk dijauhkan dengan jarak minimum 4 kali diameter luar pipa BFW, yaitu 1300 mm dari sumbu check valve. Dari simulasi aliran untuk jarak tersebut bebas dari daerah depresi aliran dan inhibitor langsung terbawa dan larut (diluted dengan BFW yang mengalir), dengan posisi pipa injektor tegak (90°).

The thesis is to investigate the failure happened in a boiler feed water (BFW) system of a petrochemical industry. The failure happened as cause of local thinning at the vicinity of inhibitor injector of BFW pipe, which cause the pipe leaked.
To find out the causes of the failure, some tests have been carried out based on the general procedure of failure analysis, which consist of hardness testing, chemical composition, fractography / metallographic, corrosion products, polarization, pH effects, and flow simulation.
Hardness Testing, chemical composition and micro structure show that the pipe material used are in accordance with the standard specification (ASTNE A 106 grade B). The test result of corrosion products show that the pipe surface corroded because the corrosion products contain corrosive elements. Tests of polarization and pH effects proved that the corrosion rate decrease by adding inhibitor and increase pH value. Test of flow simulation show that turbulence-created after the flow passed the nozzle check valve, but at the vicinity of inhibitor injector seem to be a depression area with a reversed flow.
Based on these tesis, it is concluded that the inhibitor injector located at the depression area, which created caustic as the chemist reaction between inhibitor (Sodium Tripolyphosphatel Na3PO4) and water (BFW). The caustic cause the vicinity of inhibitor injector become brittle, then only with low velocity of flow, the caustic layer can be removed.
Avoiding caustic happen at the vicinity of inhibitor injector, it is proposed that the inhibitor injector is located at least 4 times outside diameter of BFW pipe, i.e. 1300 mm, from the check valve axis. Results of flow simulation of some injector designs at the distance of 1300 mm, show that the injector is free from depression area and the inhibitor is diluted directly with flowing BFW, with the injector is vertical to the BFW pipe (90°)."
Depok: Fakultas Teknik Universitas Indonesia, 2002
T8525
UI - Tesis Membership  Universitas Indonesia Library
cover
"Boiler rentan mengalami korosi akibat adanya air umpan (feed-water) yang mengandung gas CO2 terlarut, O2 terlarut, dan ion-ion sadah seperti Ca2+ dan Mg2+. Salah satu upaya pencegahan korosi yang banyak dikembangkan adalah inhibitor organik dari bahan alam karena mudah didegradasi dan tidak bersifat toksik. Pada penelitian ini digunakan kulit kayu akasia (Acacia mangium) sebagai alternatif inhibitor korosi pada feed-water boiler karena mengandung polifenol alam terutama tanin. Ekstraksi tanin dari kulit kayu akasia dilakukan dengan cara refluks menggunakan aquades dengan perbandingan 1: 20. Selanjutnya, pengujian potensi ekstrak tanin sebagai inhibitor dilakukan dalam media EDTA jenuh gas CO2 menggunakan metode spekstroskopi impedansi elektrokimia (EIS) dan polarisasi potensiodinamik (Tafel). Hasil ekstraksi kulit kayu akasia diperoleh tanin sebesar 29,22 %. Analisis UV-Vis dan FTIR dari produk ekstraksi menunjukan adanya kesesuaian spektra serapan dengan tanin. Berdasarkan hasil pengujian Tafel diketahui bahwa baja karbon terkorosi secara signifikan dan penambahan ekstrak tanin ke dalam media dapat menurunkan laju korosinya. Pada suhu 65oC ekstrak tanin memiliki efisiensi sebesar 36,1% pada konsentrasi 80 ppm. Interaksi antara permukaan logam dengan ekstrak tanin adalah adsorpsi secara fisik yang mengikuti asumsi isoterm adsorpi Temkin dengan nilai ?Gads sebesar -13,383 kJ/mol."
541 JSTK 2:2 (2011)
Artikel Jurnal  Universitas Indonesia Library
cover
Rezki Zakaria
"Proyek FEED (Front End Engineering Design) Pembangunan Booster Pump Station Batang Heavy Oil di Rokan Hilir, Riau yang dilaksanakan oleh PT Solusi Energy Nusantara merupakan bagian dari Proyek Strategi Nasional National Capital Integrated Coastal Development (NCICD). Praktik keinsinyuran ini adalah mensimulasikan perancangan dan analisis sebuah sistem tenaga listrik dengan menggunakan software engineering ETAP (Electrical Transient Analysis Power) power station 19.5. ETAP mampu bekerja dalam keadaan offline untuk simulasi tenaga listrik dan online untuk pengelolaan data real-time dengan metode pendekatan studi aliran daya (load flow study). Metode pendekatan aliran daya yang akan digunakan dalam praktik keinsinyuran ini adalah metode Newton-Rhapson dengan faktor ketelitian 0,0001. Dari hasil analisis simulasi dan teori aliran daya, maka didapatkan nilai level tegangan dari peralatan listrik yang dihasilkan masih dalam batas yang diperbolehkan, yaitu ± 5%. Power supply dari PLN dengan hasil level tegangan, 20 kV Medium Voltage switchgear (100%); 6,6 kV Medium Voltage Switchgear (99,06%) dan 0,4 kV Low Voltage Switchgear (99,72%), sedangkan power supply dari EDG (Emergency Diesel Generator) diperoleh dengan hasil level tegangan 6,6 kV Medium Voltage switchgear (100%) dan 0,4 kV Low Voltage switchgear (99,3%). Praktik keinsinyuran dilaksanakan mulai dari pengumpulan data sampai dengan pembuatan laporan telah memenuhi aspek profesionalisme, KEI dan K3LL.

The FEED (Front End Engineering Design) Project for the Construction of the Batang Heavy Oil Booster Pump Station in Rokan Hilir, Riau implemented by PT Solusi Energy Nusantara is part of the National Capital Integrated Coastal Development (NCICD) National Strategy Project. This engineering practice is to simulate the design and analysis of an electrical power system using ETAP (Electrical Transient Analysis Power) power station 19.5 engineering software. ETAP is able to work offline for power simulation and online for real-time data management with the load flow study approach method. The power flow approach method that will be used in this engineering practice is the Newton-Rhapson method with an accuracy factor of 0.0001. From the results of simulation analysis and power flow theory, it is obtained that the voltage level value of the electrical equipment produced is still within the allowed limit, which is ± 5%. Power supply from PLN with voltage level results, 20 kV Medium Voltage switchgear (100%); 6.6 kV Medium Voltage Switchgear (99.06%) and 0.4 kV Low Voltage Switchgear (99.72%), while power supply from EDG (Emergency Diesel Generator) is obtained with voltage level results 6.6 kV Medium Voltage switchgear (100%) and 0.4 kV Low Voltage switchgear (99.3%). Engineering practices carried out from data collection to report writing have fulfilled aspects of professionalism, KEI and HSE."
Depok: Fakultas Teknik Universitas Indonesia, 2023
PR-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Rezki Zakaria
"Proyek FEED (Front End Engineering Design) Pembangunan Booster Pump Station Batang Heavy Oil di Rokan Hilir, Riau yang dilaksanakan oleh PT Solusi Energy Nusantara merupakan bagian dari Proyek Strategi Nasional National Capital Integrated Coastal Development (NCICD). Praktik keinsinyuran ini adalah mensimulasikan perancangan dan analisis sebuah sistem tenaga listrik dengan menggunakan software engineering ETAP (Electrical Transient Analysis Power) power station 19.5. ETAP mampu bekerja dalam keadaan offline untuk simulasi tenaga listrik dan online untuk pengelolaan data real-time dengan metode pendekatan studi aliran daya (load flow study). Metode pendekatan aliran daya yang akan digunakan dalam praktik keinsinyuran ini adalah metode Newton-Rhapson dengan faktor ketelitian 0,0001. Dari hasil analisis simulasi dan teori aliran daya, maka didapatkan nilai level tegangan dari peralatan listrik yang dihasilkan masih dalam batas yang diperbolehkan, yaitu ± 5%. Power supply dari PLN dengan hasil level tegangan, 20 kV Medium Voltage switchgear (100%); 6,6 kV Medium Voltage Switchgear (99,06%) dan 0,4 kV Low Voltage Switchgear (99,72%), sedangkan power supply dari EDG (Emergency Diesel Generator) diperoleh dengan hasil level tegangan 6,6 kV Medium Voltage switchgear (100%) dan 0,4 kV Low Voltage switchgear (99,3%). Praktik keinsinyuran dilaksanakan mulai dari pengumpulan data sampai dengan pembuatan laporan telah memenuhi aspek profesionalisme, KEI dan K3LL.

The FEED (Front End Engineering Design) Project for the Construction of the Batang Heavy Oil Booster Pump Station in Rokan Hilir, Riau implemented by PT Solusi Energy Nusantara is part of the National Capital Integrated Coastal Development (NCICD) National Strategy Project. This engineering practice is to simulate the design and analysis of an electrical power system using ETAP (Electrical Transient Analysis Power) power station 19.5 engineering software. ETAP is able to work offline for power simulation and online for real-time data management with the load flow study approach method. The power flow approach method that will be used in this engineering practice is the Newton-Rhapson method with an accuracy factor of 0.0001. From the results of simulation analysis and power flow theory, it is obtained that the voltage level value of the electrical equipment produced is still within the allowed limit, which is ± 5%. Power supply from PLN with voltage level results, 20 kV Medium Voltage switchgear (100%); 6.6 kV Medium Voltage Switchgear (99.06%) and 0.4 kV Low Voltage Switchgear (99.72%), while power supply from EDG (Emergency Diesel Generator) is obtained with voltage level results 6.6 kV Medium Voltage switchgear (100%) and 0.4 kV Low Voltage switchgear (99.3%). Engineering practices carried out from data collection to report writing have fulfilled aspects of professionalism, KEI and HSE.
"
Depok: Fakultas Teknik Universitas Indonesia, 2023
PR-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
New York: McGraw-Hill, 2001
R 621.6 PUM
Buku Referensi  Universitas Indonesia Library
cover
New York: McGraw-Hill, 1986
R 621.6 PUM
Buku Referensi  Universitas Indonesia Library
cover
Islamabad: Enercon, 1989
621.194 NAT b
Buku Teks SO  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>