Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 7 dokumen yang sesuai dengan query
cover
Bank, Randolph E., 1949-
Abstrak :
Intended mainly for use as a reference manual, this third edition encompasses all the improvements of the newest version of the PLTMG software package. This updated version introduces several significant changes, including the following: The data structures defining the domain (triangulation and skeleton) have been simplified; more general boundary conditions are allowed. The internal data structure (triangle tree) has been replaced by a simple triangulation; the adaptive algorithms have been revised to use this simple data structure. The linear equations solvers are multigraph methods, which are simple ILU factorizations with strong connections to the hierarchical basis multigrid method. The graphics packages have been improved and now include expanded options. The test driver has a new X-Windows gui option.
Philadelphia: Society for Industrial and Applied Mathematics, 1998
e20451218
eBooks  Universitas Indonesia Library
cover
Eka Satrya Bontang Koesuma Wardhana
Abstrak :
Sejalan dengan upaya dekarbonisasi global menuju net zero emission, pemerintah mencanangkan arah pengembangan kelistrikan menuju energi hijau melalui program pengalihan bahan bakar diesel pada Pembangkit Listrik Tenaga Diesel (PLTD) menjadi bahan bakar ramah lingkungan atau yang dikenal dengan nama program dedieselisasi. Di antara bahan bakar yang dicanangkan adalah gas bumi. Pulau Nias menjadi salah satu perhatian pemerintah dalam program pemerataan akses listrik dan percepatan dedieselisasi PLTD melalui Keputusan Menteri ESDM No. 13K/13/MEM/2020 untuk melaksanakan penyediaan infrastruktur gas bumi ke Pembangkit Listrik Tenaga Mesin Gas (PLTMG) Nias. Dalam penelitian ini dilakukan perbandingan skema logistik distribusi gas bumi dalam wujud Liquefied Natural Gas (LNG) dan Compressed Natural Gas (CNG) melalui jalur laut dari wilayah Hub Arun LNG untuk mendapatkan biaya pengangkutan yang paling rendah. Skema logistik LNG meliputi LNG Carrier-Onshore Terminal, Mini Floating Storage and Regasification Unit (FSRU) dan LNG ISO Tank, sedangkan skema logistik CNG mencakup CNG Tube-Skid dan CNG Marine. Hasil penelitian menunjukkan biaya pengangkutan paling rendah diperoleh melalui moda LNG dengan skema LNG Carrier-Onshore Terminal, yaitu sebesar $5,18/MMBtu. Dari analisis sensitivitas diperoleh harga Indonesian Crude Price (ICP) dan volume pengangkutan merupakan faktor yang sangat berpengaruh terhadap daya saing gas bumi dibandingkan bahan bakar diesel. ......The Indonesian government has set policies of green energy in power generation to support global decarbonization issue towards net zero emissions. One of the policies is fuel-switching program of diesel fuel into natural gas (de-dieselization). Nias Island becomes one of the government's concerns for equitable access to electricity and accelerating the de-dieselization program through government’s decree to provide natural gas infrastructure for the Nias Gas Engine Power Plant (PLTMG). This research performed analysis of natural gas distribution logistics scheme by sea lane in the form of LNG and CNG from the Arun LNG Hub to look for the lowest transportation cost. The LNG logistics scheme includes LNG Carrier-onshore terminal, Mini FSRU and LNG ISO Tank, while the CNG logistics scheme includes CNG Tube-Skid and Marine CNG. The result of calculation shows that the lowest transportation cost is $5.18/MMBtu by using LNG Carrier-onshore terminal logistic scheme. The result of sensitivity analysis indicates that crude oil price and gas volume transported are important factors which determine natural gas competitiveness compared to diesel fuel.
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Alifya Ananda Khairany
Abstrak :
Pulau Pagerungan Besar terletak di utara Laut Bali dengan potensi gas bumi yang dikelola oleh perusahaan KE. Pulau ini tidak terhubung dengan jaringan. Sebanyak 2312 rumah tangga bergantung pada program penerangan desa perusahaan gas KE dari mesin gas perusahaan KE sebesar 148 kW per jam, namun kebutuhan elektrifikasi di sektor rumah tangga masih belum terpenuhi. Simulasi menggunakan perangkat lunak HOMER dilakukan untuk mendapatkan optimasi penggunaan pembangkit eksisting PLTMG dengan penetrasi PLTS-BESS sehingga beban di sektor rumah tangga dapat terpenuhi. Hasil simulasi didapatkan bahwa sistem hibrid PLTMG-PLTS memiliki harga listrik sebesar $0.0791 dengan kapasitas PLTMG sebesar 148 kW, PLTS sebesar 247 kW, BESS 1.086 kW, dan Converter 141 kW dengan mode operasi cycle charging dan biaya kapital sebesar $637.426. Sistem ini dapat memenuhi 99,99% kebutuhan beban dalam satu tahun dengan kontribusi produksi listrik dari PLTS sebesar 35,9% dan dari PLTMG sebesar 64,1%. Dikaji dari sisi ekonomi, sistem ini memiliki nilai NPV sebesar $1.682.018,88, IRR 10,780% dan Payback Period selama 11 tahun. Penggunaan sistem hibrid PLTMG-PLTS selain dapat memenuhi kebutuhan beban sektor rumah tangga namun juga dapat mereduksi emisi karbon sebesar -41,90% dari program penerangan 148 kW PLTMG dan -54,27% apabila keseluruhan beban rumah tangga ditanggung oleh PLTMG milik perusahaan akibat dari pengurangan penggunaan bahan bakar gas. Studi ini juga membahas terkait arus kas rancangan sistem hibrid PLTMG-PLTS juga perbandingan harga listrik dengan sistem yang ada berdasarkan pengaruh kenaikan LCOE PLTMG dan kenaikkan beban tahunan. ......Pagerungan Besar Island, located in the north of the Bali Sea with natural gas potential managed by KE company. This island is not connected to PLN grid. The 2312 households depend on the KE gas company's village lighting program from the KE company gas engine of 148 kW per hour, but the need for electrification in household sector are still unfulfilled. Simulations using the HOMER software were carried out to optimize the existing gas engine generator with solar PV-BESS so that the load on the household sector can be fulfilled. The simulation results show that the gas engine-solar PV hybrid system has LCOE of $0.0791 with a 148-kW Gas Engine capacity, 247 kW solar PV capacity, 1.086 kW BESS, and 141 kW converter with $637,426 capital cost. This system can meet 99.99% of the load requirement in one year with a 35.9% of electricity production from solar PV and 64.1% from gas engine. From an economic point of view, this system has an NPV of $1,682,018.88, an IRR of 10.780% and a payback period of 11 years. The use of the gas engine-solar PV hybrid system can also reduce carbon emissions by -41.90% from the 148-kW lighting program and -54.27% if the entire household burden is borne by the company's gas engine. This study also discusses the project cash flow of the hybrid system as well as a comparison of electricity prices with the existing system based on the effect of increases in gas engine LCOE and yearly load increment.
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Muhammad Raihan Fuad
Abstrak :
Pemerintah Indonesia berencana meningkatkan rasio elektrifikasi hingga mencapai 100 pada tahun 2020. Mini grid merupakan sebuah pembangkit dan jaringan listrik skala kecil yang dapat menjadi solusi untuk melistriki daerah terpencil. Desa Weriagar memiliki dua masalah utama yakni belum adanya suplai listrik kontinu dan akses air bersih. Mayoritas penduduk berprofesi sebagai nelayan membutuhkan ruangan pendingin untuk menyimpan hasil tangkap ikan. Desa Weriagar terletak dekat dengan kilang LNG Tangguh yang dapat mensuplai bahan bakar pembangkit. Penelitian ini bermaksud untuk melakukan analisis teknis dan ekonomi pembangunan mini grid dengan memanfaatkan LNG untuk melistriki Desa Weriagar, menyediakan air bersih, dan ruang pendingin. Listrik dihasilkan melalui PLTMG, air bersih dengan osmosis balik, dan ruang pendingin menggunakan siklus refrijerasi kompresi uap dan pemanfaatan energi dingin LNG. Simulasi dari masing-masing sistem dilakukan dengan perangkat lunak UniSim Design R390 sedangkan analisis keekonomiannya dilakukan dengan metode arus kas. Hasil dari penelitian ini menunjukkan nilai kapasitas PLTMG sebesar 89 kW, volume cold storage sebesar 301,5 m3, dan kapasitas sistem osmosis balik sebesar 94,6 m3/hari. Konsumsi listrik total dengan dan tanpa memanfaatkan energi dingin LNG pada cold storage adalah sebesar 306.822,41 kWh/tahun dan 309.414,61 kWh/tahun secara berurutan. Penggunaan LNG sebagai bahan bakar pembangkit mampu menghemat subsidi listrik sebesar Rp 3.589/kWh dibandingkan dengan menggunakan bahan bakar diesel.
The Government of Indonesia plans to increase the electrification ratio to 100 by 2020. Mini grid is a small power grid that can be a solution for electrifying remote areas. Weriagar Village one of the villages that still need continuous power and water supply. The majority of the population who work as fishermen also need a room to store their fish. Weriagar Village is located near with LNG Tangguh Field which can be the source for electricity generation. This research intends to conduct technical and economic analysis on mini grid development by utilizing LNG to power Weriagar Village, providing clean water, and cold storage. Electricity is generated through a gas engine, clean water is generated through the reverse osmosis, and the cold storage uses a vapor compression cycle as well as cold energy from LNG. The simulation of each system will be done with UniSim Design R390 software and its economic analysis is done usinh cash flow method. The gas engine capacity was found to be 89 kW, the volume of cold storage was found to be 301,5 m3, whilst the reverse osmosis capacity was found to be 94,6 m3 day. The total electricity consumption with and without utilizing LNG cold energy in cold storage were found to be 306.822,41 kWh year and 309.414,61 kWh year respectively. There is a subsidy saving of Rp 3.589,26 kWh by using LNG instead of diesel as fuel.
Depok: Fakultas Teknik Universitas Indonesia, 2018
S-Pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Naufal Muflih Ramadhon
Abstrak :
Transesterifikasi adalah reaksi kimia yang digunakan untuk mengubah minyak hewani menjadi biodiesel yang dapat digunakan. Pada penelitian ini, bahan bakar biodiesel disintesis dari lemak sapi dalam reaktor menggunakan katalis CaO yang disintesis dari cangkang telur bebek. Katalis CaO berbasis limbah disintesis dari cangkang telur bebek melalui proses kalsinasi pada suhu 900 OC selama 2 jam. Transesterifikasi dilakukan pada suhu 55 OC pada 6 sampel dengan variasi penggunaan jumlah katalis (1.5 wt%, 6.5 wt%, dan 10 wt%) serta variasi katalis CaO komersial dan limbah. Katalis yang disintesis dari cangkang telur itik menghasilkan kadar Kalsium Oksida (CaO) sebesar 93.2%. Hasil pengujian sampel terbaik diperoleh untuk biodiesel dengan katalis 6.5% berbahan dasar limbah dan 10% katalis komersial. Untuk biodiesel dengan katalis berbasis limbah 6.5%, rendemen 90.75%, densitas 855.1 kg/m3, viskositas 5.73 mm2/cst, keasaman 1.69 mg-KOH/g, dan bilangan yodium 30.87 g-I2/100g. Untuk biodiesel dengan katalis berbasis limbah 10%, rendemen 90.81%, densitas 860.5 kg/m3, viskositas 6.52 mm2/cst, keasaman 2.03 mg-KOH/g, dan bilangan yodium 27.51 g-I2/100g. Angka keasaman standar tidak tercapai dimana maksimumnya adalah 0.5 mg-KOH/g. ......Transesterification is a chemical reaction used to convert animal oils into usable biodiesel. In this study, biodiesel fuel was synthesized from beef tallow in a reactor using a CaO catalyst which also synthesized from duck eggshells. Waste-based CaO catalyst synthesized from duck eggshells through a calcination process at 900 OC for 2 hours. Transesterification carried out at a temperature of 55 OC on 6 samples with variations in the use of the amount of catalyst (1.5 wt%, 6.5 wt%, and 10 wt%) as well as variations of commercial and waste based CaO catalysts. The catalyst synthesized from duck eggshells obtained a yield of 93.2% amount of Calcium Oxide (CaO). The synthesized biodiesel also tested for its chemical and physical properties to fulfill the Indonesian National Standard (SNI). The best sample test results were obtained for biodiesel with 6.5% catalyst from waste-based and 10% catalyst from commercial. For biodiesel with 6.5% waste-based catalyst, 90.75% yield, 855.1 kg/m3 density, 5.73 mm2/cst viscosity, 1.69 mg-KOH/g acidity, and 30.87 g-I2/100g iodine number. For biodiesel with 10% waste-based catalyst, 90.81% yield, 860.5 kg/m3 density, 6.52 mm2/cst viscosity, 2.03 mg-KOH/g acidity, and 27.51 g-I2/100g iodine number. The standard acidity number is not reached where the maximum is 0.5 mg-KOH/g.
Depok: Fakultas Teknik Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Simarmata, David Febrian
Abstrak :
ABSTRAK
Penelitian ini membahas mengenai perencanaan Pembangkit Listrik Tenaga Mesin-Gas PLTMG dengan mesin Jenbacher Type-3 Engine J320 G. Dengan menggunakan data spesifikasi mesin yang ada maka data dapat diolah untuk menentukan rancangan Pembangkit Listrik Tenaga Mesin-Gas PLTMG khususnya pada sistem bahan bakar. Bahan bakar yang akan digunakan adalah Liquified Petroleum Gas LPG . Pada skripsi ini akan menampilkan teori dasar heat rate dan flow rate serta desain pipa. Selain itu, dalam penelitian ini juga akan menghitung pressure drop pada pipa serta hubungan flow rate dengan siklus dan sistem distribusi bahan bakar. Diperoleh hasil nilai heat rate sebesar 8624.69 BTU/kWh dan nilai flow rate sebesar 0.058 kg/s. Ukuran pipa yang digunakan 4 rdquo; dengan schedule 80 serta besarnya tekanan yang hilang pressure drop sebesar 192.68 Pa.
ABSTRACT
This thesis discusses the planning of Gas Engine Power Plant with Jenbacher Engine Type 3 Engine J320 G. Using the machine specification that can be processed to determine the design of Gas Engine Power Plant especially in the system fuel. The fuel to be used is Liquified Petroleum Gas LPG . In this thesis will show the basic theory of heat rate and flow rate and pipe design. In addition, in this study will also calculate the pressure drop on the pipeline and the flow rate relationship with cycle and fuel distribution system. The result of heat value value is 8624.69 BTU kWh and the flow rate is 0.058 kg s. The size of the pipe used 4 with the schedule 80 and the amount of pressure drop of 192.68 Pa.
2017
S68442
UI - Skripsi Membership  Universitas Indonesia Library
cover
Muhammad Syofuan Karnadi
Abstrak :
Mempertimbangkan kondisi lokasi-lokasi yang berada pada daerah terluar dan/atau terpencil di Indonesia yang juga mempunyai hak atas akses terhadap energi listrik, serta dengan memperhatikan fakta bahwa kebutuhan energi listrik pada daerah-daerah tersebut sangat bervariasi dan cenderung kecil, dibutuhkan solusi pembangkit listrik yang bersifat modular, dapat diekspansi kapasitasnya sesuai pertumbuhan kebutuhan dimasa mendatang, mempunyai efisiensi yang baik, proses pembangunan yang relatif cepat dan dengan tingkat keberhasilan yang tinggi, serta mampu mendukung pola operasi yang ada. Salah satu solusi yang dapat dimanfaatkan adalah Pembangkit Listrik Tenaga Mesin Gas (PLTMG). Pada penggunaan PLTMG dengan opsi dua jenis bahan bakar (dual fuel), dengan dua tangki penyimpanan (dual storage), kombinasi antara bahan bakar gas alam cair (Liquified Natural Gas/LNG) dan diesel (High Speed Diesel/HSD), salah satu alternatif yang dapat diidentifikasi adalah optimasi pada sisi manajemen persediaan LNG sebagai bahan bakar utama dan HSD sebagai bahan bakar alternatif. Optimasi dapat dilakukan dengan cara menggunakan kombinasi yang optimal antara kapasitas tangki persediaan LNG dan kapasitas tangki persediaan HSD. Kombinasi yang optimal dapat diperoleh menggunakan model alternatif yang telah dikembangkan dari metode nilai ekuivalen biaya energi dalam bentuk seragam selama periode analisis (LCOE), untuk PLTMG yang menggunakan dua jenis bahan bakar, dengan dua tangki penyimpanan, kombinasi antara LNG dan HSD, yang telah dihasilkan pada penelitian tahap awal (seminar) yang telah dilakukan. Model alternatif yang telah dikembangkan, selanjutnya akan diuji validitasnya, sebelum digunakan dalam perhitungan. Menggunakan model yang telah divalidasi, selanjutnya dilakukan perhitungan keekonomian dan kelayakan investasi pembangkit listrik dengan menggunakan beberapa variasi kasus sebagai simulasi. Berdasarkan hasil simulasi kasus yang dilakukan, didapatkan bahwa kombinasi yang optimal, berdasarkan data referensi yang digunakan, adalah tangki LNG dengan kapasitas untuk durasi satu hari persediaan dan kapasitas tangki HSD untuk delapan hari persediaan. Optimasi pada sisi manajemen persediaan energi primer ini berhasil mereduksi besaran nilai LCOE, dari sebelumnya yang berada pada kisaran 0,0861 US$/kWh menjadi 0,0836 US$/kWh, dengan potensi penghematan sebesar 602.196,08 US$/tahun atau setara dengan Rp.8.205.523.808,46/tahun (kasus ke-9).
Considering the locations in the region of the outer and/or isolated areas in Indonesia which also has the right to access the electricity, as well as with regard to the fact that the electrical energy demand in these areas is very varied and tend to be small, needs the power plants solutions that are modular, expandable capacity according to the demand growth in the future, has a good efficiency, the construction process is relatively fast and with a high success rate, and is capable of supporting existing operating patterns. One solution that can be utilized are the Gas Engine Power Plant (GEPP). On the use of GEPP with dual fuel option, with dual storage, a combination of Liquefied Natural Gas (LNG) and High Speed Diesel (HSD), one of the alternatives that can be identified is the optimization of the supply management side of LNG as the main fuel and HSD as an alternative one. The optimization can be done by using the optimum combination between the capacity of the LNG supply tank and the tank capacity of HSD supplies Optimal combinations can be obtained using alternative models that have been developed from the levelized cost of energy (LCOE) method, for dual fuel GEPP, with dual storage tanks, a combination of LNG and HSD, which has been developed at the early stage research (seminar). The alternative model has been developed, will be tested its validity, before being used in the calculation. Using a model that has been validated, the calculation of power plant economic feasibility will be done by using some variation of the case as a simulation. Based on the simulation results of cases performed, it was found that the optimum combination, based on the reference data being used, is in the capacity of the LNG tanks for the duration of one day of inventory and HSD tank capacity for eight days of inventory. Optimization on the side of the primary energy supply management, have managed the LCOE reduction, from earlier in the range of 0,0861 US $/kWh to 0,0836 US $/kWh, with potential savings of US $ 602.196,08/year, or equivalent to 8.205.523.808,46 Indonesian Rupiah/year (the 9th case).
Depok: Universitas Indonesia, 2016
T46136
UI - Tesis Membership  Universitas Indonesia Library