Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 125174 dokumen yang sesuai dengan query
cover
Tjong, Herbert Thiery
"Infrastructure is one of the main important boosts in economy and technology advancement in Indonesia. Infrastructure that supports and facilitates the equipment for a country to develop, especially by technology such as Science Techno Park is an important infrastructure. However, just like buildings construction in general it still has significant number of casualties during the process of construction. Hence, the improvement of the construction safety program is a must and must be pursued vigorously, one way is by implementing an integrated to technology base method such as the spatial information integration. It has aim to identify and improve the safety risk plan of the construction. The output of the research will identify the risk and hazard factors of the upper structure work and its target and safety program as well. Finally, the research will deliver a construction safety strategy in order to have a good impact towards the work safety performance. From the research output, it is obtained the risk score assessment hence knowing the ranking of the risks. The risk relative score will then be used as an input for the technology-based application for the simulation. It is expected that the implementation of the method can contribute to the development of construction work safety with technology applications.

Infrastruktur adalah salah satu faktor pendukung ekonomi dan kemajuan teknologi di Indonesia. Infrastruktur yang mendukung fasilitas perkembangan negara, terutama aspek teknologi seperti Science Techno Park (STP) adalah infrastruktur yang penting. Namun, sama halnya dengan Gedung pada umumnya bangunan tersebut memiliki jumlah korban yang banyak pada konstruksi. Maka, perkembangan dari program keselamatan konstruksi merupakan keharusan, salah satunya dengan metode integrasi berbasis teknologi seperti metode integrasi informasi spasial. Metode tersebut memiliki tujuan mengidentifikasi dan memperbaiki rencana risiko pekerjaan konstruksi. Hasil dari riset ini akan diidentifikasi risiko dan bahaya pekerjaan dari paket struktur atas beserta target dan sasaran programnya. Yang terakhir, riset ini akan memperkenalkan strategi baru dalam keselamatan konstruksi dengan dampak baik pada performa keselamatan pekerjaan. Dari hasil riset, akan diperoleh skor risiko pekerjaan yang akan diketahui urutan bahaya pekerjaan. Skor bahaya pekerjaan ini merupakan input untuk aplikasi basis teknologi yang digunakan untuk implementasi. Harapannya adalah implementasi metode ini dapat berkontribusi pada perkembangan keselamatan konstruksi dengan aplikasi teknologi.
"
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Mochammad Rafly Putra Asmara
"Konstruksi merupakan industri besar yang melibatkan banyak pemangku kepentingan. Dalam mendirikan suatu bangunan, keselamatan konstruksi merupakan hal yang sangat penting. Konstruksi bangunan merupakan penyumbang terbesar terjadinya kecelakaan kerja. Hal ini disebabkan perencanaan keselamatan sebagian besar pemangku kepentingan konstruksi masih menggunakan pendekatan tradisional terutama di negara berkembang. Penelitian ini menganalisis pendekatan teknologi BIM dan VR untuk meningkatkan kinerja keselamatan. Penelitian ini menggunakan Synchro by Bentley untuk memperbaiki jadwal dan aktivitas konstruksi menjadi jadwal konstruksi keselamatan yang dihasilkan dari penggunaan konsep “Koordinasi Spasial” yang memungkinkan sinkronisasi mendeteksi aspek eksternal dari bahaya. Penelitian ini juga memanfaatkan Virtual Reality sebagai solusi atas bahaya yang terjadi secara internal dalam aktivitas. Kombinasi kedua teknologi tersebut menciptakan peningkatan keselamatan konstruksi dalam lingkup bahaya eksternal dan internal.

Construction is a massive industry that involving a lot of stakeholders. In constructing a building, the safety construction is the crucial thing. Building construction is the biggest contributor for the work accident. This is due to the safety planning that mostly construction stakeholders still used the traditional approach especially in the developing country. This research is analysing the approach of BIM and VR technologies to improve the safety performance. This research is using Synchro by Bentley to improve the construction schedule and activity into a safety construction schedule which generated from the usage of the concept “Spatial Coordination” that allows the synchro to detect the external aspect of hazard. This research is also using the Virtual Reality to be the solution for the hazard that are occur internally in the activity. With the two technologies combination creating an improvement for construction safety in the scope of external and internal hazard."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Rossy Armyn Machfudiyanto
"Sistem Manajemen Keselamatan Konstruksi (SMKK) adalah sistem perlindungan bagi pekerja dan jasa konstruksi yang meminimalkan dan menghindari kerugian moral dan material, kehilangan waktu kerja dan keselamatan orang dan lingkungan, yang kemudian dapat didukung secara lebih efektif dan efisien. Petunjuk pengenalan Sistem Manajemen Keselamatan Konstruksi di Indonesia diatur dengan nomor urut Peraturan Menteri PUPR No. 10 Tahun 2021. Penelitian ini memberikan sasaran dan program keselamatan konstruksi terkhusus pada pekerjaan struktur atas pembangunan gedung science techno park di Universitas Indonesia. Analisis data dilakukan dengan menyusun dan mendiskusikan hasil wawancara dengan para pakar keselamatan konstruksi. Kemudian, dilakukan kajian hasil observasi di lokasi proyek atau observasi langsung dan hasil evaluasi Sistem Manajemen Keselamatan Konstruksi. Data dan studi literatur yang tersedia sebagai bahan pendukung. Berdasarkan penelitian ini, disimpulkan bahwa sasaran dan program keselamatan konstruksi perlu dilakukan dan dirancang sejak masa pra konstruksi agar dapat mengidentfikasi bahaya dan risiko untuk setiap aktivitas pekerjaan. Pelaksanaan sasaran dan program keselamatan konstruksi telah memberikan dampak positif yang berkelanjutan berdasarkan penelitian terdahulu, sehingga diperlukan adanya sasaran dan program keselamatan konstruksi yang diterapkan pada pembangunan gedung science techno park di Universitas Indonesia. Integrasi dengan Building Information Modeling (BIM) antara Identifikasi Bahaya, Potensi Risiko, Penentuan Pengendalian Risiko, dan Peluang (IBPRP) dan schedule dengan layout proyek merupakan langkah digitalisasi dalam merencanakan keselamatan konstruksi agar penerapannya lebih efisien dan terintegrasi dengan baik. Hal ini juga membantu proses monitoring keselamatan konstruksi, karena proses Building Information Modeling (BIM) terjadi secara real time.

The Occupational Health and Safety Management System (OHSMS) is a protection system for construction workers and services that minimizes and avoids moral and material losses, lost work time, and the safety of people and the environment, which can then be supported more effectively and efficiently. Instructions for introducing Occupational Health and Safety Management System in Indonesia are regulated by the serial number of PUPR Ministerial Regulation Number 10 of 2021. This research provides targets and construction safety programs specifically for installing superstructures on the construction of science techno park building at University of Indonesia. Data analysis was carried out by compiling and discussing the results of interviews with Occupational Health and Safety experts. Then, the results of observations at the project site or direct observation. Furthermore, Occupational Health and Safety Management System evaluation results data and literature studies are available as supporting materials. Based on this research, it was concluded that construction safety goals and programs need to be carried out and designed from pre-construction to identify hazards and risks for each work activity. The implementation of construction safety goals and programs has had a sustainable positive impact based on previous research, so it is necessary to have construction safety goals and programs implemented in the construction of science techno park building at University of Indonesia. The integration of Building Information Modeling, Hazard Identification Risk Assessment and Determine Control, and work schedule with project layout are one of digitalization method to make efficiency in site. Also, this technology make an easy method to control and monitor healty and safety, because by using Building Information Modeling, all the platform is real time."
Depok: Fakultas Teknik Universitas Indonesia, 2023
PR-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Muhammad Al-Bagir
"Penambahan biaya pada proyek konstruksi adalah fenomena yang tidak diinginkan baik bagi klien maupun pemangku kepentingan di industri ini. Hal ini seringkali menyebabkan persilisihan hubungan kerja, penurunan kualitas proyek dan gangguan lingkungan. Beberapa pakar menyebutkan bahwa pembengkakan biaya merupakan konsekuensi dari kecelakaan konstruksi yang memengaruhi kinerja proyek. Penelitian ini bertujuan untuk mengintegrasikan IBPRP dengan BIM agar memberikan informasi kepada para praktisi konstruksi mengenai informasi risiko serta pengendalian dan rencana biaya pengendalian pada proyek konstruksi dengan metode survei responden analisis penilaian risiko dan juga integrasi IBPRP dengan BIM. Penelitian ini menghasilkan sebuah metode atau formula untuk menginformasikan IBPRP dan rencana biaya pengendaliannya dengan bantuan BIM.

Cost overrun in construction projects is an undesirable phenomenon for both clients and stakeholders in this industry. It often leads to disputes, decreased project quality, and environmental disruptions. Some experts state that cost escalation is a consequence of construction accidents that affect project performance. This research aims to integrate IBPRP (Identification of Hazards, Risk Assessment, and Risk Control) with BIM (Building Information Modeling) to provide information to construction practitioners regarding risk information, risk control, and cost control planning in construction projects through respondent survey methods, risk assessment analysis, and IBPRP-BIM integration. This research results in a method or formula to inform IBPRP and its cost control plan with the assistance of BIM."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Najla Farhan Hafiz
"Berdasarkan data Kementerian PUPR pada tahun 2022, sebagian besar jembatan nasional berada dalam kondisi tidak baik. Kondisi dan kelaikan operasional jembatan sebagai infrastruktur pendukung pertumbuhan ekonomi menjadi salah satu hal yang perlu dijaga oleh pengelola dengan melaksanakan pekerjaan pemeliharaan dan perawatan. Namun, pekerjaan pemeliharaan dan perawatan jembatan sebagai bagian dari industri konstruksi memiliki potensi kecelakaan kerja yang tinggi. Berbagai upaya telah dilakukan untuk mengurangi potensi kecelakaan dalam industri konstruksi seperti perencanaan keselamatan konstruksi berbasis ruang lingkup proyek. Selain itu, penggunaan teknologi konstruksi BIM dalam perencanaan dan penyampaian informasi keselamatan dapat memungkinkan pencegahan dan pengendalian risiko bersamaan dengan pelaksanaan pekerjaan. Penelitian ini bertujuan untuk mengembangkan integrasi perencanaan keselamatan konstruksi berbasis WBS dengan BIM berupa visualisasi 3D untuk aktivitas berisiko pada pekerjaan pemeliharaan dan perawatan jembatan serta pengaruhnya terhadap kinerja keselamatan konstruksi. WBS sebagai pernyataan lingkup proyek mengidentifikasi elemen dan aktivitas berisiko untuk perencanaan keselamatan konstruksi dan visualisasi 3D dengan BIM berdasarkan skenario pelaksanaan pekerjaan dan jenis kerusakan yang terjadi. Visualisasi RKK berbasis WBS dengan BIM yang dilakukan pada 55 elemen dan 476 aktivitas dalam standar WBS yang memiliki tingkat risiko besar dan sedang memiliki pengaruh dalam meningkatkan kinerja keselamatan konstruksi, terutama pada elemen SMKK penerapan kebijakan dan pelaksanaan program keselamatan konstruksi.

Based on data from the Ministry of Public Works in 2022, most of Indonesia’s bridges are in poor condition. The condition and operational feasibility of bridges as a infrastructure that supports economic growth needs to be maintained by carrying out maintenance and preservation work. However, bridge maintenance and preservation work as part of the construction industry has a high potential for work accidents. Various efforts have been made to reduce the potential for accidents in the construction industry such as project scope-based construction safety planning. In addition, the use of BIM construction technology in the planning and delivery of safety information can enable risk prevention and risk control throughout the project lifecycle. This research aims to develop the integration of WBS-based construction safety planning with BIM in the form of 3D visualization for risky activities in bridge maintenance and preservation work and its effect on construction safety performance. WBS as a project scope statement identifies risky elements and activities for construction safety planning and 3D visualization with BIM based on work implementation scenarios and types of damage that occur on bridge elements. Visualization of WBS-based safety plan with BIM carried out on 55 elements and 476 activities in the WBS standard that have a large and medium risk level has an influence in improving construction safety performance, especially on the elements of construction safety management system which are policies implementations and construction safety programs."
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Miftahil Alawiyah
"Universitas merupakan tempat dimana berbagai interaksi dan aktivitas terjadi antara dosen, mahasiswa, karyawan, kontraktor, dan pengunjung di berbagai tempat di kawasan kampus. Semakin meningkatnya pembangunan gedung bertingkat di Universitas Indonesia maka kecelakaan kerja akan semakin tinggi akibat adanya kegiatan konstruksi di kawasan Universitas Indonesia. Selain itu, kegiatan konstruksi yang berlangsung di kawasan Universitas memiliki risiko yang tinggi terhadap orang – orang yang beraktivitas disekitarnya. Sehingga diperlukan sebuah perencanaan Keselamatan Konstruksi (K2) pada area di kawasan UI Depok. Salah satu pekerjaan pada pelaksanaan konstruksi yang sangat berisiko adalah pada pekerjaan struktur atas gedung bertingkat tinggi sehingga perlu dilakukan analisis untuk mengurangi terjadinya kecelakaan kerja. Penelitian ini berpedoman pada Permen PUPR No.10 Tahun 2021 dengan tujuan untuk menganalisis kebutuhan sumber daya K2 pada pekerjaan struktur atas gedung bertingkat tinggi untuk mengurangi kecelakaan kerja. Objek dari penelitian ini adalah Gedung Perkuliahan FTUI. Metode penelitian yang digunakan adalah studi literatur, wawancara, dan validasi pakar. Hasil penelitian menunjukkan bahwa terdapat beberapa kebutuhan sumber daya K2 yang harus dipenuhi untuk memastikan keselamatan konstruksi. Berdasarkan penelitian ini, dapat disimpulkan penerapan manajemen keselamatan konstruksi berdasarkan Permen PUPR No.10 Tahun 2021 dapat membantu mengurangi terjadinya kecelakaan kerja.

Universities are places where various interactions and activities occur between lecturers, students, employees, contractors, and visitors in various places in the campus area. The increasing construction of high-rise buildings at the University of Indonesia will increase work accidents due to construction activities in the University of Indonesia area. In addition, construction activities that take place in the University area have a high risk to people who are active around it. Therefore, Construction Safety planning is needed in the area in the UI Depok area. One of the jobs in the implementation of construction that is very risky is the work of the upper structure of a high-rise buildings so it needs to be analyzed to reduce the occurrence of work accidents. This research is guided by Permen PUPR No.10 of 2021 to analyze the need for construction safety resources in the work of the upper structure of high-rise buildings to reduce work accidents. The object of this research is the FTUI Lecture Building. The research methods used are literature studies, interviews, and expert validation. The results showed that there are several construction safety resource requirements that must be met to ensure construction safety. Based on this research, it can be concluded that the implementation of construction safety management based on Permen PUPR No.10 of 2021 can help reduce the occurrence of work accidents."
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Almira Putri Nurindra
"Proyek konstruksi merupakan sektor berisiko tinggi dan kecelakaan kerja yang terjadi bernilai hampir tiga kali lipat dari rata-rata sektor lainnya. Penggunaan BIM atau Building Information Modeling ke dalam perencanaan konstruksi dapat membantu dan meningkatkan keselamatan konstruksi menjadi lebih efisien dan efektif. Namun, menurut beberapa penelitian terdahulu, tingkat implementasi BIM di Indonesia masih tergolong rendah akibat beberapa faktor. Oleh karena itu, pengembangan perencanaan keselamatan konstruksi berbasis BIM pada pekerjaan jembatan beton precast akan dilakukan pada penelitian ini. Metode yang digunakan pada penelitian ini adalah metode kualitatif. Hasil dari penelitian ditemukan bahwa pada pekerjaan struktur atas, perkerasan, drainase, dan aksesoris jembatan beton precast memiliki 180 potensi bahaya serta 269 potensi risiko. Adapun potensi bahaya dengan tingkat risiko tinggi, antara lain jatuh dari ketinggian, girder terjatuh atau runtuh, putusnya sling crane maupun segment terjatuh dari crane, serta tertimpa material dan alat selama proses konstruksi. Perencanaan keselamatan konstruksi yang dilakukan pada penelitian ini, akan diintegrasikan ke dalam BIM berupa safety plan dengan tujuan penyedia informasi perencanaan K2 dan mengidentifikasi kebutuhan K2 serta safety visual dengan tujuan mengidentifikasi kebutuham sumber daya APK dan mengestimasi jumlah kebutuhan maupun lokasi penempatannya. Pengembangan perencanaan keselamatan konstruksi berbasis BIM ini dapat meningkatkan kinerja keselamatan konstruksi pada jembatan beton precast.

Construction projects are high-risk sectors, and the rate of workplace accidents is nearly three times higher than the average in other sectors. The use of BIM or Building Information Modeling in construction planning can help improve construction safety to be more efficient and effective. However, according to several previous studies, the level of BIM implementation in Indonesia is still relatively low due to several factors. Therefore, the development of BIM-based construction safety planning for precast concrete bridge work will be carried out in this research. The method used in this research is a qualitative method. The results of the study found that in the work on the superstructure, pavement, drainage, and accessories of precast concrete bridges, there are 180 potential hazards and 269 potential risks. High-risk potential hazards include falling from heights, falling or collapsing girders, broken crane slings, segments falling from cranes, and being hit by materials and tools during the construction process. The construction safety planning carried out in this research will be integrated into BIM in the form of a safety plan aimed at providing Safety Construction planning information and identifying Safety Construction needs as well as safety visuals aimed at identifying the need for PPE resources and estimating the amount needed and their placement locations. The development of BIM-based construction safety planning can improve construction safety performance in precast concrete bridges."
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Mutia Zahra Nurul Aini
"Pembangunan Infrastruktur di Indonesia sedang dilakukan dengan gencar. Infrastruktur seperti Stadion, sebagai salah satu wajah Indonesia, masih  menelan banyak korban dalam pembangunannya. Untuk itu diperlukan sasaran dan program keselamatan konstruksi dengan sumber daya yang memumpuni. Penelitian ini bertujuan untuk merencanakan sumber daya daya keselamatan konstruksi berbasis BIM pada struktur atas Stadion. Dengan menggunakan BIM, perencanaan sumber daya keselamatan konstruksi, akan lebih singkat dan biaya yang dikeluarkan akan lebih rendah. Metode yang digunakan pada penelitian ini adalah dengan menggunakan metode kualitatif ddan kuantitatif. Hasil dari penelitian ini adalah risiko dan faktor bahaya menggunakan WBS pada proyek pembangunan Stadion. Penelitian ini pada akhirnya akan menghasilkan strategi manajemen keselamatan konstruksi dan akan mengukur dampak penggunaan BIM terhadap kinerja keselamatan konstruksi.

Infrastructure is being developed at a high rate in Indonesia. Infrastructures like stadiums, as one of the objects of pride of Indonesia, still claimed many casualties in its construction. Therefore, a construction safety program and goal is needed along with capable resources. One example of such resource is Personal Protective Equipment (PPE). This study aims to create a plan for BIM-based construction safety resource in stadiums' upper structure. By using BIM, the planning of safety resource. The study used qualitative and quantitative methods, and the results found risks and danger factors in using WBS in stadium constructions. Finally, this study will result in a construction safety management strategy and will measure the impact of BIM usage on construction safety performance."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ardian Chandra
"Sebagai negara berkembang, Indonesia memiliki potensi besar dalam investasi infrastruktur, seperti pembangunan rumah susun. Namun, industri konstruksi adalah salah satu sektor dengan tingkat risiko kecelakaan yang lebih tinggi dibandingkan sektor industri yang lain. Kecelakaan kerja dapat menyebabkan berbagai kerugian, baik bagi perusahaan maupun pekerja. Oleh karena itu, peningkatan angka kecelakaan kerja harus menjadi perhatian khusus karena berdampak signifikan pada keselamatan pekerja, produktivitas perusahaan, dan perekonomian. Namun, pembahasan mengenai keselamatan konstruksi pada rumah susun masih sangat minim. Kurangnya informasi mengenai penerapan Sistem Manajemen Keselamatan Kerja (SMKK) pada konstruksi rumah susun menyebabkan tingginya angka kecelakaan kerja. Dalam industri konstruksi, terdapat beberapa upaya untuk mengurangi risiko kecelakaan, salah satunya melalui penyusunan perencanaan keselamatan konstruksi. Penyusunan perencanaan ini diharapkan dapat mengurangi angka kecelakaan kerja di Indonesia. Pada penelitian ini, disusun perencanaan keselamatan konstruksi untuk pekerjaan struktur atas proyek rumah susun. Adapun metode yang digunakan adalah validasi pakar. Hasilnya teridentifikasi 5 paket pekerjaan dan 28 aktivitas pekerjaan dalam Work Breakdown Structure (WBS), 29 potensi risiko dengan kategori bahaya besar dari 133 bahaya dan risiko yang teridentifikasi, 17 sasaran dan program pengendalian. Semua ini dilakukan untuk meningkatkan kinerja keselamatan konstruksi pada pekerjaan struktur atas proyek rumah susun berbasis Work Breakdown Structure (WBS) yang mencakup empat aspek kecelakaan kerja: tenaga kerja, alat, material, dan lingkungan

As a developing country, Indonesia has significant potential for infrastructure investment, such as the construction of flats project. However, the construction industry is one of the sectors with a higher risk of accidents compared to other industries. Workplace accidents can cause various losses for both companies and workers. Therefore, the increasing number of workplace accidents must be given special attention due to its significant impact on worker safety, company productivity, and the economy. However, discussions about construction safety in flats project are still very limited. The lack of information regarding the implementation of SMKK in flats project construction leads to a high number of workplace accidents. In the construction industry, several efforts are made to reduce accident risks, one of which is through the development of a construction safety plan. This planning is expected to reduce the number of workplace accidents in Indonesia. In this study, a construction safety plan is developed for the superstructure work of flats projects. The method used is expert judgement The results identified 5 work packages and 28 work activities within the Work Breakdown Structure (WBS), 29 potential risks categorized as major hazards out of 133 identified hazards and risks, and 17 targets along with control programs. All of these efforts aim to improve construction safety performance in the superstructure work of apartment building projects based on the WBS, which encompasses four aspects of workplace accidents: worker, equipment, materials, and environment."
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Zaidan Ferro Althaf Faried
"In Indonesia, there were 332 construction accidents between 2012 and 2014. In that period, construction projects had the highest accident rate (47%), followed by housing projects (42%) and other projects (11%). Based on data from 2015 to 2020, there have been twenty-five construction incidents. The construction industry in Indonesia has the highest accident rate compared to other industries, namely 32% of the total accidents in this country. Work-related deaths from accidents, slips and falls increased by 5.6 percent in 2021, from 805 deaths in 2020 to 850 in 2021. Falls, slips and ends caused 370 deaths on construction and extraction jobs in 2021, a an increase of 7.2% from 345 deaths in 2020. Despite the increase, this figure is still 9.3 percent lower than in 2019, when 408 construction and extraction workers died as a result of these events (BLS 2021). Flyovers are an important infrastructure component in modern transportation systems, especially in urban areas where space is limited and traffic congestion is a significant problem. In Indonesia, flyovers are becoming increasingly important due to rapid urbanization and the need to increase transport efficiency and reduce pollution. However, there are major concerns during the construction and operation stages of Elevated Railway construction in Indonesia. The complexity of Elevated Railway projects, with elevated structures, complex engineering, and heavy equipment, requires more safety protocols and procedures to protect workers, passengers, and the surrounding environment. Implementing safety planning on elevated routes can effectively mitigate the occurrence of accidents by identifying and dispersing potential hazards, as well as implementing appropriate mitigation to overcome them. This research has 5 objectives, namely: (1) Identifying what activities occur in the structure above the route laying; (2) Identifying hazards and risks from structural work activities on laying lines; (3) Analyze identified risks and hazards; (4) Develop targets and programs based on identified risks and dangers; (5) Submit a construction safety plan based on identified activities, risks and hazards, as well as targets and programs, to improve construction safety performance. The method used is validation from experts in the field of construction safety.

Di Indonesia, terdapat 332 kecelakaan konstruksi antara tahun 2012 dan 2014. Pada periode tersebut, proyek konstruksi memiliki tingkat kecelakaan tertinggi (47%), diikuti oleh proyek perumahan (42%) dan proyek lainnya (11%). Berdasarkan data tahun 2015 hingga 2020, telah terjadi lima puluh insiden konstruksi. Industri konstruksi di Indonesia memiliki tingkat kecelakaan tertinggi dibandingkan industri lainnya, yaitu sebesar 32% dari total kecelakaan di negara ini. Kematian terkait pekerjaan akibat kecelakaan, terpeleset, dan tersandung meningkat sebesar 5,6 persen pada tahun 2021, dari 805 kematian pada tahun 2020 menjadi 850 pada tahun 2021. Jatuh, terpeleset, dan tersandung menyebabkan 370 kematian pada pekerjaan konstruksi dan ekstraksi pada tahun 2021, sebuah meningkat sebesar 7,2% dari 345 kematian pada tahun 2020. Meskipun meningkat, angka ini masih lebih rendah 9,3 persen dibandingkan tahun 2019, ketika 408 pekerja konstruksi dan ekstraksi meninggal akibat peristiwa ini (BLS 2021). Jalur layang merupakan komponen infrastruktur penting dalam sistem transportasi modern, khususnya di wilayah perkotaan dimana ruang terbatas dan kemacetan lalu lintas merupakan permasalahan yang signifikan. Di Indonesia, jalur layang menjadi semakin penting karena pesatnya urbanisasi dan kebutuhan untuk meningkatkan efisiensi transportasi dan mengurangi polusi. Namun, terdapat kekhawatiran besar selama tahap konstruksi dan pengoperasian konstruksi jalur layang di Indonesia. Kompleksitas proyek jalur layang, dengan struktur layang, teknik rumit, dan alat berat, memerlukan lebih banyak protokol dan prosedur keselamatan untuk melindungi pekerja, penumpang, dan lingkungan sekitar. Penerapan perencanaan keselamatan di jalur layang dapat secara efektif memitigasi terjadinya kecelakaan dengan mengidentifikasi dan mengevaluasi potensi bahaya, serta menerapkan mitigasi yang sesuai untuk mengatasinya.Pada penelitian ini memiliki 5 tujuan yaitu: (1) Mengidentifikasi kegiatan apa saja yang ada pada struktur atas jalur laying; (2) Mengidentifikasi bahaya dan risiko dari kegiatan pekerjaan struktur atas jalur laying; (3) Menganalisis risiko dan bahaya yang telah teridentifikasi; (4) Menyusun sasaran dan program berdasarkan risiko dan bahaya yang telah teridentifikasi; (5) Mengembangkan rencana keselamatan konstruksi berdasarkan aktivitas, risiko dan bahaya yang teridentifikasi, serta target dan program, untuk meningkatkan kinerja keselamatan konstruksi. Metode yang digunakan adalah validasi dari ahli pada bidang keselamatan konstruksi."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>