Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 117163 dokumen yang sesuai dengan query
cover
Istianah
"Latar belakang: Terdapat hubungan antara pertambahan umur dengan gangguan status fungsional. Pengukuran status fungsional pada penghuni panti wredha diperlukan guna mengetahui kualitas hidup mereka.
Tujuan: Mengetahui prevalensi dan faktor risiko gangguan status fungsional penghuni panti wredha di Jakarta.
Metode: Cross sectional, responden adalah penghuni empat panti wredha di Jakarta. Pengukuran status fungsional menggunakan Barthel ADL Indeks.
Hasil: Terdapat 52% penghuni panti wredha yang mengalami gangguan status fungsional (Skor BAI: 0-19). Responden dengan gangguan status emosional pada kelompok umur kurang dari 70 tahun berisiko mendapat gangguan status fungsional 6,64 kali dibandingkan responden tanpa gangguan status emosional (OR: 6,64; 95% CI: 1,74-25,35), sedangkan pads kelompok umur 70 tahun keatas risiko meningkat sebesar 26,36 kali ( OR: 26,36; 95% CI: 2,8-248,59). Hasil tersebut didapat setelah dikendalikan oleh faktor risiko lainnya yakni keluhan penyakit, pendidikan, partisipasi kegiatan di panti serta status gizi.
Kesimpulan: Hasil penelitian ini memperlihatkan tingginya prevalensi gangguan status fungsional. Faktor sosio demografi, status kesehatan, dukungan sosial dan status gizi berpengaruh pada kejadian gangguan status fungsional.
Referensi: 55 (1990-2003)

Risk Factors of Functional Decline of Dwellers of Residential Homes in JakartaBackground: There is relation of age accretion with the functional decline. Functional status assessment at dwellers of residential homes needed to examine their quality of life.
Objective: To examine the prevalence and risk factors of functional decline of dwellers of residential homes in Jakarta.
Method: Cross sectional, subjects are 250 dwellers in four of residential homes in Jakarta Functional status assessment has been measured by the Barthel ADL Index.
Results: There are 52% dwellers of residential homes had functional decline (Score BAI: 0-19). Subjects with the emotional status trouble at age group < 70 years old have risk the functional decline 6,64 times ( OR: 6,64; 95% Cl: 1,74-25,35), while age group ? 70 years old have risk 26,36 times ( OR: 26,36; 95% CI: 2,8-248,59). The result obtained by after controlled by another variables in model that is the existence of disease sigh, education, participate activity in residential home and nutritional status .
Conclusion: This result shows that the prevalence of functional decline is high enough. Factors of socio demography, social support, nutritional status, emotional status and health status have an in with the functional decline occurrence in four of residential homes in Jakarta.
"
Depok: Universitas Indonesia, 2003
T12929
UI - Tesis Membership  Universitas Indonesia Library
cover
Hamzah
"Kegiatan pengusahaan minyak dan gas bumi, adalah suatu kegiatan yang mempunyai tingkat risiko yang sangat tinggi, risiko bahaya bagi pelaksanaan operasi, instalasi dan peralatan serta lingkungan dari proses kegiatan. Disamping itu juga mempunyai dampak lingkungan dan sosial yang besar. Dalam rangka mewujudkan kegiatan pengelolaan minyak dan gas bumi yang aman, andal, efisien dan berwawasan lingkungan, maka diterapkan LK3 untuk menilai sejauh mana kinerja SMK3 kontraktor maka dibuat suatu ukuran kinerja yang terpilih dan terkait langsung dengan sasaran perusahaan sebagai salah satu alat untuk mengukur keberhasilan organisasi. Ukuran kinerja ini dapat mencerminkan hasil upaya pengelolaan lingkungan, kesehatan dan keselamatan kerja.
Tingginya angka kecelakaan pada kontraktor merupakan alasan melakukan penelitian berupa studi evaluatif untuk melihat perbedaan risiko kecelakaan karyawan dan perbedaan risiko pada lingkungan sebelum dan sesudah penerapan SMK3 Kontraktor berdasarkan data sekunder Accident report year 1998-1999 (sebelum) dan Accident report year 2002-2003 (sesudah) dengan mengambil sampel sebanyak 40 perusahaan kontraktor PT. CNOOC.
Penelitian ini menggunakan pendekatan desain Studi evaluatif untuk melihat perbedaan yang signifikan resiko kecelakaan terhadap karyawan dan resiko atau dampak terhadap lingkungan berdasarkan data sekunder berupa Accident Record Year 1998-1999 (sebelum penerapan SMK3 Kontraktor) dan Accident Record Year 2002-2003 (sesudah penerapan SMK3 Kontraktor) Berta RPL?RKL 2001 dengan sampel sebanyak 40 perusahaan kontraktor PT. CNOOC.
Analisa bivariat dengan menggunakan uji t dependen didapatkan mean rata-rata risiko pada karyawan sebelum adalah 2,48 dan mean rata-rata sesudah penerapan SMK3 Kontraktor adalah 2,13 dengan nilai p = 0,011.
Hasil analisis untuk lingkungan, didapatkan mean rata-rata risiko pada lingkungan sebelum adalah 1,50 dan sesudah penerapan SMK3 Kontraktor adalah 1,23 dengan nilai p = 0,032.
Dengan demikian maka dapat disimpulkan bahwa ada perbedaan signifikan mean rata-rata risiko pada karyawan dan lingkungan sebelum dan sesudah penerapan SMK3 Kontraktor di PT. CNOOC.
Daftar bacaan :18 (1995 - 2003)

Evaluation Study of Risc Occupational Health and Safety Relationship with Contractor Safety Management System at PT. Cnooc In 2003The activity effort of oil and gas is an activity that has a very high risk level, a hazard risk to the operation, installation and equipment and to the environment of processing activities. In other hand it also has an impact on social and environment In order to create a safe, reliable, efficient and environmental oriented of oil and gas activities, therefore it was implemented the Occupational Safety, Health and Environment to evaluate the Contractor Safety Management System performance, and refer to that matter a suitable performance measurement of company goals has made as an indicator of company's success. This performance measurement reflects an achievement of occupational safety, health and environment treatment.
The high rate of accident in contractor is a reason to do a research by doing an evaluative study research to observe a difference of employee accident rise and a difference risc in environment before and after the implementation of Contractor Safety Management System according to secondary data of Accident Report Year 1998-1999 (before) and Accident Report Year 2002-2003 (after) by taking 40 contractors of CNOOC. Ltd.
Design of this research is evaluative study approach to view a significance difference of accident risk on the employee and environment with a secondary data which is Accident Record Year 1998-1999 (before the implementation Contractor Safety Management System) and Accident Record Year 2002-2003 (after the implementation of Contractor Safety Management System ) and RPI JRKL 2001 by taking 40 contractors of CNOOC Ltd as samples .
Bivariate analysis with dependent t test for employee obtained rise mean before contractor safety management system implementation is 2.48 and after implementation is 2.13 and p value is 0.011.
Bivariate analysis with dependent t test for environment obtained rise mean before contractor safety management system implementation is 1.50 and after implementation is 1.23 and p value is 0.032.
Therefore, it concludes that from the above result there are significance difference risc mean on employee and environment before and after contractor safety management system is implemented in CNOOC Ltd.
References : 18 (1995 -- 2003)
"
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2003
T12743
UI - Tesis Membership  Universitas Indonesia Library
cover
Devi Noverina Widiarti
"Identifikasi terhadap faktor-faktor risiko yang menyebabkan perubahan lingkup pada struktur atas dan arsitektur bangunan gedung bertingkat di Jakarta termasuk salah satu proses manajemen lingkup. Dilakukan proses analisis dampak terhadap kinerja waktu pelaksanaan proyek dan diketahui bagaimana respon risikonya. Dengan metode survey pada kontraktor utama untuk mengetahui sumber risiko perubahan lingkup. Lalu dianalisis dengan Analytical Hierarchy Process (AHP) untuk mengetahui bagaimana peringkat risiko (risk ranking), kemudian dengan faktor risiko SNI dicari risk level. Hasil penelitian memperlihatkan tingkat risiko dominan penyebab perubahan lingkup yang memengaruhi kinerja waktu pelaksanaan proyek dan didapat rekomendasi risk response antisipasi terjadinya penurunan kinerja waktu.

The identification process of risk factors that will cause scope chages during upperstructure construction phase of highrise building in Jakarta is one of scope management process. Then will be analyzed the effect on schedule and find out the risk responses. This research will do some survey toward the main contractor and the data will be analyzed with Analytical Hierarchy Process (AHP) to discover risk rank, and next identify therisk level which is the result of this SNI risk factor analyzing. Then the recommend responses as the strategy to anticipate the decrease of schedule performance."
Depok: Fakultas Teknik Universitas Indonesia, 2012
S42916
UI - Skripsi Open  Universitas Indonesia Library
cover
Ayu Kartika Rachmawati
"Pembangunan infrastruktur memiliki peran penting dalam pertumbuhan ekonomi suatu negara. Berdasarkan rencana APBN tahun 2020-2024 total kebutuhan anggaran untuk penyediaan infrastruktur adalah Rp. 2.058tn, dimana anggaran pemerintah adalah 30% dari porsi kebutuhan dana yang dianggarkan. Atas kebutuhan pembangunan infrastruktur tersebut, pemerintah melakukan inisiasi Kerjasama Pemerintah dengan Badan Usaha (KPBU) untuk mempercepat pembangunan infrastruktur di Indonesia, termasuk diantaranya adalah sektor infrastruktur jalan tol. Penelitian ini dilakukan untuk menginvestigasi risiko yang teridentifikasi beserta analisa pemetaan risiko untuk mengetahui apakah terdapat kesenjangan alokasi risiko antara pemerintah dengan investor swatsa dalam pelaksanan KPBU jalan tol di Indonesia. Penelitian ini merupakan studi kualitatif dengan metode pengambilan data melalui wawancara dan kuesioner. Dari penelitian yang dilakukan, diketahui bahwa terdapat 7 (Tujuh) kategori risiko dengan 17 (Tujuh belas) peristiwa risiko yang dianggap penting oleh investor swasta. Dari penelitian yang dilakukan, diketahui bahwa terdapat 11 alokasi risiko yang telah sesuai dan 6 alokasi yang tidak sesuai dengan persepsi risiko investor swasta dalam sektor jalan tol dengan skema KPBU di Indonesia yaitu risiko selisih bunga pinjaman dana talangan tanah, kenaikan biaya konstruksi, risiko tingkat inflasi dan suku bunga, risiko tingkat penyesuaian tarif yang lebih rendah dari proyeksi, risiko perubahan regulasi (dan pajak) yang umum dan risiko force majeure politis.

Infrastructure development has an important role in a country's economic growth. Based on the 2020-2024 APBN plan, the total budget requirement for providing infrastructure is IDR. 2,058tn, where the government budget is 30% of the portion of budgeted funding needs. Due to the need for infrastructure development, the government initiated Government Cooperation with Business Entities (KPBU) in various infrastructure sector to accelerate infrastructure development in Indonesia, including toll road. This research was conducted to investigate identified risks along with risk mapping analysis to find out whether there is a gap in risk allocation between the government and private investors in implementing toll road PPPs in Indonesia. The method of this research is a qualitative study with data collection methods through interviews and questionnaires. From the research conducted, it is known that there are 7 (Seven) risk categories with 17 (Seventeen) risk events that are considered important by private investors. From the research conducted, it is known that there are 11 risk allocations that are appropriate and 6 allocations that are not in accordance with the risk perception of private investors in the toll road sector with the PPP scheme in Indonesia, namely the risk of differences in interest on land bailout loans, increases in construction costs, the risk of inflation rates and interest rates, the risk of rate adjustments being lower than projected, the risk of general regulatory (and tax) changes and the risk of political force majeure."
Jakarta: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2024
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Prischa Bintan Sari
"Penelitian ini bertujuan untuk mengetahui manajemen risiko pada Bank-bank Umum yang terdaftar di Bursa Efek Indonesia (BEI) pada tahun 2004-2010 dengan memperhatikan faktor spesifik bank. Data yang digunakan merupakan data sekunder yang diperoleh dari DPI. Sampel yang digunakan berjumlah 16 bank umum. Penelitian ini menggunakan metode panel regression. Hasil penelitian menunjukkan bahwa risiko kredit (CRISK), risiko tingkat suku bunga (ISR), profitabilitas (ROA), dan ukuran bank (SIZE) memiliki pengaruh signifikan terhadap manajemen risiko (CAR). Sementara itu risiko likuiditas (LQR), risiko pasar (MRISK), dan efisiensi operasional (OPR) tidak memiliki pengaruh yang signifikan pada manajemen risiko bank (CAR).

This study aims to determine risk management at Commercial Banks listed on the Indonesia Stock Exchange (IDX) in 2004-2010 related to bank-specific factors. The data used are secondary data obtained from the DPI. The sample used for commercial banks amounted to 16. This study uses panel regression. The results showed that the credit risk (CRISK), interest rate risk (ISR), profitability (ROA), and bank size (SIZE) has a significant influence on the management of risk (CAR). While the liquidity risk (LQR), market risk (MRISK), and operational efficiency (OPR) has no significant influence on bank risk management (CAR)."
Depok: Fakultas Ekonomi dan Bisnis Universitas Indonesia, 2012
S-Pdf
UI - Skripsi Open  Universitas Indonesia Library
cover
Irventi Susilowati
"Balai Pengobatan Umum dan Unit Rumah Bersalin Puskesmas X dan Puskesmas Y dalam aktifitas kerjanya memiliki bahaya fisik, bahaya kimia, bahaya biologi, bahaya ergonomi, bahaya perilaku, bahaya pengorganisasian pekerjaan dan bahaya lingkungan yang berpotensi menimbulkan kecelakaan. Pekerja kesehatan berisiko terpapar darah dan cairan tubuh yang terinfeksi, tertusuk jarum suntik, dan risiko yang berhubungan dengan listrik, ergonomi dan pengorganisasian pekerjaan. Penelitian ini bersifat deskriptif analitik dengan desain studi cross-sectional dan pendekatan Risk Management Standard AS/NZS 4360:2004 untuk mengidentifikasi dan menganalisis risiko. Upaya menurunkan risiko tidak hanya dengan mematuhi SOP, tetapi dukungan yang dapat berupa peningkatan keterampilan dengan pelatihan dan pengawasan dari pihak manajemen juga dibutuhkan.

There are many hazards in activities of Balai Pengobatan Umum and Unit Rumah Bersalin Puskesmas X and Puskesmas Y such as physical hazards, biological hazards, ergonomic hazards, behavior hazards, organization of work hazards and evironmental hazards. Health care workers at risk of exposure to blood and body fluids of infected, needle stick injuries and risks associated with electricity,ergonomic and organization of work. This research is a descriptive analytical studies with cross-sectional design and Risk Management Standard AS/NZS 4360:2004 approach to identify and analyze the risk. To reduce the risk is not only by doing something as procedure written, but also need aware and support from management such as optimalize the skills by training and education.
"
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2013
S45732
UI - Skripsi Membership  Universitas Indonesia Library
cover
Nani Iriani
"Penelitian ini membahas analisa faktor- faktor penyebab terjadinya keterlambatan pada pekerjaan tanah dan pondasi serta bagaimana tindakan koreksi dan pencegahan yang diterapkan untuk mengatasi permasalahan yang terjadi. Metode penelitian yang digunakan dalam penelitian ini adalah metode studi kasus dengan penyebaran kuisioner dan wawancara terhadap pakar untuk mendapatkan rekomendasi tindakan koreksi terhadap permasalahan yang terjadi. Analisa yang digunakan untuk menguji variabel didalam penelitian ini adalah metode Analytical Hierarchy process (AHP) dan analisa untuk mendapatkan rekomendasi tindakan koreksi adalah metode Delphi. Hasil dari penelitian ini didapatkan factor dominan penyebab terjadinya keterlambatan pada pekerjaan tanah dan pondasi dan rekomendasi tindakan pencegahan serta tindakan koreksi untuk mengatasi permasalahan yang terjadi.

This research talk about how to analyze cause factor the delay of foundation and land or ground work and also how to preventive and corrective action which applied to overcome problems that happened. Research method which used in this research is case study method with spreading of interview to expert to get corrective action recommendation to problems that happened. Analysis used to test variable in this research is method of Analytical Hierarchy process (AHP) and analysis to get corrective action recommendation is method of Delphi. Result of this research is got by dominant factor cause the delay of foundation and land or ground work and precaution recommendation and also corrective action to overcome problems that happened."
Depok: Fakultas Teknik Universitas Indonesia, 2008
S50556
UI - Skripsi Open  Universitas Indonesia Library
cover
Galuh Rizma Maharani
"Salah satu hal yang dilakukan dalam menjamin tercapainya sasaran adalah dengan mengelolarisikonya. Tujuan penelitian ini adalah mengidentifikasi risiko biaya dan waktu pada tahap konstruksi struktur bawah dari bangunan gedung bertingkat tinggi di Jakarta serta bagaimana respon risikonya. Penelitian dilakukan dengan survey kepada para kontraktor utama untuk mengetahui frekuensi dan pengaruh risiko yang kemudian dianalisis dengan AHP. Lalu metode Delphi Technique dilakukan untuk mencapai consensus dari para pakar mengenai hasil penelitian berupa identifikasi risiko dan rekomendasi respon. Hasil penelitian memperlihatkan peringkat risiko yang dominan pada masing-masing tahapan pekerjaan struktur bawah. Lalu, diperoleh pula rekomendasi respon untuk risiko dominan tersebut.

One thing that can be done to guarantee the achievement of the objective is by managing the risks. The objective of this research is to identify the risks on project cost and project time during substructure phase of high-rise building in Jakarta and also how to response ones. This research was done by surveying towards main contractors to discover risks frequency and impacts which are analyzed with AHP afterwards. Next, the Delphi Technique method is performed to reach consensus from the experts about the result of this research which are include risk identification and response recommendation. Then the recommended response for the dominant risks are also collected."
Depok: Fakultas Teknik Universitas Indonesia, 2011
S42455
UI - Skripsi Open  Universitas Indonesia Library
cover
May Adi Putra
"Penelitian ini membahas tentang nilai risiko yang didapat pada kegiatan teknik radiografi di Laboratorium Jurusan Teknik Radiodiagnostik dan Radioterapi Politeknik Kesehatan Kementerian Kesehatan Jakarta II tahun 2012. Penilaian risiko dilakukan dengan menganalisis nilai kemungkinan, pemajanan dan konsekuensi dari setiap tahapan pekerjaan yang kemudian dibandingkan dengan standar level risiko semikuantitatif W.T. Fine J untuk mengetahui level risiko yang ada pada setiap kegiatan praktikum. Penelitian ini adalah penelitian deskriptif analitik dengan menggunakan metode semi kuantitatif AS/NZS 4360:2004. Hasil penelitian menyatakan bahwa level risiko yang dimiliki pada setiap langkah kegiatan praktikum di laboratorium meliputi level : very high, substantial, dan priority 3
This study discusses about risk assesment acquisition practice activity technic radiografy at Laboratory Majors Technic Radiodiagnostic and Radioteraphy Polytechnic Healthy Departement Healthy Jakarta II in 2012. Risk Assesment is done by analyzing theprobability value, exposure and consequences of each phase of work which is then compared to a standard level of risk semi-quantitative WT Fine J to determine the level of risk that exist at each stage of practice activity. This study is a descriptive analytical study using semi quantitative method AS / NZS 4360:2004. The study states that the level of risk that you have on each step practice activity in laboratory includes very high level, substantial level, and priority 3 level."
Depok: Universitas Indonesia, 2012
S-Pdf
UI - Skripsi Open  Universitas Indonesia Library
cover
Aprilia Widiyani
"Penelitian ini membahas risiko keselamatan dan kesehatan kerja pada aktivitas pekerjaan di Bengkel Las AW Jakarta Selatan Tahun 2012. Penelitian ini adalah deskriptif observasional yang bertujuan untuk manajemen risiko. Penelitian ini menggunakan metode identifikasi bahaya dan dampak menggunakan JHA (Job Hazard Analysis) dan analisis penilaian risiko ukuran semi kuantitatif menurut AS/NZS 4360 dengan mengalikan consequences, exposure, dan probability. Hasil penelitian mendapatkam rekomendasi pengendalian risiko, komunikasi dan pemantauan berdasarkan penilaian tingkat risiko yang meliputi very high, priority 1, substancial, priority 3, dan acceptable.

This research describes risk management of safety and health occupational for production activity task at Bengkel Las AW South Jakarta 2012. Design for this research was descriptive observational study that objective to manage of risk. The research were used JHA (Job Hazard Analysis) for hazards and effects identification, then for analysis of assessment risk rating used AS/NZS 4360 standard by multiplied of consequences, exposure, and probability. The results of the research were recommendations control, communication, and monitoring of risk based on risk assessment of the risk rating in each activity that includes very high, priority 1, substantial, priority 3, and acceptable."
Depok: Fakultas Kesehatan Masyarakat Universitas Indonesia, 2013
S45336
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>