Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 7021 dokumen yang sesuai dengan query
cover
Warjito
"The geography of Indonesia renders it difficult to connect many areas to the national electricity grid. To overcome these problems, people need to be able to generate their own electricity. Pico hydro has been proven to be a cost-effective solution for electrification. The Turgo turbine is known for its reliability and strength, and it can perform efficiently with a range of flows. The Turgo’s blade consists of an inlet and outlet trail with a curve that joins them. The curve in this study will be made from a simple circle arc to improve manufacturability. Three blades were designed using a basic calculation derived from the velocity triangles, with each blade having a different circle radius. The Computational Fluid Dynamics (CFD) method is used to determine the stream flow through the blade at a level of detail that cannot be obtained using other methods. The boundary conditions used in the study include 2.7 meters of head and a 21 l/s flow rate, a steady-state homogenous multiphase, and the turbulent models used SST k-?. The result shows that the Turgo turbine with a 60 mm arc radius generated 477.7 Watts and has an efficiency of 85.97%, the highest when compared to the other two blades that used 50 mm and 55 mm arc radii, respectively."
Depok: Faculty of Engineering, Universitas Indonesia, 2017
UI-IJTECH 8:7 (2017)
Artikel Jurnal  Universitas Indonesia Library
cover
Salindeho, Rosalind Robertina
"Upaya pengembangan kelistrikan desa di Indonesia, pada dasarnya mempunyai dua tujuan utama, yaitu meningkatkan segi material dan segi spiritual dari masyarakat desa itu sendiri. Seperti dimungkinkannya peningkatan produktivitas, dimana akan dapat menambah pendapatan masyarakat desa, serta bimbingan--bimbingan, kursus-kursus dan penyuluhan-penyuluhan yang sebelumnya hanya diselenggarakan pada waktu siang hari, akan dapat dilakukan pada waktu malam hari. Segi keagamaan, kegiatan-kegiatan sosial pun dapat lebih ditingkatkan. Listrik mempunyai peranan penting untuk pengembangan pedesaan. Program listrik masuk desa dapat berpengaruh jauh di dalam perkembangan teknologi dan informasi (Soemardian 1990:10).
Sejauh ini pengembangan listrik pedesaan di Indonesia diterapkan dengan berbagai pendekatan seperti unit percontohan dari teknologi energi terbaharui. Terutama bagi desa-desa yang terpencil dan tidak terjangkau oleh jaringan distribusi listrik dari PLN. Listrik untuk pedesaan ini diutamakan dengan memanfaatkan sumber daya energi setempat, diantaranya energi matahari dan air. Serta bisa dikelola koperasi, swasta, atau masyarakat desa itu sendiri. Salah satu unit percontohan ialah listrik mikro-hidro yang terdapat di desa Winong, yang telah menggunakannya selama kurang lebih 5 tahun, dengan memiliki konsumen sebanyak 141 Kepala Keluarga.
Penerapan listrik mikro-hidro ini memerlukan dukungan sikap penduduk desa itu sendiri. Penelitian ini bertujuan untuk mengetahui bagaimanakah sikap penduduk terhadap listrik mikro-hidro. Selain itu apakah sikap tersebut ada hubungannya dengan tingkat pendidikan, tingkat pendapatan dan jenis pekerjaan.
Kegunaan penelitian ini ialah:
1. Untuk mendapatkan data/bukti-bukti empiris tentang sikap penduduk terhadap adanya listrik PLTM.
2. Untuk mendapatkan kejelasan lebih rinci tentang manfaat adanya listrik PLTM di pedesaan.
3. Memperkaya bahan pertimbangan pengambil keputusan dalam upaya meningkatkan kualitas hidup penduduk pedesaan, terutama yang menggunakan listrik mikro-hidro.
4. Memberikan dasar bagi penelitian selanjutnya.
Pengumpulan data melalui kuesioner dan wawancara mendalam pada responden tertentu untuk menunjang hasil penelitian. Sedangkan analisis statistik dilakukan dengan menggunakan skor T untuk mengubah skor mentah dari kuesioner sikap yang menggunakan skala Likert. Berdasarkan skor T tersebut dilakukan penggolongan-penggolongan setuju, tidak setuju, netral. Untuk melihat hubungan antara sikap dengan tingkat pendidikan dan tingkat pendapatan, dan jenis pekerjaan digunakan metode Chi-square (X2) dan Koefisien Kontingensi (C). Penelitian ini mengambil sampel secara random sebanyak 40 orang Kepala Keluarga, karena populasi sampel cukup homogen.
Hasil analisis data menunjukkan bahwa penduduk yang menggunakan listrik PLTM pada dasarnya memiliki sikap setuju atau mendukung terhadap adanya listrik PLTM di desanya yaitu sebanyak 72,5% dan yang bersikap tidak setuju atau tidak mendukung sebanyak 27,5%. Sedangkan berdasarkan uji statistik ada hubungan antara sikap setuju terhadap adanya listrik PLTM dengan tingkat pendidikan dan jenis pekerjaan. Tidak ada hubungan antara sikap setuju dengan tingkat pendapatan. Tidak ada hubungan antara sikap tidak setuju terhadap adanya listrik PLTM dengan tingkat pendidikan, tingkat pendapatan dan jenis pekerjaan.
Penduduk masih banyak yang memiliki persepsi bahwa listrik PLTM adalah lama dengan listrik PLN sehingga timbul ketidak-puasan karena tidak sesuainya harapan dan kenyataan. Hal ini bisa dikatakan kurang berhasilnya program listrik PLTM di desa Winong. Selain itu terbatasnya pengadaan suku cadang mesin-mesin hidro mengganggu penggunaan listrik PLTM. Selain itu walaupun sikap penduduk yang setuju akan adanya listrik PLTM sebesar 72,5%, yang menyatakan tidak memenuhi kebutuhan sebesar 65%.

The effort of developing village?s electricity mainly has two goals: to improve their material needs as well as spiritual life. Such as the possibility to increase people productivity, on one hand, and can improve and increase their income, on the other hand. Besides the other night and day activities can be carried out continually such as courses, counseling. Electricity has contributed some evening creative activities to improve their social needs. It has played a very important role in developing rural life.
Electricity for the Rural Program has affected deeply for rural technology and information (Soemardjan 1990:10), The Development of Rural Electricity in Indonesia has been applied in various approaches such as by sampling-units, of Renewed-Energy Technology. As for remote rural areas in particular where the PLN (State Electricity Central Unit) is unoperationable, power can be gained and supplied by local possible power such as Solar Power and Hydro Power. This can be carried out and operated by social cooperative, private bodies, or by the people themselves. One of the Sampling-Unit is the Micro-Hydro Power (MHP) located in Winong Village which has been operated and used for about five years, supplying 141 families (houses).
The operation of such unit acquires and needs a full support of the villages. This research has taken place to study the attitude towards Micro-Hydro Power itself. Besides, it is also to find out whether such attitude has any relationship with their education, income rate and kind of job.
The purpose of this Research is:
1. To obtain the data and empirical proof on villager?s attitude towards the Micro-Hydro Power.
2. To obtain more detailed information on the need of Micro-Hydro Power in villages.
3. To enriched those who might concern to improve rural people quality of life, especially people who are using micro-hydro electricity.
4. To supply basic data for further research.
The data have been collected by questionnaire and interview to certain people to support the research results. Statistical analysis is used with T score to change raw data from attitude questionnaire which using Likert scales. Based on T score it is done to classify approve, disapprove, and neutral attitude. To know the relations among attitude with educations income rate, and kind of job, chi-square (X2) method is used and contingency coefficient (C). The sampling technique is random sampling, with 40 family heads because of the homogenous of sample population.
The data analysis has pointed out that villagers, who have been using MHP, basically have had an approval and supporting attitude toward the existence of MHP they are 72,5%, and 27,5% villagers with disapproval attitude. From the statistical test, it is found that there is a relation among people's approval attitude with educational level, and kind of job. There is no relation between people's approval attitude with income level. There is no relation among people's disapproval attitude toward HHP with educational level, income level and kind of job.
There are a lot of villagers perception that MHP is the same with Government Electricity (PLN) so that dissatisfied happened because of the reality is against the expectation. This is because of the unsuccessful MHP in Winong village, and the limitation of MHP spare-parts. Besides even though there is 72,5% people's approval of MHP but there is 85% said that unsatisfied using.
"
Jakarta: Program Pascasarjana Universitas Indonesia, 1992
T-Pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Niko Lastarda
"Dalam melayani sebuah sistem kelistrikan dibutuhkan pembangkit yang handal dan efisien. Pembangkit Listrik Tenaga Gas Uap PLTGU merupakan salah satu pilihan pembangkit thermal yang mempunyai kriteria tersebut. Terdapat beberapa jenis konfigurasi PLTGU. Khusus untuk PLTGU dengan dua turbin gas memliki dua jenis konfigurasi, yaitu konfigurasi 2G-2H-3S dua turbin gas, dua HRSG, tiga turbin uap dan konfigurasi 2G-2H-1S dua turbin gas, dua HRSG, satu turbine uap . Mode operasi dari setiap jenis konfigurasi menghasilkan keandalan dan efisiensi yang berbeda.
Penelitian ini bertujuan untuk menghitung efisiensi dan keandalan dari dua jenis konfigurasi PLTGU yang menggunakan dua turbin gas, sehingga dapat menentukan pengaruh jenis konfigurasi terhadap efisiensi dan keandalan PLTGU. Dengan menggunakan metode energi input ouput untuk menentukan besar efisiensi dan dengan menghitung Equivalent Availability Factor EAF untuk mendapatkan faktor kesiapan atau keandalan pembangkit.
Dari hasil perhitungan didapatkan konfigurasi 2G-2H-1S memliki nilai efisiensi yang lebih tinggi dari konfigurasi 2G-2H-3S, terhitung Untuk mode operasi Full Blok Cycle konfigurasi 2G-2H-1S memliki efisiensi maksimum 55.5 sedangkan konfigurasi 2G-2H-3S efisiensi maksimum 53.5 . Sedangkan untuk nilai keandalan konfigurasi 2G-2H-3S lebih handal dibandingkan dengan konfigurasi 2G-2H-1S. Untuk mode operasi Full Blok Cycle memliki 93.39 EAF, sedangkan konfigurasi 2G-2H-3S 92.62 EAF. Dari segi keekonomian kedua jenis konfigurasi memiliki nilai kelayakan, dimana untuk konfigurasi 2G-2H-1S lebih ekonomis dilihat dari NPV 371,286,536 USD dan IRR 12 serta waktu pengembalian modal yang relative lebih cepat 9 tahun. Dengan mengetahui konfigurasi PLTGU yang handal, efisien dan ekonomis dapat dijadikan dasar pengambilan keputusan untuk pemilihan konfigurasi PLTGU yang sesuai dengan kebutuhan beban dasar, beban menengah, atau beban puncak di sebuah sistem kelistrikan.Kata Kunci : EAF, Efisiensi, Keandalan, Konfigurasi PLTGU, PLTGU.

In serving the electrical systems required a reliable and efficient plants. Combined Cycle Power Plant CCPP is one of the thermal power plants that have a selection criteria. There are several types of CCPP configurations. Especially for CCPP with two gas turbines have two types of configurations, the configuration of 2G 2H 3S two gas turbines, two HRSG, three steam turbines and the configuration of 2G 2H 1S two gas turbines, two HRSG, one steam turbine , The mode of operation of each type of configuration produces a different reliability and efficiency.
This study aimed to quantify the efficiency and reliability of two types of power plant configuration that uses two gas turbines, so as to determine the effect of this type of configuration on the efficiency and reliability of the CCPP. By using the input energy ouput to determine the efficiency and to calculate Equivalent Availability Factor EAF to obtain readiness factors or reliability of the power plant. From the results of the calculation.
Calculation resulting from the configuration of 2G 2H 1S has a higher efficiency values of configuration 2G 2H 3S, accounting for full block cycle operating modes configuration 2G 2H 1S discount maximum efficiency of 55.5 , while the configuration of 2G 2H 3S efficiency a maximum of 53.5 . As for the value of reliability configuration 2G 2H 3S is more reliable than the configuration of 2G 2H 1S. For full block cycle operating modes discount EAF 93.39 , while the configuration 2G 2H 3S 92.62 EAF. In terms of economics both types of configurations have a feasibility value, which for configuration 2G 2H 1S more economical views of NPV 371,286,536 USD and IRR 12 and the payback time is 9 years faster. By knowing the configuration of a reliable, efficient and economical power plant can be used as a basis for a decision on the selection of CCPP configurations in accordance with based load, medium load, or peak load requirements in an electrical system.
"
Depok: Fakultas Teknik Universitas Indonesia, 2017
T48049
UI - Tesis Membership  Universitas Indonesia Library
cover
Raditia Dwi Putra
"ABSTRAK
Kekurangan listrik di Jakarta dikarenakan peningkatan populasi dan permintaan suplai listrik merupakan salah satu masalah energi yang terus terjadi dalam kehidupan sehari-hari. Membangun pembangkit listrik baru tidak akan menjadi solusi karena lahan kosong di Jakarta sangat langka, sempit, dan sangat mahal. Slaah satu solusi untuk mengurangi masalah ini adalah dengan memodifikasi pembangkit listrik yang sudah ada untuk menghasilkan daya yang lebih besar. Sebuah proyek yang mengimplementasikan pendinginan mekanis di pembangkit listrik tenaga gas Tanjung Priok mempunyai tujuan untuk meningkatkan daya bersih keluaran ABB GT13E1 dan juga meningkatkan efisiensi termal dengan mendinginkan udara ambien di inlet turbin gas menuju temperatur ISO (15°C) menurut manufaktur. Skripsi ini mengimplementasikan pendinginan mekanis dengan menggunakan R717 (Amonia) sebagai refrigeran, memanfaatkan penampungan energi termal (TES) dengan tujuan untuk menurunkan kapasitas pendinginan dan juga sebagai parameter untuk mengkalkulasi kapasitas pendingin. Perhitungan akhir akan menunjukan bahwa daya bersih keluaran turbin gas akan meningkat 1,258%, atau sekitar 15 MW.

ABSTRACT
Electricity shortages in Jakarta due to an increase of population and also an overwhelming increase of electricity supply is one of the problems of energy that still happens in our everyday lives. Building new power plants will not be a solution to this problem since vacant lands in Jakarta is very rare, incapacious, and very expensive. One of the solution to this problem is to modify existing power plants so that it produces more power. The project to implement mechanical refrigeration in Tanjung Priok gas power plant is aiming to increase the net power output that the ABB GT13E1 produces and also its thermal efficiency by cooling the ambient air at the inlet gas turbine to the ISO temperature (15°C) according to the manufacturer. This thesis implements mechanical refrigeration cycle using R717 (Ammonia) as the refrigerant, utilize a Thermal Energy Storage in order to reduce mechanical chiller capacity and calculate the cooling load based on the capacity of the Thermal Energy Storage. The final calculations will show that the net power output of the gas turbine will indeed increase 1.258%, about 15 MW total. "
Fakultas Teknik Universitas Indonesia, 2015
S59811
UI - Skripsi Membership  Universitas Indonesia Library
cover
Afdal Gilang Adhitya
"Permintaan listrik terus meningkat secara linear seiring dengan populasi manusia, dan sebagai pulau yang berkependudukan banyak, Bali telah mengalami peningkatan dalam permintaan energi. Pada jam-jam puncak, beban dasar tenaga listrik yang harus disediakan oleh pembangkit listrik di Pesanggaran meningkat. Pada jam-jam inilah tiga buah turbin gas dioperasikan untuk menyediakan tenaga listrik tambahan yang dibutuhkan. Akan tetapi,dikarenakan temperature udara sekitar lebih tinggi dari temperature ISO, yaitu 15oC, gas turbin tidak dapat beroperasi dengan kemampuan efisiensi maksimumnya, dan ini akan menyebabkan penurunan di daya listrik yang dihasilkan. Dengan menginstal pendingin mekanis sebagai sistem pendingin udara masuk turbin, temperatur ISO untuk udara masuk dapat dicapai. Hal ini dilakukan dengan mendinginkan temperatur ambient sebelum masuk ke sistem, yang berakibat peningkatan efisiensi termal gas turbin dari 35.6% ke 36.5% dan juga meningkatkan daya keluaran dari 36.95 MW ke 41.48 MW.

Demands of electricity increases linearly with the population, and as a populous island, Bali has seen a significant increase in the demand of this energy. During peak hours, the base load power that Pesanggaran power plant need to provide increases. It is during these hours that three gas turbines operate to provide the additional power required. However, since ambient air temperatures are above the ISO temperature of 15oC, the gas turbines do not operate at their maximum efficiency, and this, in turn, decreases their power output. With the implementation of a mechanical chiller as a turbine inlet air cooling system, an ISO temperature for the inlet air can be achieved. This is done by cooling the ambient air before entering the system, resulting in an increase in thermal efficiency from 35.6% to 36.5%, and also an increase in power output from 36.95 MW to 41.48 MW."
Fakultas Teknik Universitas Indonesia, 2015
S59805
UI - Skripsi Membership  Universitas Indonesia Library
cover
Mustafa Kamal
"Rasio elektrifikasi adalah rasio antara rumah tangga yang memiliki akses listrik dan rumah tangga yang tidak memiliki akses listrik. Pada tahun 2014 Indonesia memiliki rasio elektrisikasi sebesar 81 , yang berarti terdapat sekitar 19 rumah tangga di Indonesia tidak memiliki akses listrik. Kondisi geografik Indonesia yang menyebabkan banyak daerah terpencil, daerah yang sulit terjangkau oleh jaringan listrik nasional. Untuk mengatasi masalah ini, area-area tersebut harus memiliki kemampuan untuk menghasilkan listrik sendiri karena memperpanjang jaringan listrik nasional merupakan solusi yang memakan biaya yang sangat besar. Turbin turgo merupakan turbin impuls yang biasa dipakai untuk nilai yang head tinggi. Akan tetapi penelitian-penelitian menyebutkan turbin turgo salah satu turbin tercocok untuk implementasi piko hidro yang memiliki head rendah. Mangkuk dari turbin turgo terdiri dari sebuah inlet dan outlet dengan sebuah kurva yang menghubungkan kedua nya. Kurva pada studi ini akan dibuat dari kurva lingkaran yang sederhana untuk mempermudah manufaktur. Kondisi danau Salam Universitas Indonesia yang memiliki head sebesar 2,7 m dan debit aliran sebesar 0,021 l/s dijadikan kondisi acuan untuk mendesain turbin turgo pada studi ini. Empat buah mangkuk telah didesain menggunakan perhitungan segitiga kecepatan yang sederhana, dengan setiap mangkuk memiliki jari-jari lingkaran kurva yang berbeda yakni 50 mm, 55 mm, 60 mm, dan 62,2 mm, 70 mm, 73 mm, 75 mm, and 80 mm. Simulasi Computational Fluid Dynamics CFD dilakukan untuk mengetahui kondisi aliran pada tiap mangkuk untuk mencari peforma terbaik. Model CFD yang digunakan adalah multifasa tiga dimensi. Hasil dari simulasi adalah mangkuk dengan jari-jari lingkaran 70 mm memiliki peforma yang terbaik dengan nilai effisiensi sebesar 29,2.

Electrification ratio is a ratio between household that has access to electricity and those who don rsquo t. In 2014 Indonesia has a 81 electrification ratio, which means that 19 of households do not have electricity access. Indonesia rsquo s geographic condition causes difficulty in many areas to be connected to the national electrical grid, these areas are called remote areas. To overcome these problems, those areas must have the capability to generate their own electricity as extending the national grid would be a costly investment. The turgo turbine is an impuls turbine usually used on a high head condition but previous studies stated that turgo turbine is a suitable turbine for pico hydro implementation that usually has a low head. The turgo rsquo s cup consists of an inlet and outlet trail with a curve that joins them. The curve in this study will be made from a simple circle arc to improve manufacturablity. The condition on Salam lake Universitas Indonesia that has a 2.7 m head and a flow rate of 0.021 l s becomes the reference condition to design the turgo turbin in this study. Eight cups were designed using basic calculation derived from the velocity triangles, each having a different circle radius that is used for cup rsquo s curve i.e. 50 mm, 55 mm, 60 mm, 62.2 mm, 70 mm, 73 mm, 75 mm, and 80 mm. Computational Fluid Dynamics CFD simulation is used for figuring the flow condition in each cup to obtain the best efficiency. A multiphase 3D model is used for the simulation. The result of the simulation is that the 70 mm cup has the best peformance with an efficiency of 29.2."
Depok: Fakultas Teknik Universitas Indonesia, 2017
S68207
UI - Skripsi Membership  Universitas Indonesia Library
cover
Dwijaya Febriansyah
"Energi listrik merupakan kebutuhan vital manusia dalam kehidupan sehari-hari yang perlu terus ditingkatkan penyediaannya seiring dengan perkembangan pembangunan agar tersedia dalam jumlah yang cukup, merata dan bermutu. Sampai tahun 2017, masih ada 2.382 desa di Indonesia yang belum teraliri listrik. Peningkatan rasio elektrifikasi dengan perluasan jaringan di daerah terpencil sulit dilakukan karena harga listrik yang tidak ekonomis. Pada daerah terpencil yang berbukit-bukit dan memiliki sumber energi aliran air, pikohidro (<5 kW) bisa menjadi solusi teknologi untuk memenuhi kebutuhan listrik. Penggunaan turbin Turgo untuk pikohidro direkomendasi karena biaya konstruksi yang rendah dan perawatannya yang mudah. Kearifan lokal masyarakat Indonesia melalui pemakaian material lokal sendok batok kelapa sebagai bahan baku mangkok raner turbin Turgo memberikan suatu alternatif desain pembangkit pikohidro yang murah. Dalam studi ini dilakukan perhitungan desain, manufaktur dan pengujian eksperimental turbin Turgo. Studi ini menghasilkan desain raner dengan diameter 0,22 m, jumlah mangkok 16 dengan efisiensi total tertinggi 34,97±0,22% dan daya listrik tertinggi 6,75±0,02 W dengan pemakaian diameter nosel 10 mm dengan tinggi jatuh 3,18±0,02 m dan debit 37,3±0,13  LPM.

Electrical energy is a vital human need in everyday life that needs to be continuously improved in line with the national development so that it is available in sufficient, equitable and quality. Until 2017, there are still 2.382 villages in Indonesia have not yet been electrified. Increasing the electrification ratio by expanding networks in remote areas is difficult because of uneconomical electricity prices. In remote areas that are hilly and have a water source, pico hydro (<5 kW) can be a technological solution to meet electricity needs. The use of the Turgo turbine for pico hydro is recommended because of its low construction costs and easy maintenance. The local wisdom of Indonesian people through the use of local materials coconut shell spoons as a raw material for Turgo turbine runner provides an alternative design for low cost picohydro power plant. This study have done design calculations, manufacturing and testing of Turgo turbine. Results of this study are a runner design with a diameter of 0,22 m, number of cups 16 with the highest total efficiency of 34,97±0,22% and the highest electrical power of 6,75±0,02 W with a nozzle diameter of 10 mm, head 3,18±0,02 m and discharge 37,3±0,13 LPM."
Depok: Fakultas Teknik Universitas Indonesia, 2019
T53324
UI - Tesis Membership  Universitas Indonesia Library
cover
Manurung, Dharma
"Kepulauan Seribu bagian dari Provinsi DKI Jakarta yang memiliki lebih dari 110 pulau dengan rasio elektrifikasi 100%. Pasokan listrik untuk pulau-pulau pemukiman di wilayah Kepulauan Seribu dipasok oleh PLN dengan sistem interkoneksi on-grid pada SKLTM sepanjang 76,79 km. Sementara listrik di Pulau Sebira dipasok menggunakan PLTD yang disediakan oleh PEMDA. Untuk meningkatkan keandalan sistem SKLTM sirkit I di Kepulauan Seribu, SKLTM sirkit II akan dibangun sepanjang 72,7 km pada 2018-2021. Berdasarkan uraian diatas, studi ini mendesain ulang sistem pasokan listrik dengan 100% pembangkit energi terbarukan di 11 pulau pemukiman di Kepulauan Seribu, yaitu sistem hibrid PLTS,PLTB, PLTD dan PLTBn CPO. Radiasi matahari tahunan rata-rata di Kepulauan Seribu adalah 5,08 kWh/m2/hari dan kecepatan angin tahunan rata-rata pada ketinggian 50 m adalah 3,29 m/s. Untuk mengoptimalkan sistem hibrid tersebut, maka digunakan perangkat lunak HOMER Pro versi 3.11.2 berdasarkan nilai Biaya Produksi Bersih (NPC) dan Biaya Listrik (CoE) terendah. Studi ini menunjukkan bahwa 7 pulau pemukiman direkomendasikan menggunakan hibrid PLTS-PLTB-PLTD seperti Pulau Sebira dengan persentase 59,3% (PLTS), 38,2% (PLTB) dan 2,5% (PLTD) dengan CoE 0,162 US$/kWh dan NPC US$ 1.336.418. Untuk 4 pulau pemukiman lainnya direkomendasikan hanya menggunakan 100% PLTBn CPO seperti Pulau Tidung dengan CoE US$ 0,297/kWh dan NPC US$ 21.919.058.

Thousand Islands of Jakarta which has more than 110 islands with electrification ratio of 100%. The electricity supply for the inhabitant islands in Thousand Islands is supplied by PLN with the on-grid interconnecting system by SKLTM along 76.79 km. Meanwhile Sebira Island is supplied from PLTD by PEMDA. To increase the SKLTM line I reliability, SKLTM line II will be built along 72.7 km (2018-2021). Based on the description, this thesis will redesign the electricity supply system 100% renewable energy power plants in 11 inhabitant islands of Thousand Islands, namely the hybrid system of PLTS, PLTB, PLTD and PLTBn CPO. Average annual solar radiation in the Thousand Islands is 5.08 kWh/m2/day and the annual average wind speed at an altitude of 50 m is 3.29 m/s. To optimize the hybrid system, HOMER Pro 3.11.2 version is used based on the lowest NPC and CoE value. The study showed that 7 inhabitant islands are recommended using Hybrid PV-Wind-Diesel such as Sebira Island about 59.3% (PLTS), 38.2% (PLTB) and 2.5% (PLTD) with CoE 0.162 US$/kWh and NPC US$ 1,336,418.Other 4 inhabitant islands are recommended using 100 % PLTBn CPO only such as Tidung Island with CoE 0.297 US$/kWh and NPC US$ 21,919,058."
Depok: Fakultas Teknik Universitas Indonesia, 2020
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Lubis, Muhammad Naufal
"Menurut Bank Dunia, sekitar 23 dari populasi yang hidup di daerah terpencil tidak memiliki akses listrik. Hal ini dikarenakan beberapa faktor seperti daerah yang terpencil maupun penghasilan populasi yang rendah. Salah satu solusi yang dapat digunakan untuk mengatasi masalah ini adalah melalui pembangkit listrik tenaga air skala piko. Beberapa penelitian telah mengembangkan desain turbin air yang optimum, terutama Turbin Turgo. Salah satu faktor penting dalam pembangkitan listrik di daerah terpencil adalah keterjangkauan dan portabilitas dari teknologi. Penelitian ini berusaha mencari solusi dengan cara merancang Turbin Turgo yang terjangkau dan portable menggunakan bahan baku sendok. Ancanganya adalah turbin berbahan baku sendk yang dapat dibuat dengan hanya Rp 1.000.000. Turbin kemudian di uji coba pada suatu instalasi. Hasilnya, turbin Turgo terjangkau ini dapat menghasilkan daya sebesar 36.7 W dengan nilai Head sebesar 56 m dan debit sebesar 2.371 l/. Turbin terjangkau ini juga dapat dibandingkan dengan turbin Pelton yang dibuat dengan 3D-printing dari riset-riset sebelumnya. Karena itu, turbin terjangkau ini dapat digunakan sebagai solusi untuk pembangkitanlistrik di daerah terpencil.

According to the World Bank, about 23 of the world rsquo s rural population still lacks access to electricity. This is due to factors such as the remote areas and the low income of the population. A solution that can be implemented to tackle this problem is through the utilization of Pico Hydropower generation. Several studies have developed the optimum designs and parameters in the operation of water turbines, specifically the Turgo turbine. One of the most important factor in rural power generation is the affordability and portability of the technology. This study seeks to find a solution by designing a low cost, portable Turgo turbine manufactured using spoons. The design s a low cost spoon based Turgo turbine that can be manufactured with around IDR 1.000.000. The turbine is then tested in an experiment installation to observe the performance of the Turgo turbine. As the result, the low cost Turgo turbine can generate power as high as 36.7 W under the condition of head 3.56m and water flow of 2.37 l s. The low cost turbine is also comparable with a 3D printed Pelton turbines used in previous studies. Thus the low cost turbine can serve as a solution for rural electrification"
Depok: Fakultas Teknik Universitas Indonesia, 2018
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Zainal Abidin Al Jufri
"Saat ini kebutuhan listrik semakin meningkat sehingga berbagai macam inovasi dilakukan untuk memenuhi kebutuhan tersebut. Salah satunya dengan meningkatkan kapasitas listrik yang dihasilkan oleh turbin gas. Untuk meningkatkan kapasitas listrik yang dihasilkan perlu dilakukan peningkatan suhu masukan turbin. Akan tetapi peningkatan suhu masukan turbin dapat merusak material blade. Untuk mencegah terjadinya kerusakan dilakukan proses pendinginan dengan metode blowing. Dengan teknologi ini diharapkan turbin dapat menerima masukan dengan suhu tinggi yaitu 1800°C tanpa merusak material blade sehingga listrik dengan kapasitas tinggi dapat dicapai. Proses blowing dilakukan dengan mengalirkan udara pendingin ke permukaan blade dengan suhu 177°C melalui lubang pendingin yang berbentuk spanwise. Pada proses ini akan terbentuk interface antara aliran udara pendingin dan aliran utama karena adanya perbedaan kecepatan. Peristiwa ini disimulasikan untuk menjaga suhu permukaan blade dari batas ketahanan material yaitu 640°C. Simulasi dilakukan menggunakan perangkat lunak Computational Fluid Dynamic (CFD) yaitu COMSOL Multiphysics. Dari simulasi diperoleh rasio blowing yang optimum yaitu pada M = 0,6 dengan empat lubang pendingin dengan jenis spanwise. Posisi lubang pendingin untuk sisi cekung ditempatkan pada koordinat x = 0 dan 0,113. Sedangkan untuk sisi cembung ditempatkan pada koordinat x = 0 dan 0,0858. Dengan konfigurasi ini suhu keseluruhan permukaan blade berada di bawah 640°C.

Today the demand for electricity is increasing so that various innovations made to meet those needs. One of them is by increasing the capacity of the electricity generated by gas turbines. To increase the capacity of electricity is necessary to increase the temperature of the turbin inlet. However, the increase in temperature can damage turbine blade material. To prevent the°Ccurrence of the damage, blowing method is used to cooling the blade surface. With this technology is expected turbine can accept input at high temperature of 1800°C without damaging the blade material so that electricity with high capacity can be achieved. Blowing process is carried out by flowing cool air into the blade surface with a temperature of 177°C through coolant holes. In this process will form the interface between the cooling air flow and the main flow caused by any difference in velocity. This phenomena are simulated to maintain the surface temperature of the blade below the material endurance limit is 640°C. Simulations performed using software Computational Fluid Dynamic (CFD) is COMSOL Multiphysics. From the simulations obtained optimum blowing ratio is at M = 0.6 with four cooling holes with a kind spanwise. The position of cooling hole for concave side is placed at coordinates x = 0 and 0,113. As for the convex side is placed at coordinates x = 0 and 0.0858. With this configuration the overall temperature of the surface of the blade is under 640°C."
Depok: Universitas Indonesia, 2015
S59779
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>