cover
Muhammad Ikhsan Setiawan
"The Role of Construction Personnel in the Phase of Conceptual Planning in Increasing Construction Project Cost Performance in IndonesiaModern construction has been characterized as a complex and fragmented process. These conditions have been known to lower the quality and cost efficiency of projects. It has been proven that this problem can be partially overcome by implementing constructability, which is based on the integration of construction knowledge into the early stages of planning and design process. Prior research has found a lack of application of constructability by participants in the construction industry, especially general contractors. Because builders can play an important role in implementing constructability, this thesis has addressed constructability as practiced by the general contractors in Indonesia
Constructability since 1986 has been defined as the optimum use of construction knowledge and experience in planning, design, procurement, and field operations to achieve overall project objectives. The effective integration of design and construction offers important benefits and opportunities to achieve project objectives. In order to create maximum benefits, the construction input or constructability, has to be introduced at the earliest stages of the project.
This investigation describes the constructability improvement related to three key issues derived from literature study; developing the project plan, laying out the site, and selecting major construction methods. Project data for analysis were obtained by distributing questionnaires to corporations in the Jabotabek areas and in project locations in Indonesia which were acting as contractors. The sample questionnaires were also directed to a population of contractors categorized by the characteristics of the organization, the type of work performed, and the type of contractual arrangement.
The variables in the questionnaires that were related to constructability and cost performance were assigned scores by the contractor population in the research. The data was then processed for carrying-out correlation and multiple regression modeling analysis. The research proceeded to establish through regressions analysis a non-linear model relating cost performance to two significant constructability variables. Firstly the improvement of construction personnel knowledge and experience for the scheduling preparation, cost estimations and budget. Secondly the improvement of construction personnel knowledge and experience for pre-construction planning as a basic input in the design phase.
These findings then provided the basis for deriving conclusions and various recommendations on practical applications to improve constructability during the conceptual planning phase for increasing the cost performance of a project."
Depok: Fakultas Teknik Universitas Indonesia, 2000
T8982
UI - Tesis Membership  Universitas Indonesia Library
cover
M. Ayip Rosyadi Y.
"Pada proses konstruksi, tahap pelaksanaan mempakan salah satu tahapan yang memegang peranan penting serta menentukan tercapainya tujuan proyek. Hal-hal yang perlu diperhatikan dalam proses pelaksanaan konstruksi adalah waktu, biaya, dan kualitas. Ketiga hal tersebut menjadi ukuran keberhasilan suatu proyek konstruksi. Untuk dapat mengakomodasi ketiga hal tersebut diperiukan profesionalisine dalam melakukan tugas dan tanggung jawab. Keberadaan Management konstruksi (MK) menjadi sangat penting untuk memenuhi kriteria tersebut. MK memegang peranan penting dalam tahapan pelaksanaan proyek diantaranya adalah pengelolaan waktu, biaya, dan mutu.
Skripsi ini membahas peran dan tanggung jawab MK pada tahapan pelaksanaan proyek dalam rangka meningkatkan kinerja biaya akhir proyek. Dengan menggunakan pengolahan data statistik, diperoleh suatu pola hubungan antara pengaruh peran MK dalam tahap pelaksanaan sebagai variabel tetap dengan kinerja biaya akhir proyek sebagai variabel bebas. Pengolahan data menggunakan sofhvare SPSS 11.1 sehingga perhitungan dan pengolahan data statistik menjadi lebih cepat mudah dan akurat. Hasil pengolahan data adalah peran MK yang paling dominan dalam tahap pelaksanaan proyek."
Depok: Fakultas Teknik Universitas Indonesia, 2001
S34971
UI - Skripsi Membership  Universitas Indonesia Library
cover
Widya Andrianto
"The Impact of Designer's Role in Involving Construction Personnel During the Design Phase on the Performance of Construction Project Schedule in IndonesiaThe study by The Business Roundtable's team in the US found that opportunities to reduce project costs and schedules by using existing and new construction technology are lost because construction too often is relegated to operate as a production function separated from financial planning, scheduling, and engineering or architectural design. Significant savings in both the costs and time required to complete the project can be accrued from careful interaction of planning, design, and engineering with construction into the creation of projects. The Construction Industry Institute's (CII) Task Force defines this term as Constructability, which is the optimum integration of construction knowledge and experience in planning, engineering, procurement, and field operations to achieve overall project objectives.
By ignoring constructability in design, designer may be saddling the builder with possible construction problems that could lead to delays, inefficient use of resources, out of sequence work and others. This can be particularly troublesome which may have a devastating effect on project schedule and budget. Designer has an important role in building a receptive interface with construction personnel during the design phase. By communicating the design intent to the construction personnel, designer can gain the information he/she needs to improve the constructability of the project.
This thesis study the role of designer in involving construction personnel during the design phase to improve the constructability of the project which leads to an improvement project time performance of construction project in Indonesia. A questionnaire survey was distributed to projects designers in Jakarta area. The data obtained was analyzed quantitatively to find the correlations and to make a regression between the role of designer in involving construction personnel during the design phase and the performance of construction project's schedule.
The result of this research shows a positive, nonlinear correlation between the interface of designer with construction personnel during the design phase and schedule performance of the project. The main variables are: communicating the design intent to construction and the involving construction personnel from the construction contractor."
Depok: Fakultas Teknik Universitas Indonesia, 2001
T753
UI - Tesis Membership  Universitas Indonesia Library
cover
Irika Widiasanti
"ABSTRAK
Manajemen konstruksi adalah suatu sistem pengelolaan pekerjaan pembangunan fisik yang ditangani secara multi disiplin profesional, dengan tahapan-tahapan persiapan, perencanaan, perancangan, pelelangan pekerjaan, pengoperasian diperlakukan sebagai suatu sistem yang menyeluruh dan terpadu dengan tujuan untuk mencapai hasil yang optimal dalarn aspek kuantitas, biaya, mutu dan waktu.
Dalam hal pengembangan terminal peti kemas sebagai suatu pekerjaan konstruksi berskala besar dan daur hidup jangka panjang, dipandang perlu untuk menggunakan ilmu manajemen konstruksi untuk pengendaliannya. Diperlukan suatu tim yang mengelola dan mengendalikan mulai dari timbulnya ide, feasibility study, perencanaan, konstruksi sampai dengan selesainya konstruksi. Sehingga dapat selalu terjadi kesinambungan di antara tiap-tiap tahapan dalam pekerjaan konstruksi tersebut.
Untuk dapat memperoleh keuntungan maksimum, sebelum melaksanakan perancangan bentuk dan struktur terminal peti kemas, perlu dilakukan perencanaan konseptual sebagai acuan untuk pemenuhan kebutuhan sesuai dengan kapasitas rencana. Perencanaan konseptual merupakan bagian yang penting dari perencanaan proyek. Ini dimulai sesudah kepemimpinan memutuskan konsep proyek merupakan hal yang betul-betul dibutuhkan dan dilanjutkan hingga dimulainya pelaksanaan proyek, yaitu pada saat detail perencanaan dan konstruksi dimulai secara nyata. Adalah lebih mudah untuk memperoleh keluaran proyek yang lebih tinggi pada tahap perencanaan proyek, pada saat pengeluaran biaya relatif kecil. Dibandingkan pada tahap pelaksanaan konstruksi atau operasional fasilitas dimana biaya yang dikeluarkan jauh lebih tinggi.
Dalam tesis ini akan dibahas suatu perencanaan konseptual yang merupakan kriteria disain teknis pada pengembangan terminal peti kemas berkaitan dengan semakin meningkatnya penggunaan peti kemas sebagai sarana pengiriman barang. Model ini diharapkan dapat digunakan dalam perencanaan pengembangan terminal peti kemas.
"
1996
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Doni Afila
"Proyek konstruksi mempunyai siklus perkembangan yang terdiri dari tahap konseptual, definisi, produksi (implementasi), operasional, dan penyelesaian. Pada tahap konseptual, oleh manajemen konstruksi dilakukan beberapa kegiatan, yaitu identifikasi peluang investasi, analisis proyek pendahuluan, studi kelayakan (feasibility study), dan pengambilan keputusan. Kegiatan utama dari tahap konseptual ini adalah studi kelayakan aspek finansial, yang mengkaji layak tidaknya suatu gagasan untuk direalisasi.
Suatu studi kelayakan proyek bertujuan untuk melakukan serangkaian analisis perhitungan investasi modal dengan membandingkan aliran biaya (cost) dengan manfaat (benefit) yang menggunakan berbagai kriteria penilaian investasi. Seluruh aspek studi kelayakan harus dipertimbangkan dan dianalisis secara mendalam, sehingga dapat dilakukan pengambilan keputusan (decision making) yang tepat. Semakin kompleks suatu proyek yang direncanakan dan semakin sulit kondisi yang ada, akan menjadi semakin rumit proses analisis kelayakan proyek.
Oleh karena itu, diperlukan suatu sistem analisa yang komprehensif dan adaptif, yang dapat melakukan analisis untuk penilaian investasi secara tepat, cepat, dan akurat. Maka penilaian kelayakan investasi proyek dapat dilakukan oleh suatu sistem informasi yang menggunakan komputer sebagai tool (alat bantu). Sistem tersebut tidak hanya dapat menganalisis kriteria penilaian investasi secara akurat dan komprehensif, tetapi juga harus bisa mengakomodasi perubahan-perubahan situasi secara cepat. Hal ini dapat direalisasikan dengan melakukan perancangan program analisis kelayakan investasi proyek. Perancangan program tersebut diharapkan dapat mengoptimalkan pengendalian biaya pada tahap konseptual dari suatu proyek, sehingga dapat direalisasikan suatu proyek yang feasible (layak) dan profitable (menguntungkan)."
Depok: Fakultas Teknik Universitas Indonesia, 2002
S34781
UI - Skripsi Membership  Universitas Indonesia Library
cover
Sugih Pranoto Aji
Depok: Fakultas Teknik Universitas Indonesia, 2000
T40597
UI - Tesis Membership  Universitas Indonesia Library
cover
Erman Surya Bakti
"Meningkatnya persaingan dan tuntutan efisiensi pada industri konstruksi menuntut adanya pengendalian mutu yang dikombinasikan dengan aspek ekonomis dan jadwal proyek. Hal ini memotivasi berbagai penelitian yang menghasilkan teknik-teknik peningkatan mutu dan efisiensi/efektifitas dari sebuah proyek seperti total quality management, value engineering, designability, contractability, constructability, operability, maintainability dan sebagainya. Penelitian ini bertujuan untuk mengetahui dan menganalisa salah satu peningkatan mutu proyek konstruksi yaitu penerapan peningkatan constructability pada tahap perencanaan dan perancangan proyek. Pendekatan ini dilakukan karena besarnya pengaruh perencanaan dan perancangan terhadap kualitas, biaya dan waktu pelaksanaan proyek secara keseluruhan. Pelaksanaan penelitian studi kasus ini dilakukan pada sebuah perusahaan nasional yang bergerak di bidang industri konstruksi dengan pola design and build dimana penelitian difokuskan pada pemahaman, pelaksanaan, keuntungan, dan hambatan constructability di perusahaan tersebut dan dua buah proyek yang dijadikan studi kasus. Jenis penerapan constructability secara informal yang didapat pada studi kasus ini diindikasikan oleh tidak adanya prosedur tertulis tentang constructability, rendahnya tingkat lesson learned, tidak adanya koordinator constructability yang ditunjuk secara resmi, masih banyaknya hambatan pelaksanaan dan tidak adanya pencatatan kinerja constructability. Walaupun demikian pada pelaksanaan constructability secara informal ini, bahwa penerapan constructability pada tahap perencanaan dan perancangan terbukti meningkatkan kinerja proyek konstruksi, dengan variabel yang paling berpengaruh adalah penjadwalan berdasarkan construction sensitive dan fasilitas desain dalam mengefisienkan konstruksi."
Depok: Fakultas Teknik Universitas Indonesia, 2002
T1106
UI - Tesis Membership  Universitas Indonesia Library
cover
Simanjuntak, Sheba Hartaty
"Bangunan konstruksi dapat menghasilkan rancangan yang baik, bila awalnya telah dipikirkan bagaimana cara membangunnya. Kegagalan konsultan perencana memperkirakan bagaimana suatu rancangan dibangun oleh kontraktor dapat menyebabkan permasalahan yang menimbulkan kenaikan biaya dan keterlambatan jadwal pelaksanaan konstruksi. Permasalahan tersebut dapat diselesaikan dengan constructability yaitu dengan melibatkan tenaga ahli konstruksi yang berpengetahuan dan berpengalaman untuk ikut serta dan memberi masukan pada tahap perancangan. Hal ini lebih menjamin agar rancangan disusun dengan menggunakan metode dan teknologi yang dapat diterapkan oleh kontraktor.
Penelitian ini dilakukan dengan mengirimkan kuesioner ke berbagai perusahaan konsultan perencana yang berada di wilayah Jabotabek. Dan hasil penyebaran kuesioner diperoleh 30 kuesioner dan 50 kuesioner yang diterima kembali untuk dianalisis dengan menggunakan program SPSS.
Hasil analisis dengan model regresi berganda dapat menggambarkan adanya hubungan korelasi positif yang sangat kuat antara variabel-variabel peningkatan constructability pada perancangan oleh konsultan perencana dengan kinerja biaya. Model regresi berganda terdiri dari 3 (tiga) variabel penentu yang mempengaruhi kinerja biaya berdasarkan penilaian terhadap sampel dan koordinator proyek dari perusahaan konsultan perencana, yaitu :
1. Menyesuaikan pendekatan rancangan dengan metode konstruksi,
2. Mendefinisikan secara jelas batasan kontraktor dalam dokumen perancangan, dan
3. Secara aktif meminta masukan dari personil konstruksi pada setiap tahapan dan proses perancangan.
Dan hasil penelitian ini, peningkatan constructability pada perancangan dapat digunakan untuk menghasilkan kualitas rancangan yang dapat meningkatkan kinerja biaya pada pelaksanaan proyek-proyek konstruksi di Indonesia di masa mendatang.

Influence of Constructability Improvement in Design Phase to Project Cost Performance of Construction Projects in IndonesiaConstruction building could to products a good design, if the early to think how in manner to be constructed. Failure of designer to consider how the design should be implemented by contractor can result in scheduling problems and delays during the construction process. That problems could be solved with constructability namely by the construction expert involved who had knowledge and experience to joint and seek construction input in design. This has more to warrant in order that design to arrange by using technology and method that could apply of contractor.
This research has done in the designer companies with sent some questionnaires to several of designer companies in Jabotabek. From questionnaires spread result 30 from 50 questionnaires received to be viable analysis with used SP SS program.
The result of multiple regression analysis model shows that influence constructability improvement in design of designer will improving project cost performance. Multiple regression models has 3 of key variables influencing in cost performance carried out by estimates from persons of construction expert or project coordinator in designer's firm are:
(1) Integrate design approach with construction method,
(2) Clearly define contractor interface in the design document, and
(3) Actively seek construction input to all stages of the design process.
From these research resulted, construction improvement in design can be used to obtain the quality of design result that cost performance can be improvement in operation of projects construction in the future of Indonesia construction project.
"
Depok: Fakultas Teknik Universitas Indonesia, 2000
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Tambunan, Sondang Marihut
"The Influence of Contractors Involvement in Engineering Procurement Phase to Construction Project Cost Performance in IndonesiaThe structure of the construction industry is very complex due to the involvement of a wide range of contractors including main contractors, subcontractors and design consultant. The amount of participants in the actual construction process requires various relationships and joint combination often leading to lower levels of performance in construction projects.
In Indonesia, there are many construction projects that are performed in a traditional manner, where designers and contractors are given work in separate contracts. Contractors generally get involved in the construction phase. After completing planning, design and specifications, the designer embarks on supervision in the construction phase. In 1986, The Construction Industry Institute, in Austin, USA, defined Constructability as the optimum use of construction knowledge and experience in planning, engineering, and procurement and construction field operations to achieve overall project objectives.
This research was carried out in order to complete the requirement of Magister Program Curriculum in The Department of Civil Engineering, Postgraduate Program of The University of Indonesia. It is mainly aimed to investigate the relationship between the contractors personnel involvement in engineering and procurement phases with the construction project cost performance in Indonesia.
Data of the research were obtained through questionnaires returned from contractor companies that performed many kinds of construction projects completed over the last decade between 1987-1997 in Indonesia. The method chosen for the research was a descriptive-analysis type relying on data compiled and verified from the samples of the construction projects. Both quantitative and qualitative analysis utilizing correlation and multiple regression to establish a model of the relationships.
The final model after being subjected to the needed statistical tests provided clear evidence about the influence of constructability variables as in contractor personnel involvement in engineering and procurement phases to construction project cost performance in Indonesia The significant contractor personnel variables were found to be carefully assign appropriate construction personnel who has the required experience and team approach to the project team and make timely input to design to avoid the need for changes."
Depok: Fakultas Teknik Universitas Indonesia, 2000
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Ismail
"Proyek konstruksi adalah proyek yang berkaitan dengan upaya pernbangunan suatu bangunan infrastmktur, yang umurnnya mencakup pekeljaan pokok yang termasuk dalam bidang teknik sipil dan arsitektur. Pekezjaan konstruksi memberikan tantangan yang bersifat khusus karena hampir setiap konstruksi bangunan apapun macamnya selalu direncanakan atau dilaksanakan dengan menggunakan sistern rekayasa tertentu yang khusus diperuntukkan bagi bangunan tersebut. Hampir tidak pernah ditemui struktur suatu bangunan yang tepat sama atau merupakan duplikasi dari bangunan lainnya.
Penggunaan Manajer Proyek sangat berguna bagi perusahaan jasa konstruksi, sehingga dapat mengendalikan tenaga dan sumber daya yang ada dilapangan menjadi efektif dan produktitf Manajer Proyek merupakan organisator dan koordinator proyek yang bertanggung jawab atas pelaksanaan proyek secara keseluruhan baik secara teknis maupun administratimi keuangan dan lingkungan. Manajer Proyek bertugas memimpin, mengarahkan dan mengendalikan pelaksanaan proyek, selanjutnya juga bertanggung jawab atas terselenggaranya pelaksanaan proyek sesuai dengan sistem manajemen proyek yang disetujui pemilik proyek. Dengan tujuan agar proyek menmpai sasaran tepat waktu, mutu, biaya serta aman dalam pelaksanaan.
Tujuan dari penelitian ini adalah melihat adanya huhungan secara kuantitatif melalui analisis statistik peran dari Manajer proyek terhadap kinerja akhir dari pelaksanaan proyek konstruksi. Kinerja yang akan diamati adalah kinerja waktu, sedangkan proyek konstruksi yang dijadikan :ampel adalah proyek bangunan gedung bertingkat yang berada di wilayah Jabotabek. Pengumpulan data dilakukan dengan menggunakan kuesioner yang ditujukan kepada Manajer Proyek.
Setelah dilakukan analisis secara statistik dapat diperlihatkan suatu hasil yang menyatakan bahwa peran Manajer Proyek untuk meningkatkan kinerja waktu dengan model persamaan non linier dan variabel-variabel penentu adalah melaporkan secara rutin kemajuan proyek Serta menentukan teknik monitor dan penjadwalan. Hasil dari penelitian yang telah dilakukan memperlihatkan bahwa ada korelasi yang positif antara variabel-variabel penentu bebas peran Manajer Proyek dengan peningkatan kinerja waktu pada proyek bangunan gedung bertingkat di Jabotabek pada tahap pelaksanaan konstruksi."
Depok: Fakultas Teknik Universitas Indonesia, 2000
T3202
UI - Tesis Membership  Universitas Indonesia Library