Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 107217 dokumen yang sesuai dengan query
cover
Donny Triana
"Kebutuhan energi meningkat seiring pertumbuhan penduduk dan aktivitas ekonomi. Energi fosil masih mendominasi, menyebabkan peningkatan polusi udara. Kontribusi energi terbarukan yang ramah lingkungan masih minim dalam bauran energi nasional. Penelitian ini bertujuan untuk mengkaji potensi Pembangkit Listrik Tenaga Surya (PLTS) atap ditinjau dari aspek tekno-ekonomi, sosial-ekonomi dan lingkungan, dengan contoh kasus di Jakarta. Pertama, estimasi luas atap potensial yang tersedia untuk memasang sistem PLTS atap PV dihitung dengan menganalisis data spasial penggunaan lahan dan tapak bangunan menggunakan Sistem Informasi Geografis dan menghitung potensi daya listrik yang dapat dibangkitkan dari luas atap potensial. Kedua, menghitung faktor reduksi emisi CO2 dengan memanfaatan listrik PLTS atap PV serta mengkaji kelayakan ekonomi skala rumah tangga. Terakhir, mengevaluasi difusi PLTS atap PV melalui simulasi model system dynamics untuk menghasilkan rekomendasi kebijakan. Berdasarkan hasil analisis diketahui, potensi listrik PLTS atap di Jakarta dapat memenuhi 69-135% dari kebutuhan listrik saat ini, menurunkan emisi CO2 per tahun 24,43-33,58 juta ton CO2-eq. Sistem PLTS atap PV skala rumah tangga di Jakarta dengan kapasitas 2 kW ke atas telah mencapai nilai keekonomian.

Energy demand increase along with population growth and economic activity. Fossil energy still dominates, causing an increase in air pollution. The contribution of environmentally friendly renewable energy is still minimal in the national energy mix. This study aims to examine the potential of rooftop photovoltaics solar power generation in terms of techno-economic, socio-economic, and environmental aspects, with case study of Jakarta. First, an estimate of the potential available roof area for installing a rooftop PV system is calculated by analyzing the spatial data of land use and building footprint using a Geographic Information System and calculating the potential electrical power can be generated from the potential roof area. Second, calculating the CO2 emission reduction factor by utilizing PV rooftop PLTS electricity and assessing the economic feasibility of household scale. Finally, evaluating the diffusion of PV rooftop solar through system dynamics model simulations to generate recommendations. Based on the analysis, it is known that the electricity potential of rooftop PLTS in Jakarta able to fulfil 69-135% of the current electricity demand, reducing CO2 emissions per year by 24.43-33.58 million tonnes of CO2-eq. The household-scale PV rooftop solar system in Jakarta with a capacity of 2 kW and above has achieved economic value."
Jakarta: Sekolah Ilmu Lingkungan Universitas Indonesia, 2023
D-pdf
UI - Disertasi Membership  Universitas Indonesia Library
cover
Fitria Yuliani
"Manajemen Tenaga Listrik dan Energi Judul : Analisis Skenario Optimasi Pemanfaatan Energi Listrik Tenaga Surya pada Sektor Industri Pembangkit listrik berbasis energi terbarukan diperkirakan akan meningkat secara signifikan di tahun-tahun kedepan. Pada tahun 2025, Pemerintah menetapkan target pengembanganenergi terbarukan ET sebagai energi primer sebesar 23 dengan persentase pembangkit listrik berbasis energi terbarukan sebesar 40 atau sekitar 45 GW.Permintaan tenaga listrik sektor industri merupakan kedua terbesar setelah sektor rumah tangga, yaitu sekitar 35 dari total permintaan energi final. Tujuan dari penelitian ini adalah untuk menganalisis skenariooptimasi biaya pemanfaatan listrik berbasis energi surya PV Rooftop pada sektor industri, sehingga keputusan untuk mengintegrasikan PV Rooftop dengan industri dapat menjadi solusi bagipenyediaan energi secara mandiri dan meningkatkan nilai tambah industri tersebut.
Penelitian ini menggunakan pengembangan perhitungan Levelized Cost of Electricity LCOE , dan analisis kelayakan keekonomian pada PV Rooftop terintegrasi pada industri melalui perhitungan Net Present Value NPV penghematan listrik dengan skenario skema Net Metering dan Net Bilingdengan mempertimbangkan kapasitas PV rooftop terpasangdankecenderungan tarif listrik PT PLN di Industri dengan menggunakan aplikasi System Advisor Model SAM. PV rooftop pada industri akan menghasilkan nilai pengembalian investasi positif melalui skema Net Metering. Hal ini ditunjukkan dengan nilai NPV positif sebesar 69.076 dan Payback period selama 8 tahun. NPV ini didapatkan dari hasil penghematan biaya listrik yang dihasilkan tanpa sistem PV. Semakin besar kapasitas PV terpasang semakin besar nilai NPV. Namun, kapasitas PV terpasang dibatasi oleh luas lahan tersedia daneconomic value biaya sistem PV. Kata kunci: Energi terbarukan,PV Rooftop,Industri, Levelized Cost of Electricity LCOE , Kelayakan Keekonomian ?

Study Program Electicity Power and Energy Management Title Optimization Scenario Analysis of Solar PV Utilization in Industrial Sector Renewable energy power generation is expected to increase significantly in the years to come. In 2025, the Government sets a target of renewable energy development as primary energy by 23 with a percentage of renewable energy based power generation of 40 or about 45 GW. The demand for industrial power is the second largest after the household sector, which is about 35 of the total final energy demand. The objective of this research is to analyze the optimized cost scenario of solarpv utilization PV Rooftop in industrial sector, so that the decision to integrate the Rooftop PV with the industry can be a solution for independent energy supply in some areas and increase the added value of the industry.
This research uses the development of Levelized Cost of Electricity LCOE calculation, and economic feasibility analysis on PV Rooftop integrated in industry through Net Present Value NPV electricity saving calculation with Net Metering and Net Biling scheme scenario taking into account the installed rooftop PV capacity and tariff trend electricity PT PLN in the industry by using the application System Advisor Model SAM. PV rooftop in the industry will generate positive returns on investment through the Net Metering scheme. This is indicated by a positive NPV value of 69,076 and a payback period of 8 years. This NPV is obtained from the resulting electricity cost savings without PV system. The larger the installed PV capacity the greater the NPV value. However, the installed PV capacity is limited by the available land area and the economic value of PV system costs. Keywords Renewable Energy, Rooftop PV, Industry, Levelized Cost of Electricity LCOE , Economic Feasibility.
"
Depok: Fakultas Teknik Universitas Indonesia, 2018
T49068
UI - Tesis Membership  Universitas Indonesia Library
cover
Rino Sugiarto
"Saat ini minyak bumi mendominasi sebagai sumber utama bahan bakar untuk motor bakar. Energi yang terbarukan merupakan salah satu solusi untuk menghadapi persoalan krisis energi yang memprediksi habisnya bahan bakar minyak bumi dimasa mendatang. Salah satu sumber energi yang terbarukan adalah Bioethanol.
Dalam penelitian ini, dilakukan rancang bangun compact distillator dengan memamfaatkan gas buang dari motor bakar sebagai alat utama pengolahan ethanol. Tujuannya adalah ingin menghasilkan produk ethanol layak menjadi bahan bakar yaitu ethanol dengan kadar diatas 85%. Untuk mengetahui performa dari produk low grade ethanol yang didistilasi ini dilakukan pengujian unjuk kinerja bahan bakar dengan parameter laju konsumsi bahan bakar, kondisi gas buang dan pengaruh penambahan ethanol kedalam bahan bakar terhadap kinerja mesin.
Dari hasil penelitian ini diharapkan compact distillator dapat menyerap panas gas buang dari knalpot secara maksimal sehingga laju distilasi compact distillator mampu memenuhi kebutuhan konsumsi bahan bakar Sepeda Motor Suzuki thunder 125 cc. Gas buang bioethanol hasil distillasi compact distillator lebih ramah lingkungan, kadar CO rendah (±0.5 % Vol), HC rendah (±44.3 ppm Vol), NOx tidak terdeteksi (0 ppm Vol).

Currently petroleum dominates as the main source of fuel for motor fuel. Renewable energy is one solution to face the problem of energy crisis that predict petroleum fuels in the future will be run out. One source of renewable energy is Bioethanol.
In this study, compact distillator design to utilization exhaust gases from motorcycle as the primary energy resource to processing ethanol. The goal is to produce decent products into ethanol fuel is ethanol with a concentration above 85%. To determine the performance of low-grade product distilled was carried out engine performance testing with the rate of fuel consumption, exhaust gas conditions and the effect of adding ethanol into the fuel on engine performance.
From the results of this study are expected compact distillator can absorb heat from the exhaust gases are maximum, so the rate of distillation able to sufficient the fuel consumption of Suzuki Motorcycles thunder 125 cc. Bioethanol exhaust compact distillasi results distillator more environmentally friendly, low CO levels (± 0.5% Vol), low HC (± 44.3 ppm Vol), NOx was not detected (0 ppm Vol).
"
Depok: Fakultas Teknik Universitas Indonesia, 2012
S1679
UI - Skripsi Open  Universitas Indonesia Library
cover
Siahaan, Bonardo Jonathan
"EBT di Indonesia merupakan sumber daya yang menjanjikan karena terletak di sekitar garis khatulistiwa dan iklim tropis.Potensi yang tinggi dan juga ambisi yang tinggi dari pemerintah terhadap EBT tidak sebanding dengan pelaksanaan RUEN sejak pertama kali dikeluarkan yaitu mengenai bauran energi 23 pada tahun 2025. Kurangnya minat investor dan banyaknya proyek yang mangkrak merupakan gambaran pelaksanaan yang tidak sesuai. Feed-in Tariff FiT seharusnya menjadi perangsang masyarakat dan investor untuk berinvestasi, tetapi malah sebaliknya, investor ditekan untuk menjual dengan harga murah.
Penilaian FiT PLTS Fotovoltaik ini mencakup wilayah yang dikeluarkan kementrian ESDM, sehingga pemerintah dapat sadar bahwa nilai FiT yang lebih baik perlu untuk menaikkan investasi EBT, khususnya PLTS Fotovoltaik. Perhitungan FiT menggunakan metode LCOE, berdasarkan penelitian terkait dan spesifikasi peralatan dengan kondisi sekarang dan juga kondisi penurunan efisiensi kapasitas dan harga pv modul. Nilai discount rate dan Energi yang dihasilkan merupakan parameter sensitivitas karena berpengaruh terhadap kebijakan.
Berdasarkan perhitungan FiT, daerah terluar Indonesia, bukan ibukota provinsi atau wilayah Jawa-Bali merupakan daerah dengan sarana dan situasi yang menarik untuk melakukan investasi PLTS Fotovoltaik.Pentingnya penentuan asumsi keekonomian, teknologi yang digunakan dan tata cara instalasi / maintenance PLTS supaya kebijakan yang selanjutnya dapat dikeluarkan dapat tepat sasaran.

RE in Indonesia is a promising power resource because it lies around the equator and tropical climate. The high potential and high ambition of the government against RE is not comparable with the implementation of RUEN since first issued regarding the energy mix is 23 in 2025. The lack of investor interest and the number of projects that faded is a description of implementation that is not appropriate. Feed in Tariff FiT should be a stimulant for investors to invest, but instead, investors are pressed to sell at a bargain price. The Photovoltaic FiT location assessment is issued by the ESDM ministry, so the government can be aware that better FiT values are necessary to raise EBT investments.
FiT calculation use LCOE method, based on related research and equipment specification with current condition and also condition of decreasing efficiency of capacity and price of pv module. The value of the discount rate and the energy generated are sensitivity parameters, because it affects the policy.
Based on the calculation of FiT, the outer regions of Indonesia, not the provincial capital or the region of Java Bali is an area with interesting facilities and situations to invest in Solar PV Power. The importance of the determination of economic assumptions, technology used and procedures PLTS installation maintenance so that the policy can be issued can be on target.
"
Depok: Fakultas Teknik Universitas Indonesia, 2018
T49197
UI - Tesis Membership  Universitas Indonesia Library
cover
Aero Bestari Wangsaputra
"Permintaan akan energi, khususnya energi listrik, di Indonesia semakin tinggi dan menjadi bagian tak terpisahkan dari kebutuhan hidup masyarakat dan sektor industri. Namun, ketersediaan bahan bakar fosil yang digunakan untuk menghasilkan listrik semakin terbatas, serta polusi yang dihasilkan oleh proses konversi dari bahan bakar fosil tersebut. Indonesia memiliki potensi energi surya sebesar 207,8 GWp Namun, potensi ini belum dimanfaatkan secara optimal. Oleh karena itu, potensi tersebut dapat dioptimalkan dengan instalasi PLTS atap pada bangunan dengan konsumsi listrik tinggi. Gedung MRPQ Universitas Indonesia dengan konsumsi listrik yang relatif tinggi dijadikan sebagai lokasi studi. Penelitian bertujuan untuk mengetahui konfigurasi dan skema paling optimal berdasarkan Net Present Cost (NPC) dan beberapa parameter ekonomi seperti Net Present Value (NPV), Internal Rate of Return (IRR), dan Payback Period. Pada HOMER, dilakukan simulasi dengan konfigurasi On-Grid dan Off-Grid. PLTS On-Grid disimulasikan dengan variasi penambahan generator set, sedangkan PLTS Off-Grid disimulasikan dengan variasi jenis baterai Lead Acid dan Lithium Ion. Hasil simulasi HOMER dan analisis menunjukkan bahwa penambahan generator set pada sistem PLTS On-Grid optimal menghasilkan NPC yang lebih tinggi dibandingkan dengan sistem tanpa generator set. Kemudian, penggunaan baterai jenis Lithium Ion pada sistem PLTS Off-Grid optimal menghasilkan NPC yang lebih rendah dibandingkan dengan baterai jenis Lead Acid. Dengan demikian, PLTS On-Grid tanpa generator set merupakan konfigurasi paling optimal berdasarkan NPC dan layak untuk diimplementasikan berdasarkan NPV, IRR, dan Payback Period.

The demand for energy, especially electrical energy, in Indonesia is increasing and has become an integral part of the needs of society and the industrial sector. However, the availability of fossil fuels used to generate electricity is increasingly limited, as well as the pollution generated by the conversion process of these fossil fuels. Indonesia has a solar energy potential of 207.8 GWp. However, this potential has not been optimally utilized. Therefore, this potential can be optimized by installing rooftop solar power plants (PLTS) on buildings with high electricity consumption. The MRPQ building of the University of Indonesia with relatively high electricity consumption was used as the study site. The research aims to determine the most optimal configuration and scheme based on Net Present Cost (NPC) and several economic parameters such as Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period. In HOMER, simulations were performed with On-Grid and Off-Grid configurations. On-Grid PLTS is simulated with variations in the addition of generator sets, while Off-Grid PLTS is simulated with variations in the types of Lead Acid and Lithium Ion batteries. HOMER simulation results and analysis show that the addition of a generator set to the optimal On-Grid PLTS system results in a higher NPC compared to the system without a generator set. Then, the use of Lithium Ion batteries in the optimal Off-Grid PLTS system results in a lower NPC compared to Lead Acid batteries. In summary, On-Grid PLTS without a generator set is the most optimal configuration based on NPC and feasible to implement based on NPV, IRR, and Payback Period.

"
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
"The book features innovative scientific research by scientists, academicians and students, presented at the International Conference on Energy, Materials and Information Technology, 2017 at Amity University Jharkhand, India. Covering all the promising renewable energies and their related technologies, such as wind, solar and biomass energy, it compiles current important scientific research in this field and addresses how it can be applied in an interdisciplinary manner. The selected conference papers provide important data and parameters for utilizing the main potential renewable energies, and allowing an economic and environmental assessment.
The book is a valuable resource for all those who are interested in the physical and technical principles of promising ways to utilize various renewable energies."
Singapore: Springer Singapore, 2019
e20502850
eBooks  Universitas Indonesia Library
cover
M. Aldrin Julianto
"Energi listrik yang memiliki kualitas daya yang baik dan andal menjadi faktor yang sangat vital untuk mendukung iklim dunia industri yang kompetitif. Pada sektor industri yang memiliki sistem tenaga listrik off grid, sangat penting untuk mengetahui seberapa optimal dan andal sistem tenaga listrik untuk mengantisipasi penambahan beban di masa mendatang. Selain itu dengan memperhatikan perkembangan penetrasi penggunaan energi terbarukan seperti Pembangkit Listrik Tenaga Surya (PLTS) yang semakin meluas dapat mempengaruhi stabilitas sistem tenaga listrik karena sifat intermitensi dan ketersediaannya yang tidak bisa diperkirakan. Hilangnya daya PLTS secara mendadak dapat mengakibatkan permasalahan stabilitas karena penurunan frekuensi pada sistem dan dibutuhkan respon yang cepat dari pembangkit listrik yang ada pada sistem untuk menghindari pemadaman total. Metode yang dilakukan pada penelitian ini dengan membuat pemodelan sistem tenaga listrik menggunakan perangkat lunak Electrical Transient Analyzer Program (ETAP) lalu melakukan simulasi untuk mengetahui mode operasi optimal, dilanjutkan dengan memproyeksikan penambahan beban di masa mendatang yang masih dapat disuplai oleh sistem, serta menghitung berapa penetrasi optimal dari PLTS yang dapat diintegrasikan pada sistem tenaga listrik di industri. Hasil penelitian menunjukkan bahwa sistem tenaga listrik di industri masih dapat mengantisipasi penambahan beban sampai dengan 80% dari cadangan putarnya dan stabilitas pada sistem masih terjaga dengan baik saat integrasi PLTS dilakukan sebesar 16% dari total beban sehingga sistem tenaga listrik offgrid pada industri tetap terjaga keandalan dan stabilitasnya saat diintegrasikan dengan PLTS.

The need of power system quality and stability is one of the most important thing to increase productivity and competitiveness in industrial process. Some industries have off grid electrical power systems, therefore it is important to know how optimal and reliable the electrical power system to supply load requirements in the future. Since power generation connected to system is limited, so the flexibility of power system in industry is low. In addition, rapid development of penetration of renewable energy source such as solar photovoltaic has an impact of power system stability and quality because of its intermittent, availability, and grid related problems. So when the electrical power from solar photovoltaic is suddenly lost, a frequency instability phenomenon will occur and it will be needed fast response of conventional synchronous generator to prevent power system blackout. The objective of this research was to study power system optimization in industry in terms of quality and stability by considering future load demand and penetration rate of solar photovoltaic by modeling and simulation using Electrical Transient Analyzer Program (ETAP) software then perform a simulation to find out the optimal operating mode, projecting additional future loads that can still be supplied by the system, and calculating the optimum penetration of PV can be integrated into power system. The results showed the power system can still anticipate additional loads of up to 80% of its spinning reserve and power system quality and stability is still well maintained when the PV integration is carried out at 16% of the total load."
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Andhika Prastawa
"Energi Surya merupakan Sumber Energi Terbarukan yang sangat potensial sebagai alternatif sumber energi khususnya kelistrikan, baik untuk mengurangi dampak lingkungan, maupun meningkatkan pelistrikan di daerah terpencil. Penelitian ini dilakukan untuk membangun Model Prediksi Sumber Energi Terbarukan Tenaga Surya di Indonesia. Dalam Studi ini diajukan prosedur optimalisasi Jaringan Syaraf Tiruan berdasarkan Theorema Cybenko tentang universalitas JST dengan 1-hidden layer, dan algoritma Neural Network Construction with Cross-validation Samples (N2C2S) dalam optimalisasi jumlah neuron pada hidden layer. Pemodelan dilakukan pada wilayah Indonesia menggunakan gabungan data meteorologi dan Radiasi Global Surya Bulanan dari SSE NASA dan BMKG selama 4 tahun di 14 lokasi untuk proses training JST, dan 6 lokasi sebagai target prediksi. Pola JST Feed forward multi layer digunakan dalam model ini dengan menerapkan metoda pembelajaran back propagation. Hasil modeling menunjukkan bahwa model JST dengan 1 hidden layer menghasilkan model kriteria akurasi yang sangat baik dengan MAPE 4,1% dan R2 0,82, dibandingkan dengan MAPE 7,52% dan R2 0,48 pada teknik regresi sebagai metoda yang umum digunakan dalam modeling prediksi. Penelitian ini juga mendemonstrasikan bahwa model JST dapat merepresentasikan prediksi lebih akurat dari teknik regresi, khususnya di mana terjadi dinamika yang tinggi pada variabel prediktornya. Hal ini menyimpulkan tidak saja bahwa dengan prosedur optimisasi JST dapat disusun secara optimal untuk memberikan struktur yang lebih sederhana, namun JST yang dihasilkan memberikan piranti prediksi yang akurat dan responsif terhadap dinamika data, dengan akurasi yang dapat dipertanggungjawabkan.

This study is focused on modeling the Global Solar Radiation using Artificial Neural Network to predict GSR in a location in Indonesia which is available with meteorological data but lack with radiation measurement data. In this study, an optimalisation of ANN development is proposed based on Cybenko Theorem on universal approximator of single-hidden layer Multi Layer Perceptor combined Neural Network Construction with Cross-validation Samples (N2C2S) algorithm for optimum number of hidden neuron. Data for weather and solar radiation parameter are taken from NASA and BMKG (Indonesian Meterological and Climatology Agency) for 20 cities in Indonesia during the period for 4 year, divided into two groups of 14 cities for model development and 6 cities for model validation. The developed model provides much better performance with MAPE of 4,1% and of R2 0,82, as to compare with the widely used regression technique with MAPE of 7,52% and R2 of 0,48. The simulation shows that an ANN with single-hidden layer is an excellent approximator for the solar radiation function in the targeted area, in particular in the periode where high dynamics is present in predictor variables. This shows that not only the model is able to predict the solar radiation in a good agreement with the actual data, but more importantly that the high dynamics fluctuation of parameter is successfully captured.
"
Depok: Fakultas Teknik Universitas Indonesia, 2014
D1941
UI - Disertasi Membership  Universitas Indonesia Library
cover
Yoga Adi Candra
"Pemerintah ditargetkan untuk bauran energi terbarukan minimal 23%. Kontribusi kapasitas pembangkit dari energi surya setara sebesar 6,5 GW dari total kapasitas pembangkitan energi terbarukan sebesar 45 GW pada 2025. Energi surya memiliki potensi lebih dari 200 GW dengan efisiensi teknologi photovoltaic yang tersedia saat ini. Namun, pemanfaatan energi surya dalam pembangkitan listrik masih kurang dari 100 MW. Tujuan penelitian ini adalah menganalisis selisih biaya tagihan litrik sebelum dan sesudah pemasangan PLTS, menentukan kecepatan pengembalian investasi pemasangan PLTS atap, mendeskripsikan dampak pemasangan PLTS atap terhadap pelanggan, PLN dan pemerintah. Hasil penelitian pada pelanggan daya 450 VA sebelum PV = Rp. 63.154, sesudah PV = Rp. 78.085 dan pada pelanggan daya 900 VA sebelum PV = Rp. 110.413, sesudah PV = Rp. 112.240. Skema export-import yang paling optimal adalah 85%. Potensi pengalihan subsidi listrik berjumlah Rp46.433.637.049.601 untuk pemasangan PLTS sebanyak 1.797.612 unit.

The government is targeted to a renewable energy mix of at least 23%. The contribution of generating capacity from solar energy is equivalent to 6.5 GW of the total renewable energy generation capacity of 45 GW by 2025. Solar energy has the potential of more than 200 GW with the efficiency of photovoltaic technology currently available. However, the use of solar energy in electricity generation is still less than 100 MW. The aim of this study was to analyze the difference in the cost of electricity bills before and after PLTS installation, determine the speed of return on investment in PLTS installation, describing the impact of PLTS installation on customers, PLNs and the government. Research results on 450 VA power customers before PV = Rp. 63,154, after PV = Rp. 78.085 and at 900 VA power customers before PV = Rp. 110.413, after PV = Rp. 112.240. The most optimal export-import scheme is 85%. The potential for the shifting of electricity subsidies is Rp. 46,433,637,049,601 for the installation of 1,797,612 PLTS units."
Depok: Fakultas Teknik Universitas Indonesia, 2021
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Hasmaratantra Dhaneswara
"Perkembangan harga dari PV belakangan ini telah membuat teknologi PV semakin terjangkau. Harga dari modul PV di US sudah menurun dari 60c/watt menjadi 40c/watt dalam 3 bulan belakangan ini., dan diperkirakan akan semakin menurun sampai sekitar 35c/watt kedepannya. Tujuan dari penelitian ini adalah untuk mencari karakteristik dari rugi-rugi pada saluran yang disebabkan oleh penetrasi PV dan mendapatkan lokasi optimum dan kapasitas PV optimum. Simulasi alliran daya dilakukan pada grid pulau sumba timur menggunaka software DIgSILENT Power factory 15.1. Pemasangan PV pada sistim distribusi radial dengan lokasi optiPerkembangan harga dari PV belakangan ini telah membuat teknologi PV semakin terjangkau. Harga dari modul PV di US sudah menurun dari 60c/watt menjadi 40c/watt dalam 3 bulan belakangan ini., dan diperkirakan akan semakin menurun sampai sekitar 35c/watt kedepannya. Tujuan dari penelitian ini adalah untuk mencari karakteristik dari rugi-rugi pada saluran yang disebabkan oleh penetrasi PV dan mendapatkan lokasi optimum dan kapasitas PV optimum. Simulasi alliran daya dilakukan pada grid pulau sumba timur menggunaka software DIgSILENT Power factory 15.1. Pemasangan PV pada sistim distribusi radial dengan lokasi optimum dan kapasitas optimum dapat mengurangi rugidaya aktif hingga 50 . Lokasi optimal dan persentase penetrasi optimal untuk sistim distribusi radial di Sumba Timur system Waingapu terletak di bus Kambajawa dengan penetrasi 40.

Recent price wars of the PV technology have made PV technology become more accessible. The price of solar modules in the US has already fallen from around 60c watt to 40c watt in the last quarter alone, and is expected to fall further to around 35c watt in the current quarter. The objectives of this research are to get the characteristic of line losses caused by PV penetration and get the optimum location and optimum PV penetration percentage. Load flow simulation was done on East Sumba Grid by using software DIgSILENT Powerfactory 15.1. Installation of PV in radial distribution system with optimum location and optimum percentage penetration able to decrease the active power losses up to 50 . Optimal location and penetration capacity percentage for radial distribution system in East Sumba Waingapu System Grid located in Kambajawa bus with 40 Penetration."
Depok: Fakultas Teknik Universitas Indonesia, 2016
S66050
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>