Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 10 dokumen yang sesuai dengan query
cover
Eileen Onggaria
"Energi nuklir sebagai sumber energi baru dan terbarukan merupakan salah satu penghasil listrik yang sangat potensial di Indonesia. Peraturan Pemerintah Nomor 79 Tahun 2014 (PP 79 Tahun 2014) tentang Kebijakan Energi Nasional menyebutkan bahwa rencana pembangunan Pembangkit Listrik Tenaga Nuklir (PLTN) di Indonesia akan dimulai setelah tahun 2025. Sehingga, diperlukan Technical and Scientific Support Organization (TSO) untuk mengawasi PLTN. Penelitian ini mengusulkan kriteria pengawasan TSO dengan Analytical Hierarchy Process (AHP) yang terbagi menjadi tiga perspektif yaitu Safety, Commissioning and Operation, dan Human Resource and Management, dengan bobot masing-masing perspektif 0,604, 0,210, dan 0,186. Dalam pengawasan PLTN, Safety merupakan perspektif terpenting untuk memastikan keselamatan dalam komisioning dan operasi PLTN. Asesmen pengawasan PLTN dengan SWOT dan strategi pengawasan dengan Hoshin Kanri dirancang untuk mengelaborasi seluruh komponen yang sebelumnya terpisah dan berdiri sendiri menjadi kesatuan untuk efektivitas dan efisiensi kinerja organisasi.
...... Nuclear energy as a new and renewable energy source is one of the potential electricity producers in Indonesia. Government Regulation No. 79/2014 (PP 79/2014) on National Energy Policy states that the plan to build a Nuclear Power Plant (PLTN) in Indonesia will begin after 2025. Thus, a Technical and Scientific Support Organisation (TSO) is needed to supervise nuclear power plants. This research proposes TSO supervision criteria with Analytical Hierarchy Process (AHP) which is divided into three perspectives namely Safety, Commissioning and Operation, and Human Resource and Management, with the weight of each perspective 0.604, 0.210, and 0.186. In NPP supervision, Safety is the most important perspective to ensure safety in NPP commissioning and operation. The NPP supervision assessment with SWOT and the supervision strategy with Hoshin Kanri are designed to elaborate all components for the effectiveness and efficiency of organisational performance."
Jakarta: Fakultas Teknik Universitas Indonesia, 2023
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Abdurrahman Al-Fatih Ifdal
"Pembangkit listrik tenaga nuklir (PLTN) merupakan suatu pembangkit tenaga listrik dengan daya termal yang memaksimalkan satu atau lebih reaktor nuklir selaku sumber panas. PLTN memiliki ragam manfaat esensial terhadap pemenuhan kebutuhan energi suatu negara, tak terkecuali di Indonesia. Sampai sekarang, Indonesia belum memiliki PLTN terlepas dari adanya wacana pembangunan PLTN dari sejak disahkannya Undang-Undang (UU) Nomor 31 Tahun 1964 tentang Ketentuan-Ketentuan Pokok Tenaga Atom. Hingga akhirnya UU ini dicabut dengan UU Nomor 10 Tahun 1997 tentang Ketenaganukliran sebagaimana telah diubah dengan UU Nomor 11 Tahun 2020 tentang Cipta Kerja, pengaturan PLTN kembali diperkuat dengan adanya landasan hukum yang membolehkan PLTN untuk dibangun di Indonesia selama mempertimbangkan faktor keselamatan yang ketat. Kendati demikian, prospek yang cerah terhadap pembangunan PLTN pun tidak kunjung membawakan adanya realisasi pembangunannya secara nyata di Indonesia. Berangkat dari latar belakang berikut, tulisan ini akan menggali, mengkaji, dan menganalisis tinjauan rencana pembangunan PLTN di Indonesia yang dilihat dari segi perlindungan dan pengelolaan lingkungan hidup. Penggunaan lensa hukum lingkungan dalam menjelaskan prospek PLTN jarang diliput secara ilmiah, terlebih dari kacamata hukum lingkungan Indonesia. Analisis dalam tulisan menggunakan pendekatan yuridis berupa penelitian keseluruhan data sekunder hukum terkait PLTN di Indonesia untuk menjawab permasalahan kajian prinsip hukum ketenaganukliran, kesesuaian rencana PLTN, dan tinjauan lainnya dalam rangka memberikan gambaran komprehensif secara meluas (helicopter view). Dari sini, akan didapatkan rekomendasi langkah yang harus diambil Indonesia dalam menetapkan peta jalan pembangunan PLTN jika (akhirnya) terwujudkan.

A nuclear power plant (NPP) is a power plant with thermal power that maximizes one or more nuclear reactors as heat sources. NPPs have a variety of essential benefits for meeting the energy needs of a country, including in Indonesia. Until now, Indonesia has not had a nuclear power plant apart from the discourse on nuclear power plant development since the enactment of Law Number 31 of 1964 concerning the Basic Provisions of Atomic Energy. Until finally this law was repealed by Law Number 10 of 1997 concerning Nuclear Energy as amended by Law Number 11 of 2020 concerning Job Creation, the regulation of NPP was again strengthened by the existence of a legal basis that allowed nuclear power plants to be built in Indonesia as long as it considered strict safety factors. However, the bright prospects for the construction of NPPs have not led to a real realization of its development in Indonesia. Departing from the following background, this paper will explore, study, and analyze a review of the NPP development plan in Indonesia in terms of environmental protection and management. The use of environmental law lenses in explaining the prospect of nuclear power plants is rarely covered scientifically, especially from the perspective of Indonesian environmental law. The analysis in the paper uses a juridical approach in the form of research on all secondary legal data related to nuclear power plants in Indonesia to answer the problems of nuclear law principle studies, the suitability of nuclear power plants, and other reviews in order to provide a comprehensive overview in a broad manner (helicopter view). From this, this thesis provides recommendations for steps that Indonesia should take in determining the road map for NPP development if (in the end) it is realized."
Depok: Fakultas Hukum Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Imam Bastori
"Kebutuhan listrik nasional pada masa mendatang terus meningkat seiring dengan pertumbuhan jumlah penduduk dan industri. Pembangkit listrik tenaga nuklir (PLTN) menjadi alternatif dalam memenuhi kekurangan penyediaan listrik secara nasional. Oleh karena itu, kajian investasi dan skema pembiayaan PLTN menjadi cukup mendesak untuk dilakukan.
Hasil analisa terhadap PLTN dan pembangkit konvensional dalam studi ini menunjukkan bahwa PLTN cukup kompetitif terhadap pembangkit batu bara dan gas. Biaya produksi listrik PLTN jenis AP600 sekitar 532,12 per MWh sedangkan pembangkit batu bara di antara $29 - $32 per MWh dan pembangkit gas sekitar $32,68 per MWh pada discount rate 8% tanpa pajak karbon.
Resiko bisnis PLTN mencakup biaya pertanggungjawaban nuklir terhadap ]ingkungan, resiko mundurnya penyelesaian proyek, dan premi asuransi investasi. Biaya pertanggungiawaban nuklir meliputi biaya resiko kecelakaan nuklir, asuransi properti dan para pekerja.
Ada dua skema pembiayaan yang ditinjau dalam studi ini yaitu skema tradisional (modal dan pinjaman) dan Build Operate Transfer (BOT). Dari beberapa skenario yang dikaji dalam tesis ini, hasilnya menunjukkan bahwa skema pembiayaan konsorsium dan BOT merupakan alternatif yang patut dipertimbangkan bagi para pengambil kebijakan. Skema konsorsium cukup cocok bagi negara yang sudah berpengalaman dalam proyek PLTN dan skema BOT cocok bagi negara yang belum memiiiki pengalaman dalam proyek PLTN.

In the future, national electricity demand increases according population and industry growth. Nuclear power plant is alternative to cover electricity deficit nationally. So, investment assessment and financing scheme for nuclear power plant are urgent to be done.
The result of analysis to nuclear and conventional in the study shows that nuclear power plant is competitive to coal and gas. Levelized cost of electricity (LCOE) for AP600 nuclear power plant is $32.12 per MWh but coal about 529 - $32 per MWh and gas $32.68 per MWh in 8% discount rate without carbon tax.
Nuclear power plant business risk consists of nuclear liability cost for environment, project delayed, and insurance premium of investment. Nuclear liability covers cost of nuclear accident risk, insurance premium for property and staff.
There are two financing scheme reviewed; traditional (equity and debt) and Build Operate Transfer (BOT) scheme. From some scenarios assessed in the thesis show that consortium and BOT financing scheme are alternatives can be considered by decision maker. Consortium scheme is suitable for experience country in nuclear power plant and BOT is suitable for not experience country.
"
Depok: Fakultas Teknik Universitas Indonesia, 2005
T18637
UI - Tesis Membership  Universitas Indonesia Library
cover
Dini Octavia Anggraini
"ABSTRAK
Skripsi ini membahas mengenai fungsi komunikasi risiko dalam pemanfaatan
tenaga nuklir di sektor energi. Dalam skripsi ini penulis menjabarkan dua pokok
permasalahan: Pertama, mengenai peraturan komunikasi risiko dalam UU No.
32/2009 dan kedua, mengenai fungsi komunikasi risiko itu sendiri dalam
pemanfaatan tenaga nuklir di sektor energi. Hasil dari penelitian ini menunjukkan
bahwa komunikasi risiko sebenarnya dapat dijadikan peluang dalam membangun
pemahaman dan kepercayaan masyarkat dalam rencana pembangunan pembangkit
listrik tenaga nuklir pertama di Indonesia.

ABSTRACT
This thesis discussing about the function of risk communication in the use of
nuclear power in energy sector. In this thesis the author proposes two main issues:
First, how the Law Number 32 of 2009 regulate about risk communication. While
the second, the thesis will discuss about the function of risk risk communication in
the use of nuclear power the energy sector. The result of this study showed that risk
communication can actually be used as an opportunity to build understanding and
people acceptance in the development plan of the very first nuclear power plant in
Indonesia"
2016
S64350
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ari Nugroho
"Pertumbuhan industri berdampak terhadap peningkatan kebutuhan listrik di berbagai tempat, hal ini juga terjadi di Provinsi Kalimantan Barat, khususnya di Kabupaten Bengkayang. Sebagian pasokan listrik di Bengkayang masih tergantung dari pembangkit listrik yang diperoleh dari Sarawak, yaitu salah satu negara bagian Malaysia yang berbatasan dengan Kalimantan. Maka dari itu, untuk mengurangi ketergantungan listrik, perlu dibangun suatu Pembangkit Listrik Tenaga Nuklir (PLTN). Pertimbangan penggunaan teknologi PLTN diantaranya didasari karena faktor kemampuannya dalam menghasilkan listrik dengan skala yang besar, mengurangi pemakaian energi fosil, dan juga mengurangi emisi karbondioksida sebagai hasil dari proses pembangkitannya. Namun demikian, untuk membangun suatu PLTN, diperlukan tapak yang memenuhi aspek kelayakan (feasibility) dan keandalan (reliability). Pada penelitian ini dilakukan penilaian untuk menentukan satu tapak PLTN yang merupakan hasil penilaian dari beberapa lokasi tapak PLTN di Kabupaten Bengkayang. Metode yang digunakan dalam penelitian ini adalah Multi Criteria Decision Analisis (MCDA) yang digunakan pada platform Sistem Informasi Geografi (SIG) dan Analytical Hierarchi Process (AHP). Tahap pertama analisis dengan SIG diperoleh 3 lokasi tapak (candidate sites) PLTN, sedangkan tahap kedua dengan menggunakan analisis AHP diperoleh 1 tapak (selected site). Selected site untuk tapak PLTN di Kabupaten Bengkayang terletak di Batu Belah di Desa Karimunting.
......Industrial growth has an impact on increasing the electricity demands in various places, this has also taken place in West Kalimantan Province, especially in Bengkayang Regency. Some electricity supplies in Bengkayang mainly depend on the power plant that is imported from Sarawak, which is one of the Malaysian states. Therefore, to reduce dependence on electricity, it is necessary to build a Nuclear Power Plant (NPP). Some of considerations for utilizing a nuclear power plant technology are based on its advantages factors such as the capability of generating electricity on a large scale, reducing the use of fossil energy, as well as reducing carbon dioxide emissions as a result of the generation process. However, to build a nuclear power plant requires a thorough assessment to meets the feasibility and reliability requirements. This study was carried out to determine one selected NPP site out of three NPP candidates sites located in Bengkayang Regency. The method used in this study is Multi Criteria Decision Analysis (MCDA) under the Geographic Information System (GIS) platform and Analytical Hierarchy Process (AHP). The first step analysis using GIS resulted 3 candidate sites, while the second step by means of applying AHP analysis resulted 1 selected site. The selected site for NPP in Bengkayang Regency is located at Batu Belah in Karimunting Village."
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Ari Nugroho
"Pertumbuhan industri berdampak terhadap peningkatan kebutuhan listrik di berbagai tempat, hal ini juga terjadi di Provinsi Kalimantan Barat, khususnya di Kabupaten Bengkayang. Sebagian pasokan listrik di Bengkayang masih tergantung dari pembangkit listrik yang diperoleh dari Sarawak, yaitu salah satu negara bagian Malaysia yang berbatasan dengan Kalimantan. Maka dari itu, untuk mengurangi ketergantungan listrik, perlu dibangun suatu Pembangkit Listrik Tenaga Nuklir (PLTN). Pertimbangan penggunaan teknologi PLTN diantaranya didasari karena faktor kemampuannya dalam menghasilkan listrik dengan skala yang besar, mengurangi pemakaian energi fosil, dan juga mengurangi emisi karbondioksida sebagai hasil dari proses pembangkitannya. Namun demikian, untuk membangun suatu PLTN, diperlukan tapak yang memenuhi aspek kelayakan (feasibility) dan keandalan (reliability). Pada penelitian ini dilakukan penilaian untuk menentukan satu tapak PLTN yang merupakan hasil penilaian dari beberapa lokasi tapak PLTN di Kabupaten Bengkayang. Metode yang digunakan dalam penelitian ini adalah Multi Criteria Decision Analisis (MCDA) yang digunakan pada platform Sistem Informasi Geografi (SIG) dan Analytical Hierarchi Process (AHP). Tahap pertama analisis dengan SIG diperoleh 3 lokasi tapak (candidate sites) PLTN, sedangkan tahap kedua dengan menggunakan analisis AHP diperoleh 1 tapak (selected site). Selected site untuk tapak PLTN di Kabupaten Bengkayang terletak di Batu Belah di Desa Karimunting.
......Industrial growth has an impact on increasing the electricity demands in various places, this has also taken place in West Kalimantan Province, especially in Bengkayang Regency. Some electricity supplies in Bengkayang mainly depend on the power plant that is imported from Sarawak, which is one of the Malaysian states. Therefore, to reduce dependence on electricity, it is necessary to build a Nuclear Power Plant (NPP). Some of considerations for utilizing a nuclear power plant technology are based on its advantages factors such as the capability of generating electricity on a large scale, reducing the use of fossil energy, as well as reducing carbon dioxide emissions as a result of the generation process. However, to build a nuclear power plant requires a thorough assessment to meets the feasibility and reliability requirements. This study was carried out to determine one selected NPP site out of three NPP candidates sites located in Bengkayang Regency. The method used in this study is Multi Criteria Decision Analysis (MCDA) under the Geographic Information System (GIS) platform and Analytical Hierarchy Process (AHP). The first step analysis using GIS resulted 3 candidate sites, while the second step by means of applying AHP analysis resulted 1 selected site. The selected site for NPP in Bengkayang Regency is located at Batu Belah in Karimunting Village."
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Mas Gunawan Haryanto
"Pada tanggal 11 Maret 2011, serangkaian tsunami yang disebabkan oleh Gempa Tohoku Area Pasifik Lepas Pantai menghancurkan semua off-site dan hampir semua sumber listrik internal di Fukushima-daiichi. Kerugian ini menyebabkan kegagalan untuk mendinginkan reaktor dan kolam penyimpanan bahan bakar bekas dan akhirnya menyebabkan kecelakaan besar Level 7 pada Skala Peristiwa Nuklir dan Radiologi Internasional (INES). PLTN Fukushima-daini (Fukushima-Daini) juga rusak dan mengalami insiden serius Level 3. TEPCO adalah perusahaan tenaga listrik terbesar di Jepang yang memasok listrik ke wilayah metropolitan Tokyo dan wilayah sekitarnya. Jika terjadi kecelakaan seperti kerusakan inti atau hilang daya pada pembangkit listrik tenaga nuklir (PLTN), penukar panas alternatif biasanya digunakan untuk mendinginkan bejana tekan dan bejana penampung. Namun, ada resiko terkondensasinya uap yang dapat mengakibatkan tekanan negative yang merusak pada bejana penamung, atau ledakan dari gas bakar yang dihasilkan oleh proses radiolysis. Untuk mencegah situasi seperti masalah telah dirumuskan, perlu dikembangkan peralatan untuk mensuplai pendingin alternatif kedalam bejana penampung. Salah satunya dengan menggunakan gas inert nitrogen menggunakan mobile nitrogen gas generator. GEN 3 memiliki diameter yang lebih kecil daripada dua pendahulunya. Diameter yang lebih kecil dapat menghasilkan permukaan kontak yang lebih besar sehingga proses adsorbsi dapat mengikat oksigen lebih banyak dan menghasilkan nitrogen yang lebih banyak juga. Pada nitrogen dengan kemurnian 99%, 1 ton CMS GEN 1 dapat menghasilkan nitrogen sebesar 330 Nm3/h, lalu pada GEN 2 360 Nm3/h, serta setelah dioptimalisasi terakhir GEN 3 didapatkan sebesar 400 Nm3/h.
......On March 11, 2011, a series of tsunamis caused by the Tohoku Pacific Area Offshore Earthquake destroyed all off-site and nearly all internal power sources at Fukushima-daiichi. These losses led to failure to cool the reactors and spent fuel storage ponds and eventually led to a major Level 7 accident on the International Nuclear and Radiological Events Scale (INES). The Fukushima-daini (Fukushima-Daini) nuclear power plant was also damaged and experienced a serious Level 3 incident. TEPCO is the largest electric power company in Japan that supplies electricity to the Tokyo metropolitan area and surrounding areas. In the event of an accident such as a breakdown of the core or loss of power at a nuclear power plant (NPP), alternative heat exchangers are usually used to cool pressure vessels and containment vessels. However, there is a risk of condensation of the vapors which could result in a destructive negative pressure on the containment vessel, or an explosion of the combustion gases produced by the radiolysis process. In order to prevent a situation like the problem having been formulated, it is necessary to develop equipment for supplying alternative refrigerants into the storage vessel. One of them is by using inert nitrogen gas using a mobile nitrogen gas generator. The GEN 3 has a smaller diameter than its two predecessors. Smaller diameter can produce a larger contact surface so that the adsorption process can bind more oxygen and produce more nitrogen as well. At 99% purity nitrogen, 1 tonne of CMS GEN 1 can produce nitrogen of 330 Nm3/h, then at GEN 2 360 Nm3/h, and after the last optimization, GEN 3 is obtained at 400 Nm3/h."
Depok: Fakultas Teknik Universitas Indonesia, 2022
PR-pdf
UI - Tugas Akhir  Universitas Indonesia Library
cover
Laurentius Kristianto Adi Wicaksono
"Di era dimana krisis iklim semakin menjadi ancaman nyata bagi dunia, Pembangkit Listrik Tenaga Nuklir semakin menarik perhatian untuk melakukan transisi energi menuju energi yang lebih bersih demi mengurangi emisi karbon. Namun sebagai bangunan yang memiliki risiko tinggi, pembangunan Pembangkit Listrik Tenaga Nuklir (PLTN) perlu dirancang dengan baik dengan mempertimbangkan aspek kegempaan, salah satunya peak ground acceleration sebagai parameter. Penelitian ini bertujuan menganalisis kondisi peak ground acceleration di pulau Bangka sebagai salah satu kandidat lokasi PLTN di Indonesia dengan menggunakan metode probabilistic seismic hazard analysis untuk dapat mengkuantifikasi probabilitas terlampauinya masing-masing tingkatan peak ground acceleration. Untuk melakukan prediksi nilai peak ground acceleration, dilakukan identifikasi sumber-sumber gempa yang berpengaruh bagi pulau Bangka dilakukan pada penelitian ini beserta pemodelan seismisitasnya. Hasil penelitian menunjukkan Pulau Bangka memiliki probabilitas terjadinya peak ground acceleration yang setara atau lebih dari 0.1 hingga 0.125 g sebesar 1% dalam 100 tahun yang menunjukkan bahwa Pulau Bangka relatif aman dan memenuhi kriteria untuk lokasi Pembangkit Listrik Tenaga Nuklir.
......In an era where climate change become real threat for the world, Nuclear Power Plant (NPP) getting more attention to do energy transition toward a cleaner energy in order to reduce carbon emission. But has a high risk building and facility, Nuclear Power Plant need to be specifically designed by considerating seismisicity aspect with peak ground acceleration as one of its parameter. This research aims to analyze the peak ground acceleration condition in Bangka Island as one of the Nuclear Power Plant location candidate in Indonesia using probabilistic seismic hazard analysis method in order to quantify exceedance probability of certain level of peak ground acceleration. In order to predict the peak ground acceleration, seismic source that affecting Bangka Island was identified on this research, including its seismicity model. This research results show that Bangka Island has 1% probability in a hundred year that a 0.1-0.125 g peak ground acceleration was felt on this island and that was considered relatively safe and pass the peak ground acceleration criteria for Nuclear Power Plant location candidate."
Depok: Fakultas Matematika Dan Ilmu Pengetahuan Alam Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Asystasia Sabathrin Cindananti
"ABSTRACT
Penggunaan bahan-bahan tambang, material, dan teknologi nuklir adalah inalienable right dalam rangka penerapan Permanent Sovereignty pada konteks pemanfaatan tenaga nuklir. Convention on Nuclear Safety CNS tahun 1994 menjadi l rsquo;accord-cadre bagi pemanfaatan energi nuklir untuk pembangkitan tenaga listrik yang mengharuskan pemanfaatannya dijamin dengan hukum domestik yang baik. Penelitian ini bertujuan untuk menjelaskan bagaimana prinsip keselamatan di CNS dapat hidup dan mengatur aktivitas pemanfaatan tenaga nuklir untuk pembangkitan listrik domestik melalui kaidah-kaidah hukum positif dalam sebuah kerangka hukum nuklir municipal. Selama ini, sulit untuk menentukan ukuran pelanggaran kaidah hukum CNS karena tidak adanya elemen-elemen kontekstual yang disepakati oleh para sarjana hukum selain aspek teknis. Hal tersebut berusaha dijawab dengan memaparkan best practice pada hukum di beberapa negara, dan dengan pendekatan problem-based, salah satunya dalam hal kecelakaan. Dalam penelitian ini, kecelakaan PLTN Fukushima tahun 2011 lalu dianalisis secara mendalam dan hasilnya didapatkan bahwa terdapat ketaatan parsial Jepang dengan simpulan akhir tidak ada indikasi atas niat pelanggaran yang berakibat kelalaian. Namun lebih kepada kurangnya kesadaran pemerintah Jepang terhadap kultur keselamatan. Penelitian ini dapat digunakan sebagai pembuktian bahwa energi nuklir merupakan opsi yang sangat efesien dan terpercaya apabila keselamatannya terjamin. Selain itu, penelitian ini dapat pula menjadi rujukan untuk memperbaiki hukum dan kebijakan terkait yang masih dirasa kurang tepat, serta menyugestikan reformasi hukum keselamatan nuklir nasional agar sesuai dengan standar keselamatan nuklir internasional yang berlaku. Kata Kunci: Kedaulatan, Energi Nuklir, Hak Berdaulat Tenaga Nuklir, PSNR, Hak Aktivitas Berbahaya, Pembangunan Berkelanjutan, Prinsip Keseimbangan Antar-Generasi, PLTN, Keselamatan nuklir, Hukum Keselamatan Nuklir Internasional, Convention on Nuclear Safety 1994, Kasus Fukushima 2011, Badan Pengawas Nuklir.

ABSTRACT
The usage of nuclear ores, materials, and technologies is an inalianable right in respect with the application of the Permanent Sovereignty doctrine on the context of atomic energy utilization. The 1994 Convention on Nuclear Safety CNS is the l rsquo accord cadre for nuclear energy utilization, in casu nuclear power plants NPPs , which needs to be guaranteed by a satisfying domestic law. This research aims to explain how the CNS rsquo s safety principles shall prevail and rule the utilization of nuclear power activities for NPPs through positive laws in a municipal nuclear law. It has been strenuous attempt to measure the violations towards the CNS rsquo safety principles since there is no agreement amongst the legal scholars on contextual elements but the technical elements. To solve such problem, this research will explain the states rsquo legal best practice over the world, and by problem based solving, such as accident. This research further analyze on the 2011 Fukushima NPP accident, and it is proven that there is a partial compliance by Japan. It can be concluded that Japan has no intention to breach any law which later relevant with the imprudence . However, the omission was caused by lack of Japan government rsquo s concern on safety culture. This research may proper to be used as a scientific proof that nuclear energy is an efficient and reliable option if only the safety has been settled. Notwithstanding, this research also may be used as a reference to enhance the lack of high safety priority on the laws and policies, and to reform the national nuclear safety law in accordance to the international legal standards. Keywords Sovereignty, Nuclear Energy, Sovereign Right over Natural Resources, PSNR, Right to Conduct a Dangerous Activity, Sustainable Development, Intergenerational Equity Principle, NPP, Nuclear Safety, International Nuclear Safety Law, 1994 Convention on Nuclear Safety, 2011 Fukushima Case, Regulatory Bodies. "
[;;, , ]: 2017
S70031
UI - Skripsi Membership  Universitas Indonesia Library
cover
Kamilia Salsabila
"Kabupaten Bengkayang dan Kabupaten Mempawah di Kalimantan Barat dipilih sebagai calon lokasi PLTN berdasarkan kriteria eksklusi dan diskresioner. Kriteria eksklusi terdiri atas struktur geologi, jenis batuan, keberadaan dan ketersediaan air pendingin, kedekatan dengan pusat populasi, dan bentuk medan, sedangkan kriteria diskresioner yaitu kedekatan dengan infrastruktur jalan. Penelitian ini bertujuan untuk melakukan pemetaan serta menganalisis kriteria eksklusi dan diskresioner lokasi potensial PLTN. Dalam penelitian ini, digunakan metode penapisan (screening) dengan menggunakan analisis keterjangkauan, analisis kesesuaian wilayah, dan analisis spasial deskriptif yang dilakukan menggunakan perangkat lunak dari Sistem Informasi Geografis (SIG) berdasarkan informasi data spasial. Proses penapisan tersebut menghasilkan enam lokasi yang potensial untuk dijadikan lokasi PLTN. Lima lokasi terletak di Kabupaten Bengkayang tepatnya di Kecamatan Sungai Raya Kepulauan dan Kecamatan Sungai Raya. Satu lokasi lainnya terletak di Kabupaten Mempawah tepatnya di Kecamatan Sungai Kunyit. Keenam lokasi tersebut termasuk ke dalam jarak cukup aman dari keberadaan struktur geologi, memiliki jenis batuan yang kuat, tidak berada jauh dari keberadaan air pendingin, jauh dari pusat populasi, memiliki bentuk medan yang datar hingga berombak, dan memiliki lokasi yang dekat dengan jalan arteri.

Bengkayang Regency and Mempawah Regency in West Kalimantan were selected as prospective nuclear power plant (NPP) locations based on exclusion and discretionary criteria. Exclusion criteria consist of geological structure, rock type, existence and sufficiency of cooling water, proximity to population center, and terrain shape, while discretionary criteria is proximity to road infrastructure. This study aims to map and analyze exclusion and discretionary criteria for potential NPP. In this study, screening method using affordability analysis, regional suitability analysis, and spatial descriptive analysis are performed using software from Geographic Information Systems (GIS) based on spatial data information. The screening process produced six potential locations to be used as NPP. Five locations are in Bengkayang Regency, precisely in Sungai Raya Kepulauan District and Sungai Raya District. Another location is in Mempawah Regency precisely in Sungai Kunyit District. The six locations are included in a fairly safe distance from the presence of geological structures, have a strong rock type, are not far from the existence of cooling water, far from the population center, have flat to wavy terrain, and have a location close to arterial road."
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library