Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 9 dokumen yang sesuai dengan query
cover
Irene Maulina
Abstrak :
Dalam pembangunan rumah tinggal, pekerjaan bekisting merupakan salah satu pekerjaan besar yang perlu diperhitungkan. Dengan membandingkan bekisting dari sisi metode pelaksanaan, jenis material yang digunakan dan dimensi penampang struktur, akan mendapatkan metode bekisting yang lebih effektif. Dalam penelitian ini akan dibandingkan metode bekisting cara tradisional dimana pekerjaan pasangan dinding dikerjakan sebelum pekerjaan struktur, dan metode bekisting semi sistem dengan menggunakan material baja dimana pekerjaan struktur dikerjakan terlebih dahulu. Analisa perbandingan tersebut terdiri dari analisa struktur, perbandingan kekuatan dan daya layan struktur, perencanaan jenis dan dimensi bekisting, desain gambar bekisting, perhitungan pemakaian material, analisa harga material dan upah pekerja dan perbandingan biaya pekerjaan bekisting. Pada perhitungan struktur didapat perbandingan rasio keamanan yang bervariasi. Hal ini tergantung pada dimensi penampang yang menahannya. Pada rumah tinggal dengan bekisting cara tradisional dimensi lebar penampang kolom mengikuti dimensi dinding, mengakibatkan kekuatan dan kekakuan elemen kolom pada arah lebar menjadi lebih kecil. Harga material bekisting baja lebih mahal dari bekisting cara tradisional, tetapi dengan ketahanan yang tinggi, bekisting baja dapat digunakan berulang-ulang. Pada perhitungan analisa biaya bekisting baja akan lebih ekonomis pada pemakaian berulang-ulang dengan biaya upah kecil.
Depok: Fakultas Teknik Universitas Indonesia, 2008
S35731
UI - Skripsi Open  Universitas Indonesia Library
cover
Rocky Yanu Mahendra
Abstrak :
Formwork or concrete matrix is one of vltal paris ln physical erection of concrete-based building. As most formwork is prepared manually by hand, the degree of denslty ln each edge varies, resulted ln different quality of concrete. Examination on this matter is required to see the differences in strength and stllfness of beam having different size of crevice. This work ls conducted by using two types of fonnwork, which were formwork made from wood with different crevice size : 3 mm, 5 mm and 10 mm, and another fonnwork made from fully steel without crevice. The result suggested that there are considerable effect of crevice within fon'nwork to the strength of structure. Venous tests of the effect of crevice occurring In fonrlwork to the strength of concrete had been performed which were compressive strength, spllttlng tensile, shear strength and flexural strength. It was suggested that the bigger the size of crevice, the bigger the declining of strength of me ooncrete. From this result, lt Is recommended to ellmlnate or prevent crevice formation ln formwork connection In the construction work. Crevlce will only be allowed for 3-5 mm, because this crevice size will glve a strength and stllfness nearly the same with concrete without crevice. This Investigation will not only to observe the effect of the crevice but also to see the differences of the degree of strength ln every layer (upper, middle and lower layers) of the formwork with crevlces. After conducting test on the different layers, the middle layer performed the most stable tightness, nearly the same as nomdal. Analysis to this middle layer suggested that there was evenness of raw materials, compared to those of other layers.
Beklstlng atau cetakan beton merupakan salah satu baglan yang vltal pada pelaksanaan flslk bangunan beton. Menglngat balok pengaku yang banyak dlpakal dlpasang secara manual dengan tenaga manusia dan tingkal; kerapatan tiap-tiap slsi yang berbeda-beda maka dlrasakan terdapat pengamh ketldakrapalzn beklstlng terhadap mutu beton. Oleh karena Itu perlu dllakukan penelltian dengan tujuan membandingkan kekuatan dan kekakuan balok dengan Iebar celah yang berbeda-beda. Penelltlan Inl menggunakan 2 tipe beklsting yaltu : belsltlng dengan bahan kayu yang beroelah dengan varlasl Iebar celah 3 mm, 5 mm dan 10 mrn serta beklstlng baja (Mly steel) tanpa celah. Penelltlan lnl membuktlkan adanya pengaruh celah pada bekistlng balok terhadap kekuatan struktumya. Dan setelah dllakukan pengujlan terhadap perilaku beton yaltu uji tekan (compressive strength), uji tarik (splitting tensile), ui geser (shear strength) dan ujl lentur (flexural strength) maka semakln lebar celah sernakin tumn kekuatan darl suuktur tersebut. Maka sebalknya dlhlndarkan adanya celah-celah pada sambungan beklstlng di lapangan. Toleransl Iebar celah yang dlzlnkan yaltu 3 - 5 mm karena dengan rentang celah ini dldapat kekyatan dan kekakuan yang mendekatl strylctur tanpa celah. Penelltlan lnl tldak hanya membedakan Iebar celah tetapl juga lngln mellhat perbedaan kekuatannya dari tiap-tlap layer (layer atas, tengah dan bawah) pada rnaslng-maslng beldsdng bercelah. Dan setelah dllakukan pengujlan maka untuk layer tengah nllal tegangannya paling stabil dan kenalkannya hamplr mendekati dengan normalnya. Sehlngga setelah dlanallsa untuk layer tengah material penyusunnya tarnpak hornogen dlbandlng dengan layer Iainnya.
Depok: Fakultas Teknik Universitas Indonesia, 2006
S35244
UI - Skripsi Membership  Universitas Indonesia Library
cover
Ayu Herzanita Yufrizal
Abstrak :
Fabric formwork merupakan metode pembentukan konstruksi beton menggunakan membran sebagai cetakannya, terbuat dari serat sintesis (nilon, poliester, polypropylene). Tujuan dari penelitian ini adalah mengidentifikasi faktor-faktor dan menghitung besaran efisiensi serta resiko yang mempengaruhi efisiensi dari pemakaian fabric formwork. Metode penelitian yang dilakukan adalah eksperimen dan analisa simulasi pemodelan penggunaan fabric formwork dibandingkan dengan bekisting konvensional. Dari penelitian ini, penggunaan fabric formwork lebih efisien dibandingkan dengan bekisting konvensional, faktor-faktor yang mempengaruhi efisiensi adalah penggunaan kayu yang sedikit, n-kali pakai dan metode kerja yang tepat. Resiko yang mempengaruhi efisiensi adalah jumlah n-kali pakai yang tidak tercapai, pekerja yang kurang memahami metode, perawatan yang salah. ...... Fabric formwork is constructed using textile sheets made of synthetic fibers (tipicallly nylon, polyesters, polypropylene). The objectives of this study are to identify the factors, calculate the magnitude, and risk that affect the efficiency of the use of fabric formwork. The research method is simulation modeling experiments and analysis of the use of fabric formwork compared to conventional formwork. From this research, the use of fabric formwork more efficient than conventional formwork, the factors that affect the efficiency is the use of a little wood, n-times the wear and appropriate working methods. Risks that affect the efficiency is the number of n-times the wear that is not achieved, workers who lack an understanding of the method, the wrong treatment.
Depok: Fakultas Teknik Universitas Indonesia, 2014
T36348
UI - Tesis Membership  Universitas Indonesia Library
cover
Ikhwan Hidayat
Depok: Fakultas Teknik Universitas Indonesia, 2002
S37899
UI - Skripsi Membership  Universitas Indonesia Library
cover
Timothy Brian
Abstrak :
Bekisting yang merupakan penyumbang limbah konstruksi terbesar, dan sampah plastik di Indonesia yang terus meningkat tiap tahunnya memerlukan solusi penanganan yang tepat. Dapat digunakan limbah plastik jenis HDPE (High-Density Polyethylene) di Indonesia sebagai bahan baku untuk produk bekisting. Pada penelitian ini akan dilakukan perbandingan analisa properti mekanik kuat lentur balok bekisting HDPE dengan tambahan metode DIC (Digital Image Correlation) dengan pemodelan numerik menggunakan ABAQUS. Hasil dari penelitian ini diharapkan dapat memberikan solusi alternatif bahan bekisting dari HDPE yang kuat dan lebih ramah lingkungan. ......Formwork, which is one of the largest contributors to construction waste, and plastic waste in Indonesia, which continues to increase every year, require appropriate handling solutions. HDPE (High-Density Polyethylene) waste in Indonesia can be used as raw material for formwork products. This study will compare the mechanical properties, specifically the flexural strength of HDPE formwork beams, using the Digital Image Correlation (DIC) method and numerical modeling with ABAQUS. The results of this study are expected to provide an alternative solution for formwork materials from HDPE that are strong and more environmentally friendly.
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Rudolfus Rivaldo Raharja
Abstrak :
Dalam beberapa tahun terakhir, permintaan akan bekisting untuk pekerjaan struktur beton mengalami peningkatan yang signifikan, memicu pengembangan berbagai sistem dan metode bekisting dengan menggunakan berbagai jenis material, termasuk kayu, logam, dan polimer HDPE. Penelitian ini bertujuan untuk mengamati dan mengevaluasi kinerja bekisting berbahan dasar polimer HDPE pada elemen struktur beton vertikal dalam proyek konstruksi di Indonesia. Penelitian ini menggunakan data primer yang dikumpulkan melalui observasi lapangan dan dokumentasi proyek, serta data sekunder dari studi literatur. Hasil penelitian menunjukkan bahwa papan bekisting Polimer HDPE mampu memberikan hasil pengecoran yang baik. Kapasitas produksi menggunakan papan bekisting Polimer HDPE mendekati atau sesuai dengan standar kapasitas pekerja bekisting metode semi sistem dinding, menunjukkan efektivitas dalam mempertahankan efisiensi kerja. Analisis biaya menunjukkan bahwa meskipun Polimer HDPE memiliki biaya awal yang lebih tinggi dibandingkan multipleks dan polyfilm, biaya jangka panjangnya lebih ekonomis karena ketahanannya yang tinggi dan biaya pemakaian yang konsisten. Secara keseluruhan, bekisting berbahan dasar Polimer HDPE adalah pilihan yang efektif dan efisien untuk pekerjaan bekisting dalam proyek konstruksi yang memerlukan material tahan lama dan ekonomis dalam jangka panjang. ......In recent years, the demand for formwork for concrete structures has significantly increased, prompting the development of various formwork systems and methods using different materials, including wood, metal, and HDPE polymer. This research aims to observe and evaluate the performance of HDPE polymer-based formwork in vertical concrete structural elements in construction projects in Indonesia. The research utilizes primary data collected through field observations and project documentation, as well as secondary data from literature studies. The results show that HDPE polymer formwork panels can provide good casting results. The production capacity using HDPE polymer formwork panels is close to or in line with the standard capacity of workers using the semi-system wall formwork method, demonstrating effectiveness in maintaining work efficiency. Cost analysis indicates that although HDPE polymer has a higher initial cost compared to multiplex and polyfilm, its long-term cost is more economical due to its high durability and consistent usage costs. Overall, HDPE polymer-based formwork is an effective and efficient choice for formwork work in construction projects that require durable and long-term economical materials.
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Nicholas Alvin
Abstrak :
Bekisting merupakan salah satu komponen penting yang banyak digunakan khususnya pada konstruksi bangunan beton. Penggunaan kayu sebagai material penyusun bekisting masih sangat umum digunakan di Indonesia dan menimbulkan limbah konstruksi yang tidak dapat digunakan kembali. Dalam upaya mengurangi limbah kayu tersebut, pemanfaatan limbah plastik jenis HDPE (High-Density Polyethylene) sebagai bahan baku untuk produk bekisting dapat menjadi sebuah solusi. Penelitian ini mengamati pengaruh bukaan pada balok rangka polimer HDPE dan perbandingannya dengan balok solid tanpa bukaan. Dilakukan perbandingan analisa properti mekanik kuat lentur dari balok bekisting HDPE dengan metode DIC (Digital Image Correlation) dengan pemodelan numerik menggunakan ABAQUS. ......Formwork is one of the essential components widely used, especially in concrete building construction. The use of wood as the material for formwork is still very common in Indonesia and generates construction waste that cannot be reused. In an effort to reduce wood waste, utilizing HDPE (High-Density Polyethylene) plastic waste as a raw material for formwork products can be a solution. This study observes the effect of openings in HDPE polymer truss beams and compares them with solid beams without openings. A comparison of the mechanical flexural properties of HDPE formwork beams is carried out using the DIC (Digital Image Correlation) method with numerical modeling using ABAQUS software.
Depok: Fakultas Teknik Universitas Indonesia, 2024
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Astri Novita
Abstrak :
Penentuan metode bekisting yang akan digunakan dalam suatu proyek faktor pertimbangan yang diperhitungkan. faktor yang paling menentukan adalah biaya dan waktu pelaksanaan. Murah dari segi biaya dan cepat dari segi waktu, inilah yang menjadi tujuan setiap pemborong kerja dalam menentukan metode kerjanya. Penelitian ini membandingkan antara 2 (dua) buah metode bekisting yaitu sistem PERI dan Konvensional. Hal ini ditujukan untuk mencari metode bekisting yang paling optimal dari segi waktu dan biaya. Studi kasus yang diambil pada proyek Apartement Salemba Residence. Jenis bekisting yang ditinjau adalah bekisting balok, plat lantai, kolom dan dinding. Metode yang digunakan untuk melakukan penelitian ini yaitu melakukan analisa perbandingan terhadap biaya dan waktu. Analisa perbandingan tersebut terdiri dari perencanaan komposisi material dan alat bekisting, desain gambar bekisting, perhitungan pemakaian material dan alat, analisa harga material, alat, dan upah harian pekerja, analisa waktu efektif pekerjaan, analisa upah borong pekerjaan, parameter pendukung analisa harga satuan, analisa harga satuan pekerjaan bekisting, biaya total pekerjaan bekisting, dan perbandingan biaya dan waktu pekerjaan. Dari analisa didapatkan beberapa perbedaan antara bekisting metode konvensional dengan sistem PERI. Biaya pekerjaan bekisting pada proyek Apartement Salemba Residence untuk metode konvensional sebesar Rp 3.161.568.136,- dengan waktu pelaksanaan 216 hari. Sedangkan untuk metode sistem PERI sebesar Rp 3.150.662.945,- dengan waktu pelaksanaan 185 hari. Perbedaan biaya dan waktu pelaksanaan pada kedua metode itu disebabkan material dan alat yang digunakan. Sehingga mengakibatkan waktu yang lebih lama dan biaya yang lebih besar. Kemampuan tenaga kerja juga mempengaruhi perbedaan biaya dan waktu tersebut. Dengan adanya penelitian ini diharapkan dalam menentukan metode atau sistem kerja sebaiknya memperhatikan tingkat efisiensi serta kemudahan yang diperoleh dalam pelaksanaan dengan metode tersebut. Serta untuk pemeliharaan dan sistem pemasangan serta pembongkaran bekisting harap diperhatikan sehingga material dapat awet dan dapat digunakan secara optimal.
To definite a work method of formwork tht will be used on a current project have many certain factors which should be considered. Main certain factors are ; cost and construction time. Low on cost and fast from time factor is the main idea of labour foremen and the constructor to pick their choise on a work method. This experiment had compare between 2 (two) formwork methode which as PERI system and conventional. The idea is to find which method is more optimal from the cost and time factor. The object of the experiment is on Apartement Salemba Residence. Kinds of formworks examined are; beam, slab, column and wall formworks. Method of the experiment by analizing the comparity on cost and working time. This analysis start from planning the formworks compotition of material and tools ; design the shop drawing; calculating of materials and tools volume ; Materials, tools, and labour sallary analysis ; formworks unit price analysis, total construction cost of formwork and compare of total cost and construction time. Analysis contains many difference of conventional and PERI system. Total cost of forwork on Apartement Salemba Residence project of conventional method values Rp 3.161.568.136,- and total construction time of 216 days. On the other side, Total cost of PERI system values Rp 3.150.662.945,- with total construction time 185 days. The difference of cost and time on those two types of formwork caused by the used materials and tools. Until produced the longer work time and more expencive cost. Ability of the labours also take a part of causing those difference. With the existance of this experiment hoped that we should have more aware of the efficiency and workability on certaining a formwok method. Also on maintenance , setting and stripping the formwok panels must be carefull in order to optimalize the use of materials.
Depok: Fakultas Teknik Universitas Indonesia, 2006
S38700
UI - Skripsi Membership  Universitas Indonesia Library
cover
A. Farouk Khasougi
Abstrak :
Dengan semakin berkembangnya teknologi konstruksi di dunia, maka semakin berkembang pula teknologi konstruksi di Indonesia diantaranya dengan pemanfaatan teknologi precast dan bekisting (formwork). Dimana teknologi bekisting ini selalu dikembangkan untuk mendapatkan biaya, waktu dan mutu pekerjaan proyek sesuai dengan apa yang telah direncanakan. Perencanaan, disain, dan pelaksanaan pekerjaan bekisting perlu mendapat perhatian penting dari kontraktor mengingat pekerjaan bekisting ini dapat menghabiskan 50 % dari total biaya pekerjaan pembetonan. Pengendalian pekerjaan bekisting yang buruk akan menyebabkan pemborosan material bekisting yang digunakan dan juga dapat menghambat pelaksanaan pekerjaan proyek secara menyeluruh karena hasil dari pekerjaan bekisting tersebut tidak sesuai dengan apa yang telah direncanakan di awal. Pada skripsi ini akan dibahas mengenai simulasi pengendalian biaya dan waktu pekerjaan bekisting berdasarkan prosedur mutu pekerjaan bekisting untuk masingmasing penjadwalan pelaksanaan proyek dengan metode konvensional ataupun dengan metode precast. Dari hasil simulasi pekerjaan bekisting masing-masing metode di atas, akan dibandingkan satu sama lainnya sehingga pada akhirnya diperlihatkan kelebihan ataupun kekurangan dari metode precast dibandingkan dengan metode konvensional (cor di tempat). Pada skripsi ini juga diharapkan akan menghasilkan variabel-variabel apa saja yang dapat mempengaruhi pekerjaan bekisting pada saat proses pabrikasi modul beton precast. Hal ini diharapkan dapat menjadi masukan kepada pihak kontraktor untuk pelaksanaan pekerjaan bekisting proyek RUSUNAWA lainnya.
As the construction technology in the world is developing continuously, it also affect the development of technology in Indonesia. One of the impact that can be observed is the development of precast and formwork technology used in the construction projects in order to achieve certain standards that has already been determined previously at the planning process. Planning, design and formwork fabrication and instalation needs to be considered as the main focus for construction projects because of the high precentage as high as 50% of the total acticity related to concrete works. Poor control of the activities related to this matter can cause inefficient formwork material usage and also progress setback due to the extra work which has to be done because of spesification divergence from the initial planning. This final assignment will explain coprehensively about the cost and time control simulation based on the quality procedure of formwork from project scheduling of both conventional and precast method. The result from the formwork simulation of each method will be compared one to another so that each method will show its strong points and disadvantages. This final assignment is also expected to generate variables which affect the formwok exertion at the precast module fabrication and installation process. This conclusion is expected to be a good recommendation for the contractor for the subsequent project related to the matter discussed.
Depok: Fakultas Teknik Universitas Indonesia, 2008
S38699
UI - Skripsi Open  Universitas Indonesia Library