Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 39779 dokumen yang sesuai dengan query
cover
Koichi Murata
"The purpose of this paper is to describe a proposed support system of Kaizen activity which contributes to improve related performance indicators in a production department. Background research consisted of the following three parts. First, a Decision Support System (DSS) provided an illustration for the proposed system; its three elements of interest include Kaizen case-base, Model-base and User-interface. The first element accumulates useful cases for developing new cases. The second element accumulates models to utilize the case-base effectively, including the Kaizen strategic model, Kaizen objective model, Kaizen data analysis model, and model building blocks and subroutines. The third element links Kaizen case-base, Model-base and Kaizen engineers. The linkages are realized by four procedures: installation of proposed support system, construction of Kaizen case-base, evaluation of the case-base, and development of new cases. The second portion of our research was a discussion of Kaizen case-base from three viewpoints: its utilization purpose, its information structure, and data types accumulated in it. Thirdly, investigation of the three primary model types mentioned above was performed and the proposed model-base was constructed. Proposed system was designed to maintain and improve Key Performance Indicators (KPIs) in a manufacturing system through discussions with Kaizen experts whose factory collaborated in this research."
Depok: Faculty of Engineering, Universitas Indonesia, 2011
UI-IJTECH 2:3 (2011)
Artikel Jurnal  Universitas Indonesia Library
cover
cover
cover
Betrianis
"ABSTRAK
Tugas akhir ini dibuat berdasarkan studi kasus sebuah'perusahaan manufaktur yang bemama PT. Arhapro. Proses produksi yang ada pada pabrik perusahaan ini adalah proses produksi yang bersifat process layout dengan tenaga kerja yang relatif sedikit dan biaya overhead yang tinggi. Perbandingan antara biaya-biaya langsung dengan biaya-biaya tidak
langsung atau overhead berkisar antara 1 banding 5. Melihat fakta-fakta di atas, maka yang hendak dilakukan dalam tugas akhir ini adalah menerapkan metode alokasi biaya activitybased costing (ABC) untuk melakukan alokasi biaya-biaya overhead pabrik. Data-data yang diperlukan dalam penerapan metode ini antara lain adalah jenis-jenis produk yang diliasilkan, job description, biaya overhead selama tahun 2000, data-data yang berkeiitaii dengan produksi pabrik perusahaan selama tahun 2000, dan data-data keorganisasian pabrik perusahaan. Semua data telah tersedia di pabrik perusahaan. Pengolahan data dilakukan dengan terlebih dahulu mengalokasikan biaya overhead kepada aktivitas-aktivitas pabrik perusahaan. Alokasi biaya overhead dilakukan dengan secara langsung mengalokasi suatu pool biaya kepada suatu aktivitas atau dengan menggunakan pemacu biaya sebagai basis alokasi biaya. Lalu aktivitas-aktivitas tersebut dikelompokkan ke dalam 4 tingkat aktivitas. Setiap kelompok inemiliki pemacu biayanya sendiri, dan berdasarkan pemacu biaya ini biaya masing-masing kelompok aktivitas dialokasilvan kepada obyek-obyek biaya yang telah diidentifikasikan. Hasil akhir berupa hasil alokasi biaya overhead pabrik kepada obyek-obyek biaya yang ditetapkan. Dipaparkan juga analisa smgkat mengenai konsumsi biaya oleh aktivitasaktivitas yang ada dan juga oleh obyek-obyek biaya.
ABSTRACT
This final assignment was made based on a case study in a manufacturing company by the name ofPT. Arhapro. The production process is a process layout production process with relatively small amount of labour and a very high amount of overhead cost. The odds between direct manufacturing cost and indirect manufacturing cost or overhead cost is roughly J to 5. Based on these facts, the purpose of this final assignment is to implement activity-based costing method to allocate the factory's overhead The data needed to implement this method are product types, job description, overhead cost in the year 2000, data and information relating to factory's production in the year 2000, and data relating to factory's organizational structure. All of these data are available in the company's factory. Data processing was done by first allocating the overhead costs into factory's activities. Overhead costs allocation M'as done by directly allocating a cost pool into an activity or by using cost drivers as cost allocation bases for a cost pool. Activities are then grouped into 4 levels of activities. Each group has a unique cost driver that is used as the cost allocation base in allocating the activities costs into cost objects that has before been identified. The final result is the allocation offactory's overhead into determined cost objects. A short analysis concerning the consumption of costs by activities and by cost objects is also presented in the end of chapter 4."
Fakultas Teknik Universitas Indonesia, 2002
07 Bet a-1
UI - Laporan Penelitian  Universitas Indonesia Library
cover
Amanda Elvira Asha
"Industri pracetak dan prategang adalah industri konstruksi berbasis manufaktur yang dari sejak masa awal pembangunan Indonesia sudah menunjukkan perannya dalam menghasilkan kualitas pekerjaan infrastruktur yang baik, cepat, ekonomis dan berkelanjutan. Namun beberapa penggunaan produk dalam negeri masih rendah, artinya masih banyak produk impor yang memenuhi pasar nasional. Disisi lain, para petinggi menjadi tersangka kasus korupsi mengindikasikan rendahnya kualitas kepemimpinan sehingga mengakibatkan kerugian negara. Untuk itu perlu dibangunnya budaya invoasi dengan cara pengembangan leadership system berbasis ISO 56002 yang diintegrasikan dengan Lean Six Sigma. Dalam pengolahan data, penelitian ini menggunakan metode delphi serta SEM. Hasil penelitian ini dapat memberikan masukan dan strategi pengembangan leadership system guna membangun budaya inovasi pada perusahanan pracetak di Indonesia. Hasil dari penelitian ini terdapat 10 indikator leadership system dari integrasi antara ISO 56002 dan Lean Six Sigma. Pengaruh integrasi antara LSS dan ISO sangat tinggi, sedangkan ISO terhadap budaya inovasi serta LSS terhadap budaya inovasi cenderung medium. Indikator yang paling berpengaruh terhadap budaya inovasi antara lain tujuan inovasi, kebijakan inovasi, pakar yang dikembangkan, serta integrasi orang, system, dan informasi.

The precast and prestressed industry is a construction manufacturing industry with the potential to produce high-quality, fast, cost-effective, and sustainable infrastructure since the early days of Indonesia's development. However, the usage of domestic products in the national market is still low, with imported products being more prevalent. Furthermore, the low leadership quality of high-ranking officials, who are suspects in corruption cases, has resulted in state losses. Therefore, it is necessary to cultivate cultural innovation by developing an ISO 56002-based leadership system inspired by Lean Six Sigma. In data processing, this research employs the Delphi method and SEM. The research's findings can provide valuable input and strategies for developing a leadership system that fosters a culture of innovation within precast companies in Indonesia. This research resulted in 10 leadership system indicators derived from integrating ISO 56002 and Lean Six Sigma. The integration's impact on innovation culture is high, while ISO's influence on innovation culture and Lean Six Sigma's influence on innovation culture are moderate. The most influential innovation culture indicators include innovation goals, innovation policies, expert development, and the integration of people, systems, and information."
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Ferryanto Nugroho
"ABSTRAK
Sistem Produksi yang ramping merupakan salah satu cara untuk
mengurangi biaya produksi dan meningkatkan keuntungan. Proses produksi yang
ramping dapat diwujudkan dengan mengurangi berbagai macam pemborosan yang
terjadi pada lini produksi seperti transportasi yang tidak perlu, inventori,
kelebihan produksi, waktu tunggu, dan cacat pada produk. Oleh karena itu,
penelitian ini akan memetakan sebuah aliran proses produksi, sehingga
pemborosan – pemborosan tersebut dapat terlihat dan dihilangkan. Dengan
melakukan simulasi dengan software Plant Simulation, maka perilaku (baik statis,
maupun dinamis) dalam proses produksi dapat terlihat. Hasil dari penelitian ini
akan memunculkan sebuah usulan berupa usulan peta proses produksi masa depan
yang mengacu pada lean production system.

ABSTRACT
Lean production system is a way to decrease production cost and increase
profit. Lean production system can be achieved by reducing any wastes which
happened in a production line, such as unnecessary transportation, inventory,
overproduction, wating time, and product defects. Therefore, this research will
mapping a production process flow, so those wastes can be seen and eliminated.
By doing a simulation with Plant Simulation software, then the behavior (either
static or dynamic) of the production process can be seen. The result of this
research will bring up suggestions in the form of future state map that refer to lean
production system"
Fakultas Teknik Universitas Indonesia, 2014
S57516
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ariel Bramantyo Putra
"ABSTRAK
Proses produksi berdasarkan konsep lean production system adalah proses produksi yang efektif dan efisien dimana pada proses produksi tidak ditemukannya pemborosan-pemborosan seperti inventori, kelebihan produksi, transportasi dan pergerakan yang tidak diperlukan. Pada penelitian kali ini, proses produksi dipetakan ke dalam sebuah peta yang dinamakan current state map sehingga keseluruhan aktivitas dapat terlihat dan dapat mengidentifikasi pemborosan yang ada. Semua aktivitas yang tidak memberi nilai tambah dihilangkan dengan melakukan perbaikan dan merancang peta usulan atau proposed state map. Setelah itu disimulasikan dengan software plant simulation. Hasil penelitian ini menghasilkan sistem produksi sesuai dengan filosofi dari lean production system.

ABSTRACT
The production process is based on the concept of lean production system is a production process that is effective and efficient in which the production process is not the discovery of wastes such as inventory, overproduction, transportation and movement are not required. In the present study, the production process is mapped into a map folder called current state so that all activities can be seen and can identify existing waste. All activities that do not add value is eliminated by improving and designing proposals or proposed state maps folder. Once the plant is simulated with software plant simulation. The results of this study resulted in the production system in accordance with the philosophy of lean production system."
Fakultas Teknik Universitas Indonesia, 2014
S55505
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ferdiansyah Zhultriza
"ABSTRAK
Perkembangan dunia manufaktur di abad ke-21 ini berkembang seiring bertambahnya permintaan produk. Pembuatan produk baru yang inovatif, cepat, dan murah dapat memberikan keuntungan bagi industri manufaktur. Desain produk dengan pembuatan prototipe nyata membuat harga penelitian produk dan risiko kegagalan menjadi tinggi. Penelitian ini menggagas konsep virtual manufacturing yang dapat digunakan untuk melakukan assembly dan desain memanfaatkan hasil data image processing. Penggunaan perakitan secara virtual dapat memangkas harga pembuatan produk uji coba dan merasakan sensasi langsung. Model software yang dikembangkan menggunakan kamera webcam pada laptop dan integrasi hasil identifikasi dan tracking tangan dengan 3D CAD System. Pengguna menggunakan software ini tanpa perlu terganggu dengan sensor yang banyak maupun pembelian device tambahan yang mahal sehingga lebih leluasa dalam melakukan simulasi virtual manufacturing. Hasil akhir dari penelitian ini adalah model software virtual designing dan virtual assembly sebagai bagian dari virtual manufacturing.

ABSTRACT
The development of the manufacturing world in the 21st century is growing as the demand for product rsquo s increase. Creating innovative, fast, and inexpensive new products can provide benefits for the manufacturing industry. Product design with real prototype has expensive cost for research and the failure is too high. This research initiated a concept of virtual manufacturing that can be used to perform assembly and design utilize the results of image processing data. The use of virtual assembly can cut the price of making test products and feel the sensation instantly. The software model is developed using webcam cameras on laptop and integration of the results of identification and hand tracking based on image processing with 3D CAD System. User can use this software without feeling interupted by the sensors so they can feel more flexible in performing virtual manufacturing simulation and do not have to purchase of additional devices that are expensive. The end results of this research are virtual designing and virtual assembly software model as part of virtual manufacturing. "
Depok: Fakultas Teknik Universitas Indonesia, 2018
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Rahmi Husna
"Telah dibuat suatu rancang bangun ruang vakum bebas oksigen, dengan temperatur terkendali sebagai alat ukur uji impedansi bahan. Temperatur bertindak dalam menentukan keseimbangan energi dalam proses suhu. Tranduser temperatur yang di ukur dengan termokopel tipe-K. Dan heater akan mentransfer panas pada suhu yang ditentukan. Heater Elstein FSR yang dipakai memiliki daya 250 watt, dan mampu menghasilkan panas sebesar 720°C. Sistem yang digunakan mikrokontroller Atmega 16, alat ni menggunakan proses kontrol PID dengan metode kurva reaksi. Percobaan yang dilakukan secara manual mode dan auto mode. Manual mode dengan cara mengatur power heater sedangkan auto mode memberikan nilai set point temperatur. Sistem tuning PID menggunakan metode kurva reaksi, maka didapatkan nilai lag time (L) sebesar 39 dan nilai rise time (T) sebesar 1422. Dengan melakukan proses sistem kontrol didapatkan nilai Kp = 38.46, Ki =0.013 dan KD =19.5.

A vacum furnace system with automatic temperature controller had been made for measuring material impedance as a function of temperature. Ceramic Elstein FSR heater of 250 watt power used to heat up the chumber inside the furnace. PID control process is using microcontroller Atmega 16. The experiment was running in manual mode by adjusted power heater and auto mode by valued temperature setpoint. PID tuning system used reaction curve method, hence resulting lag time (L) 39 second and rise time (T) 1422 second. By processing controlled system it could get value of Kp = 38.46, Ki =0.013 and KD =19.5."
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 2009
S29438
UI - Skripsi Open  Universitas Indonesia Library
cover
Ralf Maruli
"ABSTRAK
Permasalahan utama yang mengawali penelitian ini adalah tingginya jumlah
inventori bahan baku pada gudang bahan baku perusahaan yang menyebabkan
inefisiensi waktu produksi pada production line TCRB, Ltd. Dari permasalahan
ini, kemudian dilakukan pendekatan lean production dan pemetaan dengan value
stream mapping (VSM) untuk mengevaluasi sistem awal dan merancang sistem
baru. Hasil penelitian kepada current VSM menunjukan terdapat beberapa akar
permasalahan yang menyebabkan terjadinya inventory pada gudang bahan baku
serta beberapa permasalahan lain. Temuan ini kemudian ditindaklanjuti dengan
penyusunan improvement untuk memecahkan setiap masalah yang ada secara
spesifik yang hasilnya dapat dilihat pada proposed VSM.

ABSTRACT
The main problem that initiated this study is the high amount of raw material
inventory in the warehouse that caused an inefficiency of production time in
production line of TCRB, Ltd. From this main problem, the writer tried to make a
lean production approach and map the whole system by using value stream
mapping (VSM) to evaluate the current system and to design a new system. The
evaluation to the current VSM resulted that there are some root causes of the
problem that caused the inventory in the warehouse and also some other problems.
Based on this finding, we generate some improvements to solve the problem, and
the result can be seen on the proposed VSM."
2014
S53199
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>