Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 130 dokumen yang sesuai dengan query
cover
Hennyey, Zoltan
Oxford: Pergamon Press, 1962
621.319 HEN l
Buku Teks  Universitas Indonesia Library
cover
Budak, Aram
[Place of publication not identified]: [Publisher not identified], [Date of publication not identified]
R 621.381 BUD s
Buku Referensi  Universitas Indonesia Library
cover
Raditya Arrizki Dewantara
Abstrak :
ABSTRACT
The importance of power electronics has significantly increased in the last few decades. Many applications such as electric vehicles and renewable energy systems would not be possible without them. Power electronics is based primarily on the switching of power semiconductor devices. One of the most important power semiconductors used is silicon-controlled rectifier or thyristor. Its characteristics allows for control of electric power. However, thyristors operating in DC systems requires an additional circuit to turn off. This circuit is called an extinction circuit. This thesis used the software LTspice to simulate the circuit and analyze the waveforms produced by it and the software EAGLE to design the printed circuit broad. The developed ignition circuit produced a current of 27 mA on the gate of the thyristor which is controlled manually by a push button to turn on the thyristor. During the measurement of the extinction circuit, the supply voltage and load current were varied to see its effects on the circuit turn off time. The measurement results show that an increasing supply voltage cause the circuit turn off time to increase while increasing the load current resulted in a lower circuit turn off time.
ABSTRAK
Pentingnya elektronika daya telah meningkat secara signifikan dalam beberapa dekade terakhir. Banyak aplikasi seperti kendaraan listrik dan sistem energi terbarukan tidak akan mungkin diporduksi tanpanya. Elektronika daya didasarkan pada penggunaan perangkat semikonduktor daya. Salah satu perangkat semikonduktor yang paling penting digunakan adalah Silicon Controlled Rectifier atau thyristor. Karakteristiknya memungkinkan untuk mengontrol tenaga listrik. Namun, thyristor yang beroperasi dalam sistem DC membutuhkan rangkaian tambahan untuk dimatikan. Rangkaian ini disebut extinction circuit. Skripsi ini menggunakan perangkat lunak LTspice untuk mensimulasikan rangkaian dan menganalisis bentuk gelombang yang dihasilkan olehnya dan perangkat lunak EAGLE untuk merancang PCB. Ignition circuit yang dikembangkan menghasilkan arus sebesar 27 mA di gate thyristor yang dikendalikan secara manual dengan menekan tombol untuk menyalakan thyristor. Selama pengukuran extinction circuit, tegangan suplai dan arus beban divariasikan untuk melihat efeknya pada circuit turn off time. Hasil pengukuran menunjukkan bahwa peningkatan tegangan suplai menyebabkan circuit turn off time untuk meningkat sedangkan meningkatkan arus beban mengakibatkan circuit turn off time yang lebih rendah.
2018
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Hendra Oktawira
Abstrak :
ABSTRAK
Penerapan inspeksi berbasis resiko pada unit cracking heater merupakan suatu langkah jitu dalam mencegah terjadinya kegagalan secara tiba-tiba akibat korosi yang dapat menyebabkan kerugian. Hal ini dikarenakan unit cracking heater merupakan unit yang sangat vital di dalam kegiatan operasional pada industri petrokimia sehingga perlu dibuat skala resikonya. Penelitian bertujuan untuk membuat suatu analisa probabilitas kegagalan dan konsekuensi kegagalan dengan menggunakan sistem inspeksi berbasis resiko (Risk-Based Inspection) dengan bantuan perangkat lunak pada unit cracking heater, khususnya pada circuit piping yang menuju cracking heater pada pabrik etilena yang telah beroperasi bertahun-tahun, sehingga dapat diperoleh peringkat resikonya dan untuk dapat memberikan jadwal inspeksi dan metode inspeksi di masa yang akan datang. Risk-Based Inspection merupakan metode inspeksi yang menggunakan resiko sebagai dasar untuk memprioritaskan dan mengatur kegiatan di dalam program inspeksi. Resiko dapat didefinisikan sebagai kombinasi probabilitas dan konsekuensi. Probabilitas adalah kemungkinan kegagalan untuk terjadi, dan konsekuensi adalah ukuran kerusakan yang dapat terjadi sebagai hasil dari kegagalan. Hasil assessment terhadap circuit piping CL01A menunjukkan bahwa mekanisme degradasi yang terjadi adalah aerated-water corrosion dan flowinduced corrosion. Pipa tersebut memiliki tingkat probabilitas kegagalan medium. Penilaian terhadap konsekuensi kegagalan yang mencakup beberapa tinjauan, seperti kerugian ekonomi, efek terhadap kesehatan dan keselamatan dan dampak terhadap lingkungan memberikan peringkat resiko medium. Peringkat resiko total pada circuit piping CL01A adalah medium-high dan dengan tingkat kepercayaan high, maka akan menghasilkan interval faktor sebesar 0,4. Interval inspeksi maksimum atau maximum inspection interval (MII) yang merupakan hasil perkalian antara sisa umur pakai (remnant life) dan interval faktor memberikan nilai 5,16 tahun, sehingga jadwa inspeksi berikutnya adalah pada tahun 2016. Inspeksi dilakukan secara non instrusive dengan uji tidak merusak dengan menggunakan teknik ultrasonic thickness (UT) dan visual pada titik eksternal pipa. Selain itu, teknik inspeksi yang cukup aplikatif untuk memantau proses penipisan adalah dengan radiografi (RT). Resiko dapat direduksi dengan menggunakan sistem yang dapat menghilangkan atau mengurangi kandungan air, yang bertujuan untuk mengurangi probabilitas kegagalan, sehingga nafta yang masuk ke dalam aliran proses dapat diminimalisasi.
Abstract
Application of risk-based inspection in unit of cracking heater is a recommended method to avoid sudden failure which may cause losses as the result of corrosion process. Unit of cracking heater is a vital unit in petrochemical industry so that it is required to determine its risk-rank. The purpose of this study is to make probability of failure and consequence of failure assessment by using risk-based inspection system supported by software which is applied to the unit of cracking heater that focuses on circuit piping located before entering the cracking heater in the ethylene plant which has been operating for years so that risk-rank can be determined properly. Furthermore, inspection schedule and inspection method can be fixed based on the risk-rank. Evaluation to reduce risk is also established by applying system which may be able to remove or reduce water content in the process flow. Risk-based inspection is an inspection method which is applying risk as a base to obtain priority scale in inspection activity. Risk can be defined as the combination of probability failure and consequence of failure. Probability is a measure of failure to occur, and consequence is desribed as the measure of damage which may occur as the result of failure. Assessment result of circuit piping CL01A shows that degradation mechanism which may occur in CL01A piping is aerated-water corrosion and flow-induced corrosion. Probability of failure assessment gives result medium. Assessment of consequence of failure which is considering some aspect including economic cost, health and safety effect and environment impact shows medium risk-rank. Total risk-rank of circuit piping CL01A is medium-high and its confidence rating is high so that the obtained interval factor is 0,4. Maximum inspection interval (MII) as the result of multiplication of remnant life with interval factor gives value 5,16 years. Based on the result, then, next inspection date will be performed in 2016. Inspection is carried out intrusively by non destructive test method using ultrasonic thickness test (UT) and visual test on the eksternal location of the pipe. Radiography as the additional method is also be able to be applied to monitor thinning mechanism. Risk can be minimized by applying system which may eliminate or reduce water content in the process stream so that probability of failure can be reduced.
2011
T 29885
UI - Tesis Open  Universitas Indonesia Library
cover
Robby Julian
Abstrak :
Daerah X merupakan salah satu daerah di Indonesia dengan rasio elektrifikasi yang belum mencapai 100 (seratus) persen. Pertumbuhan penduduk dan peningkatan produk domestik bruto pada daerah X juga akan memacu pertumbuhan beban. Penyambungan Pembangkit Listrik Tenaga Surya (PLTS) dapat membantu menyelesaikan permasalahan tersebut dengan memberikan suplai tenaga listrik tambahan guna meningkatkan performa pelayanan sistem tenaga listrik daerah X. Pada penelitian ini sistem tenaga listrik daerah X dievaluasi perbandingan arus hubung singkatnya, serta tegangan dan pembebanan pada bus dengan analisis loadflow sebelum dan sesudah penyambungan PLTS dengan melakukan simulasi aliran beban dan hubung singkat. Dari hasil simulasi ditemukan bahwa penyambungan PLTS pada sistem tenaga listrik daerah X menghasilkan peningkatan nilai tegangan pada setiap bus dalam rentang yang masih sesuai dengan standard SPLN 1:1978 yaitu lebih dari 90% dan dibawah 105% nilai tegangan nominal bus, di mana nilai tegangan tertinggi terdapat pada bus 2 sebesar 67,759 kV (96,8% tegangan nominal bus) sementara nilai tegangan terendah terdapat pada bus 3 sebesar 18,253 kV (91,27% tegangan nominal bus) serta meningkatkan arus hubung singkat pada 7, 9, dan 29 dengan peningkatan tertinggi terdapat pada bus 9 sebesar 1,85% dan peningkatan terendah pada bus 29 sebesar 0,48% ......Area X is one of many in Indonesia that has not yet reached 100 (a hundred) percent electrification ratio. Increment in population and gross domestic product of area X will also spur load growth rate. Connecting Solar Power Plant (PLTS in Indonesian) can help solve those setbacks by providing additional electrical power supply to enhance the performance of service in area X power system. In this study, area X power system will be evaluated in the difference it experiences before and after PLTS connection in terms of short circuit and bus voltage level as well as loading percentage using loadflow simulation. It is found from the simulation that a connection of PLTS to Area X power system causes an increase in voltage on every bus within range of tolerance of SPLN 1:1978 which is more than 90% and less than 105% of bus nominal voltage, where the highest bu voltage is on bus 2 with 67,759 kV (96,8% of bus nominal voltage) while the lowest bus voltage is on bus 3 with 18,263 kV (91,27% of bus nominal voltage), as well as increases the short circuit current on bus 7,9 dan 29 with the highest increase on bus 9 by 1,85% and the lowest increase on bus 29 by 0,48%
Depok: Fakultas Teknik Universitas Indonesia, 2019
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Rosenthal, Murray P.
New Jersey: Hayden Book , 1975
621.381 ROS u
Buku Teks  Universitas Indonesia Library
cover
Hayt, William H.
Boston: Houghton Mifflin , 1984
621.381 5 HAY e
Buku Teks  Universitas Indonesia Library
cover
Hayt Jr., William H.
London : McGraw-Hill, 2002
621.319 2 HAY e
Buku Teks  Universitas Indonesia Library
cover
Kularatna, Nihal
Boston : Newnes, 2000
621.317 KUL m
Buku Teks  Universitas Indonesia Library
cover
Kularatna, Nihal
Boca Raton: CRC Press, Taylor & Francis Group, 2008
621.381 5 KUL e
Buku Teks  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>