Hasil Pencarian

Ditemukan 5 dokumen yang sesuai dengan query
cover
Galuh Rizma Maharani
"Salah satu hal yang dilakukan dalam menjamin tercapainya sasaran adalah dengan mengelolarisikonya. Tujuan penelitian ini adalah mengidentifikasi risiko biaya dan waktu pada tahap konstruksi struktur bawah dari bangunan gedung bertingkat tinggi di Jakarta serta bagaimana respon risikonya. Penelitian dilakukan dengan survey kepada para kontraktor utama untuk mengetahui frekuensi dan pengaruh risiko yang kemudian dianalisis dengan AHP. Lalu metode Delphi Technique dilakukan untuk mencapai consensus dari para pakar mengenai hasil penelitian berupa identifikasi risiko dan rekomendasi respon. Hasil penelitian memperlihatkan peringkat risiko yang dominan pada masing-masing tahapan pekerjaan struktur bawah. Lalu, diperoleh pula rekomendasi respon untuk risiko dominan tersebut.

One thing that can be done to guarantee the achievement of the objective is by managing the risks. The objective of this research is to identify the risks on project cost and project time during substructure phase of high-rise building in Jakarta and also how to response ones. This research was done by surveying towards main contractors to discover risks frequency and impacts which are analyzed with AHP afterwards. Next, the Delphi Technique method is performed to reach consensus from the experts about the result of this research which are include risk identification and response recommendation. Then the recommended response for the dominant risks are also collected."
Depok: Fakultas Teknik Universitas Indonesia, 2011
S42455
UI - Skripsi Open  Universitas Indonesia Library
cover
R. Rifi Firdaus Lustika
"Penyediaan rumah atau papan menjadi satu kebutuhan primer atau dasar yang masih belum sepenuhnya tuntas sejak Indonesia merdeka. Salah satu upaya pemerintah dalam penyediaan perumahan adalah melalui program bantuan pembangunan rumah khusus yang ditujukan untuk masyarakat berkebutuhan khusus seperti nelayan, daerah perbatasan, korban bencana, dll. Percepatan penyediaan perumahan yang layak huni dan terjangkau sangat dibutuhkan untuk mengurangi jumlah Backlog Rumah dan Rumah Tidak Layak Huni (RTLH) yang semakin tinggi. Dalam pelaksanaannya, penyediaan perumahan di Indonesia memiliki beberapa kendala antara lain permasalahan keterlambatan penyediaan perumahan dan keterbatasan anggaran pemerintah.
Keterlambatan penyediaan perumahan disebabkan oleh ketidakcermatan dalam hal justifikasi verifikasi kelayakan administrasi dan teknis pada calon lokasi pembangunan rumah khusus, selain itu juga, dikarenakan terbatasnya anggaran pemerintah maka diperlukan terobosan inovatif kebijakan penyediaan perumahan yang dapat menghasilkan rumah layak huni dan terjangkau, dengan tetap menyesuaikan Anggaran APBN yang tersedia. Teknologi rumah baru tersebut harus tetap memenuhi ketentuan syarat-syarat teknis yang berlaku seperti tahan terhadap gempa dan mudah pelaksanaannya di daerah-daerah terpencil di Indonesia. Teknologi RISHA merupakan terobosan teknologi inovatif yang dapat digunakan.
Tujuan dari penelitian ini adalah untuk mengetahui kinerja biaya dan waktu rumah khusus menggunakan aplikasi RISHA dan Pengembangan Strategi Penerapan Pembangunan Rumah Khusus di Kementerian PUPR. Metodologi yang digunakan adalah metodologi Empiris, Risk Analysis (Matriks Probabilitas dan Dampak) dan Wawancara Pakar.
Metodologi Empiris digunakan untuk mengetahui kinerja biaya rumah RISHA dibandingkan dengan harga rumah konvensional, Metode Risk Analysis (Matriks Probabilitas dan Dampak) digunakan untuk mengetahui faktor dominan yang berpengaruh terhadap kinerja waktu rumah RISHA pada proyek pembangunan rumah khusus, sedangkan metode wawancara para ahli digunakan untuk mengetahui Pengembangan Strategi Penerapan Tahap Konstruksi dan Pra Konstruksi melalui perubahan SOP verifikasi administrasi dan kelayakan teknis.
Berdasarkan hasil penelitian, diketahui bahwa Rumah RISHA memerlukan biaya yang lebih murah dengan mutu beton yang lebih tinggi serta waktu pengerjaan yang lebih cepat dibandingkan rumah konvensional prototipe 36 m2, selain itu dihasilkan pengembangan SOP verifikasi administrasi dan teknis yang dapat mengurangi peluang terjadinya keterlambatan pelaksanaan pekerjaan pembangunan rumah khusus.

The provision of houses is one of the primary or basic needs that has not yet been fully completed since Indonesia's independence. One of the government's efforts in providing housing is through a special housing development assistance program aimed at people with special needs such as fishermen, border areas, disaster victims, etc. Accelerating the provision of affordable and habitable housing is needed to reduce the number of inadequate Backlog of Houses and Houses (RTLH). In its implementation, the provision of housing in Indonesia has several obstacles, among others, the problem of delays in providing housing and limited government budgets. The delay in the provision of housing is caused by inaccuracies in the justification of verification of administrative and technical feasibility in prospective special housing construction sites.
In addition, due to the limited government budget, innovative breakthroughs on housing provision policies are needed that can produce decent and affordable housing, while still adjusting the APBN Budget. which are available. The new home technology must still meet the provisions of applicable technical conditions such as earthquake resistance and easy implementation in remote areas in Indonesia. RISHA technology is an innovative technology breakthrough that can be used.
The purpose of this study was to find out the cost and time performance of houses specifically using the RISHA application and the Development of Strategies for the Application of Special Housing Development in the Ministry of public works and public housing.
The methodology used is the Empirical methodology, Risk Analysis (Probability and Impact Matrix) and Expert Interview. Empirical methodology was used to determine RISHA's home cost performance compared to conventional house prices, the Risk Analysis Method (Probability and Impact Matrix) was used to determine the dominant factors that affected RISHA's home time performance on special home construction projects, while the interview method experts used to find out Strategy Development Implementation of Construction and Pre-Construction Phase through changes in SOP for administrative verification and technical feasibility.
Based on the results of the study, it is known that RISHA houses require cheaper costs with higher concrete quality and faster processing time than conventional 36 m2 prototype houses, besides that, the development of applicable administrative and technical verification SOPs is produced and can reduce the chance of late implementation special house building work.
"
Depok: Fakultas Teknik Universitas Indonesia, 2019
T53362
UI - Tesis Membership  Universitas Indonesia Library
cover
Andias Mintoharjo
"Salah satu klasifikasi Bangunan Gedung Negara berupa gedung khusus yang menjadi perhatian dalam pembangunannya saat ini yaitu Stadion. Penyelenggaraan pembangunan Stadion di Indonesia baik berupa bangunan baru ataupun renovasi beberapa diantaranya telah menggunakan kontrak terintegrasi rancang bangun karena dinilai lebih baik dari aspek biaya dan waktu. Namun dalam pelaksanaan pembanguan Stadion tersebut masih banyak dihadapkan dengan permasalahan berupa keterlambatan jadwal, variasi pekerjaan tambah kurang yang tidak sesuai dengan rencana awal, kelebihan biaya, klaim, dan hingga terjadinya sengketa diantara pengguna jasa, penyedia jasa, maupun pihak auditor. Masalah ini terjadi karena banyak risiko-risiko terkait biaya dan waktu yang tidak teridentifikasi sejak awal tahap perencanaan. Oleh karena itu, tujuan dari penelitian ini adalah mengembangkan standard Work Breakdown Structure (WBS) berbasis risiko pada bangunan utama gedung Stadion dengan kontrak terintegrasi rancang bangun untuk perencanaan biaya dan waktu. Dalam pelaksanaan penelitian ini akan dilakukan identifikasi risiko-risiko yang mempengaruhi perencanaan biaya dan waktu pada suatu pekerjaan konstruksi khususnya bangunan utama gedung Stadion melalui analisis arsip dari berbagai referensi, wawancara, dan validasi pakar yang digunakan untuk pengembangan WBS Stadion. Analisis risiko akan dilakukan secara kualitatif. Hasil penelitian ini menunjukkan bahwa standar WBS bangunan utama gedung stadion dengan kontrak terintegrasi rancang bangun terdiri atas 6 level dan memiliki 14 risiko tertinggi terhadap perencanaan biaya dan waktu. Tindakan preventif dan korektif digunakan untuk meminimalkan dampak risiko tertinggi sebagai dasar pengembangan standar WBS.

One of the classifications of state buildings which is classified as a special building and that its concern in current construction called as Stadium. Nowadays, the implementation of stadium construction in Indonesia, either its new buildings or renovations, some of stadium use an integrated design-build project delivery system because it is considered better in terms of cost and time. However,  the implementation of the Stadium project construction still faced with many problems such as schedule delays, variations of work that are not in line with the planning, cost overrun, claims, and disputes between owner, contractor, as well as the auditor. This problem occurs because there are still many risks related to cost and time that have not been identified since the planning phase. Therefore, the aim of this study is to develop a risk-based Work Breakdown Structure (WBS) standard in an integrated design and build on stadium main building for cost and time planning.  In the implementation of this research, the identification of risks that affect the planning of costs and time in a construction project, especially the stadium main building, will be identified through an archive analysis of various related references that will be used for the development of the WBS Stadium. The risk analysis will be carried out qualitatively. The results of this study indicate that the standard WBS of stadium main building with integrated design-build contract consists of 6 levels and has 14 highest risks to cost and time planning. The preventive and corrective actions are used to minimize the highest risk impact as the basis for standard WBS development.

 

"
Depok: Fakultas Teknik Universitas Indonesia, 2022
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Andias Mintoharjo
"Salah satu klasifikasi Bangunan Gedung Negara berupa gedung khusus yang menjadi perhatian dalam pembangunannya saat ini yaitu Stadion. Penyelenggaraan pembangunan Stadion di Indonesia baik berupa bangunan baru ataupun renovasi beberapa diantaranya telah menggunakan kontrak terintegrasi rancang bangun karena dinilai lebih baik dari aspek biaya dan waktu. Namun dalam pelaksanaan pembanguan Stadion tersebut masih banyak dihadapkan dengan permasalahan berupa keterlambatan jadwal, variasi pekerjaan tambah kurang yang tidak sesuai dengan rencana awal, kelebihan biaya, klaim, dan hingga terjadinya sengketa diantara pengguna jasa, penyedia jasa, maupun pihak auditor. Masalah ini terjadi karena banyak risiko-risiko terkait biaya dan waktu yang tidak teridentifikasi sejak awal tahap perencanaan. Oleh karena itu, tujuan dari penelitian ini adalah mengembangkan standard Work Breakdown Structure (WBS) berbasis risiko pada bangunan utama gedung Stadion dengan kontrak terintegrasi rancang bangun untuk perencanaan biaya dan waktu. Dalam pelaksanaan penelitian ini akan dilakukan identifikasi risiko-risiko yang mempengaruhi perencanaan biaya dan waktu pada suatu pekerjaan konstruksi khususnya bangunan utama gedung Stadion melalui analisis arsip dari berbagai referensi, wawancara, dan validasi pakar yang digunakan untuk pengembangan WBS Stadion. Analisis risiko akan dilakukan secara kualitatif. Hasil penelitian ini menunjukkan bahwa standar WBS bangunan utama gedung stadion dengan kontrak terintegrasi rancang bangun terdiri atas 6 level dan memiliki 14 risiko tertinggi terhadap perencanaan biaya dan waktu. Tindakan preventif dan korektif digunakan untuk meminimalkan dampak risiko tertinggi sebagai dasar pengembangan standar WBS.

One of the classifications of state buildings which is classified as a special building and that its concern in current construction called as Stadium. Nowadays, the implementation of stadium construction in Indonesia, either its new buildings or renovations, some of stadium use an integrated design-build project delivery system because it is considered better in terms of cost and time. However, the implementation of the Stadium project construction still faced with many problems such as schedule delays, variations of work that are not in line with the planning, cost overrun, claims, and disputes between owner, contractor, as well as the auditor. This problem occurs because there are still many risks related to cost and time that have not been identified since the planning phase. Therefore, the aim of this study is to develop a risk-based Work Breakdown Structure (WBS) standard in an integrated design and build on stadium main building for cost and time planning. In the implementation of this research, the identification of risks that affect the planning of costs and time in a construction project, especially the stadium main building, will be identified through an archive analysis of various related references that will be used for the development of the WBS Stadium. The risk analysis will be carried out qualitatively. The results of this study indicate that the standard WBS of stadium main building with integrated design-build contract consists of 6 levels and has 14 highest risks to cost and time planning. The preventive and corrective actions are used to minimize the highest risk impact as the basis for standard WBS development."
Depok: Fakultas Teknik Universitas Indonesia, 2022
T-pdf
UI - Tesis Membership  Universitas Indonesia Library
cover
Susanto
"Syarat kinerja proyek yang cukup baik adalah kesesuaian produk terhadap rencana yang erpenuhi, realisasi biaya dan waktu dimungkinkan lebih rendah dari rencana. Suatu pendekatan terhadap kondisi ideal evaluasi kinerja dilakukan sebagai studi pada proyek pembangunan gedung yang dilakukan PT.X dengan metode earned value yang merupakan salah satu alat yang digunakan dalam pengelolaan proyek yang mengintegrasikan biaya dan waktu.
Tujuan dari penelitian ini adalah memperoleh evaluasi kinerja proyek dari manajemen biaya dan waktu dengan metode earned value dengan indikator cost variance (CV), schedule variance (SV), SPI, CPI, EAC, dan ECD serta mengetahui biaya dan jadwal apa saja yang tidak sesuai dari rencana juga memperoleh tindakan koreksi apa yang dapat dilakukan oleh PT.X pada biaya dan jadwal yang tidak sesuai dengan rencana.
Metode penelitian yang dipilih yaitu dengan pendekatan kuantitatif berupa archival analysis ke lapangan. Archival analysis dimaksud adalah merupakan studi yang bersifat kuantitatif yang digunakan untuk meneliti penerapan earned value pada proyek ABC PT.X.
Hasil penelitian ini menunjukkan grafik ECD vs waktu rencana penyelesaian proyek dan grafik EAC vs RAPK, dari analisis kinerja waktu akumulasi tiap bulan, jenis pekerjaan yang paling terlambat adalah pekerjaan persiapan, tanah, pondasi bangunan gedung, basement, ground floor, struktur atas lantai 3. Sedangkan jenis pekerjaan yang paling rugi adalah pekerjaan tanah, pondasi bangunan gedung, basement, ground floor, struktur atas ruang mesin. Lalu dari beberapa jenis pekerjaan yang paling terlambat dan rugi, didapatkan perbandingan antara upaya proyek di lapangan dengan upaya yang dilakukan menurut pakar di lapangan.

Terms of a good project performance are the suiteness of the product according to the plan, the realization of costs lower than planned. An approach to ideal conditions as a performance evaluation is conducted on the development of building projects undertaken by PT.X with the earned value method, which is one of the tools used in the management of projects that integrate the cost and time.
The objective of this research is to obtain the performance evaluation of the project management cost and time with the earned value method with the indicators such as cost variance (CV), schedule variance (SV), SPI, CPI, EAC, and the ECD and the cost and schedule to know what's not according to work plan but also to obtain corrections which can be done by PT.X on cost and schedule.
The research method that was used is the approach of the form of quantitative analysis to the archival field. Archival analysis is referred as a quantitative study that is used to examine the implementation of earned value project on ABC PT.X.
The results of this research shows a graph of time versus ECD project plan and the settlement of the graph EAC versus RAPK, analysis of the performance of the accumulation of each month, the type of work which is delayed the most, preparatory work, land, building the foundation of buildings, basement, ground floor, the floor third landing. While the type of job loss are mostly of landwork, building the foundation of buildings, basement, ground floor, the upperstructure of the machine compartment. Then, of the several types of work and the loss, it was able to find the comparison between project efforts in the field with the efforts made by experts in the field.
"
Depok: Fakultas Teknik Universitas Indonesia, 2009
S50468
UI - Skripsi Open  Universitas Indonesia Library