Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 215860 dokumen yang sesuai dengan query
cover
Francesco Theodore Budiman
"Energi listrik merupakan salah satu kebutuhan utama dalam kehidupan modern. Akan tetapi, pertumbuhan penduduk di Indonesia cenderung meningkatkan konsumsi listrik. Sementara itu, ketersediaan energi fosil semakin terbatas. Meskipun potensi energi matahari di Indonesia mencapai 207,8 GWp, pemanfaatan energi surya hanya mencapai peringkat keempat dalam penggunaan energi terbarukan, yakni sebesar 322,6 MW pada tahun 2023. Oleh sebab itu, pengoptimalan penggunaan energi surya melalui sistem pembangkit listrik tenaga surya (PLTS) sangat penting. Gedung Departemen Teknik Elektro Universitas Indonesia dengan konsumsi listrik yang relatif besar dijadikan sebagai lokasi studi. Penelitian mencakup simulasi konfigurasi PLTS Atap On-Grid dan Off-Grid dengan variasi penambahan generator set. PLTS Off-Grid juga disimulasikan dengan jenis Baterai Lead Acid dan Baterai Lithium Ion, dengan biaya komponen masing-masing $235,72/kWh dan $392,87/kWh, serta dengan spesifikasi teknis menurut standar HOMER Pro. Semua konfigurasi dan skema PLTS akan dibandingkan untuk mendapatkan yang paling optimal berdasarkan biaya Net Present Cost (NPC). Hasil simulasi HOMER Pro dan analisis menunjukkan bahwa Baterai Lithium Ion merupakan baterai yang paling optimal untuk PLTS Off-Grid. Penambahan generator set meningkatkan NPC pada sistem On-Grid optimal, tetapi menurunkan NPC pada sistem Off-Grid optimal. PLTS On-Grid akan optimal tanpa penambahan generator set. Sementara, PLTS Off-Grid akan optimal dengan penambahan generator set dan penggunaan Baterai Lithium Ion. Analisis ekonomi dengan parameter Net Present Value (NPV), Internal Rate of Return (IRR), dan Payback Period menunjukkan bahwa PLTS On-Grid tanpa generator set optimal layak untuk diimplementasikan.

Electricity is one of the primary necessities in modern life. However, Indonesia’s population growth tends to increase electricity consumption. Meanwhile, fossil energy availability is becoming increasingly limited. Despite Indonesia’s solar energy potential reaching 207.8 GWp, solar energy utilization only ranked fourth in renewable energy usage, reaching 322.6 MW in 2023. Therefore, optimizing solar energy utilization through solar photovoltaics plants (PLTS) is crucial. The Department of Electrical Engineering Building at the University of Indonesia, with its relatively high electricity consumption, is chosen as the study site. The research includes simulating On-Grid and Off-Grid Rooftop PLTS configurations with variations in the addition of generator set. Off-Grid PLTS is also simulated with Lead Acid and Lithium Ion Batteries, with component costs $235.72/kWh and $392.87/kWh, respectively, and technical specifications according to HOMER Pro standards. All PLTS configurations and schemes will be compared to obtain the most optimal for one based on the Net Present Cost (NPC). The HOMER Pro simulation results and analysis show that adding generator sets increases the NPC in optimal On-Grid system but decreases it in optimal Off-Grid systems. On-Grid PLTS will be optimal without adding a generator set, while Off-Grid PLTS will be optimal with the addition of a generator set and the use of Lithium Ion Batteries. Economic analysis with Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period parameters indicates that optimal On-Grid PLTS without a generator set is feasible for implementation."
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Aero Bestari Wangsaputra
"Permintaan akan energi, khususnya energi listrik, di Indonesia semakin tinggi dan menjadi bagian tak terpisahkan dari kebutuhan hidup masyarakat dan sektor industri. Namun, ketersediaan bahan bakar fosil yang digunakan untuk menghasilkan listrik semakin terbatas, serta polusi yang dihasilkan oleh proses konversi dari bahan bakar fosil tersebut. Indonesia memiliki potensi energi surya sebesar 207,8 GWp Namun, potensi ini belum dimanfaatkan secara optimal. Oleh karena itu, potensi tersebut dapat dioptimalkan dengan instalasi PLTS atap pada bangunan dengan konsumsi listrik tinggi. Gedung MRPQ Universitas Indonesia dengan konsumsi listrik yang relatif tinggi dijadikan sebagai lokasi studi. Penelitian bertujuan untuk mengetahui konfigurasi dan skema paling optimal berdasarkan Net Present Cost (NPC) dan beberapa parameter ekonomi seperti Net Present Value (NPV), Internal Rate of Return (IRR), dan Payback Period. Pada HOMER, dilakukan simulasi dengan konfigurasi On-Grid dan Off-Grid. PLTS On-Grid disimulasikan dengan variasi penambahan generator set, sedangkan PLTS Off-Grid disimulasikan dengan variasi jenis baterai Lead Acid dan Lithium Ion. Hasil simulasi HOMER dan analisis menunjukkan bahwa penambahan generator set pada sistem PLTS On-Grid optimal menghasilkan NPC yang lebih tinggi dibandingkan dengan sistem tanpa generator set. Kemudian, penggunaan baterai jenis Lithium Ion pada sistem PLTS Off-Grid optimal menghasilkan NPC yang lebih rendah dibandingkan dengan baterai jenis Lead Acid. Dengan demikian, PLTS On-Grid tanpa generator set merupakan konfigurasi paling optimal berdasarkan NPC dan layak untuk diimplementasikan berdasarkan NPV, IRR, dan Payback Period.

The demand for energy, especially electrical energy, in Indonesia is increasing and has become an integral part of the needs of society and the industrial sector. However, the availability of fossil fuels used to generate electricity is increasingly limited, as well as the pollution generated by the conversion process of these fossil fuels. Indonesia has a solar energy potential of 207.8 GWp. However, this potential has not been optimally utilized. Therefore, this potential can be optimized by installing rooftop solar power plants (PLTS) on buildings with high electricity consumption. The MRPQ building of the University of Indonesia with relatively high electricity consumption was used as the study site. The research aims to determine the most optimal configuration and scheme based on Net Present Cost (NPC) and several economic parameters such as Net Present Value (NPV), Internal Rate of Return (IRR), and Payback Period. In HOMER, simulations were performed with On-Grid and Off-Grid configurations. On-Grid PLTS is simulated with variations in the addition of generator sets, while Off-Grid PLTS is simulated with variations in the types of Lead Acid and Lithium Ion batteries. HOMER simulation results and analysis show that the addition of a generator set to the optimal On-Grid PLTS system results in a higher NPC compared to the system without a generator set. Then, the use of Lithium Ion batteries in the optimal Off-Grid PLTS system results in a lower NPC compared to Lead Acid batteries. In summary, On-Grid PLTS without a generator set is the most optimal configuration based on NPC and feasible to implement based on NPV, IRR, and Payback Period.

"
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ibadurrahman Ramadhan
"ABSTRAK
Pulau Tunda yang terletak di Kabupaten Serang, Provinsi Banten yang terdiri dari 2000 penduduk saat ini tidak mendapat pasokan listrik dari PLN (Perusahaan Listrik Nasional). Kebutuhan listrik sehari-hari diperoleh dari generator diesel 100 kW yang dioperasikan selama 10 jam per hari dikarenakan biaya operasional yang tinggi pada bahan bakar, itupun dengan harga solar bersubsidi. melihat potensi dari energi matahari yang begitu besar dan kemajuan di bidang panel surya saat ini serta banyaknya lahan yang tersedia, Pulau Tunda memiliki potensi yang besar akan pemanfaatan pembangkit listrik energi baru dan terbarukan. Dengan menggunakan perangkat lunak Pvsyst terlihat bahwa penerapan sistem PLTS di Pulau Tunda sangat cocok untuk diterapkan. Dengan total beban sebesar 735 kWh perhari dibutuhkan sistem dengan total 240 kWp panel surya dengan luas total 1441 m2. Biaya yang dibutuhkan untuk penerapan sistem sejumlah Rp 4.858.915.000 yang jika dibandingkan dengan sistem sebelumnya, net present cost dengan jangka waktu proyek selama 10 tahun maka akan jauh lebih murah..

ABSTRACT
Tunda Island, which is located in Serang Regency, Banten Province, which consists of 2000 residents currently does not get electricity from the National Electric Company (PLN). Daily electricity needs are obtained from a 100 kW diesel generator that is operated for 10 hours per day due to high operational costs on fuel, and even then with the price of subsidized diesel. Seeing the enormous potential of solar energy and the progress in the field of solar panels today and the large amount of land available, Tunda Island has a large potential for the utilization of new and renewable energy power plants. By using Pvsyst software, it is seen that the application of the PV-VP system on Tunda Island is very suitable to be implemented. With a total load of 735 kWh per day a system with a total of 240 kWp of solar panels with a total area of 1441 m2 is needed. The cost needed to implement the system is Rp 4.858.915.000 which, compared to the previous system, the net present cost with a project period of 10 years, will be much cheaper."
Depok: Fakultas Teknik Universitas Indonesia, 2019
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Salma Azra Fatimah
"

Energi listrik adalah salah satu energi yang sangat dibutuhkan demi keberlangsungan hidup manusia dengan peningkatan penggunaan setiap tahunnya. Di Indonesia sendiri, sebagian besar sumber energi pembangkitan listrik masih berasal dari batu bara, sehingga pemerintah menargetkan pengembangan PLTS atap hingga 3,6 GW pada tahun 2025. Demi mendukung program tersebut, PLTS eksisting tetap harus dijaga kinerjanya, di mana salah satu cara untuk menguji keandalan sistem tersebut adalah dengan melakukan evaluasi kinerja mengacu pada standar IEC 61724, yaitu standar untuk mengukur kinerja fotovoltaik. Penelitian ini melakukan studi mengenai implementasi PLTS Atap On-Grid 90 kWp di Gedung Energi 625 Pusat Penelitian Ilmu Penerapan dan Teknologi (Puspiptek), Serpong, Tangerang Selatan. Gedung ini merupakan pusat pengembangan dan penerapan ilmu pengetahuan dan teknologi berbasis penelitian. Sebagai data acuan, akan dilakukan simulasi data seharusnya menggunakan perangkat lunak PVsyst. Berdasarkan simulasi, dihasilkan energi keluaran PLTS tahunan sebesar 130.451 kWh dengan  performance ratio sebesar 81,30% dan capacity factor sebesar 16,21%. Sedangkan, hasil pengukuran menghasilkan energi keluaran tahunan sebesar 102.491 kWh dengan rasio performa sebesar 73,51% dan capacity factor sebesar 13%. Rata-rata penurunan produksi energi tahunan sebesar 6,32% dengan energy performance index yang diperoleh adalah 80,21%.


Electrical energy is one of the most important energies for human life and sustainability with a constant increase in usage every year. In Indonesia, most of the electricity generated comes from coal, resulting in the government targeting solar power plant development up to 3,6 GW by 2025. To support the initiative, all the existing solar power plants have to sustain their performance, and one of the methods is to evaluate the system's performance according to the IEC 61724 standard, which is a standard to measure the performance of photovoltaic. This research is studying the implementation of a 90 kWp On-Grid Rooftop Solar Power Plant in the Energy Building of Pusat Penelitian Ilmu Pengetahuan dan Teknologi (Puspiptek), Serpong, South Tangerang. This government-owned building is used as a center for the development and application of science and technology based on research. For data reference, a simulation with PVsyst software was conducted. Based on simulation, the yearly output energy yielded 130.451 kWh with a performance ratio of 81,30% and a capacity factor of 16,21%. While the measured data obtained a yearly energy output of 102.491 kWh with a performance ratio of 73,51% and a capacity factor of 13%. The average output energy degradation is 6,32% with an acquired energy performance index of 80,21%.

"
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Muhammad Gillfran Samual
"Energi surya semakin dikenal sebagai sumber energi masa depan yang penting karena ketersediaannya yang melimpah dan sifatnya yang terbarukan. Namun, sifat energi surya yang intermiten dapat menyebabkan fluktuasi listrik yang dihasilkan, sehingga sulit menjamin pasokan listrik yang stabil dan andal. Salah satu solusi yang dapat diterapkan adalah dengan menggunakan baterai pada sistem Pembangkit Listrik Tenaga Surya (PLTS) fotovoltaik dengan algoritma pengendalian Simple Moving Average, yang dapat membantu menghaluskan dan meredakan fluktuasi daya keluaran tenaga surya. Parameter yang dapat disesuaikan pada algoritma Simple Moving Average adalah window size atau lebar waktu rerata aritmetika daya keluaran PLTS fotovoltaik. Penelitian ini mengevaluasi pengaruh perubahan parameter window size pada algoritma Simple Moving Average terhadap penghalusan daya keluaran PLTS fotovoltaik yang dihasilkan, dan efek teknis pada baterai yang ditimbulkan. Berdasarkan hasil evaluasi yang dilakukan, peningkatan parameter window size akan memperlambat respons PLTS fotovoltaik terhadap perubahan iradiasi, dan meningkatkan tingkat penghalusan dari daya keluaran PLTS fotovoltaik yang intermiten. Selain itu, meningkatnya window size akan mengurangi daya maksimum yang diterima di sisi beban, dan jumlah energi yang digunakan baterai selama proses penghalusan daya akan meningkat, sehingga kapasitas baterai yang dibutuhkan akan semakin besar.

Solar energy is increasingly recognized as an important future energy source due to its abundant availability and renewable nature. However, the intermittent nature of solar energy can cause fluctuations in the electricity produced, making it difficult to guarantee a stable and reliable electricity supply. One solution that can be implemented is to use batteries in a photovoltaic solar power plant system with a Simple Moving Average control algorithm, which can help smooth and reduce fluctuations in solar power output power. The parameter that can be adjusted in the Simple Moving Average algorithm is the window size or the arithmetic average width of the photovoltaic output power over time. This research evaluates the effect of change of window size parameter in the Simple Moving Average algorithm on the resulting smoothed photovoltaic output power, and the technical effects on batteries. Based on the results of evaluation, the increase of window size parameter will slow down the response of photovoltaic output power to changes in irradiation and increase the smoothing quality of the intermittent photovoltaic output power. In addition, increasing the window size will reduce the maximum power received on the load side, and the amount of energy used by the battery during the power smoothing process will increase, resulting in the increase of required battery capacity."
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Pieter
"Penggunaan bahan bakar fosil memiliki dampak yang berbahaya bagi lingkungan seperti emisi gas rumah kaca. Oleh karena itu, dibutuhkan sebuah energi alternatif yang digunakan sebagai sumber bahan bakar pembangkit listrik yang lebih ramah lingkungan. Pada studi kali ini membahas perancangan interkoneksi yang efisien dalam sistem pembangkit listrik tenaga surya fotovoltaik (PLTS) on-grid dalam jaringan tegangan menengah di Wilayah X. Studi ini menggunakan software seperti DIgSILENT Power Factory, untuk menyelidiki dampak interkoneksi terhadap stabilitas frekuensi dan tegangan. Pada percobaan ini dilakukan beberapa variasi kapasitas PLTS ketika terjadi pemadaman PLTS pada detik ke-5, yang mana kapasitas 2 MW merupakan kapasitas yang optimal. Hal ini dibuktikan dengan nilai frekuensi sebesar 50 Hz dan nilai tegangan sebesar 0.998 pu ketika mencapai kondisi stabil. Selain itu, melalui hasil simulasi dapat disimpulkan jika interkoneksi PLTS dapat mengurangi gangguan arus hubung singkat. Selanjutnya, pada simulasi kestabilan, dengan kondisi salah satu generator padam pada detik ke-5 diperoleh jika sistem sebelum dan sesudah interkoneksi PLTS masih stabil. Percobaan selanjutnya, dengan asumsi pemadaman pada PLTS dan kondisi eksternal (hujan, berawan, mendung, dan gelap) diperoleh jika penggunaan generator cadangan sangat penting untuk menyuplai daya agar memperoleh sistem yang stabil. Kestabilan diperoleh ketika frekuensi berada pada rentang yang berlaku 49.5 Hz - 50.5 Hz dan tegangan berada pada rentang kerja yang sesuai yaitu -10% dan +5%.

The use of fossil fuels has dangerous impacts on the environment such as greenhouse gas emissions. Therefore, an alternative energy is needed that is used as a fuel source for power plants that is more environmentally friendly. This study discusses the design of efficient interconnections in on-grid solar photovoltaic power generation systems (PLTS) in the medium voltage network in Region X. This study uses software such as DIgSILENT Power Factory, to investigate the impact of interconnections on frequency and voltage stability. In this experiment, several variations in PLTS capacity were carried out when the PLTS outage occurred at the 5th second, where a capacity of 2 MW was the optimal capacity. This is proven by a frequency value of 50 Hz and a voltage value of 0.998 pu when it reaches a stable condition. Apart from that, through the simulation results it can be concluded that PLTS interconnection can reduce short circuit current disturbances. Furthermore, in the stability simulation, with the condition that one of the generators goes out at the 5th second, it is found that the system before and after the PLTS interconnection is still stable. The next experiment, assuming a blackout at the PLTS and external conditions (rainy, cloudy, cloudy and dark), showed that the use of a backup generator was very important to supply power to obtain a stable system. Stability is obtained when the frequency is in the applicable range of 49.5 Hz - 50.5 Hz and the voltage is in the appropriate working range, namely -10% and +5%."
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Adhi Devawijaya
"Dalam rangka mendorong pencapaian target bauran energi terbarukan nasional, khususnya energi surya, Pemerintah Indonesia menerbitkan Peraturan Menteri Energi dan Sumber Daya Mineral Nomor 21 Tahun 2021 tentang Pembangkit Listrik Tenaga Surya Atap yang Terhubung dengan Jaringan Tenaga Listrik Pemegang Izin Usaha . Peraturan ini memungkinkan konsumen untuk memasang pembangkit listrik tenaga surya di atap. Sehingga saat ini sudah banyak industri yang membangun PLTS di atap pabrik. Namun, investasi PLTS atap masih menjadi tantangan tersendiri bagi industri, sehingga model bisnis kepemilikan pihak ketiga (TPO) menjadi alternatif solusi untuk mengatasi masalah tersebut. Tujuan dari penelitian ini adalah untuk menganalisis tekno-ekonomi pembangkit listrik tenaga surya atap dengan studi kasus pabrik makanan dan minuman. Metodologi yang digunakan adalah merancang PLTS rooftop menggunakan simulasi homer untuk mendapatkan kapasitas optimal kemudian menganalisa keekonomian untuk mendapatkan tarif terendah dengan metode cash flow menggunakan 12 skenario yaitu skenario 1 untuk suku bunga lokal 10%, skenario 2 untuk suku bunga internasional 2,6%, skenario 3 untuk suku bunga lokal 10% dan tanpa kewajiban TKDN, skenario 4 untuk suku bunga internasional 2,6% dan tanpa tanpa kewajiban TKDN, skenario 5 : skenario 3 dan Insentif Tax Holiday, skenario 6 : skenario 4 dan Insentif Tax Holiday. Skema bisnis TPO dianalisis dengan skema leasing solar performance based rent (PBR). Hasil  yang diperoleh adalah modul PV yang digunakan sebesar 2.100 kW, produksi listrik tahunan PLTS atap sebesar 3.005.331 kWh/tahun, biaya investasi sebesar 1.785.246 USD dengan menggunakan modul PV lokal dan 1.341.424 USD dengan Modul PV Impor. Luas atap yang dibutuhkan adalah 1,19 Ha. Tarif yang diperoleh dari perhitungan 6 skenario adalah 10.23 cent USD/kWh untuk skenario 1; 9,86 cent USD/kWh untuk skenario 2, 7,71 cent USD/kWh untuk skenario 3; 7,4 cent USD/kWh untuk skenario 4; 6,98 cent USD/kWh untuk scenario 5 dan 6,44 cent USD/kWh untuk scenario 6. Selama kontrak TPO, penghematan terbesar terjadi pada skenario 6 dengan potensi penghematan 22.840 USD/Tahun. Penerapan TPO hanya layak untuk skenario 5 dan skenario 6 karena tarifnya lebih rendah dari tarif PLN.

In order to encourage the achievement of the national renewable energy mix target, especially solar energy, the Government of Indonesia issued the Minister of Energy and Mineral Resources Regulation Number 21 Year  2021 concerning Rooftop Solar Power Plants Connected to the Electric Power Grid Holders of Business Licenses. This regulation allows consumers to install rooftop solar power plant. So now many industries have built rooftop solar power plant on factory roofs. However, rooftop solar power plant investment is still a challenge for industry, so the third-party ownership (TPO) business model is an alternative solution to overcome this problem. The purpose of this study is to analyze the techno-economy of rooftop solar power plant with in a case study of the food and beverage factory. The methodology used is to design rooftop solar power plant using homer simulation to get the optimal capacity then analyze the economy to get the lowest tariff with the cash flow method using 4 scenarios, namely scenario 1 for Local Interest Rate 10%, scenario 2 for International Interest Rate 2.6%, scenario 3 for Local Interest Rate 10% and without local content, scenario 4 for International Interest Rate 2.6% and without local content, scenario 5: scenario 3 and Incentive Tax Holiday, scenario 6: scenario 4 and Incentive Tax Holiday. The TPO business scheme analyzed by leasing solar performance-based rent (PBR) schemes. The optimization results obtained are the modul PV used is 2,100 kW, annual electricity production of rooftop solar power plant is 3,005,331 kWh/year, investment cost is 1.785.246 USD with using local pv modul and 1.341.424 USD with PV Module Local Content Exemption (Imported PV Module)  and the required area is 1.19 Ha. The tariff obtained from the calculation of 4 scenarios is 10.23 cent USD/kWh for scenario 1; 9.86 cent USD/kWh for scenario 2, 7.71 cent USD/kWh for scenario 3; 7.4 cent USD/kWh for scenario 4; 6.98 cent USD/kWh for scenario 5 and 6.44 cent USD/kWh for scenario 6. During the TPO contract, the biggest savings occurred in scenario 6 with potential savings of 22.840 USD/year. The application of TPO is only feasible for scenario 5 and scenario 6 because the tariff is lower than the PLN tariff."
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
James Mikhail Emmanuel Haning
"Penggunaan Energi Baru dan Terbarukan merupakan salah satu solusi yang ditawarkan dalam upaya mitigasi dampak perubahan iklim. Letak geografis Indonesia yang berada di garis khatulistiwa memiliki kesempatan besar dalam pemanfaatan energi matahari. Sistem PLTS atap merupakan sebuah sistem pembangkit yang memanfaatkan teknologi fotovoltaik untuk mengubah energi matahari menjadi energi listrik, yang ditempatkan pada atap sebuah bangunan. Penelitian ini akan membahas perencanaan sistem PLTS atap on-grid tanpa baterai pada gedung kantor PLN area Ciputat. Modal awal yang dibutuhkan untuk melakukan investasi pada sistem PLTS yang dirancang bernilai Rp752.470.500,00. Rata – rata energi yang dapat dihasilkan oleh sistem yang dirancang adalah sebesar 171,6 kWh/hari dengan nilai LCOE Rp633,66/kWh dengan potensi penghematan tagihan sebesar Rp8.015.381,00 setiap bulannya.

The use of renewable energy is one of the solutions offered in efforts to mitigate the impacts of climate change. The geographical location of Indonesia, which is on the equator, has a great opportunity in utilizing solar energy. Rooftop Solar System is an electric generating system that utilizes photovoltaic technology to convert solar energy into electrical energy, which is placed on the roof of a building. This study will discuss the planning of an on-grid rooftop solar system without using batteries in the PLN Ciputat office building. The initial capital required to invest in the designed solar system is Rp752,470,500,00. The average energy that can be produced by the designed system is 171,60 kWh/day with an LCOE value of Rp633,66/kWh with a potential bill saving of Rp8.015.381,00 per month."
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Syifa Restu Pramesti
"ABSTRAK
Pada COP ke-26 tahun 2021 di Glasgow, Pemerintah Indonesia menegaskan komitmen tanah air untuk mencapai net zero emissions (NZE) pada tahun 2060, seiring dengan aksi percepatan dalam rangka Paris Agreement dan United Nations Framework Convention on Climate Change. Fokus utama di sini adalah penggunaan Energi Baru Terbarukan (EBT), khususnya energi surya yang memiliki potensi sangat besar di Indonesia dan dianggap menjadi pemegang peran penting dalam mewujudkan serangkaian pilar Sustainable Development Goals (SDGs), yaitu affordable and clean energy; industry, innovations, and infrastructure; dan climate action. Dalam upaya mencapai target 23% EBT pada bauran energi nasional tahun 2025, Pemerintah Indonesia sedang menggalakkan program pengembangan dari pemanfaatan PLTS atap, terutama untuk daerah perkotaan yang memiliki permasalahan keterbatasan lahan. Penelitian ini akan difokuskan terkait perancangan sistem PLTS atap on-grid pada Gedung Teknologi 3, BRIN yang mana memiliki intensitas radiasi matahari cukup tinggi sekitar 4,83 kWh/m2/hari dan potensi pemanfaatan area atap yang luas menggunakan perangkat lunak PVsyst. Selain itu, dilakukan perbandingan atas fixed tilted plane dengan seasonal tilt adjustment terhadap nilai optimum tilt angle (OTA) tertentu dalam rangka memaksimalkan radiasi matahari untuk dimanfaatkan oleh panel surya. Berdasarkan analisis dan evaluasi secara teknis maupun ekonomis melalui empat skenario yang mampu dilakukan berdasarkan kombinasi hasil perhitungan jumlah komponen dengan pengaturan orientasi, dihasilkan perancangan PLTS yang memiliki pembangkitan sebesar 106,015 kWp dengan kebutuhan komponen sebanyak 233 modul surya dan 4 inverter serta melalui pengaturan orientasi berupa seasonal tilt adjustment adalah berkinerja paling optimal. Menurut aspek teknis yang ditinjau, perancangan tersebut mampu memberikan kontribusi terhadap penggunaan energi listrik pada hari kerja sebesar 46% dan hari libur sebesar 61%, menghasilkan Performance Ratio (PR) sebesar 82,74%, dan menyediakan pembangkitan energi listrik sebesar 158.156 kWh per tahun dengan global incident in collector plane sebesar +2,4%, near shadings: irradiance loss sebesar -0,80%, dan IAM factor on global sebesar -1,84%. Sementara itu, menurut aspek ekonomis yang ditinjau, perancangan tersebut mampu memberikan kontribusi terhadap penghematan biaya tagihan listrik sebesar 37% per tahun, membutuhkan biaya investasi awal sebesar Rp2.220.984.249, menghasilkan Payback Period (PP) pada tahun ke-16, menyediakan Net Present Value (NPV) sebesar Rp2.612.851.243, dan membentuk Benefit Cost Ratio (BCR) sebesar 1,18 dengan umur proyek yang direncanakan selama 20 tahun.

ABSTRACT
At the 26th COP in 2021 in Glasgow, the Government of Indonesia emphasized the country's commitment to achieve net zero emissions (NZE) by 2060, along with accelerated action within the framework of the Paris Agreement and the United Nations Framework Convention on Climate Change. The main focus here is using renewable energy, especially solar energy, which has enormous potential in Indonesia and is considered to be an essential role holder in realizing a series of Sustainable Development Goals (SDGs) pillars, namely affordable and clean energy; industry, innovations, and infrastructure; and climate action. To achieve the 23% renewable energy target in the national energy mix by 2025, the Government of Indonesia is promoting a development program for using rooftop solar power plants, particularly in urban areas with limited land availability. This research will focus on designing an on-grid rooftop solar power plant system at Technology Building 3, BRIN, which has a high solar radiation intensity of around 4,83 kWh/m2/day and the potential to utilize a large roof area using PVsyst software. In addition, a comparison of the fixed tilted plane with the seasonal tilt adjustment to certain optimum tilt angle (OTA) values is carried out to maximize solar radiation to be utilized by solar panels. Based on the analysis and evaluation, technically and economically, through four scenarios that can be done based on the combination of the results of the calculation of the number of components with the orientation settings, the resulting solar power plant design has a generation of 106,015 kWp with a component requirement of 233 solar modules and 4 inverters and through orientation setting in the form of seasonal tilt adjustment is the most optimal performance. According to the technical aspects reviewed, the design can contribute to the use of electrical energy on weekdays by 46% and weekends by 61%, resulting in a Performance Ratio (PR) of 82,74%, and providing electrical energy generation of 158.156 kWh per year with a global incident in collector plane of +2,4%, a near shadings: irradiance loss of -0,80%, and a IAM factor on global of -1,84%. Meanwhile, according to the economic aspects reviewed, the design can contribute to savings in electricity bill costs of 37% per year, requiring an initial investment cost of IDR 2.220.984.249, generating a Payback Period (PP) in year 16, providing a Net Present Value (NPV) of IDR 2.612.851.243, and forming a Benefit Cost Ratio (BCR) of 1,18 with the planned project life of 20 years.
"
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ayas Kalyana Pendit
"Munculnya EBT memberikan solusi terhadap ketergantungan terhadap listrik yang semakin meningkat. Indonesia, negara yang terletak di garis khatulistiwa dengan rata-rata Iradiasi Horisontal Global (GHI) sebesar 4,8kWh/m2 per hari di daratan yang hanya memiliki musim kemarau dan hujan memberikan potensi tenaga surya yang sangat besar untuk dimanfaatkan. Menurut Kementerian Energi dan Sumber Daya Mineral, rasio elektrifikasi pada tahun 2022 sebesar 99,63%, meningkat 1,8% dari tahun sebelumnya. Pada tahun 2022 saja, penambahan kapasitas pembangkit listrik sebesar 81,2GW dimana 12,5GW atau sekitar 15% berasal dari pembangkit listrik terbarukan. Konferensi pers dari kementerian yang sama juga menambahkan bahwa pada tahun 2023, Indonesia Timur akan mengalami kenaikan tarif elektrifikasi. Sebagai perbandingan, Malaysia telah mencapai tingkat elektrifikasi 100% sejak tahun 2019 berdasarkan data Bank Dunia, dimana 18% berasal dari sumber terbarukan. Skripsi ini akan memberikan analisis teknis dan ekonomi penggunaan konfigurasi on-grid, off-grid, dan hybrid untuk tenaga surya dari simulasi HOMER untuk menentukan metode penerapan sumber energi tenaga surya yang paling hemat biaya di Mentawai, sebuah rangkaian pulau 150 kilometer lepas pantai barat Sumatera, khususnya di desa Saibi Samukop. Hasilnya menunjukkan bahwa konfigurasi hybrid merupakan konfigurasi yang paling hemat biaya dibandingkan konfigurasi lain maupun konfigurasi eksisting, dengan Net Present Cost (NPC) sebesar Rp22,2 miliar dan Cost of Energy (COE) sebesar Rp2.381,00/kWh. Dari produksi listrik tersebut, pembangkit listrik PV menyumbang 64% atau 386.717 kWh/tahun pada bauran energi terbarukan sebagai jalan untuk mencapai target SDG’s ke-7 yaitu energi terjangkau dan bersih.

The advent of renewable energies provides a solution to the ever-growing dependency on electricity. Indonesia, a country located on the equator with an average Global Horizontal Irradiation (GHI) of 4,8kWh/m2 per day on land with only dry and rainy seasons provides an immense solar power potential to be harvested. According to Indonesia’s Ministry of Energy and Mineral Resources, the electrification ratio in 2022 was 99,63%, a 1,8% increase from the previous year. In 2022 alone, the added electricity generation capacity was 81,2GW of which 12,5GW or around 15% came from renewable plants. A press conference from the same ministry also added that in 2023, East Indonesia would be subject to an increase in electrification rates. As a comparison, Malaysia has reached a 100% electrification rate since 2019 based on the data from The World Bank, in which 18% is derived from renewable sources. This thesis will provide the technical and economic analysis of utilizing on-grid, off-grid, and hybrid configurations for solar power from HOMER simulation to determine the most cost-effective method of implementing a solar power energy source in Mentawai, an island chain 150 kilometres off the western coast of Sumatra, especially in Saibi Samukop village. The results show that the hybrid configuration is the most cost-effective configuration compared to the other configurations as well as the existing configuration, with a net present cost (NPC) of Rp22,2 billion and a cost of energy (COE) of Rp2.381,00/kWh. From the electricity production, the PV power plant contributes 64% or 386.717 kWh/year to the renewable energy mix as a path to secure the 7th SDG’s target of affordable and clean energy."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>