Hasil Pencarian  ::  Simpan CSV :: Kembali

Hasil Pencarian

Ditemukan 32 dokumen yang sesuai dengan query
cover
Bertram, Volker
Oxford: Butterworth-Heinemann, 2002
623.812 BER p
Buku Teks  Universitas Indonesia Library
cover
Muhamad Agil Fadhel Kurnianto
"ABSTRAK
Pada saat ini, Indonesia tengah menghadapi tantangan pasokan dan distribusi listrik yang sangat besar. Dengan pertumbuhan permintaan listrik jangka pendek dalam dekade mendatang diproyeksikan akan tumbuh pada tingkat 6,8% setiap tahun. Laporan terakhir menyatakan bahwa ada sekitar 5 juta atau 1.7% orang Indonesia yang tidak memiliki akses listrik, terutama di daerah terpencil karena sulitnya akses listrik untuk memasuki wilayah tersebut. Disisi lain menunjukan bahwa ekonomi dan peningkatan standar kehidupan masyarakat sangat tergantung pada penggunaan listrik. Untuk mengatasinya, turbin piko hidro dianggap cocok untuk jenis turbin yang akan diterapkan, terutama untuk masyarakat di daerah terpencil. Roda Air langkah bawah merupakan salah satu jenis teknologi piko hidro turbine yang cocok digunakan karena desain dan pemasangan turbin diyakini lebih mudah (operasional dan pemeliharaan) dan lebih murah (investasi dan biaya operasional) daripada jenis lainnya. Namun, roda air langkah bawah memiliki masalah mengenai rendahnya effisiensi yang dihasilkan. Studi ini bertujuan untuk memvalidasi persamaan jumlah sudu lurus yang diadaptasi dari turbin Pelton dan mengetahui jumlah sudu lurus yang tepat untuk digunakan pada roda air langkah bawah secara komputasi dan eksperimen terhadap variasi jumlah sudu yang lebih banyak. Dalam studi ini dilakukan variasi sudu 8, 12, 16, dan 20 sudu. Berdasarkan seluruh hasil studi roda air dapat disimpulkan bahwa jumlah sudu terbaik yang diperoleh secara numerikal dan eksperimental adalah sudu berjumlah 8 dengan effisiensi sebesar 41% untuk numerikal dan 35.12% untuk eksperimental. Perbedaan efisiensi antara perhitungan analitikal, numerikal dan eksperimental terjadi karena adanya beberapa kerugian-kerugian yang tidak dapat dihitung dalam perhiungan metode eksperimen.
ABSTRAK
In 2019, Indonesia faces enormous electricity supply and distribution challenges. With the growth of short-term electricity demand in the coming decade it is projected to grow at a rate of 6.8% each year. The latest report states that there are around 5 million or 1.7% of Indonesians who do not have access to electricity, especially in remote areas due to difficulties accessing electricity to enter remote areas. On the other hand it shows that the economy and the improvement in the standard of living of the people are very dependent on electricity usage. To overcome this, Pico-hydro turbines are considered suitable for the type of turbine that will be applied, especially for people in remote areas. Undershot waterwheel is one type of pico hydro turbine technology suitable for use because turbine design and installation is believed to be easier (operational and maintenance) and cheaper (investment and operational costs) than other types. However, undershot waterwheel has problems regarding the resulting low efficiency. For this reason, this study to verify the equation of the number of blades adapted from the pelton turbine and find out the optimal number of blades for undershot waterwheel with analytical, numerical, and experimental methods for more variations in the number of blades. In the study variations in blades 8, 12, 16 and 20. Based on results of straight blade undershot waterwheel study, it can be concluded that the best number of blades obtained numerical and experimentally is 8 blades with an efficiency of 41% for numerical and 35.12% for experimental. The difference in efficiency between analytic, numerical and experimental calculations occurs because of some losses that cannot be calculated in the calculation of experimental methods."
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Masyhuri
"Dalam sistem tenaga listrik terdiri dari beberapa unit pusat tenaga listrik termasuk sejumlah pusat listrik hidro-termal (PLTA, PLTP, PLTU, PLTG, PLTGU). Jadwal operasi pembangkit yang tepat menghasilkan operasi yang optimum bagi sistem tenaga listrik secara keseluruhan untuk mencapai biaya bahan bakar yang minimum. Agar dicapai operasi yang optimum, perlu dilakukan pengaturan pembebanan pada pembangkit listrik yang melayani beban tenaga listrik. Beban sistem tenaga listrik berubah-ubah menurut waktu dalam rupiah per jam juga berubah-ubah menurut waktu, biaya operasi sistem tenaga listrik merupakan tujuan yang akan diminimalkan, masalah ini dapat diselesaikan dengan menggunakan metoda Dynamic Programming. Biaya terbesar yang dipergunakan pada suatu pembangkitan listrik adalah biaya bahan bakar, sehingga dalam perencanaan operasi sistem diinginkan agar biaya bahan bakar serendah mungkin, dalam arti dicapai biaya bahan bakar yang optimum. Dengan mengkoordinasikan pembangkit hidro termal di system Jawa Tengah dan DIY menggunakan Dynamic Programming diperoleh total biaya operasi sebesar Rp 23.972.678.655. Sedangkan total biaya operasi yang dikeluarkan oleh PT.PLN adalah sebesar Rp 25.013.942.180.
In a power system consisting of several units including a power station hidro-thermal power station (PLTA, PLTP, PLTU, PLTG, PLTGU).Schedule the operationof appropriate plants produce optimum operation for the electric power system as a whole to achieve a minimum fuel costs. In order to achieve the optimum operation, necessary to set the load at power plants serving the electric power load. Power system load varies according to the time in rupiahs per hour also vary according to the time, the operating costs of electric power system is a goal to be minimized, this problem can be solved using Dynamic Programming method. The biggest cost is used in the generation of electricity is the cost of fuel, so that the operation of the planning system is desirable in order to fuel costs as low as possible, in the sense that achieve optimum fuel costs. By clicking coordinate hydro-thermal power system in Middle Java and DIY using Dynamic Programming the total operating expenses of Rp Rp 23.972.678.655. While total operating cost incurred by PT.PLN is Rp 25.013.942.180."
Depok: Fakultas Teknik Universitas Indonesia, 2015
S59233
UI - Skripsi Membership  Universitas Indonesia Library
cover
Dwijaya Febriansyah
"Energi listrik merupakan kebutuhan vital manusia dalam kehidupan sehari-hari yang perlu terus ditingkatkan penyediaannya seiring dengan perkembangan pembangunan agar tersedia dalam jumlah yang cukup, merata dan bermutu. Sampai tahun 2017, masih ada 2.382 desa di Indonesia yang belum teraliri listrik. Peningkatan rasio elektrifikasi dengan perluasan jaringan di daerah terpencil sulit dilakukan karena harga listrik yang tidak ekonomis. Pada daerah terpencil yang berbukit-bukit dan memiliki sumber energi aliran air, pikohidro (<5 kW) bisa menjadi solusi teknologi untuk memenuhi kebutuhan listrik. Penggunaan turbin Turgo untuk pikohidro direkomendasi karena biaya konstruksi yang rendah dan perawatannya yang mudah. Kearifan lokal masyarakat Indonesia melalui pemakaian material lokal sendok batok kelapa sebagai bahan baku mangkok raner turbin Turgo memberikan suatu alternatif desain pembangkit pikohidro yang murah. Dalam studi ini dilakukan perhitungan desain, manufaktur dan pengujian eksperimental turbin Turgo. Studi ini menghasilkan desain raner dengan diameter 0,22 m, jumlah mangkok 16 dengan efisiensi total tertinggi 34,97±0,22% dan daya listrik tertinggi 6,75±0,02 W dengan pemakaian diameter nosel 10 mm dengan tinggi jatuh 3,18±0,02 m dan debit 37,3±0,13  LPM.

Electrical energy is a vital human need in everyday life that needs to be continuously improved in line with the national development so that it is available in sufficient, equitable and quality. Until 2017, there are still 2.382 villages in Indonesia have not yet been electrified. Increasing the electrification ratio by expanding networks in remote areas is difficult because of uneconomical electricity prices. In remote areas that are hilly and have a water source, pico hydro (<5 kW) can be a technological solution to meet electricity needs. The use of the Turgo turbine for pico hydro is recommended because of its low construction costs and easy maintenance. The local wisdom of Indonesian people through the use of local materials coconut shell spoons as a raw material for Turgo turbine runner provides an alternative design for low cost picohydro power plant. This study have done design calculations, manufacturing and testing of Turgo turbine. Results of this study are a runner design with a diameter of 0,22 m, number of cups 16 with the highest total efficiency of 34,97±0,22% and the highest electrical power of 6,75±0,02 W with a nozzle diameter of 10 mm, head 3,18±0,02 m and discharge 37,3±0,13 LPM."
Depok: Fakultas Teknik Universitas Indonesia, 2019
T53324
UI - Tesis Membership  Universitas Indonesia Library
cover
Satria Mulia Purnomo
"Disepakatinya perjanjian Paris membuat Indonesia berkomitmen dalam transisi energi terbarukan. Komitmen ini mendorong Indonesia dan PLN dalam membuat RUPTL yang membuat potensi tenaga air di Indonesia semakin meningkat. Meningkatnya potensi tersebut membuat investor tertarik investasi ke usaha PLTM. Namun demikian, usaha PLTM masih memiliki risiko yang membuat biaya fluktuatif sehingga membuat prospek terganggu dan menimbulkan keraguan dalam investasi. Untuk mengatasi masalah tersebut, penulis membuat model proyeksi keuangan menggunakan discounted cash flow model dengan pendekatan risiko menggunakan value at risk metode monte carlo agar dapat mengukur valuasi PLTM secara lebih akurat serta dapat memberikan bahan pertimbangan kelayakan investasi. Dari analisis yang telah dibuat, didapatkan bahwa terdapat tiga variabel risiko dalam PLTM, yaitu loss factor, biaya operasional dan pemeliharaan, dan biaya retribusi air. Dalam keadaan normal mengikuti PPA, NPV PLTM masih bernilai positif yang menandakan investasi masih layak. Dalam bahan pertimbangan kelayakan investasi, peneliti menggunakan price book value dan tingkat return modal, dimana didapatkan bahwa PLTM masih layak dijual dan layak diinvestasikan.

The Paris agreement made Indonesia committed to the renewable energy transition. This commitment encourages Indonesia and PLN to make RUPTL which increases the potential for hydropower in Indonesia. This increased potential has attracted investors to invest in the MHP business. However, the MHP business still has risks that make costs fluctuate, disrupting prospects and causing doubts in investment. To overcome this problem, the authors created a financial projection model using a discounted cash flow model with a risk approach using the value at risk monte carlo method so that it can measure MHP valuations more accurately and can provide investment feasibility considerations. From the analysis that has been made, it is found that there are three risk variables in the MHP, namely loss factor, operational and maintenance costs, and water retribution costs. Under normal circumstances following the PPA, the NPV of MHP is still positive, indicating that the investment is still feasible. In considering investment feasibility, researchers used price book value and the rate of return on capital, where it was found that PLTM is still worth selling and worth investing in."
Depok: Fakultas Teknik Universitas Indonesia, 2023
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Warjito
"The geography of Indonesia renders it difficult to connect many areas to the national electricity grid. To overcome these problems, people need to be able to generate their own electricity. Pico hydro has been proven to be a cost-effective solution for electrification. The Turgo turbine is known for its reliability and strength, and it can perform efficiently with a range of flows. The Turgo’s blade consists of an inlet and outlet trail with a curve that joins them. The curve in this study will be made from a simple circle arc to improve manufacturability. Three blades were designed using a basic calculation derived from the velocity triangles, with each blade having a different circle radius. The Computational Fluid Dynamics (CFD) method is used to determine the stream flow through the blade at a level of detail that cannot be obtained using other methods. The boundary conditions used in the study include 2.7 meters of head and a 21 l/s flow rate, a steady-state homogenous multiphase, and the turbulent models used SST k-?. The result shows that the Turgo turbine with a 60 mm arc radius generated 477.7 Watts and has an efficiency of 85.97%, the highest when compared to the other two blades that used 50 mm and 55 mm arc radii, respectively."
Depok: Faculty of Engineering, Universitas Indonesia, 2017
UI-IJTECH 8:7 (2017)
Artikel Jurnal  Universitas Indonesia Library
cover
Celine Kevin
"Rasio elektrifikasi Indonesia pada tahun 2018 mencapai 98.3%. Dimana persentase sebesar 38.1% berasal dari daerah terpencil di NTT. Daerah terpencil merupakan daerah yang memiliki rasio elektrifikasi rendah. Turbin pikohidro jenis arus lintang merupakan salah satu solusi yang memungkinkan karena biaya investasi yang murah, perawatan yang sederhana, dan kemudahan manufaktur. Turbin arus lintang adalah turbin tipe impuls yang memiliki kelebihan seperti efisiensi yang stabil dalam berbagai kondisi debit, konstruksi sederhana, dan baik dalam skala portabilitas dan modularitas. Studi ini akan mencari nilai kedalaman sudu yang optimum. Variasi dibuat menjadi rasio kelengkungan terhadap panjang sudu (T/R) diantaranya 0.08, 0.12, dan 0.16. Untuk meningkatkan performa turbin cross flow studi ini akan merancang bentuk nosel baru dengan menggunakan perhitungan geometri dan CFD. Simulasi akan dijalankan dengan menggunakan fitu 6-DoF dan menggunakan kondisi batas debit aliran 12.8 l/s dan tinggi jatuh 2.1 m. Selanjutnya ukuran timestep yang digunakan adalah 0.001. Hasil komputasi mendapatkan efisiensi maksimum sebagai berikut T/R = 0.08 sebesar 7.22%, T/R = 0.12 sebesar 2.9 %, dan T/R = 0.16 sebesar 3.3%. Sudu dengan T/R= 0,08 menghasilkan efisiensi yang lebih tinggi karena lebih banyak jumlah air yag menumbuk sudu. Sedangkan, untuk optimalisasi performa turbin dengan merancang nosel, menunjukkan bahwa nilai λ = 50o menghasilkan efisiensi yang lebih baik dibandingkan dengan variasi nilai λ lainnya. Nilai efisiensi maksimum yang dicapai pada λ = 50o adalah 60.60%. Sedangkan untuk nilai λ lainnya efisiensi maksimum yang dicapai berturut-turut mulai dari λ = 60o-90o adalah 49.19%; 42.70%; 36.66%; dan 40.41%.Dengan demikian sudu dengan rasio T/R sebesar 0,08 dan nosel dengan λ = 50o direkomendasikan untuk digunakan pada debit aliran 12.8 l/s dan kondisi tinggi jatuh 2,1 meter .

Rasio elektrifikasi Indonesia pada tahun 2018 mencapai 98.3%. Dimana persentase sebesar 38.1% berasal dari daerah terpencil di NTT. Daerah terpencil merupakan daerah yang memiliki rasio elektrifikasi rendah. Turbin pikohidro jenis arus lintang merupakan salah satu solusi yang memungkinkan karena biaya investasi yang murah, perawatan yang sederhana, dan kemudahan manufaktur. Turbin arus lintang adalah turbin tipe impuls yang memiliki kelebihan seperti efisiensi yang stabil dalam berbagai kondisi debit, konstruksi sederhana, dan baik dalam skala portabilitas dan modularitas. Studi ini akan mencari nilai kedalaman sudu yang optimum. Variasi dibuat menjadi rasio kelengkungan terhadap panjang sudu (T/R) diantaranya 0.08, 0.12, dan 0.16. Untuk meningkatkan performa turbin cross flow studi ini akan merancang bentuk nosel baru dengan menggunakan perhitungan geometri dan CFD. Simulasi akan dijalankan dengan menggunakan fitu 6-DoF dan menggunakan kondisi batas debit aliran 12.8 l/s dan tinggi jatuh 2.1 m. Selanjutnya ukuran timestep yang digunakan adalah 0.001. Hasil komputasi mendapatkan efisiensi maksimum sebagai berikut T/R = 0.08 sebesar 7.22%, T/R = 0.12 sebesar 2.9 %, dan T/R = 0.16 sebesar 3.3%. Sudu dengan T/R= 0,08 menghasilkan efisiensi yang lebih tinggi karena lebih banyak jumlah air yag menumbuk sudu. Sedangkan, untuk optimalisasi performa turbin dengan merancang nosel, menunjukkan bahwa nilai λ = 50o menghasilkan efisiensi yang lebih baik dibandingkan dengan variasi nilai λ lainnya. Nilai efisiensi maksimum yang dicapai pada λ = 50o adalah 60.60%. Sedangkan untuk nilai λ lainnya efisiensi maksimum yang dicapai berturut-turut mulai dari λ = 60o-90o adalah 49.19%; 42.70%; 36.66%; dan 40.41%.Dengan demikian sudu dengan rasio T/R sebesar 0,08 dan nosel dengan λ = 50o direkomendasikan untuk digunakan pada debit aliran 12.8 l/s dan kondisi tinggi jatuh 2,1 meter ."
Depok: Fakultas Teknik Universitas Indonesia, 2020
S-pdf
UI - Skripsi Membership  Universitas Indonesia Library
cover
Wenang Irmansyah
"Penelitian ini dilatarbelakangi oleh kondisi fisik yang mendukung untuk dibangunnya PLTMH serta masih adanya rumah tangga di Kabupaten Sukabumi yang belum teraliri listrik. Untuk itu diperlukan pencarian lokasi yang potensial dan dapat dipetakan sebaran lokasi tersebut sebagai bahan rujukan untuk pembangunan PLTMH. Metode yang digunakan dalam penelitian ini adalah metode K-Means Cluster.
Metode K-Means Cluster berguna untuk mengklasifikasikan variabel penelitian yaitu nilai stream power, jarak lokasi potensial ke permukiman, jumlah rumah tangga yang masih membutuhkan listrik, dan sebarannya di kawasan lindung.
Hasil dari analisis cluster lokasi potensial PLTMH dibagi menjadi 3 kelas, yaitu tinggi, sedang, dan rendah, dengan penyebarannya dipengaruhi oleh karakteristik topografi wilayahnya. Kondisi topografi wilayah tersebut mempengaruhi pembangunan instalasi listrik, akses jarak lokasi potensial dengan permukiman, serta energi listrik yang dihasilkan di lokasi potensial PLTMH.

The research is caused by the physical conditions that support the development of Micro Hydro Power Plant as well as the existence of the households is not powered of electricity in Sukabumi District. It is necessary to map the potential locations and its distribution as a reference for the development of Micro Hydro Power Plan.
The method of K-Means Cluster is used in this research which is useful for classifying the variables such as, the value of stream power, the distance between potential location and settlement, the number of households need electricity, and the spreading in protected area.
The results of this research conclude the potential locations for the Micro Hydro Power Plan are divided into 3 classes, high, middle, and low potensial locations. The spreading of potential locations is influenced by topographic characteristics of region. Topographic regions are affects instalation of electrict,access to the settlement, and energy of electrict can producted in the potential locations for the Micro Hydro Power Plan.
"
Depok: Fakultas Matematika dan Ilmu Pengetahuan Alam. Universitas Indonesia, 2012
S42054
UI - Skripsi Open  Universitas Indonesia Library
cover
Rizqi Cakti Bramantyo
"ABSTRAK
Kegunaan logam seng yang luas untuk kebutuhan industri maupun kebutuhan sehari-hari secara otomatis akan meningkatkan angka permintaan terhadap logam seng setiap tahunnya. Mengolah kembali logam seng dari dross seng merupakan salah satu cara agar cadangan mineral seng di bumi tidak habis. Salah satu metode yang dapat dilakukan untuk memperoleh kembali logam seng dari dross seng adalah dengan metode hidro-elektrometalurgi. Proses terdiri dari pemanggangan 700°C, pelindian H2SO4, dan elektrowinning. Penelitian ini meneliti pengaruh dari parameter-parameter pelindian dan elektrowinning pada proses perolehan kembali logam seng. Untuk karakterisasi sampel menggunakan XRD yang dilengkapi dengan perangkat lunak XRD Match!, AAS, dan EDS. Dari penelitian ini, parameter optimal terjadi pada konsentrasi pelindi 2 M H2SO4 dan suhu elektrowinning 25°C pada rapat arus 2000 A/m2. Parameter tersebut menghasilkan efisiensi arus sebesar 91.57% dan kemurnian logam seng sebesar 77.68%.

ABSTRACT
Extensive usability of zinc metal for industry needs and daily needs will automatically increase demand for zinc metal annually. Recovery of zinc metal from zinc dross is one way for zinc mineral deposits in the earth is not exhausted. One method that can be done to recover zinc metal from zinc dross is hydroelectrometallurgy method. The pr°Cess consists of roasting 700°C, H2SO4 leaching, and electrowinning. This study investigated the effect of leaching and electrowinning parameters on recovery of zinc metal. For characterization of samples using XRD, that comes with XRD Match! software, AAS, and EDS. From this study, optimal parameters °Ccurred at 2 M H2SO4 leaching concentration and 25°C electrowinning temperature at 2000 A/m2 current density, each performed for 60 minutes. These parameters produced a current efficiency of 91.57% and a purity of 77.68% zinc metal."
Depok: Fakultas Teknik Universitas Indonesia, 2014
S55417
UI - Skripsi Membership  Universitas Indonesia Library
cover
Arbi Nugroho
"ABSTRAK
Semakin bertambahnya jumlah manusia di dunia semakin meningkatnya juga kebutuhan energi, terbatasnya kebutuhan kesediaan sumber daya energi konvensional membuat berkembangnya penelitian tentang energi terbarukan. Salah satu energi terbarukan yang sedang berkembang ialah mengenai air. Di Indonesia, terdapat banyak sungai dan memiliki iklim hujan yang lumayan bagus untuk mengembangkan energi terbarukan ini. Untuk menciptakan sistem Pembangkit Listrik Tenaga Air PLTA Mikro yang dapat beroperasi pada berbagai kecepatan alir air maka dirancang sistem Otonomus PLTA Mikro.Untuk merancang sistem otonomus tersebut maka digunakan generator induksi catu ganda DFIG dan generator sinkron magnet permanen PMSG . Turbin menggerakkan DFIG dan PMSG yang terpasang dengan perantara rantai dan sproke gear, PMSG akan memberikan tegangan keluarannya sebagai masukan rotor untuk DFIG sehingga sistem generator menjadi sistem otonomus dikarenakan tidak memerlukan sumber daya eksternal. Tegangan listrik yang dihasilkan dari generator dihubungkan dengan Boost Converter dengan tujuan agar sistem memiliki level tegangan keluaran yang stabil dan sesuai dengan tegangan referensi yang diberikan.

ABSTRAK
The increasing number of people in the world is also increasing the need for energy, limited availability of conventional energy resources makes the development of research on renewable energy. One of the developing renewable energy is water. In Indonesia, there are many rivers and have a pretty good rainy climate to develop this renewable energy. To create a Micro Hydro Power Plant PLTA System that can operate at various water flow speeds, the Micro Hydro Power Plant System is designed.To design the autonomous system, a dual supply induction generator DFIG and permanent magnet synchronous generator PMSG are used. Turbine drives DFIG and PMSG installed with intermediate chain and sprock gear, PMSG will give its output voltage as rotor input for DFIG so that the generator system becomes autonomous system because it does not require external power source. The voltage generated from the generator is connected to the Boost Converter in order for the system to have a stable output voltage level and in accordance with the reference voltage provided. "
2017
S69139
UI - Skripsi Membership  Universitas Indonesia Library
<<   1 2 3 4   >>