Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 212998 dokumen yang sesuai dengan query
cover
Adrian Wasistoadi Budiarto
"In 2020, renewable energy sources contribution in Indonesia’s energy production mix had only reached 14,71%. The percentage was still far from Indonesia’s renewable energy mix target of 23% in 2025 and 31% in 2050 according to their own national energy plan. To enhance their progress in reaching those targets, one way that can be done is to benefit promising renewable energy potential in many areas, including coastal area such as Muara Bungin Beach located in Pantai Bakti Village, Bekasi. The village mentioned before have an average of 3,26-5,41 m/s wind speed and solar radiation of 5-5,4 kWh/m2/day. To utilize the area’s potential, three units of The Sky Dancer TSD-500 wind turbine and two monocrystalline solar panels with a total capacity of 1800 Watt peak have been installed in that area since 2014, making Muara Bungin Village mostly known as Bungin Techno Village to public. Sadly, the wind turbines have been removed recently in October 2021 due to poor physical condition, and the solar panels rarely being used and maintenanced. A revitalization plan can be done to keep Bungin Techno Village’s existance in utilizing their renewable energy potential alive.

The revitalization plan will create huge project, which is to install renewable energy power plants that can serve Desa Pantai Bakti’s electricity demand. A modelling result by LEAP shows that Desa Pantai Bakti’s electricity demand will reach 1.965,1 kWh/day in 2031. The planned renewable energy power plants will handle electricity load of 1.021,85 kWh/day or 51,6% from the village’s total electricity demand. A solar power plant consisting 104 units of Monocrystalline Maysun Solar Cell 500 Wp Peak Power with a lifetime of 25 years, a wind power plant consisting 24 units of 2000 W/220 V capacity wind turbines with a lifetime of 20 years, and a waste-to-energy power plant consisting a TG30 gasification machine and a 200 kVa/160 kW capacity diesel genset Caterpillar with a lifetime of 20 years. The total cost for lifetime operation of the planned solar, wind, and waste-to-energy power plant is estimated to be around Rp1.519.049.423; Rp3.238.231.499; and Rp859.733.884 respectively. The investment for the renewable energy technology revitalization plan can be considered economically worthy, judging by the NPV and ROR of every single planned power plants showing positive values or greater than zero."
2021: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Ade Firmansyah
"Negara kesatuan Republik Indonesia memiliki tujuh wilayah besar dengan karakteristik yang berbeda dalam system kelistrikan, perkembangan kebijakan kelistrikan di Indonesia dimulai pada abad ke-19 dan mulai berkembang dengan adanya pemberian hak konsesi oleh Pemerintah kolonial Hindia Belanda kepada swasta di beberapa daerah, kemudian ketika Jepang menguasai Indonesia, sektor kelistrikan berubah fungsi sebagai alat pertahanan dalam peperangan. Indonesia memperoleh kemerdekaan pada tahun 1945 dibarengi dengan proses nasionalisasi aset-aset yang dimiliki oleh Hindia-Belanda dan Jepang, kemudian sektor kelistrikan dikuasai sepenuhnya oleh Negara yang diamanahkan melalui Badan Usaha Milik Negara yaitu PLN. Pada tahun 1966, sektor ketenagalistrikan merupakan bagian dari proses pembangunan yang digaungkan dalam RPLT (Rencana Pembangunan Lima Tahun), di era tahun 1998 terjadilah pergolakan reformasi, yang berdampak pada kebijakan ketenagalistrikan, dimana porsi swasta/Independent Power Producer (IPP) meningkat signifikan menjadi 3.169 MW pada tahun 2003, rentan waktu era reformasi kebijakan sektor ketenagalistrikan mengalami 2 kali perubahan, konsepnya masih sama yaitu demonopolisasi, namun ada beberapa konsep yang diluruskan oleh Mahkamah Konstitusi, sehingga sektor ketenagalistrikan tetap menjadi bagian dari kontrol negara. Indonesia telah meratifikasi Paris Agreement, dimana konsep perencanaan kelistrikan akan berbasis pada energi baru terbarukan, berbagai skenario telah dipersiapkan pemerintah namun baru bersifat pemenuhan kebutuhan supply-demand dengan mengoptimalkan pemanfataan energi terbarukan untuk kebutuhan pembangkit listrik, belum ada kebijakan yang mengatur terkait agregasi energi terbarukan sehingga diperlukan proyeksi kebutuhan energi dengan alat bantu perangkat lunak Powersim dan Arena untuk menghitung kebutuhan energi secara skenario BAU (Business As Usual) dan skenario penambahan supply dari 20% dari PLTS Atap dan variabel lainnya dari PLT Energi Terbarukan sebesar 10 s.d 15 TWh dan penambahan demand dari adanya peningkatan penggunaan electric vehicle, kompor induksi dan ekspor listrik ke Singapura dan Timor Leste.

The unitary state of the Republic of Indonesia has seven large regions with different characteristics in the electricity system, the development of electricity policy in Indonesia began in the 19th century and began to develop with the granting of concession rights by the Dutch East Indies colonial government to the private sector in some areas, then when Japan controlled Indonesia, the electricity sector changed its function as a means of defense in warfare. Indonesia gained independence in 1945 coupled with the process of nationalization of assets owned by the Dutch East Indies and Japan, then the electricity sector was fully controlled by the State mandated through state-owned enterprises, namely PLN. In 1966, the electricity sector was part of the development process echoed in the RPLT (Five-Year Development Plan), in the era of 1998 there was a reform upheaval, which had an impact on electricity policy, where the portion of private / Independent Power Producer (IPP) increased significantly to 3,169 MW in 2003, vulnerable when the era of electricity sector policy reform experienced 2 changes,  The concept is still the same as demonopolisation, but there are several concepts straightened out by the Constitutional Court, so that the electricity sector remains part of state control. Indonesia has ratified the Paris Agreement, where the concept of electricity planning will be based on new renewable energy, various scenarios have been prepared by the government but only meet the needs of supply-demand by optimizing the utilization of renewable energy for electricity generation needs, there is no policy that regulates the aggregation of renewable energy so that it requires the projection of energy needs with Powersim and Arena software tools for electricity generation.  Calculate the energy needs in the BAU (Business As Usual) scenario and the scenario of increasing supply from 20% of roofing power plants and other variables of renewable energy power plants of 10 to 15 TWh and the addition of demand from the increased use of electric vehicles, induction stoves and electricity exports to Singapore and Timor Leste."
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Alfian Nurshadiq
"Conservation Voltage Reduction (CVR) adalah metode untuk mengurangi konsumsi daya dan permintaan puncak. Ini bukan studi baru karena sudah banyak implementasi dan penelitian tentang CVR sebelumnya. CVR menyiratkan bahwa dengan mengurangi tegangan suatu perangkat atau sistem, daya yang dikonsumsi juga akan berkurang. Hal ini dapat dibuktikan dengan menggunakan persamaan daya listrik yang menyatakan bahwa daya sebanding dengan tegangan.
Sistem energi terbarukan sedang meningkat karena semakin murah dan lebih efisien. Daya yang dikeluarkan oleh sistem energi terbarukan tergantung pada faktor sumbernya, apakah itu radiasi atau kecepatan angin. CVR memungkinkan pengurangan konsumsi daya beban. Ini membantu mengurangi beban sistem karena mereka tidak harus menghasilkan lebih banyak daya daripada kebutuhan beban.
Sistem PV dan turbin angin mikro memiliki keluaran yang berbeda, tetapi keduanya perlu memasok beban yang sama dalam jaringan mikro. Kedua sistem pada akhirnya diubah menjadi daya AC untuk digunakan beban. Inverter digunakan di kedua sistem untuk membantu konversi. Inverter umum memiliki fluktuasi tegangan antara -20% dan +10% dari tegangan nominalnya. Sebuah sistem kontrol digunakan untuk mengatur tegangan keluaran inverter dan memastikan tidak mencapai kisaran tegangan maksimum. Sistem kontrol akan memungkinkan output inverter diatur lebih dekat ke tegangan nominal dan dengan demikian mengurangi tegangan berlebih.
Sistem energi terbarukan menghasilkan tegangan yang lebih rendah setelah sistem kontrol diterapkan untuk mengatur keluaran inverter. CVR telah dicapai dalam sistem ini. Sistem telah mengurangi konsumsi daya dan dengan demikian menurunkan beban sistem. Sistem tidak menghemat energi dengan menerapkan CVR. Perangkat yang bergantung pada voltase masih akan membutuhkan lebih banyak daya jika voltase perangkat dinaikkan. Sistem PV dan turbin angin mikro dengan CVR memungkinkan beban mendapatkan input tegangan yang lebih sehat sekaligus mengurangi konsumsi daya.

Conservation voltage reduction (CVR) is a method to reduce power consumption and peak demand. It is not a new study as there have been plenty of implementations and research regarding CVR for a long time. CVR implies that by reducing the voltage of a device or system, the power consumed will also be reduced. This can be proven using the electrical power equation where it states that power is proportional to voltage. Renewable energy systems are on the rise as they are getting cheaper and more efficient. The power outputted by a renewable energy system depends on their source factor whether it is irradiance or wind speed. Conservation voltage reduction allows the reduction of power consumption of the load. This helps decrease the burden of the system as they do not have to generate more power than the load needs.
PV systems and micro wind turbines have different outputs, but both need to supply the same load in a micro-grid. Both systems are eventually converted to AC power for the load to use. An inverter is used in both systems to help with the conversion. A common inverter has a voltage fluctuation between -20% and +10% of its nominal voltage. A control system is used to regulate the inverter’s output voltage and make sure it does not reach the maximum voltage range. The control system will allow the output of the inverter to be regulated much closer to the nominal voltage and thus decreasing excess voltage. The renewable energy system outputs a lower voltage after a control system has been applied to regulate the output of the inverter. Conservation voltage reduction has been achieved in this system. The system has reduced power consumption and thus lowering the burden of the system. The system does not save energy by implementing conservation voltage reduction. A voltage-dependent device will still demand more power if the voltage of the device is increased. The PV and micro wind turbine system with CVR allows the load to benefit healthier voltage input while having reduced power consumption.
"
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Orecchini, Fabio
"This book describes and assesses energy technologies, markets and future strategies, focusing on their capacity to produce, exchange, and use energy vectors. Special attention is given to the renewable energy resources available in different areas of the world and made exploitable by the integration of energy vectors in the global energy system. Clear definitions of energy vectors and energy systems are used as the basis for a complete explanation and assessment of up-to-date, available technologies for energy resources, transport and storage systems, conversion and use. The energy vectors scheme allows the potential realization of a worldwide sustainable energy system to fulfill global development expectations by minimizing both the impact on the environment, and the international political frictions for access to limited and concentrated resources."
London: [Springer, ], 2012
e20418832
eBooks  Universitas Indonesia Library
cover
Dwi Cahya Agung Saputra
"Pemerintah Indonesia menargetkan dapat mencapai Net-Zero Emission (NZE) di sektor energi pada tahun 2060 atau lebih cepat dengan mengoptimalkan pemanfaatan sumber daya energi baru dan terbarukan (EBT), terutama yang berasal dari variable renewable energy (VRE). Kondisi sistem tenaga listrik Jawa, Madura, Bali (Jamali) yang saat ini masih didominasi oleh pembangkit listrik berbasis fosil telah memberikan tantangan dalam upaya transisi ke energi bersih. Di samping itu, karakteristik intermittency yang dimiliki oleh pembangkit VRE berpotensi meningkatkan ketidakpastian di sisi pasokan energi dan tekanan pada pengoperasian pembangkit termal. Salah satu solusi untuk mengatasi kendala intermittency dari pembangkit VRE adalah sistem Jamali harus dibuat fleksibel. Pada penelitian ini, dilakukan analisis terhadap fleksibilitas sistem Jamali untuk tahun 2030, 2040, dan 2050 dengan bantuan perangkat lunak IRENA Flextool, dengan tujuan mengevaluasi kemampuan sistem JAMALI dalam mengakomodasi integrasi pembangkit VRE yang masif di tahun 2030, 2040, dan 2050. Perangkat lunak beroperasi dengan prinsip economic load dispatch untuk memperoleh kondisi generation dispatch yang optimum dengan biaya operasi semurah mungkin. Dari hasil analisis, sistem Jamali tahun 2030 diperkirakan memiliki kemampuan fleksibilitas yang memadai untuk mengakomodasi integrasi VRE dengan presentase sebesar 5%. Sistem Jamali tahun 2040 juga diperkirakan memiliki kemampuan fleksibilitas yang cukup memadai untuk mengakomodasi integrasi VRE sebesar 36,97% dari total kapasitas terpasang pembangkit di tahun tersebut. Sedangkan sistem Jamali tahun 2050 diperkirakan memiliki kemampuan fleksibilitas yang tidak memadai untuk mengakomodasi integrasi VRE sebesar 51,95%. Hal ini disebabkan pada tahun 2050, sistem mengalami kehilangan beban sebesar 109,79 TWh dan pembatasan kapasitas VRE sebesar 706,69 MW.

The integration of variable renewable energy (VRE) into the JAMALI power system, characterized by intermittency and high uncertainty, has the potential to disrupt reliability and increase the operational complexity of the power system. These challenges can be mitigated if the power systems possess adequate flexibility. An analysis of the flexibility of the JAMALI power system is carried out to assess power system flexibility due to the increasing share of VRE in the JAMALI power system, phased as follows 5% in 2030, 37% in 2040, and 52% in 2050. The analysis is performed with the assistance of the IRENA FlexTool, running on the principle of economic dispatch. Based on the analysis results, it is observed that the greater the share of VRE in the JAMALI power system the lower the power system’s flexibility. This is evidenced by a VRE curtailment of 706.62 MW and a loss of load of 109.79 TWh in the JAMALI power system in 2050."
Depok: Fakultas Teknik Universitas Indonesia, 2024
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Dendang Bayu Aji
"Kampung Bungin, Bekasi memiliki potensi energi terbarukan (ET) yang cukup banyak. Potensi ET di Kamoung Bungin berupa energi matahari dan energi angin. Energi ini dapat ditangkap untuk menghasilkan energi dengan menggunakan pembangkit listrik angin, surya maupun perpaduan anatara kedua (hibrida). Setelah menghitung potensi energi, didapatkan hasil berupa jumlah unit modul PV ataupun unit turbin angin yang akan diimplementasikan dalam PLTB, PLTS dan sistem pembangkit hibrida. Dalam menghitung spesifikasi pembangkit listrik PLTS, PLTB dan sistem hibrida, dilakukan analisis ekonomi dengan life cycle costing untuk menentukan indikator performa ekonomi berupa LCC (Life Cycle Cost) dan LCOE (Levelized Cost of Energy) serta mencari potensi di masa depan dalam bentuk keseimbangan gardu atau grid parity. Diharapkan ditemukan pembangkit dengan nilai LCC dan LCOE terendah sebagai pembangkit yang paling optimal untuk diimplementasikan di Kampung Bungin, Bekasi.

Bungin Village, located in Bekasi, has a large potential for renewable energy. The largest potentials for renewable enrgy in Bungin Village come in the form of wind and solar energy. These energies can be harnessed through solar, wind or even hybrid power plants. After calculating the energy potential, the requirements for the units of turbines and/or PV panels in wind, solar and hybrid power plants are acquired. When calculating the specifications for the power plants, an economic analysis using Life Cycle Costing is used to determine economic performance indicators in Life Cycle Cost and Levelized Cost of Energy as well as finding the future prospect of the LCOE in the form of grid parity. It is hoped that the power plant with the lowest LCC and LCOE can be the optimum choice for the power plant in Bungin Village, Bekasi."
Depok: Fakultas Teknik Universitas Indonesia, 2019
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Darian Valerian
"ABSTRAK
Efisiensi yang tinggi merupakan persyaratan yang vital dalam merancang
sebuah pembangkit. Salah satu alternatif yang memenuhi persyaratan tersebut
adalah DFIG . Namun DFIG tersebut perlu dikendalikan agar bisa bekerja sesuai
dengan aplikasinya.
Skripsi ini membahas metoda pengendalian tegangan dan frekuensi
keluaran daripada DFIG . Metoda pengendalian yang digunakan merupakan
pengendalian skalar. Dimana frekuensi dan tegangan keluaran dikendalikan secara
terpisah dan keluaran sinyal kendalinya akan menyesuaikan dengan putaran turbin
generator dan setpoin yang diinginkan.

ABSTRACT
High efficiency is the most vital aspect to design a power distribution
system . One of the alternative to meets the requirement is DFIG. But, we need to
control the DFIG to meet the desired output.
This paper introduce a method to control the voltage and frequency output
of the DFIG . The method is called scalar control. Where the voltage and
frequency are controlled separately . The control signal will adapt to the turbine
speed from the generator and desired setpoint."
2016
S65435
UI - Skripsi Membership  Universitas Indonesia Library
cover
Munthe, Jeriko Hasian
"Indonesia merupakan salah satu negara kepulauan terbesar di dunia, sehingga memiliki tantangan yang signifikan dalam menyediakan energi berkelanjutan, terutama di wilayah 3T (terdepan, terluar, tertinggal) yang masih bergantung pada Pembangkit Listrik Tenaga Diesel (PLTD). Ketergantungan ini meningkatkan emisi karbon, yang bertentangan dengan target Net Zero Emission (NZE) pada tahun 2060. Salah satu solusi potensial adalah penerapan sistem Pembangkit Listrik Tenaga Hibrid (PLT-Hibrid), yang mengintegrasikan Pembangkit Listrik Tenaga Surya (PLTS) dan Battery Energy Storage System (BESS). Sistem PLT-Hibrid dirancang untuk mengurangi penggunaan diesel dengan memanfaatkan energi terbarukan secara optimal. Penelitian ini bertujuan untuk mengoptimalkan kapasitas PLTS dan BESS dalam meningkatkan penetrasi energi terbarukan serta mengefisiensikan Biaya Pokok Penyediaan (BPP) PLTD dengan prioritas BPP PLTS dan BESS dengan nilai yang tak jauh berbeda. Program optimasi berbasis MATLAB dikembangkan sebagai alternatif perangkat lunak HOMER untuk membantu menentukan kapasitas PLTS dan BESS yang optimal sesuai target keekonomian, nilai Renewable Energy Fraction (REF) yang optimal, serta keekonomian seluruh sistem. Penelitian dilakukan dengan 6 lokasi berbeda di Indonesia. Program yang dikembangkan tervalidasi memiliki tingkat akurasi tinggi dengan error validasi 0.02%-0.35%, sehingga program dapat diimplementasikan ke optimalisasi. Hasil penelitian menunjukkan bahwa REF optimal bervariasi antara 44.931% hingga 85.671%, dengan BPP hibrid mencapai rentang 0.296 USD/kWh hingga 0.426 USD/kWh. Penelitian ini membuktikan bahwa sistem PLT-Hibrid tidak hanya menekan biaya energi tetapi juga mendukung transisi energi bersih yang berkelanjutan, khususnya di wilayah terpencil Indonesia.

Indonesia is one of the largest archipelagic countries in the world, facing significant challenges in providing sustainable energy, particularly in 3T (frontier, outermost, and underdeveloped) regions that still rely heavily on Diesel Power Plants (PLTD). This dependency increases carbon emissions, which contradict Indonesia's target of achieving Net Zero Emissions (NZE) by 2060. One potential solution is the implementation of a Hybrid Power Plant (PLT-Hybrid) system, which integrates Solar Power Plants (PLTS) and Battery Energy Storage Systems (BESS). The PLT-Hybrid system is designed to reduce diesel consumption by optimizing the use of renewable energy. This research aims to optimize PLTS and BESS capacities to enhance renewable energy penetration and reduce the Cost of Electricity Production (BPP) of PLTD, prioritizing PLTS and BESS BPP values that are economically competitive. A MATLAB-based optimization program was developed as an alternative to HOMER software to determine the optimal PLTS and BESS capacities, the optimal Renewable Energy Fraction (REF), and the overall system's economic performance. The study was conducted across six different locations in Indonesia. The developed program was validated to have a high accuracy level with a validation error of 0.02%-0.35%, ensuring its feasibility for optimization applications. The results showed that the optimal REF ranged from 44.931% to 85.671%, with hybrid BPP values between 0.296 USD/kWh and 0.426 USD/kWh. This research demonstrates that the PLT-Hybrid system not only reduces energy costs but also supports the transition to sustainable clean energy, particularly in remote regions of Indonesia. "
Depok: Fakultas Teknik Universitas Indonesia, 2025
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Siska Widyastuti
"Berlatar belakang dari munculnya permasalahan berkurangnya kapasitas daya pembangkit Bendungan PLTA yang ada, akibat pendangkalan sungai dan sedimentasi yang mengurangi kapasitas tampungan waduk dan umur bendungan.  Sedangkan kebutuhan akan listrik terus naik menyebabkan kelangkaan energi dimasa depan. Kementerian Pekerjaan Umum dan Perumahan Rakyat (PUPR) dengan sejumlah instansi terkait mengadakan rapat di Solo tanggal 25 Agustus 2016 untuk membahasn hal tersebut, tema rapat tersebut adalah Pengembangan Infrastruktur PUPR dalam mendukung ketahanan energi wilayah Pulau Jawa-Bali. Solusi dari pemerintah untuk membangun bendungan-bendungan baru dianggap tidak sesuai dengan target pemerintah untuk mencapai 23% baruan energi ditahun 2025. Karena pembangunan bendungan baru membutuhkan waktu konstruksi yang lama. Solusi tersebut dianggap merupakan solusi jangka panjang yang tidak sejalan dengan target pemerintah. Sehingga pemerintah berupaya untuk mencari alternatif lain yaitu dengan memanfaatkan bendungan single purpose yang telah terbangun, seperti bendungan yang sebelumnya hanya diperuntukan untuk irigasi, banjir maupun air baku masyarakat. Bendungan single purpose tersebut akan di tambahkan pernagkat pembangkit didalam konstruksinya sehingga menjadi bendungan multipurpose yang dapat menghasilkan daya listrik. Solusi ini dianggap lebih efektif daripada membangun bendungan baru, karena dengan menambahkan instalasi atau perangkat pembangkit (PLTA) kedalam konstruks bendungan single purpose yang ada, tentunya tidak membutuhkan waktu konstruksi yang lama, keuntungan lainnya adalah menghemat anggaran pemerintah. Membangun bendungan baru, diperlukan waktu dan biaya yang tidak sedikit. Pemerintah mengambil langkah awal dengan melakukan rapid assesment dan mendapatkan 17 nama bendungan eksisting yang diharapkan memiliki potensi daya listrik yang dapat dimanfaatkan untuk mengganti daya listrik dari Waduk PLTA yang operasinya sudah tidak optimal. Diharapkan dapat menjadi solusi untuk memenuhi target bauran energi baru terbarukan 23% tahun 2025. Dalam penelitian ini, akan menganalisa data hidrologis dari 17 bendungan tersebut untuk mengetahui besarnya potensi daya listrik yang mungkin dibangkitkan. Dengan mengumpulkan data hidrologi, menguji data tersebut secara statistik kemudian menggunakan metode Flow Duration Curve untuk menghitung debit rencana pembangkit, serta menghitung hasil akhirnya menggunakan rumus potensi daya sehingga diperolehlah total potesi energi yang mampu dibangkitkan dari 17 bendungan tersebut. Hasil dari pendekatan menunjukkan bahwa total energi dari 17 bendungan eksisting tersebut adalah 135 MW, angka ini belum dapat memenuhi angka target pemerintah untuk pembangkitan energi terbarukan tahun 2021 yaitu 1542 MW. Masih jauh dari target RUEN hingga tahun 2025 yang mencapai 45.200 MW (23%). Meski begitu, ini merupakan potensi awal yang baik sehingga pemerintah bisa menggali lebih banyak potensi bendungan eksisting lainnya.

The background is the emergence of the problem of reducing the power capacity of the existing hydropower dam, due to river silting and sedimentation which reduces the reservoir's storage capacity and the life of the dam. Meanwhile, the need for electricity continues to increase causing energy scarcity in the future. The Ministry of Public Works and Public Housing (PUPR) with a number of related agencies held a meeting in Solo on August 25, 2016 to discuss this, the theme of the meeting was PUPR Infrastructure Development in supporting energy security in the Java-Bali region. The solution from the government to build new dams is considered not in accordance with the government's target of achieving 23% new energy by 2025. Because the construction of new dams requires a long construction time. The solution is considered a long-term solution that is not in line with the government's target. So the government is trying to find another alternative, namely by utilizing single-purpose dams that have been built, such as dams that were previously only intended for irrigation, flooding and community raw water. The single-purpose dam will be added with generating devices in its construction so that it becomes a multipurpose dam that can generate electrical power. This solution is considered more effective than building a new dam, because by adding a generator installation or device (PLTA) into the existing single-purpose dam construction, of course it does not require a long construction time, another advantage is saving the government budget. Building a new dam requires a lot of time and money. The government took the initial step by conducting a rapid assessment and obtaining 17 names of existing dams which are expected to have potential for electrical power that can be utilized to replace electrical power from hydropower reservoirs whose operations are no longer optimal. It is expected to be a solution to meet the new renewable energy mix target of 23% by 2025. In this study, we will analyze the hydrological data from the 17 dams to determine the amount of potential electrical power that may be generated. By collecting hydrological data, statistically testing the data and then using the Flow Duration Curve method to calculate the planned discharge of the generator, and calculating the final result using the power potential formula so that the total potential energy that can be generated from the 17 dams is obtained. The results of the approach show that the total energy of the 17 existing dams is 135 MW, this figure has not been able to meet the government's target figure for renewable energy generation in 2021, which is 1542 MW. It is still far from the RUEN target until 2025 which reaches 45,200 MW (23%). Even so, this is a good initial potential so that the government can explore more potential for other existing dams. "
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Eka Nurdiana
"Buruknya pencemaran lingkungan sebagai dampak pemanfaatan energi fosil, membuat dunia bertransformasi pada pemanfaatan energi ramah lingkungan yaitu energi terbarukan, khususnya energi surya photovoltaic (PV). Bagian terpenting dari sistem PV adalah performansinya dalam menghasilkan energi. IEC 61724 menetapkan parameter performansi sistem PV antara lain produksi energi, array yield, final yield, reference yield, performance ratio, capacity factor, efisiensi energi dan losses. Pada penelitian ini, kinerja sistem PV atap berkapasitas 10,6 kWp di Gedung Energi, Puspiptek dievaluasi untuk mengetahui nilai parameter performansinya menurut IEC 61724 sebagai tolok ukur kinerja sistem PV. Evaluasi dilakukan berdasarkan pemantauan selama delapan bulan dengan data yang diperolah dari SCADA pada sistem PV. Analisis produksi energi menunjukkan bahwa sistem PV mampu menghasilkan energi AC sebesar 36,10 kWh per hari. Analisis array yield, reference yield dan final yield memperlihatkan bahwa sistem PV mampu beroperasi secara penuh rata-rata selama 3,51 jam per hari dengan potensi penyinaran matahari rata-rata selama 4,14 jam per hari dimana produksi energi AC rata-rata selama 3,41 jam per hari. Analisis performance ratio menunjukkan bahwa sistem PV mampu mengubah 82,67% energi matahari yang diterimanya. Analisis capacity factor memberikan hasil 14,19% yang berarti sistem PV beroperasi secara penuh selama 34,62 hari selama periode pemantauan. Analisis efisiensi menunjukkan bahwa array PV bekerja dengan efisiensi 15,31% dan inverter bekerja dengan efisiensi 96,70%. Dari nilai-nilai efisiensi tersebut, dihasilkan bahwa sistem PV secara keseluruhan bekerja dengan efisiensi sistem 14,80%. Hasil analisis array capture losses menunjukkan bahwa pada array PV terjadi losses rata-rata sebesar 0,63 kWh/kWp per hari dan analisis system losses menunjukkan bahwa losses pada inverter PV rata-rata sebesar 0,1 kWh/kWp per hari. Pada akhir penelitian ini dilakukan simulasi menggunakan aplikasi online PVGIS untuk untuk mendapatkan data jumlah produksi energi. Hasil simulasi tersebut dibandingkan dengan hasil perhitungan yang dilakukan sebelumnya. Setelah dilakukan perbandingan, disimpulkan bahwa hasil perhitungan produksi energi dan radiasi matahari global secara umum mendekati hasil simulasi produksi energi dan radiasi matahari global kecuali pada bulan Januari dan Februari 2020. Hasil perhitungan dan simulasi pada bulan-bulan tersebut memilki selisih cukup tinggi. Berdasarkan evaluasi kinerja secara keseluruhan, sistem PV 10,6 kWp di Gedung Energi Puspiptek memiliki kinerja yang baik.

Poor environmental pollution as a result of the use of fossil energy, making the world transform to use renewable energy that is more environmentally friendly, especially photovoltaic (PV) solar energy. The most important issue of a PV system is their performance in producing energy. IEC 61724 establishes the performance parameters of a PV system including energy production, array yields, final yields, reference yields, performance ratios, capacity factors, energy efficiency and losses. In this study, the performance of the 10,6 kWp PV rooftop system in the Energy Building, Puspiptek was evaluated to determine the value of its performance parameters according to IEC 61724 as a benchmark for PV system performance. The evaluation was carried out based on eight months monitored period with the data obtained from the SCADA in the PV system. Analysis of energy production shows that the PV system is able to produce AC energy of 36.10 kWh per day. Analysis of array yields, reference yields, and final yields shows that the PV system is capable to operate for 3.51 hours per day on average with an average solar irradiation potential of 4.14 hours per day and the AC energy production is 3.41 hours per day on average. Performance ratio analysis shows that the PV system is able to convert 82.67% of the concerning solar energy. Capacity factor analysis gives a result of 14.19% which means the PV system has been operated for 34.62 days at its full nominal power during the monitoring period. Analysis of efficiency shows that the PV array works with an efficiency of 15.31% and the inverter works with an efficiency of 96.70%. Based on these efficiency values, the whole PV system works with a system efficiency of 14.80%. The analysis of array capture losses shows that losses on the PV arrays 0.63 kWh/kWp per day on average and system losses analysis shows that losses on PV inverters 0.1 kWh/kWp per day on average. At the end of this study, a simulation by an online PVGIS application is used to obtain data on energy production. The results of the simulation are compared with the results of previous calculations. From the comparison, it was concluded that the results of the calculations of energy production and global solar radiation approached the results of simulations of energy production and global solar radiation except in January and February 2020. The calculation and simulation results of these months show greater differences. Based on an overall performance evaluation, the 10,6 kWp PV system at the Puspiptek Energy Building has good performance."
Depok: Fakultas Teknik Universitas Indonesia, 2020
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>