Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 158391 dokumen yang sesuai dengan query
cover
Rezki Zakaria
"Proyek FEED (Front End Engineering Design) Pembangunan Booster Pump Station Batang Heavy Oil di Rokan Hilir, Riau yang dilaksanakan oleh PT Solusi Energy Nusantara merupakan bagian dari Proyek Strategi Nasional National Capital Integrated Coastal Development (NCICD). Praktik keinsinyuran ini adalah mensimulasikan perancangan dan analisis sebuah sistem tenaga listrik dengan menggunakan software engineering ETAP (Electrical Transient Analysis Power) power station 19.5. ETAP mampu bekerja dalam keadaan offline untuk simulasi tenaga listrik dan online untuk pengelolaan data real-time dengan metode pendekatan studi aliran daya (load flow study). Metode pendekatan aliran daya yang akan digunakan dalam praktik keinsinyuran ini adalah metode Newton-Rhapson dengan faktor ketelitian 0,0001. Dari hasil analisis simulasi dan teori aliran daya, maka didapatkan nilai level tegangan dari peralatan listrik yang dihasilkan masih dalam batas yang diperbolehkan, yaitu ± 5%. Power supply dari PLN dengan hasil level tegangan, 20 kV Medium Voltage switchgear (100%); 6,6 kV Medium Voltage Switchgear (99,06%) dan 0,4 kV Low Voltage Switchgear (99,72%), sedangkan power supply dari EDG (Emergency Diesel Generator) diperoleh dengan hasil level tegangan 6,6 kV Medium Voltage switchgear (100%) dan 0,4 kV Low Voltage switchgear (99,3%). Praktik keinsinyuran dilaksanakan mulai dari pengumpulan data sampai dengan pembuatan laporan telah memenuhi aspek profesionalisme, KEI dan K3LL.

The FEED (Front End Engineering Design) Project for the Construction of the Batang Heavy Oil Booster Pump Station in Rokan Hilir, Riau implemented by PT Solusi Energy Nusantara is part of the National Capital Integrated Coastal Development (NCICD) National Strategy Project. This engineering practice is to simulate the design and analysis of an electrical power system using ETAP (Electrical Transient Analysis Power) power station 19.5 engineering software. ETAP is able to work offline for power simulation and online for real-time data management with the load flow study approach method. The power flow approach method that will be used in this engineering practice is the Newton-Rhapson method with an accuracy factor of 0.0001. From the results of simulation analysis and power flow theory, it is obtained that the voltage level value of the electrical equipment produced is still within the allowed limit, which is ± 5%. Power supply from PLN with voltage level results, 20 kV Medium Voltage switchgear (100%); 6.6 kV Medium Voltage Switchgear (99.06%) and 0.4 kV Low Voltage Switchgear (99.72%), while power supply from EDG (Emergency Diesel Generator) is obtained with voltage level results 6.6 kV Medium Voltage switchgear (100%) and 0.4 kV Low Voltage switchgear (99.3%). Engineering practices carried out from data collection to report writing have fulfilled aspects of professionalism, KEI and HSE."
Depok: Fakultas Teknik Universitas Indonesia, 2023
PR-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Rezki Zakaria
"Proyek FEED (Front End Engineering Design) Pembangunan Booster Pump Station Batang Heavy Oil di Rokan Hilir, Riau yang dilaksanakan oleh PT Solusi Energy Nusantara merupakan bagian dari Proyek Strategi Nasional National Capital Integrated Coastal Development (NCICD). Praktik keinsinyuran ini adalah mensimulasikan perancangan dan analisis sebuah sistem tenaga listrik dengan menggunakan software engineering ETAP (Electrical Transient Analysis Power) power station 19.5. ETAP mampu bekerja dalam keadaan offline untuk simulasi tenaga listrik dan online untuk pengelolaan data real-time dengan metode pendekatan studi aliran daya (load flow study). Metode pendekatan aliran daya yang akan digunakan dalam praktik keinsinyuran ini adalah metode Newton-Rhapson dengan faktor ketelitian 0,0001. Dari hasil analisis simulasi dan teori aliran daya, maka didapatkan nilai level tegangan dari peralatan listrik yang dihasilkan masih dalam batas yang diperbolehkan, yaitu ± 5%. Power supply dari PLN dengan hasil level tegangan, 20 kV Medium Voltage switchgear (100%); 6,6 kV Medium Voltage Switchgear (99,06%) dan 0,4 kV Low Voltage Switchgear (99,72%), sedangkan power supply dari EDG (Emergency Diesel Generator) diperoleh dengan hasil level tegangan 6,6 kV Medium Voltage switchgear (100%) dan 0,4 kV Low Voltage switchgear (99,3%). Praktik keinsinyuran dilaksanakan mulai dari pengumpulan data sampai dengan pembuatan laporan telah memenuhi aspek profesionalisme, KEI dan K3LL.

The FEED (Front End Engineering Design) Project for the Construction of the Batang Heavy Oil Booster Pump Station in Rokan Hilir, Riau implemented by PT Solusi Energy Nusantara is part of the National Capital Integrated Coastal Development (NCICD) National Strategy Project. This engineering practice is to simulate the design and analysis of an electrical power system using ETAP (Electrical Transient Analysis Power) power station 19.5 engineering software. ETAP is able to work offline for power simulation and online for real-time data management with the load flow study approach method. The power flow approach method that will be used in this engineering practice is the Newton-Rhapson method with an accuracy factor of 0.0001. From the results of simulation analysis and power flow theory, it is obtained that the voltage level value of the electrical equipment produced is still within the allowed limit, which is ± 5%. Power supply from PLN with voltage level results, 20 kV Medium Voltage switchgear (100%); 6.6 kV Medium Voltage Switchgear (99.06%) and 0.4 kV Low Voltage Switchgear (99.72%), while power supply from EDG (Emergency Diesel Generator) is obtained with voltage level results 6.6 kV Medium Voltage switchgear (100%) and 0.4 kV Low Voltage switchgear (99.3%). Engineering practices carried out from data collection to report writing have fulfilled aspects of professionalism, KEI and HSE.
"
Depok: Fakultas Teknik Universitas Indonesia, 2023
PR-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Andri Rahadian Fikri
"Untuk menjaga kelancaran kegiatan produksi industri diperlukan sistem proteksi yang memenuhi persyaratan keandalan, selektifitas, sensitifitas dan kecepatan. Semua persyaratan ini bergantung kepada pengaturan peralatan proteksi. Pada skripsi ini penulis menguji kehandalan sistem serta pengaturan rele proteksi pada panel MVMDB C2 Plant PT. Asahimas menggunakan program ETAP dan MELSHORT. Dari hasil simulasi, didapatkan hasil tegangan jatuh terbesar pada LV C2-6 yaitu 95,29%. Analisa hubung singkat pada Trafo TR-4 dengan hasil sebesar 63,3 kA. Lalu ketika disimulasikan gangguan hubung singkat tiga fasa sebesar 0,754 kA, rele arus lebih outgoing C2F4 bekerja selektif dengan waktu trip sebesar 443 ms.

To maintain the running of industrial production, protection system that meets the requirements of reliability, selectivity, sensitivity and speed is needed. All of these depend on the settings of the protective equipment. In this thesis, the authors test the reliability and the protection relay settings on the MVMDB of C2 Plant PT. Asahimas using the ETAP and MELSHORT. From simulation, voltage drop was found with the largest on LV C2-6 with 95.29%. Short circuit analysis on Transformer TR-4 with 63,3 kA. When 0.754 kA short circuit three phase fault occurs, C2F4 overcurrent relay works selectively with 443 ms trip time."
Depok: Fakultas Teknik Universitas Indonesia, 2021
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Aditya Putranto
"Pada tahun 2022, konsumsi listrik per kapita di Indonesia mencapai 1.172 kWh, dan perkiraan menunjukkan bahwa angka tersebut akan terus meningkat sejalan dengan pertumbuhan ekonomi yang diharapkan mencapai 5,3% pada tahun 2023. Oleh karena itu, peningkatan kapasitas pembangkit listrik dari sumber energi baru terbarukan (EBT) menjadi suatu kebutuhan. Oleh karena itu, untuk mencukupi kebutuhan listrik masyarakat Indonesia, maka diperlukan sebuah jaringan distribusi listrik yang andal dan efisien agar kualitas listrik yang disuplai dapat terjaga dengan baik. Terdapat berbagai metode untuk menghitung indeks keandalan, salah satunya aalah metode section technique. Metode section technique merupakan metode yang membagi sistem menjadi beberapa bagian atau "section" yang lebih kecil dan menganalisis keandalan setiap bagian tersebut secara terpisah. Setelah itu, keandalan keseluruhan sistem dihitung dengan menggabungkan keandalan dari setiap bagian tersebut. Penelitian ini mengimplementasikan metode section technique untuk menghitung indeks keandalan SAIDI dan SAIFI di GH0092 dan hasilnya kemudian dibandingkan dengan dengan hasil pemodelan jaringan melalui perangkat lunak ETAP 19.0.1 serta standar SPLN 68 – 2 : 1986 dan IEEE Std. 1366 – 2000 untuk dievaluasi tingkat keandalannya. Hasil akhir menunjukkan bahwa GH0092 memiliki tingkat keandalan yang sudah memenuhi standar SPLN 68 – 2 : 1986 atau batas standar keandalan yang ada di Indonesia, namun belum memenuhi standar keandalan IEEE Std. 1366 – 2000. Hasil indeks keandalan yang diperoleh yakni indeks SAIDI sebesar 9.3103 jam/tahun dan indeks SAIFI sebesar 0.9241 kali/tahun . Hasil tersebut kemudian dievaluasi dengan melakukan rekonfigurasi jaringan dan menghasilkan indeks keandalan SAIDI sebesar 0.9614 jam/tahun dan indeks SAIFI sebesar 0.0262 kali/tahun. Namun, rekonfigurasi jaringan tidak disarankan untuk menjadi strategi dalam menaikkan indeks keandalan karena membutuhkan biaya yang tinggi dan juga proses operasional yang kompleks.

In 2022, Indonesia's per capita electricity consumption reached 1,172 kWh, and projections indicate that this figure will continue to rise in line with the expected economic growth of 5.3% in 2023. Therefore, increasing the capacity of power plants from new renewable energy sources (EBT) becomes a necessity. To meet the electricity needs of the Indonesian people, a reliable and efficient electricity distribution network is required to ensure the quality of the supplied electricity is well maintained. There are various methods to calculate reliability indices, one of which is the section technique method. The section technique method divides the system into several smaller parts or "sections" and analyzes the reliability of each part separately. Then, the overall system reliability is calculated by combining the reliability of each section. This study implements the section technique method to calculate the SAIDI and SAIFI reliability indices in GH0092, and the results are then compared with network modeling results through ETAP 19.0.1 software as well as SPLN 68 – 2: 1986 and IEEE Std. 1366 – 2000 standards to evaluate the level of reliability. The final results show that GH0092 has a reliability level that meets the SPLN 68 – 2: 1986 standard or the existing reliability standards in Indonesia but does not yet meet the IEEE Std. 1366 – 2000 reliability standards. The obtained reliability indices are a SAIDI index of 9.3103 hours/year and a SAIFI index of 0.9241 times/year. These results were then evaluated by reconfiguring the network, resulting in a SAIDI reliability index of 0.9614 hours/year and a SAIFI reliability index of 0.0262 times/year. However, network reconfiguration is not recommended as a strategy to improve the reliability index because it requires high costs and complex operational processes."
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Dhany Harmeidy Barus
"Pembangkit Listrik Tenaga Bayu (PLTB) merupakan salah satu energi terbarukan yang cukup populer dan sudah banyak dikembangkan karena kelebihannya sebagai energi bersih, berbahan bakar murah, serta biaya investasinya yang cenderung semakin ekonomis. Tetapi di sisi lain PLTB termasuk pembangkit bersifat intermiten yang disebabkan adanya fluktuasi alami (variability) dan kesalahan prediksi (uncertainty) dari daya keluaran PLTB tersebut. Kondisi ini berpotensi menyebabkan gangguan sistem serta pemadaman listrik konsumen yang cukup besar, bahkan sampai terjadi blackout. Untuk itu diperlukan model integrasi PLTB yang tepat dalam menentukan kebutuhan tambahan cadangan operasi yang optimal sebagai antisipasi sifat intermiten PLTB tersebut, sehingga sistem tenaga listrik dapat tetap beroperasi secara andal dan ekonomis.
Penelitian ini bertujuan menentukan model algoritma untuk menghitung kebutuhan tambahan cadangan operasi harian yang dinamis dan optimal pada integrasi PLTB di sistem Sulawesi bagian Selatan (Sulbagsel). Dengan menggunakan usulan algoritma Multi-Stage Statistical Approach (MSSA) maka dapat diketahui karakteristik daya keluaran PLTB pada sistem Sulbagsel. Kemudian hasil analisa tersebut diolah dengan menggunakan usulan algoritma Seasonal Daily Variability and Uncertainty (SDVU) berbasis Hybrid Artificial Intelligence (Hybrid AI) untuk memprediksi pola variability dan uncertainty dari data yang ada untuk menghitung parameter Dynamic Confidence Level (DCL). Hasil DCL tersebut kemudian digunakan untuk menghitung kebutuhan optimal tambahan cadangan operasi harian yang dibutuhkan.
Dari beberapa alternatif Hybrid AI yang digunakan, diketahui bahwa kombinasi Seasonal Auto Regressive Moving Average (SARIMA) dan Long Short-Term Memory (LSTM) menghasilkan prediksi yang paling akurat dan konsisten, baik untuk data variability maupun uncertainty. Dampak signifikan dari penelitian ini ditunjukkan dengan adanya potensi penghematan biaya bahan bakar pembangkit rata-rata sekitar 250 milyar rupiah per tahun untuk kebutuhan tambahan cadangan operasi saat dibandingkan dengan metoda eksisting yang menggunakan parameter Static Confidence Level (SCL) dengan tingkat keandalan yang sama.

Wind Power Plant (WPP) is part of renewable energy which is quite popular and has been widely developed due to its advantages as clean energy, cheap fuel, and decreasing trend of its investment cost. But on the other hand, WPP is part of Variable Renewable Energy (VRE) due to natural fluctuation (variability) and forecast errors (uncertainty) of the wind power output. This situation has the potential to cause significant system disturbance and costumer power outages, even blackouts. For this reason, a WPP integration model is needed in determining the optimum operational operating reserve to anticipate of the intermittent nature of the WPP, so that the electric power system can be operated reliably and economically.
This study aims to determine the algorithm model to calculate the need for additional dynamic and optimal daily operational reserves for the integration of WPP in the Southern Sulawesi power system. By using the first proposed method, Multi-Stage Statistical Approach (MSSA) algorithm, the characteristics of the wind power output can be discovered. Then the results of the analysis are processed using the second proposed method, Seasonal Daily Variability and Uncertainty (SDVU) algorithm based on Hybrid Artificial Intelligence (Hybrid AI) to forecast variability and uncertainty patterns of the observed data in calculating Dynamic Confidence Level (DCL) parameters. The DCL results are then used to determine the optimal daily additional operating reserve.
Among the Hybrid AI variants, it is concluded that the combination of Seasonal Auto Regressive Moving Average (SARIMA) and Long Short-Term Memory (LSTM) produces the most accurate and consistent forecast, both for variability and uncertainty data. The significant impact of this research is indicated by the potential cost savings of around 250 billion rupiah per year on average for additional operational reserves when compared to the existing method using Static Confidence Level (SCL) parameters with the same level of reliability.
"
Depok: Fakultas Teknik Universitas Indonesia, 2022
D-pdf
UI - Disertasi Membership  Universitas Indonesia Library
cover
Yuwono Wicaksono
"Listrik merupakan sebuah kebutuhan primer di zaman teknologi saat ini. Tak terkecuali di dalam dunia industri. Karena kebutuhan akan listrik yang memiliki ketahanan terhadap gangguan, maka diciptakanlah alat-alat yang mendukung hal tersebut agar system listrik tidak menganggu kegiatan produksi di dunia industri.
PT. Chevron Pacific Indonesia yang bergerak dibidang eksplorasi minyak bumi, sangat membutuhkan listrik dengan tingkat kehandalan yang tinggi. Pada tahun 2005, diadakan pembelian produk Static Transfer Switch (STS) untuk meningkatkan produksi minyak mereka. Hal ini diharapkan dapat menjadi solusi akan energy yang efisien dan tahan terhadap gangguan.
Static Transfer Switch adalah sebuah alat elektronik yang dapat memindahkan secara cepat sumber tenaga listrik dari satu sumber ke sumber lainnya tanpa harus mematikan beban. Kecepatan waktu perpindahan dapat diartikan, jika satu sumber mati, maka STS mengalihkan sumber ke sumber cadangan dengan sangat cepat sehingga beban tidak dapat merasakan pengalihan tersebut. STS dapat melakukan transfer antara dua sumber dengan kecepatan kerja empat sampai 20 milidetik sehingga dapat digunakan untuk mengamankan beban dalam jumlah besar dan beberapa fasilitas lainnya dari gangguan singkat. Kedua buah sumber harus memiliki karakteristik yang tidak jauh berbeda, sehingga beban akan benar-benar tidak terganggu.

Electricity is a primary need in this era of technology, including in the industrial sector. Therefore, to fulfill the demand of reliable electricity against disturbance; there is a necessity to create electrical devices which are designed to meet the required standards in the industrial sector in order to keep the production running.
PT. Chevron Pacific Indonesia , a multinational energy company specifically specializes in the oil exploration, is one of the big industries in high needs. In 2005, this company applied the Static Transfer Switch (STS) so that the oil production would keep increasing. The STS is expected to be part of solution of efficient and resilient energy against disturbance.
Static Transfer Switch is an electronic device that functions to switch the supply of electricity instantly from one source to other source without having to deactivate the connected load. The switching is such a rapid-timing process that the load would not even affected. STS can deal a transfer between two sources within only 4 to 20 milliseconds. This allows STS to safely protect even the massive load and other components from brief disturbance. One of the requirements to make the STS work in full capacity is that the both sources must have similar characteristics so that the load will not be greatly affected.
"
Depok: Fakultas Teknik Universitas Indonesia, 2008
S51039
UI - Skripsi Open  Universitas Indonesia Library
cover
Zico Muhammad Achlazzikry
"Dalam suatu perusahaan minyak dan gas, sistem tenaga listrik sangat berperan penting dalam proses pengolahan produksi. Oleh karena itu pada suatu sistem tenaga listrik dibutuhkan sistem proteksi yang baik. Salah satu gangguan yang sering terjadi pada suatu sistem tenaga listrik adalah gangguan beban berlebih. Pada skripsi ini akan dibahas mengenai suatu metode sistem proteksi untuk menanggulangi gangguan beban berlebih yang dikenal sebagai metode pelepasan beban dengan menggunakan rele frekuensi pada sistem tenaga listrik CNOOC SES Ltd. Gangguan berlebih yang terjadi adalah akibat lepasnya generator, dimana pada skripsi ini akan dibuat beberapa skenario kejadian lepasnya generator untuk melihat respon frekuensi sistem.
Dengan melakukan metode pelepasan beban, diharapkan frekuensi sistem dapat kembali pulih ke frekuensi nominal dengan beban yang dilepaskan seminimal mungkin. Oleh sebab itu diperlukan pembuatan prioritas beban dan beberapa pengaturan pada rele frekuensi. Untuk membuktikan keefektifannya dilakukan simulasi menggunakan perangkat lunak ETAP 12.6.0 dengan sebelumnya melakukan pemodelan sistem tenaga listrik CNOOC SES Ltd. Dari hasil simulasi terbukti bahwa skema pelepasan beban yang dibuat berhasil memulihkan frekuensi sistem setelah terjadi gangguan dengan tahap pelepasan sesuai dengan yang diharapkan.

In an oil and gas company, the power system plays an important role in the production process. Therefore, a power system required a good protection system. One of the most common disturbances in a power system is overloading. In this essay will be discussed about a method of protection system to overcome the overload known as the load shedding method by using under frequency relay on the power system of CNOOC SES Ltd. Overload that occurs is due to the trip fault of the generator, which in this essay will be made some scenarios of generator trip to see the response of frequency system.
By doing the load shedding method, it is expected that the system frequency can be recovered to the nominal frequency with the load that released is as minimum as possible. Therefore we need to make the priority of load and some settings on the under frequency relay. To prove the mehthod effectiveness, in this essay will be made some simulation using software ETAP 12.6.0 with previously modeling the power system of CNOOC SES Ltd. The simulation results proved that the load shedding scheme that is created successfully recover the frequency of the system after a disturbance with the shedding phase as expected.
"
Depok: Fakultas Teknik Universitas Indonesia, 2018
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Hanindito Titah Prameswara
"Salah satu contoh penerapan energi baru terbarukan EBT yang sedang berkembang adalah Pembangkit Listrik Tenaga Surya PLTS. Berdasarkan data Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) PT PLN (Persero) 2019-2028 disebutkan bahwa potensi energi matahari (surya) di Indonesia sebesar 207.898 MW (4,80 kWh/m2/hari) dan hanya sebesar 78,5 MW kapasitas terpasang di Indonesia. Pada penelitian ini dilakukan studi interkoneksi PLTS 5 MWp dengan jaringan tegangan menengah 20 kV Daerah X sebagai salah satu penerapan energi baru terbarukan di Indonesia. Studi interkoneksi mencakup analisis aliran daya dan analisis gangguan hubung singkat tiga fasa. Pada analisis aliran daya diperoleh hasil bahwa sistem PLTS mampu menyuplai kebutuhan beban pada sistem sebesar 5.000 kW daya aktif. Didapatkan juga bahwa interkoneksi PLTS dengan sistem mengakibatkan kenaikan level tegangan dari setiap bus pada sistem sebesar 0,08-1,41%, serta membuat perubahan persentase pembebanan komponen sebesar 0,01% hingga 93,01%. Hasil analisis gangguan hubung singkat tiga fasa menunjukkan bahwa interkoneksi PLTS dengan sistem memiliki besar nilai arus gangguan hubung singkat sebesar 5,70-7,01 kA, sehingga nilai arus gangguan untuk seluruh bus masih jauh di bawah nilai kapasitas pemutusan arus hubung singkat sistem proteksi yang bernilai 25 kA. Hasil studi interkoneksi yang diperoleh menujukkan bahwa interkoneksi sistem PLTS 5 MWp dengan jaringan tegangan menengah 20 kV Daerah X dapat dilakukan.

One example of the application of new renewable energy that is currently developing is solar power plant. Based on data from Rencana Usaha Penyediaan Tenaga Listrik (RUPTL) PT PLN (Persero) 2019-2028, it is stated that the potential of solar energy in Indonesia is 207,898 MW (4.80 kWh/m2/ day) and only 78.5 MW of capacity installed in Indonesia. In this study, a 5 MWp solar power plant was interconnected with a 20 kV medium-voltage network of Area X as one of the renewable energy applications in Indonesia. Interconnection studies include power flow analysis and three phase short circuit fault analysis. In the analysis of the power flow results obtained that the Solar Power Plant system is capable of supplying the load requirements to the system of 5,000 kW active power. It was also found that interconnection of solar power plant with the system resulted in an increase in the voltage level of each bus in the system by 0.08 to 1.41%, as well as changing the percentage of component loading by 0.01% -93.01%. The results of the three-phase short circuit fault analysis show that the interconnection of the solar power plant system has a short circuit fault current value of 5.70-7.01 kA, so the fault current value for the whole bus is still far below the value of the short circuit current capacity of the protection systems short circuit worth 25 kA. The results of the interconnection study showed that interconnection of a 5 MWp solar power plant system with a 20 kV medium voltage network Area X can be carried out."
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Kukuh Kurniawan
"Pembangkit listrik memikul beban energi listrik yang senantiasa berubah. Oleh karena itu, kemampuan manuver pembangkit listrik untuk selalu mengikuti perubahan set-point harus baik. Pengendalian pembangkit listrik tenaga fosil menggunakan pengendali feedforward berbasis neural network bertujuan agar pembangkit memiliki kemampuan manuver yang baik. Pembahasan meliputi perancangan dekopler dan pengendali feedforward berbasis neural network.
Analisa dilakukan terhadap kemampuan dekopler mengurangi interaksi yang terjadi pada sistem multivariabel dan perbandingan unjuk kerja antara sistem dengan pengendali konvensional PID dan pengendali feedforward berbasis neural network. Simulasi dilakukan dengan bantuan perangkat lunak Matlab versi 6.5.
Dari simulasi, dapat dilihat bahwa sistem dengan pengendali feedforward berbasis neural network memiliki kemampuan manuver lebih baik dibandingkan dengan pengendali PID, hanya saja kekurangannya %OS masih lebih dari 10%. Oleh karena itu, pada simulasi terakhir dilakukan pengaturan ulang parameter Kp, Ki, dan Kd untuk memperbaiki transien respon sistem."
Depok: Fakultas Teknik Universitas Indonesia, 2005
S40075
UI - Skripsi Membership  Universitas Indonesia Library
cover
Robby Julian
"Daerah X merupakan salah satu daerah di Indonesia dengan rasio elektrifikasi yang belum mencapai 100 (seratus) persen. Pertumbuhan penduduk dan peningkatan produk domestik bruto pada daerah X juga akan memacu pertumbuhan beban. Penyambungan Pembangkit Listrik Tenaga Surya (PLTS) dapat membantu menyelesaikan permasalahan tersebut dengan memberikan suplai tenaga listrik tambahan guna meningkatkan performa pelayanan sistem tenaga listrik daerah X. Pada penelitian ini sistem tenaga listrik daerah X dievaluasi perbandingan arus hubung singkatnya, serta tegangan dan pembebanan pada bus dengan analisis loadflow sebelum dan sesudah penyambungan PLTS dengan melakukan simulasi aliran beban dan hubung singkat. Dari hasil simulasi ditemukan bahwa penyambungan PLTS pada sistem tenaga listrik daerah X menghasilkan peningkatan nilai tegangan pada setiap bus dalam rentang yang masih sesuai dengan standard SPLN 1:1978 yaitu lebih dari 90% dan dibawah 105% nilai tegangan nominal bus, di mana nilai tegangan tertinggi terdapat pada bus 2 sebesar 67,759 kV (96,8% tegangan nominal bus) sementara nilai tegangan terendah terdapat pada bus 3 sebesar 18,253 kV (91,27% tegangan nominal bus) serta meningkatkan arus hubung singkat pada 7, 9, dan 29 dengan peningkatan tertinggi terdapat pada bus 9 sebesar 1,85% dan peningkatan terendah pada bus 29 sebesar 0,48%

Area X is one of many in Indonesia that has not yet reached 100 (a hundred) percent electrification ratio. Increment in population and gross domestic product of area X will also spur load growth rate. Connecting Solar Power Plant (PLTS in Indonesian) can help solve those setbacks by providing additional electrical power supply to enhance the performance of service in area X power system. In this study, area X power system will be evaluated in the difference it experiences before and after PLTS connection in terms of short circuit and bus voltage level as well as loading percentage using loadflow simulation. It is found from the simulation that a connection of PLTS to Area X power system causes an increase in voltage on every bus within range of tolerance of SPLN 1:1978 which is more than 90% and less than 105% of bus nominal voltage, where the highest bu voltage is on bus 2 with 67,759 kV (96,8% of bus nominal voltage) while the lowest bus voltage is on bus 3 with 18,263 kV (91,27% of bus nominal voltage), as well as increases the short circuit current on bus 7,9 dan 29 with the highest increase on bus 9 by 1,85% and the lowest increase on bus 29 by 0,48%"
Depok: Fakultas Teknik Universitas Indonesia, 2019
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>