Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 52228 dokumen yang sesuai dengan query
cover
Mahdi Jufri
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 1998
LP-pdf
UI - Laporan Penelitian  Universitas Indonesia Library
cover
Mahdi Jufri
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 1998
LP-pdf
UI - Laporan Penelitian  Universitas Indonesia Library
cover
cover
Falah Setyo Pambudi
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 1997
TA942
UI - Tugas Akhir  Universitas Indonesia Library
cover
KLET 8:2 (2009)
Artikel Jurnal  Universitas Indonesia Library
cover
"Para eksistensialis menyatakan bahwa manusia adalah makhluk (being) yang ada dalam hubungannya dengan waktu dan tempat tertentu, serta makna tertentu. Penelitian ini bertujuan untuk mngetahui pengaruh perspektif waktu terhadap kualitas relasi sosial. Partisipan penelitian ini adalah 96 mahasiswa. Penelitian ini menggunakan skala Zimbardo Time Perspective Inventory dan Positive Relations with others. Analisis data menggunakan multiple regression. Hasil penelitian menunjukkan bahwa kelima dimensi perspektif waktu secara bersama-sama berpengaruh terhadap kualitas relasi sosial. "
JPSU 1:1 (2012)
Artikel Jurnal  Universitas Indonesia Library
cover
"Telah diadakan studi pengaruh waktu sintering terhadap kualitas superkonduktor YBCO melalui pengamatan suseptibilitas AC. Cuplikan dibuat dalam bentuk pelet dan disinter dengan variasi waktu 8 jam, 10 jam, 13 jam, 16 jam, dan 18 jam pada suhu 930 C. Hasil studi menunjukkan bahwa prosentase efek meissner meningkat denan pertambahan waktu sintering"
JURFIN 5:15 (2001)
Artikel Jurnal  Universitas Indonesia Library
cover
Yuliana D. Sutanto
"Adanya permasalahan di dalam pekerjaan barang dan jasa di dalam suatu proyek lansekap dapat menimbulkan kerugian yang cukup besar. Tulisan ini menganalisa pengelolaan penyediaan barang dan jasa untuk proyek lansekap di wilayah Jakarta maupun di luar Jakarta; yang bertujuan memberikan cara kerja yang efektif dan efisien. Pengertian yang dapat kita tarik dari penjelasan di atas adalah apabila proyek tersebut tidak direncanakan secara baik sejak awal maka akan menimbulkan inefisiensi dalam pemakaian sumber daya.

There are major problems in procurement for a landscape project, and it could end up a big loss. This paper analyses procurement landscape projects in or outside Jakarta through in depth research within the procurement time cycle area in order to achieve c/jicienr completion of works. The research is aimed to illustrate the procurement management required for a landscape project for effective utilization of resources."
Depok: Fakultas Teknik Universitas Indonesia, 2003
T10797
UI - Tesis Membership  Universitas Indonesia Library
cover
Karamoy, Andrita
"Tujuan: Untuk mengetahui apakah pemberian suplemen antioksidan dapat mengurangi pemanjangan waktu pemulihan makula pada juru las dengan pemakaian safety goggle. Design: Uji klinis tersamar ganda kelompok paralel secara randomisasi.
Metode: 44 subyek dibagi menjadi.2 kelompok. Kelompok perlakuan 21 subyek mendapat suplemen vitamin C 50 mg, vitamin E 10 mg dan β-carotene 6 mg selama 2 minggu berturut-turut, sedangkan kelompok kontrol 23 subyek mendapat plasebo. Pengukuran WPM dilakukan sebelum dan sesudah suplementasi baik pada saat sebelum dan sesudah 5 menit bekerja menggunakan safety goggle.
Hasil : Selisih WPM sebelum dan sesudah mendapat suplemen (WPM 2) pada kelompok perlakuan adalah 17,90±5,58 detik, sedangkan kelompok kontrol adalah 23,78±6,64 detik terdapat perbedaan bermakna secara statistik (3WPM 2) antara kedua kelompok penelitian (p<0,05).
Kesimpulan : Pemberian suplemen vitamin C 50 mg, vitamin E 10 mg and β -carotene 6 mg selama 2 minggu berturut-turut pada juru las yang menggunakan safety goggle terbukti dapat mengurangi pemanjangan WPM.

Objective: To evaluate whether assigning antioxidants supplement to welders using safety goggles could influence the prolong recovery time of photostress lest.
Methods: The study is randomized, double-blinded clinical trial. Forty-four male welders were included and divided into two groups and conduct matched pairs based on age and visual acuity. Twenty-one (21) welders for 5 minutes work assigned with antioxidants (subject group), while twenty-three (23) welders for the same duration assigned with placebo (control group) were given supplement for 14 days continuously. The antioxidants contained vitamin C 50 mg, vitamin E 10 mg and β-carotene 6 mg. The study was conducted at the Technical Institute of Welders in Surakarta from December 2004 through January 2005.
Results: The photostress recovery test in subject group produce an improvement (p< 0,05) while in placebo group remains unchanged (p>0,05).
Conclusion: Oral vitamin C 50 mg, vitamin E 10 mg and β -carotene 6 mg are proven to reduce the prolong time of photostress recovery test in welders using safety goggles.
"
Jakarta: Fakultas Kedokteran Universitas Indonesia, 2005
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Dhian Puspitasari
"Salah satu struktur inti perusahaan konstruksi dalam menjalankan sebuah proyek adalah tim proyek. Tim proyek bersifat khusus, mengingat struktur organisasi tim proyek biasanya dibentuk dalam tempo yang singkat dan difungsikan hanya untuk kurun waktu terbatas. Tim proyek biasanya terdiri dari sejumlah orang yang ahli dalam bidangnya dan mempunyai suatu hubungan kerja yang saling berkaitan.
Tim proyek dituntut untuk dapat bekerja secara efektif dan efisien pada keadaan lingkungan yang berbeda-beda agar proyeknya dapat berhasil baik. Dan dalam menjalankan tugasnya, banyak faktor yang akan mempengaruhi kesuksesan tim proyek tersebut.
Penelitian ini bertujuan untuk mengidentifikasi faktor-faktor sukses dalam tim proyek yang mempengaruhi kinerja waktu proyek serta menganalisis hubungan faktor-faktor tersebut dengan kinerja waktu proyek. Dalam penelitian ini, instrumen yang digunakan sebagai variabel faktor-faktor pengaruh didapat dari penelusuran literatur, survey, dan wawancara langsung dengan pakar dan stakeholder. Pen gumpulan data dilakukan dengan penyebaran quisioner untuk pimpinan proyek, manajer lapangan, serta staff proyek dari kontraktor di daerah Jakarta.
Hasil penilaian responden tentang faktor-faktor sukses tim proyek terhadap kinerja waktu proyek ini kemudian dianalisis menggunakan analisis regresi berganda untuk mengetahui faktor-faktor yang signifikan berpengaruh terhadap kinerja waktu proyek Dari hasil analisis diperoleh faktor-faktor yang signifikan mempengaruhi kinerja waktu proyek yaitu: tim mengerjakan tugas dengan alokasi biaya yang direncanakan, tim mengerjakan tugas dengan standar mutu yang ditetapkan.

One of core structure in construction company to run a project is project team. Project team is special form, because organization structure of project team is formed in short time and has limited time. Project team usually has many experts and each of them is connected.
Project team must work effectively and efficiently in different circumstances in order to get the goal. Beside it, many of factors will influence the success of project team.
This research aimed to identify many factors of success in project team which influence project time performance and analyze the relation between those factors to project time performance. We got variables of influence from literature, survey and direct interview with experts and stockholders. Data collection conducted by uestionnaires for project leader, filed manager and their staffs at Jakarta. The responses from respondents about factors of success of project team to project time performance were analyzed by double regression analysis to find significant between variables.
The result showed that the factors which influence project time performance were significant : project team was doing their work in planned budget allocation and appropriate with standard quality."
Depok: Universitas Indonesia, 2007
T24799
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>