Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 23082 dokumen yang sesuai dengan query
cover
Haryo Koco Buwono
"Perkembangan teknologi beton, seiring dengan perkembangan kebutuhan akan beton masa depan, sehingga dibutuhkan mutu beton dan metode perhitungan yang membantu dalam mendapatkannya. Dalam ilmunya, semakin tinggi mutu beton, akan selalu dikaitkan dengan rendahnya kadar w/c dan tingginya kadar s/c dalam mixdesign. Beton berkinerja tinggi diperoleh kuat tekan yang tinggi dan permeabilitas yang rendah. Pada kenyataan hasil penelitian menunjukkan: makin tinggi kadar air semen dan makin rendah kadar silicafume dalam desain campur beton, makin tinggi kinerja beton (meningkatkan mutu kuat tekan beton dan permeabilitas). Analisa beton dalam penelitian ini dikaitkan dengan bahan yang ada di alam Indonesia, sehingga dibutuhkan suatu formulasi tersendiri untuk kondisi tersebut. Formulasi tersebut diberi nama Formulasi KC, yang mempunyai 2 tawaran formulasi yaitu dengan basis polinomial orde 2. Hasil maksimum yang diperoleh formulasi ini adalah saat w/c = 0.3 dan s/c = 15%. Kadar s/c adalah ratio semen dan silicafume. Hasil formulasi sebagai berikut:
t"c = (1/k2). (k1(w/c - a)2 + a(s/c) + b3(s/c)2)"
Depok: Fakultas Teknik Universitas Indonesia, 2002
T1100
UI - Tesis Membership  Universitas Indonesia Library
cover
Sahala Bachtiar
"Konstruksi merupakan suatu proses dimana rencana dan spesifikasi para perancang dikonversikan menjadi suatu struktur dan fasilitas fisik. Hal ini melibatkan pengorganisasian dan koordinasi dari semua sumber untuk proyek yaitu tenaga kerja, peralatan konstruksi, material-material tetap dan sementara, persediaan dan keperluan umum, dana/biaya, teknologi dan metode serta waktu penyelesaian proyek yang harus tepat waktu, dalam batas - batas anggarannya dan sesuai dengan standar kualitas dan pelaksanaan yang dispesifikasikan oleh perancang.
Metode yang digunakan dalam penelitian ini menggunakan pengumpulan data primer dengan menyebarkan kuesioner kepada para kontraktor yang terlibat didalam pelaksanaan proyek pemeliharaan DPU DKI Jakarta.
Dari hasil pengumpulan data sejumlah 35 sampel didapatkan 26 data yang dilakukan analisis statistik untuk mendapatkan model persamaan analisis regresi berganda. Dari analisis yang dilakukan dengan menggunakan bantuan paket program SPSS 10.0 didapatkan persamaan model regresi berganda linier.
Adapun hasil dari penelitian ini menunjukkan bahwa peningkatan kinerja biaya yang didapatkan dari hasil analisis statistik dipengaruhi oleh 2 variabel secara linier yaitu, Kualitas Perkiraan Harga Peralatan yang digunakan, dan kualitas sumber bahan mentah."
Depok: Fakultas Teknik Universitas Indonesia, 2002
T1140
UI - Tesis Membership  Universitas Indonesia Library
cover
Djasiodi Djasri
"Undang-Undang no. 22 1 1999 tentang Pemerintahan Daerah memberi kewenangan yang luas kepada Pemerintah Daerah (Kabupaten dan Kota) untuk mengembangkan daerahnya, sementara itu Undang-Undang no. 36 / 1999 tentang Telekomunikasi memberi peluang kepada swasta untuk melakukan usaha di bidang jaringan dan layanan telekomunikasi. Dengan demikian Pemerintah Daerah juga mempunyai kewewenangan dan berpeluang untuk mengembangkan jaringan dan layanan telekomunikasi di daerahnya.
Penulisan tesis ini membahas kajian antisipasi Pemerintah Daerah dalam memanfaatkan kewenangan dan peluang tersebut di atas. Kajian antisipasi ini menggunakan teori manajemen bisnis dalam menentukan strategi-strategi yang diperlukan. Sebagai tujuannya adalah menciptakan lingkungan yang kondusif bagi pengusaha jaringan dan layanan telekomunikasi untuk melakukan usaha di daerahnya. Sebagai obyek untuk contoh penerapan hasil kajian ini adalah Pemerintah Kota Depok. Dan hasil analisis lingkungan eksternal dan internal Pemerintah Kota Depok diperoleh strategi-strategi yang diperlukan yang dapat diusulkan untuk menangani pengembangan jaringan dan layanan telekomunikasi di wilayah Kota Depok.

Law no. 22 of 1999 relating to Local Government confers extensive power on Local Governments (Districts and Towns) to develop themselves, whereas Law no. 36 of 1999 relating to Telecommunication provides the private sector the opportunity to engage in business in the field of telecommunication networks and services. The Local Governments have, therefore, also the competency and opportunity to develop telecommunication networks and services in their regions.
This thesis is a study of the Local Government anticipation in taking advantage of the aforementioned competency and opportunity, and uses the business management theory in determining the strategies required. The aim is to create a conducive environment for telecommunication network and service entrepreneurs to engage in business in their region.
The Kota Depok Government serves as example of the result of the study. From the outcome of the Kota Depok Government external and internal environmental analyses, the required strategies were obtained that might be proposed to manage the development of telecommunication networks and services in Depok."
2001
T1478
UI - Tesis Membership  Universitas Indonesia Library
cover
Sugih Pranoto Aji
"In order to increase the quality of Project implementation much research will need to be carried out in Indonesia and abroad. In 1960 the Government of UK identified many construction projects that were not able to increase the communication and coordination between the design and construction phase. The concept of build ability arose in 1979 in order to enhance the design process by inputting the construction method during the design phase. The Construction Industry Research Information Association (CIRIA) has defined build ability as follows: "the extent to which the design of a building facilitates ease of construction, subject to overall requirements for the completed building?.
Project (CICE) researched into the increasing of quality, efficiency, productivity and cost effectiveness in the construction projects. The research estimates that constructability improvements saved at least 10-20 times the cost of the constructability effort. The Construction Industry Institute, Austin, USA in 1986 defined constructability as ?the optimum use of construction knowledge and experience in planning, engineering, procurement and field operations to achieve overall project objectives?.
The research, which is a partial requirement for a Master degree in construction management at the University of Indonesia, was aimed at understanding the coordinating position and influence of the owner of projects for improving constructability during conceptual planning phase.
The research proceeded to study into the impact of owner contribution for improving constructability during conceptual planning phase. In order to further understand such owner contribution, its impact on project construction cost performance was measured and quantified.
Data of projects constructed in Indonesia were then obtained through questionnaires from official owner representatives of companies hi Jakarta. Variables in the questionnaire which represented owner quality contribution were then correlated to the same project cost performance variable.
In depth analysis of the correlation were then carried out to build regression models of the relationship between quality of owner contribution during conceptual planning phase to project cost performance.
The statistical including validation test needs were also carried out in order to provide the guidelines for increasing knowledge in constructability for future projects in Indonesia.
"
Depok: Fakultas Teknik Universitas Indonesia, 2000
T666
UI - Tesis Membership  Universitas Indonesia Library
cover
Budhijakto Atrnosasmito
"Upaya untuk menghubungkan antara kebutuhan suatu produk dengan aktivitas produksinya, membutuhkan suatu manajemen sistem logistik yang efektif, efisien dan saling menguntungkan antara kedua belah pihak Dalam konsep manajemen sistem logistik diperlukan strategi untuk menyeimbangkan antara demand yang terjadi dengan kemampuan produksi dan distribusi. Konsep pengembangan model sistem logistik dilakukan dengan pendekatan dinamika sistem, di mana proses yang terjadi dalam aktivitas sistem logistik pada suatu waktu akan berpengaruh pada proses aktivitas selanjutnya, dan terus akan berfluktuasi mengikuti kondisi yang terjadi. Skenario yang dirancang dalam proses pemenuhan pesanan terdiri dari : skenario prioritas pemenuhan pesanan dan pesanan tunda berdasakan jarak, berdasarkan daerah yang memberikan keuntungan terbesar, kombinasi antar dua skenario di atas, dan skenario yang merancang optimalisasi akumulasi keuntungan yang mungkin didapat. Untuk menguji validitas model, dilakukan simulasi dengan memasukkan sejumlah data masukan, yaitu data logistik dari P.T Semen Cibinong. Analisa model dilakukan dengan membandingkan kecenderungan (trend) yang terjadi untuk masing-masing variabel dari tiap skenario. Untuk skenario yang memberikan prioritas pemenuhan pesanan berdasarkan jarak, pesanan tunda terbanyak berasal dari daerah dengan jarak terjauh, sedangkan untuk skenario yang memberikan prioritas berdasarkan keuntungan dari tiap daerah (region), pesanan tunda terbanyak berasal dari daerah yang memberikan keuntungan terkecil. Dan untuk skenario yang memberikan prioritas pemenuhan pesanan berdasarkan optimalisasi keuntungan yang didapat, jumlah pesanan tunda bervariasi untuk masing-masing daerah, karena fungsi yang digunakan adalah fungsi optimalisasi akumulasi keuntungan yang didapat.Berdasarkan hasil simulasi, akumulasi keuntungan yang didapat untuk skenario 1 adalah Rp.10.860.000.000 dengan sisa pesanan tunda sebanyak 36.116 ton, untuk skenario 2 adalah Rp.11.200.000.000 dengan sisa pesanan tunda sebanyak 37.925 ton, untuk skenario 3 adalah Rp.9.982.000A00 dengan sisa pesanan tunda sebanyak 8907 ton, untuk skenario 4 adalah Rp.10.770.000.000 dengan sisa pesanan tunda sebanyak 46.991 ton, untuk skenario 5 adalah 4.12.800.000.000 dengan sisa pesanan tunda sebanyak 45.490 ton."
Fakultas Teknik Universitas Indonesia, 2000
T705
UI - Tesis Membership  Universitas Indonesia Library
cover
Marlian
"The Fire damage occurs in unpredictable time and can cause losses to the owner because of the damage. It can occur in buildings that do not have Fire Protection and Fire Safety Management System in the building. By detecting and preventing against fire damage, which arise in unpredictable times will prevent loss of lives and assets of the buildings.
There has been considerable research into the fire damage such as at the Polo Condominium in Colorado. The Polo Condominium that was built in 1967 caught fire on October 31' because it did not have the Fire Protection System in each floor. When the fire came and burned the building interior, the building could not extinguish the fire because it did not have fire detector and sprinklers in place.
To solve the problem, in Jakarta there are a lot of guidelines such as the Minister Of Public Works Decree # 02IKPTSI1985 for Fire Safety in building. But from many fire damages, the guidelines could not accommodate the problem because the buildings did not incorporate Fire Protection and Fire Safety Management System. Relevant research indicated that Fire Protection and Fire Safety Management System are very important to detect and prevent against fire damage. In this research, the Fire Protection and Fire Safety Management System are defined as Fire Safety Design which have been taken from many relevant theories and journals.
From 50 questionnaires sent to various high rise office buildings in Jakarta, 30 responses were received to be viable for in depth analysis. The result of the analysis shows clearly that the Fire Safety Design is positively correlated in a linear manner to four of the key Fire Safety Design variables. The four key variables influencing building reliability in design carried out by the consultant and controlled by the construction manager in the projects are : detection and fire alarm, building architecture, the designer's fire certificate and special equipment to stop fire_ This research can then be used to control and measure the quality of Future Fire Safety Design of the high rise building reliability in Jakarta."
Depok: Fakutlas Teknik Universitas Indonesia, 2000
T676
UI - Tesis Membership  Universitas Indonesia Library
cover
Achirwan S.
"Pengendalian kinerja biaya proyek agar tetap berjalan sesuai dengan rencana adalah penting. Penelitian ini membahas mengenai pola hubungan antara kinerja biaya proyek dengan dampak penyimpangan biaya proyek dengan pendekatan indikator cost overrun, terutama pada pengelolaan sub kontraktor, studi dikhususkan pada proyek gedung bertingkat terutama di kota Jakarta, Bogor, Tanggerang dan Bekasi. Berdasar dari bahan hasil penelitian yang sebelumnya, didapat 4 indikator cost overrun pada pengeloiaan sub kontraktor, yang masing-masing atau kombinasi diantaranya sebagai ukuran dari dampak yang menyebabkan turunnya kinerja proyek, dari indikator tersebut akan dikaji dengan menggunakan perangkat pengolah data SPSS, pada bagian mana penyebab paling significant mempengaruhi penurunan kinerja biaya. Dan dampak yang significant selanjutnya diindentifikasi penyebabnya, untuk kemudian dilakukan corrective action (langkah perbaikan)."
Depok: Fakultas Teknik Universitas Indonesia, 2003
T809
UI - Tesis Membership  Universitas Indonesia Library
cover
Djoni Bagy
"Proses globalisasi perekonomian dunia saat ini yang semakin meningkat telah mendorong perusahaan perusahaan termasuk industri jasa konstruksi untuk mengusahakan proses produksi yang semakin cepat dan semakin tepat dalam melayani konsumen, atau dengan kata lain hanya produk dan jasa yang memiliki daya saing tinggi yang dapat berkompetisi. Dalam meningkatkan daya saing maka masalah standar prosedur pelaksanaan menjadi sangat panting. Suatu standar prosedur mutu yang dapat diterima oleh banyak negara adalah standar ISO 9000 yang dapat meningkatkan daya saing.
Hampir semua usaha mengandung resiko, demikian juga halnya dengan proyek. Salah satu resiko yang cukup tinggi yang dialami oleh semua proyek adalah resiko keterlambatan. Standar ISO 9000 adalah suatu sistim manajemen mutu yang dapat mengendalikan dan mencegah masalah masalah yang akan terjadi dalam pelaksanaan proyek termasuk masalah penyebab keterlambatan. Kemampuan ISO 9000 dalam mengendalikan dan mencegah masalah masalah yang akan terjadi sangat tergantung pada kualitas penerapannya.
Penelitian ini mempunyai tujuan adalah untuk mengidentifikasi factor-faktor keterlambatan yang paling mempengaruhi kinerja waktu pelaksanaan konstruksi dalam penerapan manajemen mutu ISO 9000. Penelitian ini dilakukan dengan melakukan survey melalui alat bantu kuesioner.
Hasil penelitian yang dilakukan dengan menggunakan analisa regresi berganda terhadap data-data yang terkumpul, berhasil diidentifikasi faktor keterlambatan yang paling mempengaruhi kinerja waktu adalah faktor waktu pengiriman material yang diatur dalam persyaratan pembelian ( elemen 4.6 ISO 9000 - 1994 ) atau dalam persyaratan proses pembelian ( elemen 7.4 ISO 9001 - 2000 ).
Pada hasil penelitian juga memperlihatkan bahwa semakin rendah faktor-faktor keterlambatan maka semakin tinggi kinerja waktu pelaksanaan konstruksi dalam penerapan manajemen mutu ISO 9000."
Depok: Fakultas Teknik Universitas Indonesia, 2002
T1144
UI - Tesis Membership  Universitas Indonesia Library
cover
Mochamad Ruslan Abdulmuni
"Penerapan Jaringan Virtual Pribadi (VPN) dalam jaringan internet telah mendorong upaya untuk memperoleh manfaat lebih jauh lagi terutama dalam segi pengelolaannya, melalui konsep hose. Dengan teknik menggabungkan trafik dari sumber tunggal ke sejumlah titik tujuan atas dasar persamaan kualitas layanan (QoS), selain fleksibilitas pengelolaan saluran-saluran, manfaat utamanya adalah didapatnya keuntungan penggandaan (multiplexing gain) yang cukup signifikan[l]. Dalam implementasi VPN, terdapat aspek sekuriti dimana pada perkembangan terakhir, VPN dapat dibentuk oleh tunnel IP diatas IP (1P over IP tunnel) yang disertai arsitektur sekuriti IPsec[2]. IPsec memungkinkan layanan-layanan sekuriti dengan menerapkan konsep SA (security associatation) terhadap saluran-saluran yang berupa tunnel IP diatas IP, walaupun pada sisi lain terjadi penurunan kinerja akibat pemakaian sumberdaya komputasi dan pemakaian lebar pita saluran yang lebih besar.
Guna memenuhi dua kebutuhan pelanggan berupa kualitas layanan dan jaminan sekuriti, dalam tugas ini dipelajari kemungkinan penerapan konsep dan antarmuka hose pada VPN yang dibangun dengan arsitektur IPsec. Selanjutnya dengan hipothesa bahwa konsep hose dapat diterapkan pada VPN IPsec dengan tetap memperoleh keuntungan penggandaan, dilakukan suatu penelitian penerapan teknik antarmuka hose dan VPN IPsec pada satu implementasi VPN. Penelitian ini menggunakan model antrian dan simulasi jaringan pada beberapa asumsi. Pada batas lebar pita dan topologi tertentu terjadi penurunan keuntungan penggandaan, tetapi masih didapat harga yang cukup untuk hose dengan IPsec.

Virtual Private Network (VPN) on Internet network has motivated efforts to gain more benefit especially in term of its management, through a hose concept. By a traffic multiplication techniques, traffics originated from a source point to multiple destination to be united into a hose based on Quality of Service (QoS). Beside management flexibility, the main benefit is sigificant multiplexing gain [1]. In the recent VPN implementations there are security aspects can be built on IP over IP tunnels which are combined with IPSec architecture [2]. IPsec enables an operator to provide security services with Security Association concept (SA) over links obtained from IP over IP tunnels. However on the other hand the use of IPsec imposes performace cost on computational resources and more bandwidth utilization on links.
In order to provide customer needs of service quality and security guarantee, this thesis studies the possibility of hose interface concept implementation based on VPN with IPsec architecture. By the hipothese that the multiplexing gain still can be obtained when both concepts to be combined, the study and research were conducted. This research uses a combination of queueing model and network simulation on some asumptions. The IPsec hose gain still can be obtained from a certain bandwidth range and certain given topologies."
Depok: Fakultas Teknik Universitas Indonesia, 2001
T123
UI - Tesis Membership  Universitas Indonesia Library
cover
Moch. Budianto
"Dengan mulai bangkitnya perekonomian dari keterpurukan akibat krisis ekonomi yang baru saja melanda Indonesia, maka saat ini roda ekonomi mulai berputar. Dan pemerintah lewat Departemen Permukiman Prasarana Wilayah mulai merancang pembangunan jalan baru baik pembangunan jalan tol maupun jalan non tol yang diharapkan akan memperlancar lalu lintas yang juga akan memperlancar angkutan barang. Pada proses pembangunan jalan baru, pemerintah melakukan terlebih dahulu pengadaan lahan yang diperlukan untuk membangun konstruksi jalan. Pengadaan lahan sangat perlu dipikirkan mengingat selain sudah menjadi kebutuhan untuk pembuatan jalan juga, proses pengadaannya memerlukan waktu dan biaya yang cukup besar. Proses pengadaannya mencakup kegiatan jual beli, pekerjaan potret udara, proses pembuatan peta rincik, proses penyusunan daftar nominatif yang termasuk didalamnya inventaris bangunan, tanaman, ukuran tanah, proses musyawarah harga serta negosiasi harga, dan proses jual beli.
Penelitian ini bertujuan untuk menilai pengaruh kualitas pembebasan tanah terhadap kinerja biaya pembebasan tanah pada proyek konstruksi di Indonesia. Data perihal proses pembebasan tanah yang berhubungan dengan kinerja biaya pembebasan tanah proyek konstruksi diperoleh melalui questionnaire yang disampaikan pada pimpinan proyek yang bertanggung jawab atas pelaksanaannya. Dari 40 question diperoleh 30 buah untuk dilakukan analisis statistik yang direncana bagi penulisan.
Model regresi berganda linier berhasil untuk menggambarkan hubungan antara variabel terikat kinerja biaya pembebasan tanah terhadap tiga variabel babas penentu yang terpengaruh, yaitu: pengamanan lokasi tanah, pendataan kepemilikan tanah dan permintaan kenaikan harga. Selain temuan utama model, suatu variabel dummy yang mungkin berpengaruh pada kinerja biaya pembebasan diperhatikan dalam penelitian lanjutan yaitu pendataan fisik tanah dimasa mendatang.

With the economic rising from the crisis which just happened in Indonesia now it's time for the economic wheel to spin. The Indonesian government through Department Kimpraswil is starting to plan the new roads, expected to accelerate traffic and slipment. In the process to build new roads, the government will do the land acquisition before construction. The land acquisition is important because it costs highly and it takes time. It is not just a common trading, but it needs aero photograph, mapping, registering, which contain name list, building data, plantation data, land measurement, etc. Than it comes to an agreement process and a price negotiation.
This research is aimed to evaluate between the quality influences of land acquisition to land acquisition cost at construction project in Indonesia. The data process from questionnaire. From 40 questionnaires found 30 for statistic analysis. Double linear regression model described relation between land acquisition fixed variable cost to 3 influence variables which is secure land location, land owners data and price increment demand Besides that model, one dummy variable which maybe influence to land acquisition cost is added to evaluate for next research in the future."
Depok: Fakultas Teknik Universitas Indonesia, 2002
T988
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3 4 5 6 7 8 9 10   >>