Hasil Pencarian

Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 28 dokumen yang sesuai dengan query
cover
Boston: McGraw-Hill, 2009
624 KNU c
Buku Teks  Universitas Indonesia Library
cover
Jackson, Barbara J.
"Launch your career in construction management with this one-of-a-kind book. The construction management industry is expected to increase employment by 16 percent over the next decade. This second edition of a bestselling introduction to construction management walks you through each stage of the construction management process. Written from the constructor’s perspective, this book will familiarize you with all the construction management fundamentals and how Building Information Modeling (BIM) is impacting the construction management profession. Covers interoperability of technology advances in the construction industry. Explains how BIM is challenging the traditional approach to project delivery and how this affects the constructor’s role. Elaborates each stage of the design and construction process and the tasks associated with each of them. Shows step-by-step how to estimate project costs, administer contracts, manage job site and construction operations, plan and schedule a project, monitor project performance, manage project quality and safety, and assess project risks. Provides review questions at the end of each chapter to help enforce understanding. The tried-and-true project management principles presented in this book will help ensure you a successful start to your career."
Lengkap +
Indianapolis: Wiley Publishing, 2010
624.068 JAC c
Buku Teks  Universitas Indonesia Library
cover
Fish, Edward R.
New Jersey : Pearson-Prentice Hall, 2006
624 FIS c
Buku Teks  Universitas Indonesia Library
cover
Lambeck, Richard
New York: McGraw-Hill, 2009
690.0684 LAM u
Buku Teks SO  Universitas Indonesia Library
cover
Luckett, Kelly
New York: McGraw-Hill, 2009
635.9 LUC g
Buku Teks  Universitas Indonesia Library
cover
Goldhaber, Stanley
Canada: John Wiley & Sons, 1977
658.924 GOL c
Buku Teks SO  Universitas Indonesia Library
cover
Reiner, Laurence E.
Englewood Cliffs, New Jersey.: Prentice-Hall, 1972
R 658.99 REI h
Buku Referensi  Universitas Indonesia Library
cover
New York: McGraw-Hill, 1971
R 658.924 CON
Buku Referensi  Universitas Indonesia Library
cover
Nunnally, Stephen. W., 1927-
Harlow: Pearson, 2014
624 NUN c
Buku Teks  Universitas Indonesia Library
cover
Widya Andrianto
"The Impact of Designer's Role in Involving Construction Personnel During the Design Phase on the Performance of Construction Project Schedule in IndonesiaThe study by The Business Roundtable's team in the US found that opportunities to reduce project costs and schedules by using existing and new construction technology are lost because construction too often is relegated to operate as a production function separated from financial planning, scheduling, and engineering or architectural design. Significant savings in both the costs and time required to complete the project can be accrued from careful interaction of planning, design, and engineering with construction into the creation of projects. The Construction Industry Institute's (CII) Task Force defines this term as Constructability, which is the optimum integration of construction knowledge and experience in planning, engineering, procurement, and field operations to achieve overall project objectives.
By ignoring constructability in design, designer may be saddling the builder with possible construction problems that could lead to delays, inefficient use of resources, out of sequence work and others. This can be particularly troublesome which may have a devastating effect on project schedule and budget. Designer has an important role in building a receptive interface with construction personnel during the design phase. By communicating the design intent to the construction personnel, designer can gain the information he/she needs to improve the constructability of the project.
This thesis study the role of designer in involving construction personnel during the design phase to improve the constructability of the project which leads to an improvement project time performance of construction project in Indonesia. A questionnaire survey was distributed to projects designers in Jakarta area. The data obtained was analyzed quantitatively to find the correlations and to make a regression between the role of designer in involving construction personnel during the design phase and the performance of construction project's schedule.
The result of this research shows a positive, nonlinear correlation between the interface of designer with construction personnel during the design phase and schedule performance of the project. The main variables are: communicating the design intent to construction and the involving construction personnel from the construction contractor."
Lengkap +
Depok: Fakultas Teknik Universitas Indonesia, 2001
T753
UI - Tesis Membership  Universitas Indonesia Library
<<   1 2 3   >>