Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 14 dokumen yang sesuai dengan query
cover
Sri Tudjono
"This paper elaborates on the theoretical background, necessity, and techniques for enhancing the flexural capacity of a T-section member under combined bending and shear. The paper is based on a continuing research program seeking solutions to the design disparities arising from the introduction of new seismic codes and revised earthquake mapping prior to the tsunami and major earthquakes that occurred in South East Asia more than a decade ago. The research considered the application of external reinforcement using fiber-reinforced polymer (FRP) sheets, creating confinement in the shear area, and improving the tensile strength zone. The test results suggested that the methods sufficiently increased the load-carrying capacity to meet the new provisions, but they also showed that the optimum load-carrying capacity was not reached due to debonding of the FRP sheets in the tensile zone. The work was expanded to search for a surface treatment method that could shift the failure mode from debonding to FRP rupture by performing direct shear tests on treated FRP-to-concrete bond surfaces. Using the best surface treatment method, a failed member was straightened, retrofitted, and re-reinforced in terms of both shear and tension. The experimental results showed that the load-carrying capacity of the flexural member not only increased significantly, but the surface treatment methods also overcame the interface debonding problem. This research provides a method for upgrading the flexural capacity of T-section members designed prior to the tsunami and earthquakes of 2004, and it offers a solution for cracked section repair and restoration."
Depok: Faculty of Engineering, Universitas Indonesia, 2018
UI-IJTECH 9:1 (2018)
Artikel Jurnal  Universitas Indonesia Library
cover
Rizkiawan Pangestu
"Saat ini masih terdapat kawasan industri yang belum bisa memberikan dampak baik terhadap lingkungan. Dalam merencanakan dan membangun konsep hijau 10-20% lebih mahal dari pada bangunan konvensional. Dalam hal ini Kawasan Industri untuk memberikan dampak yang baik terhadap lingkungan, dapat melakukan proses Green Retrofitting dengan acuan assessment berdasarkan kaidah-kaidah Petunjuk Teknis Permen PUPR No. 1 Tahun 2022, yang di dalamnya terdapat tiga peringkat. Setelah diterapkannya proses Green Retrofitting pada Kawasan Industri XXX. Diperoleh nilai sebesar 70 poin dengan nilai Rp 24.352.030.022,- pada kondisi awal. Setelah dilakukan assessment dan penyesuaian RAB menjadi tingkat Pratama diperoleh nilai sebesar 84 poin dengan nilai RAB sebesar Rp 27.409.030.022,-, sedangkan untuk menjadi tingkat Madya diperoleh nilai sebesar 116 poin dengan nilai RAB sebesar Rp 28.013.580.022,-, sedangkan untuk menjadi tingkat Utama sebesar 135 poin dengan nilai RAB sebesar Rp 28.872.580.022,-. Secara presentasi peningkatan RAB untuk mencapai tingkat Pratama terdapat penambahan biaya sebesar 11,15%, sedangkan untuk mencapai tingkat Madya membutuhkan penambahan biaya sebesar 13,07% dan tingkat Utama sebesar 15,66% dari biaya awal.

Many industrial estate still failed to positively impact the environment. Implementing and constructing green concepts typically costs 10-20% more than traditional buildings. To improve environmental impact, industrial estate can undergo Green Retrofitting based on the guidelines provided in Technical Instructions Permen PUPR No. 1 of 2022, which outlines three rating levels. Following the Green Retrofitting process in the XXX Industrial Area, the initial assessment yielded a score of 70 points with a cost of Rp 24,352,030,022. After reassessment and adjustment of the Budget Plan (RAB) to achieve the Pratama level, the score increased to 84 points with an RAB of Rp 27,409,030,022. For the Madya level, the score reached 116 points with an RAB of Rp 28,013,580,022, and for the Utama level, the score reached 135 points with an RAB of Rp 28,872,580,022. The cost increases to achieve these levels were 11.15% for Pratama, 13.07% for Madya, and 15.66% for Utama, compared to the initial cost.
"
Depok: Fakultas Teknik Universitas Indonesia, 2024
PR-PDF
UI - Tugas Akhir  Universitas Indonesia Library
cover
Naufal Ihsan Kamal
"Saat ini, energi panas yang terbuang dari kondensor Air Conditioner kebanyakan hanya menjadi limbah energi yang terbuang ke lingkungan. Energi panas tersebut berpotensi sebagai sumber energi yang dapat dimanfaatkan untuk proses pemanasan. Pada penelitian ini energi panas tersebut dimanfaatkan untuk memanaskan air menggunakan penukar kalor jenis double pipe dengan refrijeran hidrokarbon yang ramah lingkungan sebagai salah satu upaya dalam mengurangi dampak pemanasan global. Kedua alat ini dapat digabungkan menjadi satu sistem yang disebut sebagai Air Conditioner Water Heater (ACWH). Tujuan dari penelitian ini yaitu untuk mencari tahu dampak dari retrofitting refrijeran R290 pada sistem ACWH dengan memvariasikan temperatur evaporasi pada sistem. Metode yang digunakan pada penelitian ini adalah eksperimen. Pengambilan data berupa waktu pemanasan air, tekanan kompresor, dan temperatur pada sistem dilakukan saat temperatur air keluar storage mencapai 50 ˚C yang kemudian diolah untuk mendapatkan nilai konsumsi listrik dan COP pada sistem. Hasil penelitian menunjukan, untuk memanaskan air hingga 50˚C refrijeran R290 membutuhkan waktu antara 25 menit hingga 27 menit, dan mengonsumsi listrik antara 0,32 kWh hingga 0,42 kWh. Selain itu COP sistem saat temperatur air mencapai 50˚C bernilai 2,4 hingga 4,4.

The heat energy that is wasted from the Air Conditioner condenser is currently only a waste of energy that is wasted into the environment. The heat energy has the potential as an energy source that can be used for the heating process. In this study, the heat energy is used to heat water using a double pipe heat exchanger with an environmentally friendly hydrocarbon refrigerant as an effort to reduce the impact of global warming. These two tools can be combined into a single system known as Air Conditioner Water Heater (ACWH). The purpose of this study was to find out the impact of retrofitting refrigerant R290 on the ACWH system by varying the evaporation temperature in the system. The method used in this research is experimental. Data retrieval in the form of water heating time, compressor pressure, and temperature in the system is carried out when the temperature of the water exiting the storage reaches 50 C which is then processed to obtain the value of electricity consumption and COP in the system. The results showed, to heat water up to 50˚C refrigerant R290 takes between 25 minutes to 27 minutes, and consumes electricity between 0.32 kWh to 0.42 kWh. In addition, the COP of the system when the water temperature reaches 50˚C is worth 2.4 to 4.4."
Depok: Fakultas Teknik Universitas Indonesia, 2021
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Febrianti Silviana Dewi
"Latar belakang penelitian ini adalah komitmen pengurangan emisi karbon hingga 31% pada tahun 2030. Penelitian ini berupaya melakukan green retrofitting pada bangunan eksisting terbanyak di Indonesia yaitu gedung bertingkat tinggi untuk mencapai tujuan tersebut. Sektor konstruksi menyumbang emisi karbon sebesar 40%. Menurut penelitian yang sudah ada sebelumnya, Green Retrofitting atau Penggubahsesuaian merupakan strategi yang paling menguntungkan untuk mengurangi emisi karbon pada sektor konstruksi, karena hanya menggunakan biaya sebesar 30 % hingga 50% dibandingkan dengan bongkar bangunan yang sudah ada dan bangun bangunan baru, serta 20% jika dibandingan dengan membangun bangunan baru dengan standar bangunan hijau di lahan kosong. Implementasi Green Retrofitting di Indonesia belum terlalu banyak walaupun sudah terdapat payung hukum Permen PUPR No.21 Tahun 2021 dan GBCI sebagai standar bangunan hijau. Berdasarkan data yang sudah ada, terdapat banyak masalah dalam menentukan keputusan pembangunan proyek green retrofitting, salah satunya karena estimasi biaya yang kurang akurat. Dengan terjadinya ketidakakuratan estimasi biaya, banyak realisasi proyek yang mengalami pembengkakan anggaran dan tidak sesuai dengan anggaran yang ditetapkan pada tahap perencanaan proyek. Penggunaan BIM 5D pada proses estimasi biaya merupakan salah satu solusi untuk meningkatkan akurasi biaya. Dalam melakukan proses estimasi biaya ini mempertimbangkan juga risiko yang terjadi pada BIM 5D dan proses estimasi biaya itu sendiri. Penelitian ini akan mempelajari setiap proses, aktivitas, output dan risiko pada penggunaan BIM 5D dan proses estimasi biaya. Selain itu untuk mengetahui model hubungan antara risiko BIM 5D dan proses estimasi biaya dengan tingkat akurasi biaya. Hasil dari penelitian ini didapatkan bahwa model hubungan risiko BIM 5D dengan akurasi biaya adalah saling mempengaruhi dan berbanding terbalik Y = 2,573 – 0,171X1 – 0,052X2. Sedangkan hubungan antara risiko proses estimasi biaya dengan tingkat akurasi biaya sebagai berikut Y’ = 2,573 – 0,201X. Setiap risiko level tinggi sudah diberikan strategi penanganan baik secara tindakan preventif maupun korektif, sehingga penerapan BIM 5D dalam proses estimasi biaya menghasilkan tingkat akurasi biaya yang diharapkan. Penerapan BIM 5D pada penelitian ini menggunakan software Revit untuk melakukan quantity take off kemudian dengan proses Analisa Harga dikombinasikan dengan teknik perhitungan menggunakan Ms. Excel.

The background to this research is the commitment to reduce carbon emissions by up to 31% by 2030. This research seeks to carry out green retrofitting of the largest number of existing buildings in Indonesia, namely high-rise buildings, to achieve this goal. The construction sector contributes 40% of carbon emissions. According to previous research, Green Retrofitting is the most profitable strategy for reducing carbon emissions in the construction sector, because it only costs 30% to 50% compared to demolishing existing buildings and building new buildings, and 20 % when compared to building a new building with green building standards on the land blank. There is not much implementation of Green Retrofitting in Indonesia even though there is a legal umbrella for PUPR Ministerial Decree No. 21 of 2021 and GBCI as a green building standard. Based on existing data, there are many problems in determining the decision to build a green retrofitting project, one of which is due to inaccurate cost estimates. Due to inaccurate cost estimates, many project realizations experience budget overruns and do not comply with the budget set at the project planning stage. Using BIM 5D in the cost estimation process is one solution to increase cost accuracy. In carrying out the cost estimation process, you also consider the risks that occur in 5D BIM and the cost estimation process itself. This research will study each process, activity, output and risk in the use of 5D BIM and the cost estimation process. Apart from that, to find out the model of the relationship between BIM 5D risk and the cost estimation process with the level of cost accuracy. The results of this research show that the 5D BIM risk relationship model with cost accuracy influences each other and is inversely proportional to Y = 2.573 – 0.171X1 – 0.052X2. Meanwhile, the relationship between the risk of the cost estimation process and the level of cost accuracy is as follows Y' = 2.573 – 0.201X. Every highlevel risk has been given a handling strategy, both preventive and corrective, so that the application of BIM 5D in the cost estimation process produces the expected level of cost accuracy. The application of BIM 5D in this research uses Revit software to carry out quantity take off then the Price Analysis process combined with calculation techniques using Ms. Excel."
Jakarta: Fakultas Teknik Universitas Indonesia, 2024
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Widya Apriani
"ABSTRAK
Pada umumnya Bangunan yang ada di Indonesia telah dibangun dengan
acuan pedoman SNI 1726-1989-F dan SNI 03-1726-2002, telah lahir peraturan
baru SNI 03-1726-2010. Bangunan yang telah ada boleh jadi tidak memenuhi
standar baru, sehingga harus diperkuat (retrofitting). untuk mendapatkan sistem
struktur dengan respon yang paling baik terhadap gempa dilakukan studi
pengembangan analisis mengenai perilaku BRB. Bresing tipe ini diaplikasikan
pada bangunan tinggi struktur beton bertulang. Penelitian terlingkup mengenai,
mekanisme, kinerja, dan parameter-parameter aktualnya terkait dengan adanya
pengaruh gempa rencana sesuai FEMA 356. Hal-hal tersebut diteliti dengan
membandingkan antara struktur eksisting, dengan struktur hasil retrofitting-nya.
Hasil penelitian menunjukkan bahwa hasil analisa statik nonlinier (pushover
analysis) untuk struktur sistem ganda (DS) dengan BRBS sampai pada target
peralihan (performance point) yang dihitung berdasarkan FEMA 356 struktur
gedung yang didesain masih memiliki taraf kinerja Life safety.

ABSTRACT
In general, the existing building in Indonesia has been constructed with
reference to the guidelines SNI 1726-1989-F and SNI 03-1726-2002, along with
expanding knowledge of the new regulations have been born SNI 03-1726-2010.
Existing buildings may be not meeting the new standards, so the buildings are
vulnerable to safety and rigidity of the structure. To that end, should be
strengthened (retrofitting). To get the system structure with the best response to
the earthquake made the development of analytical studies on the behavior of
BRB. Bracing is applied to the type of reinforced concrete structures in tall
buildings. The study included about mechanisms, performance and actual
parameters associated with the influence of earthquake plans with FEMA 356.
Those things are investigated by comparing the existing structure with its
retrofitting the structure. The results showed that the results of nonlinear static
analysis (pushover analysis) for the structure of the dual system (DS) with BRBS
to the intermediate targets (performance point) are calculated based on FEMA
356, designed the building structure still has the Life Safety performance level.
This indicates that the building is designed according to the performance already
qualified FEMA 356 because the building is designed as an office building.

"
2012
T31210
UI - Tesis Membership  Universitas Indonesia Library
cover
Widya Apriani
"ABSTRAK
Pada umumnya Bangunan yang ada di Indonesia telah dibangun dengan
acuan pedoman SNI 1726-1989-F dan SNI 03-1726-2002, telah lahir peraturan
baru SNI 03-1726-2010. Bangunan yang telah ada boleh jadi tidak memenuhi
standar baru, sehingga harus diperkuat (retrofitting). untuk mendapatkan sistem
struktur dengan respon yang paling baik terhadap gempa dilakukan studi
pengembangan analisis mengenai perilaku BRB. Bresing tipe ini diaplikasikan
pada bangunan tinggi struktur beton bertulang. Penelitian terlingkup mengenai,
mekanisme, kinerja, dan parameter-parameter aktualnya terkait dengan adanya
pengaruh gempa rencana sesuai FEMA 356. Hal-hal tersebut diteliti dengan
membandingkan antara struktur eksisting, dengan struktur hasil retrofitting-nya.
Hasil penelitian menunjukkan bahwa hasil analisa statik nonlinier (pushover
analysis) untuk struktur sistem ganda (DS) dengan BRBS sampai pada target
peralihan (performance point) yang dihitung berdasarkan FEMA 356 struktur
gedung yang didesain masih memiliki taraf kinerja Life safety.

Abstract
In general, the existing building in Indonesia has been constructed with
reference to the guidelines SNI 1726-1989-F and SNI 03-1726-2002, along with
expanding knowledge of the new regulations have been born SNI 03-1726-2010.
Existing buildings may be not meeting the new standards, so the buildings are
vulnerable to safety and rigidity of the structure. To that end, should be
strengthened (retrofitting). To get the system structure with the best response to
the earthquake made the development of analytical studies on the behavior of
BRB. Bracing is applied to the type of reinforced concrete structures in tall
buildings. The study included about mechanisms, performance and actual
parameters associated with the influence of earthquake plans with FEMA 356.
Those things are investigated by comparing the existing structure with its
retrofitting the structure. The results showed that the results of nonlinear static
analysis (pushover analysis) for the structure of the dual system (DS) with BRBS
to the intermediate targets (performance point) are calculated based on FEMA
356, designed the building structure still has the Life Safety performance level.
This indicates that the building is designed according to the performance already
qualified FEMA 356 because the building is designed as an office building."
Fakultas Teknik Universitas Indonesia, 2012
T31210
UI - Tesis Open  Universitas Indonesia Library
cover
Yusup Arjuna
"Di Indonesia, pekerjaan green retrofitting mengacu pada Peraturan Menteri PUPR Nomor 21 Tahun 2021 dan rating tools GBCI. Digunakan pendekatan WBS untuk membagi pekerjaan menjadi tingkatan yang lebih sederhana, dengan menggabungan 2 (dua) standar pekerjaan green retrofitting bangunan kantor bertingkat tinggi dari aspek konservasi dan efisiensi energi menjadi 5 tingkatan yang mudah untuk dikelola. Melakukan retrofitting bangunan dapat menghemat penggunaan energi sebesar 50% - 70%. Upaya pemaksimalan pekerjaan green retrofitting dipengaruhi oleh akurasi perencaan WBS serta akurasi perencaan sumber daya pada proyek. Penelitian yang dilakukan dibatasi untuk pekerjaan green retrofitting bangunan gedung kantor bertingkat tinggi aspek konservasi dan efisiensi energi (EEC). Data dikumpulkan menggunakan metode studi literatur, analisis arsip, analisa deskriptif, dan kuesioner yang diuji mengunakan analisa delphi, serta analisa statistik mengunakan uji homogenitas, uji kecukupan data, validitas internal, reliabilitas data, dan validitas eksternal. Hasil penelitian ini adalah untuk mengetahui indikator/aktivitas pada struktur WBS yang penting dan berpengaruh terhadap akurasi perencanaan sumber daya.

In Indonesia, the term "green retrofitting" refers to Minister of Public Works Regulation Number 21 of 2021 and the GBCI rating tools. The Work Breakdown Structure (WBS) approach is utilized to divide the work into simpler levels,by combining two green retrofitting standards for high-rise office buildings, focusing on conservation and energy efficiency, into five manageable levels. Retrofitting buildings can result in energy savings of 50% - 70%. The effectiveness of green retrofitting efforts is influenced by the accuracy of WBS planning and resource planning in the project. The research is limited to green retrofitting of high-rise office buildings, specifically focusing on conservation and energy efficiency aspects (EEC). Data is collected using literature study, archival analysis, descriptive analysis, and questionnaires tested with Delphi analysis, as well as statistikal analysis using tests for homogeneity, data adequacy, internal validity, data reliability, and external validity. The results of this research aim to identify the important indicators/activities in the WBS structure that significantly affect resource planning accuracy.
"
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Nadine Aurelia Pasha
"Green retrofit merupakan salah satu langkah bagi Indonesia untuk mengurangi emisi GRK. Melalui retrofitting, bangunan eksisting dapat dimanfaatkan untuk tujuan keberlanjutan yang mengurangi pengeluaran berlebihan. Untuk mengimplementasi bangunan konvensional menjadi bangunan hijau, terdapat 2 (dua) penilaian yang dapat digunakan yaitu Peraturan Menteri PUPR Nomor 21 Tahun 2021 dan Rating Tools GBCI. Dalam menyusun struktur WBS pekerjaan retrofitting gabungan dari Peraturan Menteri PUPR Nomor 21 Tahun 2021 dan GBCI khususnya aspek BEM, terdapat 74 aktivitas untuk menilai pekerjaan green retrofitting pada bangunan gedung kantor bertingkat tinggi. Agar pekerjaan green retrofitting dapat berjalan maksimal serta dapat mencapai target dan dapat selesai tepat pada waktu seperti yang telah direncanakan, maka dapat lebih memperhatikan sumber daya dari proyek tersebut. Penelitian hanya terbatas pada bangunan gedung kantor bertingkat tinggi khususnya aspek BEM. Hasil kuesioner dianalisa menggunakan metode analisis delphi, metode RII, dan metode statistik seperti uji homogenitas, kecukupan data, validitas, reliabilitas, dan regresi linier. Hasil dari penelitian ini adalah mengetahui aktivitas yang penting dan berpengaruh terhadap akurasi perencanaan sumber daya.

Green retrofit is one step for Indonesia to reduce GHG emissions. Through retrofitting, existing buildings can be utilized for sustainability purposes by reducing excessive expenditure. To implement conventional buildings into green buildings, there are 2 (two) assessments that can be used, namely Peraturan Menteri PUPR Nomor 21 Tahun 2021 and the GBCI Rating Tools. In compiling the WBS structure for combined retrofitting work from PUPR Ministerial Regulation Number 21 of 2021 and GBCI especially the BEM aspect, there are 74 activities to assess green retrofitting work on high-rise office buildings. In order for the green retrofitting work to run optimally and be able to achieve the target and be completed on time as planned, it can pay more attention to the resources of the project. Research is only limited to high-rise office buildings, especially aspects of BEM. Questionnaire results were analyzed using the Delphi analysis method and statistics such as homogeneity test, data adequacy, validity, reliability, and linear regression. The result of this research is to know which activities are important and influence the accuracy of resource planning."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Muhammad Faizurrahman
"Analisis risiko pada aktivitas pekerjaan WBS Green Retrofitting berbasis GBCI dan Permen PUPR Nomor 21 Tahun 2021 pada Aspek EEC dan Aspek IHC masih belum dilakukan. Pelaksanaan Green Retrofitting merupakan konsep yang relatif baru di negara berkembang, sehingga sehingga risiko proyek Green Retrofitting kemungkinan lebih besar dan kompleks dibandingkan risiko pada proyek konvensional. Penelitian bertujuan untuk mengidentifikasi pengaruh estimasi biaya pada pekerjaan Green Retrofitting yang dipengaruhi oleh faktor risiko yang dominan. Penelitian menggunakan metode regresi linier, melalui aplikasi SPSS. Diketahui beberapa risiko dominan yang berpengaruh terhadap biaya Green Retrofitting adalah kelangkaan material serta fluktuasi harga material Green Products.

Risk analysis on green retrofitting WBS work activities based on GBCI and PUPR Regulation Number 21 of 2021 on EEC and IHC aspects has not yet been carried out. The implementation of Green Retrofitting is relatively a new concept in developing countries, so that the risks of Green Retrofitting are likely to be greater and more complex than those of conventional projects. This study aims to identify the effect of cost estimation on Green Retrofitting work which is influenced by the dominant risk factors. This research uses linier regression method, through the SPSS application. It is known some of the dominant risks that affect the cost of Green Retrofitting are material scarcity and fluctuations in the price of Green Product’s materials."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Risya Josephine
"Meskipun implementasi green retrofitting sudah terbukti memiliki peran penting untuk memperbaiki masalah lingkungan, keinginan dan kepercayaan masyarakat terhadap penerapan green retrofitting masih minim. Akar permasalahan terdapat pada tidak adanya standar biaya untuk pekerjaan green retrofitting. Penelitian ini bertujuan untuk menyusun Pedoman Perencanaan Biaya Pelaksanaan Pekerjaan Green Retrofitting pada Bangunan Kantor Bertingkat Tinggi di Jakarta berdasarkan Permen PUPR No. 22 Tahun 2018 guna memudahkan pengguna untuk mengaplikasikan green retrofitting sekaligus meningkatkan akurasi biaya pada pembangunan kantor bertingkat tinggi di Jakarta. Pedoman perencanaan biaya ini juga membahas Work Breakdown Structure (WBS) Green Retrofitting, Klasifikasi Peringkat Green Retrofitting dan Komponen Biaya Pekerjaan Green Retrofitting. Pedoman perencanaan biaya ini diharapkan dapat berfungsi sebagai sebuah standar yang diciptakan oleh perencana pada tahap awal proyek untuk memperkirakan keseluruhan biaya konstruksi yang selanjutnya digunakan oleh owner, konsultan, maupun kontraktor dalam pekerjaan green retrofitting untuk menghasilkan perhitungan biaya yang lebih akurat.

In spite of the well-documented effectiveness of green retrofitting in addressing environmental challenges, the widespread adoption of this approach in Jakarta remains incomplete. The primary underlying factor contributing to this issue is the absence of project cost considerations in green retrofitting initiatives. This study aims to develop Cost-Planning Guidelines for Implementing Green Retrofitting on High-Rise Office Buildings in Jakarta based on PUPR No. 22 Tahun 2018. These guidelines are of utmost importance, as they not only facilitate the advancement of green retrofitting efforts but also enhance project cost accuracy. Additionally, this study delves into various aspects including the Work Breakdown Structure (WBS), building rating systems and cost components in green retrofitting works."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2   >>