"Modularization is one of the key strategies for increasing responsiveness to customers. In modular product architecture a wide variety of product configurations can be generated by altering a limited number of modules and components. Product modules are identified by grouping highly coupled components in the same module. A Design Structure Matrix (DSM) is a compact presentation of the interaction between the components. In this paper, Analytical Hierarchy Process (AHP) and Genetic Algorithm (GA)-based methodology is proposed for the clustering of highly coupled DSM components in modules. Multi-criteria DSMs are proposed, which are aggregated by using weights generated by AHP. A genetic algorithm is designed to change the order of components in DSM and to bring highly coupled interactions near the diagonal. An illustrative case study is also made to validate the proposed algorithm. Two large sized and two small size modules are identified by selecting high density clusters around the diagonal. The clustered DSM also shows independent components and loose coupling between the two modules."
Depok: Faculty of Engineering, Universitas Indonesia, 2018
UI-IJTECH 9:4 (2018)
Artikel Jurnal  Universitas Indonesia Library
cover
Bell, Jonathan.
Chichester: Wiley-Academy, 2000.
728 BEL t
Buku Teks  Universitas Indonesia Library
cover
Raihan Haryanto Sumohadiwijoyo
"Proyek ini bertujuan untuk menciptakan hunian yang modular dan kompak. Produk ini dirancang untuk dimodifikasi dan cukup ringkas untuk diangkut dan digunakan oleh pengguna. Masalah utama yang ingin dicapai oleh produk ini adalah gagasan tentang kontingensi - kebutuhan akan ruang untuk mengakomodasi pengguna yang berbeda dengan kebutuhan yang berbeda, pada periode waktu yang mungkin berbeda. Menjawab masalah ini, tantangan utama dari produk ini adalah menciptakan sesuatu yang ergonomis sementara juga user friendly untuk bisa dibongkar dan dimodifikasi. Hasilnya adalah produk akhir yang terbuat dari bahan terpal yang dapat dimodifikasi dari sebuah tas ke sebuah shelter dan dapat digunakan oleh lebih dari satu individu jika digabungkan bersama. Namun, tahap yang dicapai dalam proyek ini adalah produk beta tunggal yang masih perlu ditingkatkan dan belum mencapai kemungkinan konfigurasi penuh seperti yang dirancang.

This project aims to create a modular and compact shelter. This product is designed to be modifiable and compact enough to be transported and used by the users. The main problems this product is aimed to overcome is the idea of contingency - the need for a space to accommodate different users with different needs, at possibly different periods of time. With this problem at hand, the main challenge of this product is to create something that is ergonomic all the while user friendly to dismantle and modify. The result is a final product made of tarpaulin material that can be modified from bag to shelter and can be used by more than one individual if combined together. However, the stage reached in this project is a single beta product that still needs improvement and hasn't reached the full configuration possibility as designed."
Depok: Fakultas Teknik Universitas Indonesia, 2018
TA-Pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Le Corbusier, 1887-1965
Boston: bhirkouser, 2000
729.23 LEC m
Buku Teks  Universitas Indonesia Library
cover
Le Corbusier, 1887-1965
Boston: Bhirkouser, 2000
729.23 LEC m II
Buku Teks  Universitas Indonesia Library
cover
Woods, Charles G.
New York: McGraw-Hill , 1997
728.37 WOO n
Buku Teks  Universitas Indonesia Library
cover
"Increasing environmental problems enforce companies to be more environmental responsible. A conmpany's environmental performance is not only related to the company's inner environmental efforts, but also it is affected by the suppliers' environmental performance and image...."
Artikel Jurnal  Universitas Indonesia Library
cover
Nugrahani Najmidhia Perlita
"ABSTRAK
Perancangan dengan metode pengulangan banyak dijumpai pada arsitektur
masa kini. Metode tersebut tidak lain adalah modular, penggunaan standar sebagai
pengatur keseluruhan elemen bangunan. Penulisan bermaksud untuk mengungkap
alasan seorang arsitek memakai sistem modular dan bagaimana ia menggunakan sistem
tersebut dalam rancangannya. Pembahasan isu terhadap kemunculan modular dan
aplikasinya hingga kini dibahas melalui kasus-kasus berdasarkan periode sejarah, dan
dilihat melalui sejarah singkat, teori-teori arsitek, serta karakteristik denah atau kasus
pada zaman tersebut. Metode yang digunakan dalam penulisan adalah deskriptif dengan studi literatur

ABSTRACT
Repetition method in design is common in architecture these days. That method
is none other than modular, a standard used as a regulator for the entire building
elements. This thesis intends to reveal the reasons why architects use and how they use
the modular system in their design. The issue of the emergence of modular and its
applications up to now discussed through cases based on historical periods, and viewed
through a brief history, theories of architects, as well as their plan characteristics or the
case of the era. The method used in writing is descriptive from literature study.;"
2016
S64568
UI - Skripsi Membership  Universitas Indonesia Library
cover
Windi Astuti
"Evaluasi kinerja proyek diperlukan sebagai tolak ukur perusahaan dalam menjalankan proyek di masa yang akan datang. Pengukuran kinerja pada perusahaan konstruksi proyek jembatan baja hanya berfokus pada kriteria waktu dan biaya, sehingga tidak dapat terlihat nilai kinerja proyek secara keseluruhan. Penelitian ini bertujuan untuk memberikan perbaikan evaluasi kinerja melalui klasifikasi pengawasan kriteria manajemen proyek yang paling penting. Metode yang digunakan adalah Project Performance Cube (PCUBED). Multi criteria decision analysis dibutuhkan untuk melihat kinerja proyek secara keseluruhan. Dihasilkan elemen dimensi manajemen proyek ke dalam empat kelas klasifikasi pengawasan kinerja yaitu kelas absolut, khusus, perlu diamati dan normal. Pada perusahaan konstruksi jembatan baja diperoleh nilai kinerja manajemen proyek secara keseluruhan adalah 79% dengan manajemen pengadaan dan manajemen risiko perlu terlebih dahulu mendapatkan perbaikan dari perusahaan.

Project performance evaluation plays an important role as a benchmark to running the project better in the future. Project performance measurement on steel bridge construction focuses solely on the criteria of time and cost, so that the value of overall performance can not be seen. This study aims to provide a project performance evaluation improvement through classification of important project management criteria. Method used in this study is performance project performance measurement system cube (PCUBED). Multi criteria decision analysis is used to see overall performance project. Output from this research are overall performance value on project management dimension and classification performance monitoring into four classes which are absolute vigilance, strong attention, close surveillance and normal. As result, overall performance value on project management dimension in steel bridge construction is 79% with procurement project management and risk project management should be given immediate improvement."
Depok: Fakultas Teknik Universitas Indonesia, 2016
S63899
UI - Skripsi Membership  Universitas Indonesia Library
cover
Malinda Ghassani
"Proyek konstruksi perkantoran di Indonesia banyak yang tidak memenuhi target penyelesaian proyek yang diharapkan, serta belum mengukur performa proyek secara komprehensif, sehingga diperlukan penggunaan indikator kinerja utama IKU untuk meningkatkan performa industri konstruksi. Penelitian ini bertujuan untuk memperoleh IKU yang berpengaruh terhadap performa proyek konstruksi dengan menggunakan metode AHP Analytical Hierarchy Process dan melakukan pengukuran kinerja proyek konstruksi perkantoran terbaik terhadap 3 proyek yang dimiliki PT Aguna, yaitu : WIM3, NPC, dan INDO4 dengan menggunakan metode WPM Weighted Product Model . Penelitian ini menghasilkan prioritas kepentingan dari 5 dimensi, dan 15 IKU. Didapatkan nilai kinerja terbaik adalah proyek WIM3 sebesar 0.340, dan dihasilkan nilai gap terbesar yaitu angka keselamatan dan kecelakan kerja yang perlu ditingkatkan untuk proyek selanjutnya.

Many office construction projects in Indonesia do not meet the expected project completion targets, and haven rsquo t measure the project 39 s performance comprehensively, so it is necessary to use the key performance indicators IKU for performance improvement of the construction industry. This study aims to obtain IKU which influences the performance of construction projects by using AHP Analytical Hierarchy Process method and performs the best performance of office building project for 3 projects owned by PT Aguna, namely WIM3, NPC and INDO4 using WPM Weighted Product Model method. This research yields a priority interest of 5 dimensions, and 15 IKU. The best performance value is WIM3 project achieved 0.340, and the biggest gap value is the number of safety and work accidents rsquo s indicators that need to be improved for the next project."
Depok: Fakultas Teknik Universitas Indonesia, 2017
S67062
UI - Skripsi Membership  Universitas Indonesia Library